Permit GraphShortlistSan Francisco building permits since 2000

Kevin James

License
C27743
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Mcg
Based in
San Francisco
On San Francisco permits
Aug 2004 to Oct 2023

14 permits since 2000 (architect on 14 permits): 7 completed, 2 never finaled, 5 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Da Chung Incorporated (2), Amone Corp, Cannon Constructors North Inc, Michael Heavey Construction, Oak Park Construction, P S R West Coast Builders Inc
Engineers
Daniel Yau

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 18, 2023Completed
final sign-off Mar 2024
1567 Sloat BlOak Park Constructionthe work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenant
Details
Permit
202310188910
Permit issued
Feb 8, 2024
Final sign-off
Mar 1, 2024

the work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenant

Open the permit page

$15,000
Jun 7, 2021Expired or cancelled
cancelled Oct 2024
3535 Geary Bltenant improvement: partial demolition of (2) walls, (2) electrical receptacles for owner provided fixturs.
Details
Permit
202106071827

tenant improvement: partial demolition of (2) walls, (2) electrical receptacles for owner provided fixturs.

Open the permit page

$45,000
Mar 23, 2021Expired or cancelled
cancelled Jan 2026
201 Bay Shore Blnew hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains.
Details
Permit
202103237051

new hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains.

Open the permit page

$50,000
Mar 23, 2021Expired or cancelled
cancelled Jan 2026
201 Bay Shore Blremoval and upgrade to existing electrical services
Details
Permit
202103237080

removal and upgrade to existing electrical services

Open the permit page

$50,000
Nov 17, 2020Never finaled
issued Feb 2021, no final
728 Pacific AvAmone Corpsuite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions
Details
Permit
202011179082
Permit issued
Feb 9, 2021

suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions

Open the permit page

Sep 26, 2020Completed
final sign-off Jun 2021
2633 San Bruno AvDa Chung Incorporatedsuite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a.
Details
Permit
202009265090
Permit issued
Jan 14, 2021
Final sign-off
Jun 4, 2021

suite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a.

Open the permit page

$80,000
Sep 26, 2020Expired or cancelled
withdrawn Nov 2020
3251 20th Avupgrade of (e) door to be secure with new secure hardware. not visible to street.
Details
Permit
202009265045

upgrade of (e) door to be secure with new secure hardware. not visible to street.

Open the permit page

$5,000
Sep 26, 2020Never finaled
issued Jun 2021, no final
2633 San Bruno AvDa Chung Incorporatedsuite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged.
Details
Permit
202009265094
Permit issued
Jun 2, 2021

suite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged.

Open the permit page

$60,000
Sep 26, 2020Expired or cancelled
cancelled Jan 2026
1301 Van Ness Avsecurity improvement to an existing 19,246 sq ft retail tenant. work limited to the replacement of an existing glazed door at sutter facade w/(n) hollow metal door and (n) rolling security door at internal stairs per plans. **maher n/a**
Details
Permit
202009265087

security improvement to an existing 19,246 sq ft retail tenant. work limited to the replacement of an existing glazed door at sutter facade w/(n) hollow metal door and (n) rolling security door at internal stairs per plans. **maher n/a**

Open the permit page

$20,000
Jul 19, 2013Completed
final sign-off May 2014
761 Post Stinterior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017.
Details
Permit
201307192286
Permit issued
Jul 26, 2013
Final sign-off
May 14, 2014

interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017.

Open the permit page

$375,000
Jun 14, 2012Completed
final sign-off Nov 2012
1401 California StP S R West Coast Builders Incdocumentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work.
Details
Permit
201206142606
Permit issued
Jun 21, 2012
Final sign-off
Nov 21, 2012

documentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work.

Open the permit page

Nov 30, 2011Completed
final sign-off Mar 2013
1401 California StCannon Constructors North Incpartial exterior demolition and partial renovation of the core and shell.
Details
Permit
201111309782
Permit issued
Apr 6, 2012
Final sign-off
Mar 13, 2013

partial exterior demolition and partial renovation of the core and shell.

Open the permit page

$950,000
Dec 2, 2005Completed
final sign-off Dec 2005
899 Howard StMichael Heavey Constructionoccupy vacant space for retail expansion
Details
Permit
200512029399
Permit issued
Dec 2, 2005
Final sign-off
Dec 20, 2005

occupy vacant space for retail expansion

Open the permit page

$40,000
Aug 9, 2004Completed
final sign-off Apr 2006
899 Howard Stmodify (e) facade, entrance and handicap ramp.
Details
Permit
200408090993
Permit issued
Dec 16, 2004
Final sign-off
Apr 12, 2006

modify (e) facade, entrance and handicap ramp.

Open the permit page

$100,000