Daniel Yau
- Listed as
- architect, engineer
- Firm
- Acies Enginerring
- Based in
- Santa Clara
- On San Francisco permits
- Jun 2018 to May 2026
11 permits since 2000 (engineer on 10 permits, architect on 1 permit): 7 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | In progress issued Jul 2026 | 5238 Diamond Heights Bl | Paul Aboumrad General Contractor | non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakroom sink, water heater, millwork, finishes, ada upgradesDetails
non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakroom sink, water heater, millwork, finishes, ada upgrades | $714,756 |
| Dec 22, 2025 | Completed final sign-off Sep 2026 | 3360 Geary Bl | Paul Aboumrad General Contractor | 3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms, millwork and finishes.Details
3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms, millwork and finishes. | $372,470 |
| Mar 26, 2024 | Completed final sign-off Jan 2026 | 301 Junipero Serra Bl | Paul Aboumrad General Contractor | demo 1 wall,install (n) non bearing interior partitions,furred walls,doors,(n) hard ceilings,suspended ceilings,(n)elec panel,breakers,receptacles,switches,light fixtures.new mech,vav box,heat pump,fans,exhaust fans. 2 (n) non accessible restrooms,breakroom,elec,water, new millwork and finishes.Details
demo 1 wall,install (n) non bearing interior partitions,furred walls,doors,(n) hard ceilings,suspended ceilings,(n)elec panel,breakers,receptacles,switches,light fixtures.new mech,vav box,heat pump,fans,exhaust fans. 2 (n) non accessible restrooms,breakroom,elec,water, new millwork and finishes. | $364,525 |
| Oct 28, 2022 | Completed final sign-off Nov 2023 | 2270 Jerrold Av | Ferma Corporation | demolition of type v, 1-story office.Details
demolition of type v, 1-story office. | $60,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 2040 Chestnut St | Americo Builders Llc | ti to an existing building, formerly clothing retail (gap), change of use to a restaurant. modifications include new wall partition, ceilings, mep for fast casual salad restaurant (sweet greens).Details
ti to an existing building, formerly clothing retail (gap), change of use to a restaurant. modifications include new wall partition, ceilings, mep for fast casual salad restaurant (sweet greens). | $500,000 |
| Mar 23, 2021 | Expired or cancelled cancelled Jan 2026 | 201 Bay Shore Bl | new hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains.Details
new hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains. | $50,000 | |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 101 Natoma St | Wolves Heating & Air | relocate (e) ducts (rigid pipes) replace the (e) air conditioning unit, install new thermostat and wiring thermostat. refer to pa 2019 1007 3703Details
relocate (e) ducts (rigid pipes) replace the (e) air conditioning unit, install new thermostat and wiring thermostat. refer to pa 2019 1007 3703 | $30,000 |
| Oct 8, 2019 | Completed final sign-off Dec 2019 | 5 The Embarcadero | Ssw Construction Corp | philz coffee: equipment replacement for barista, new door to scullery, handsink added for health/convenience at barista. additional existing door activated/made operational for existing. new point of sale location. new cabinetry at customer area. maher naDetails
philz coffee: equipment replacement for barista, new door to scullery, handsink added for health/convenience at barista. additional existing door activated/made operational for existing. new point of sale location. new cabinetry at customer area. maher na | $150,000 |
| Apr 9, 2019 | Completed final sign-off Nov 2019 | 2300 16th St | Reeve-Knight Construction Inc. | suite 220: t.i. improvement in (e) retail space, new walls, doors, lighting, power, plumbing, mechanical/duct work. n/a maher ref demo pa 2019-0606-2778.Details
suite 220: t.i. improvement in (e) retail space, new walls, doors, lighting, power, plumbing, mechanical/duct work. n/a maher ref demo pa 2019-0606-2778. | $1,400,000 |
| Feb 1, 2019 | Never finaled filed Feb 2019, never issued | 425 Mission St | tjpa first ti for street level coffee shop suite 100. scope to include instalation of new gysum board walls & ceilings, millwork, finishes & food servie equip. mech, elec & plumbing systems.Details
tjpa first ti for street level coffee shop suite 100. scope to include instalation of new gysum board walls & ceilings, millwork, finishes & food servie equip. mech, elec & plumbing systems. | $500,000 | |
| Jun 11, 2018 | Completed final sign-off Dec 2019 | 2234 Polk St | Tri-Quest Builders & Developers Inc | change of use from bookstore to coffee shop. tenant improvement incl electrical, plumbing, mechanical & interior partitions. maher n/a.Details
change of use from bookstore to coffee shop. tenant improvement incl electrical, plumbing, mechanical & interior partitions. maher n/a. | $350,000 |