David Ayres
- License
- C26558
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Hereld & Ayres
- Based in
- Pleasanton
- On San Francisco permits
- Mar 2024 to Oct 2026
5 permits since 2000 (architect on 5 permits): 3 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Paul Aboumrad General Contractor (5)
- Architects
- Daniel Yau
- Engineers
- Daniel Yau (2), Wilson Lee (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2026 | In progress issued Nov 2026 | 5238 Diamond Heights Bl | Paul Aboumrad General Contractor | revision to pa#202605271931. remove existing stair 1 assessibility upgrade from scope or work. the upgrades are included under pa #202604068976Details
revision to pa#202605271931. remove existing stair 1 assessibility upgrade from scope or work. the upgrades are included under pa #202604068976 | |
| May 27, 2026 | In progress issued Jul 2026 | 5238 Diamond Heights Bl | Paul Aboumrad General Contractor | non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakroom sink, water heater, millwork, finishes, ada upgradesDetails
non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakroom sink, water heater, millwork, finishes, ada upgrades | $714,756 |
| Dec 22, 2025 | Completed final sign-off Sep 2026 | 3360 Geary Bl | Paul Aboumrad General Contractor | 3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms, millwork and finishes.Details
3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling, new mep, restrooms, millwork and finishes. | $372,470 |
| May 16, 2025 | Completed final sign-off Jan 2026 | 301 Junipero Serra Bl | Paul Aboumrad General Contractor | unit 150- revisions 202403268638- for field conditions revision include elimination of mech unit and electrical panel which are not required to serve the spaceDetails
unit 150- revisions 202403268638- for field conditions revision include elimination of mech unit and electrical panel which are not required to serve the space | |
| Mar 26, 2024 | Completed final sign-off Jan 2026 | 301 Junipero Serra Bl | Paul Aboumrad General Contractor | demo 1 wall,install (n) non bearing interior partitions,furred walls,doors,(n) hard ceilings,suspended ceilings,(n)elec panel,breakers,receptacles,switches,light fixtures.new mech,vav box,heat pump,fans,exhaust fans. 2 (n) non accessible restrooms,breakroom,elec,water, new millwork and finishes.Details
demo 1 wall,install (n) non bearing interior partitions,furred walls,doors,(n) hard ceilings,suspended ceilings,(n)elec panel,breakers,receptacles,switches,light fixtures.new mech,vav box,heat pump,fans,exhaust fans. 2 (n) non accessible restrooms,breakroom,elec,water, new millwork and finishes. | $364,525 |