Vasko Electric Inc
- Based in
- Sacramento
- On San Francisco permits
- Dec 2022 to Nov 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2025 | In progress issued Oct 2026 | 850 Stockton St | verizon remove 1 (e) antennas 1 (e) vent; install 6 (n) antennas within 6 (n) radomes; remove 1 (e) cabinet & install 2(n) cabinets; remove (e) 60a panel & install 100a panel; install (n) batteriesDetails
verizon remove 1 (e) antennas 1 (e) vent; install 6 (n) antennas within 6 (n) radomes; remove 1 (e) cabinet & install 2(n) cabinets; remove (e) 60a panel & install 100a panel; install (n) batteries | $125,000 |
| Jun 21, 2024 | Completed final sign-off Jul 2025 | 5 Embarcadero Center | current (6) fully screened antennas flush mounted to the side of the subject buildng. proposed work involves removing (4) antennas and installing (7) new fully screened antennas for total of (9) antennasDetails
current (6) fully screened antennas flush mounted to the side of the subject buildng. proposed work involves removing (4) antennas and installing (7) new fully screened antennas for total of (9) antennas | $49,500 |
| Dec 15, 2022 | Completed final sign-off Mar 2025 | 55 Chumasero Dr | verizon wireless. replace (7) and add (2) antennas, replace (6) rrus, replace (2) ovp surge protectors. remove (18) coax cable and replace (2) hybrid cable.Details
verizon wireless. replace (7) and add (2) antennas, replace (6) rrus, replace (2) ovp surge protectors. remove (18) coax cable and replace (2) hybrid cable. | $67,000 |