Da Chung Incorporated
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Mar 2023
- Last 24 months
- 0 permits filed
31 permits since 2000: 25 completed, 6 never finaled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2023 | Never finaled issued Mar 2023, no final | 728 Pacific Av | suite 118: revision to permit 202210073992. back-of-house ceilings to change from suspended assembly to painted gyp board. modification includes relocation of proposed fire smoke dampers.Details
suite 118: revision to permit 202210073992. back-of-house ceilings to change from suspended assembly to painted gyp board. modification includes relocation of proposed fire smoke dampers. | |
| Oct 7, 2022 | Completed final sign-off Jun 2023 | 728 Pacific Av | additive work to pa# 202204222843. reconfiguration of suites & buildout of restaurant.Details
additive work to pa# 202204222843. reconfiguration of suites & buildout of restaurant. | $500,000 |
| Apr 22, 2022 | Completed final sign-off Jun 2023 | 728 Pacific Av | suite 118: subdivision of (e) non-formula restaurant space, t.i. for 460 sq. ft. retail (suite 118a) & 2,300 sq. ft. future restaurant (suite 118). new non-load bearing partitions, casework, accessible toilet rooms, interior mall windows, doors, & mepDetails
suite 118: subdivision of (e) non-formula restaurant space, t.i. for 460 sq. ft. retail (suite 118a) & 2,300 sq. ft. future restaurant (suite 118). new non-load bearing partitions, casework, accessible toilet rooms, interior mall windows, doors, & mep | $100,000 |
| Oct 6, 2020 | Completed final sign-off Apr 2021 | 782 23rd Av | construct rear timber deck & stairs; construct new bathroom on 2nd flr; construct new bathroom on 1st flr; renovate bathroom on 2nd flr. renovate kitchen at 1st flr.Details
construct rear timber deck & stairs; construct new bathroom on 2nd flr; construct new bathroom on 1st flr; renovate bathroom on 2nd flr. renovate kitchen at 1st flr. | $90,000 |
| Sep 26, 2020 | Never finaled issued Jun 2021, no final | 2633 San Bruno Av | suite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged.Details
suite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged. | $60,000 |
| Sep 26, 2020 | Completed final sign-off Jun 2021 | 2633 San Bruno Av | suite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a.Details
suite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a. | $80,000 |
| Feb 21, 2020 | Completed final sign-off Jan 2021 | 2633 San Bruno Av | new interior wall and doors to be added in. new suspended gypsum/act/wood panel ceilings. new plumbing at restrooms and sinks for space. new interior finishes throughout space for floors, walls ceiling. new electrical power outlets. new lighting throughout space. addition of new rtu and roof screen.Details
new interior wall and doors to be added in. new suspended gypsum/act/wood panel ceilings. new plumbing at restrooms and sinks for space. new interior finishes throughout space for floors, walls ceiling. new electrical power outlets. new lighting throughout space. addition of new rtu and roof screen. | $150,000 |
| Jan 14, 2019 | Completed final sign-off Oct 2019 | 728 Pacific Av | 5th floor suite 503 - t.i. improvement, new walls, doors, relocating plumbing, new lightsDetails
5th floor suite 503 - t.i. improvement, new walls, doors, relocating plumbing, new lights | $60,000 |
| May 28, 2015 | Completed final sign-off Oct 2015 | 1033 Clement St | 3rd flr: add power & data in 1 room & a low partition in a 2nd ofc rm. add gy board, lights. power & data., add another office, full ht partitions maher naDetails
3rd flr: add power & data in 1 room & a low partition in a 2nd ofc rm. add gy board, lights. power & data., add another office, full ht partitions maher na | $15,000 |
| May 7, 2015 | Completed final sign-off Aug 2015 | 2218 Irving St | change to speciality market. ti for market, update accessibility/ada restroo, new kitchen, new wash & prep area, new service counter.Details
change to speciality market. ti for market, update accessibility/ada restroo, new kitchen, new wash & prep area, new service counter. | $25,000 |
| Mar 13, 2015 | Completed final sign-off Aug 2015 | 1033 Clement St | install gyp bd on one side of (e) partition (approx 60 l.f.) for new office. misc elec outlets, lights. n/a maher ordinanceDetails
install gyp bd on one side of (e) partition (approx 60 l.f.) for new office. misc elec outlets, lights. n/a maher ordinance | $15,000 |
| Nov 26, 2014 | Completed final sign-off Dec 2014 | 616 Jackson St | remodel/replace kitchen cabinets and countertops.Details
remodel/replace kitchen cabinets and countertops. | $5,000 |
| Aug 25, 2014 | Completed final sign-off Dec 2014 | 616 Jackson St | remodel bathroom, title cabinet, patch wall windows (8) back. 2nd floor residence.Details
remodel bathroom, title cabinet, patch wall windows (8) back. 2nd floor residence. | $15,000 |
| Nov 1, 2013 | Never finaled issued Nov 2013, no final | 800 40th Av | replace all windows in the top fl (total of 12) u factor of .34 & one bakony door (milbard) u-factor .34Details
replace all windows in the top fl (total of 12) u factor of .34 & one bakony door (milbard) u-factor .34 | $5,000 |
| Oct 16, 2013 | Completed final sign-off Nov 2013 | 1033 Clement St | to erect non electric wall signDetails
to erect non electric wall sign | $6,500 |
| Oct 16, 2013 | Completed final sign-off Nov 2013 | 1033 Clement St | non structural stucco work on third floorDetails
non structural stucco work on third floor | $4,000 |
| Oct 4, 2013 | Never finaled issued Oct 2013, no final | 1507 Ocean Av | change of use - no work. retail to office.790-108 professional /servicesDetails
change of use - no work. retail to office.790-108 professional /services | |
| Aug 14, 2013 | Completed final sign-off Oct 2013 | 1426 Noriega St | change of use from take out to office. replace (e) lighting & replace (e) front & back doors in kind. new soffit for dropped ceiling, retrofit restroom for ada.Details
change of use from take out to office. replace (e) lighting & replace (e) front & back doors in kind. new soffit for dropped ceiling, retrofit restroom for ada. | $77,700 |
| Jul 22, 2013 | Completed final sign-off Oct 2013 | 1422 Noriega St | install soffit and hvac furnace, lights, restroom to complianceDetails
install soffit and hvac furnace, lights, restroom to compliance | $30,000 |
| May 20, 2013 | Completed final sign-off Sep 2013 | 800 40th Av | additional drawing for ceiling joist supports. revision to app#201304164679.Details
additional drawing for ceiling joist supports. revision to app#201304164679. | |
| Apr 22, 2013 | Completed final sign-off Nov 2013 | 1400 Noriega St | existing front windows sill to be raised up 6" min., replace (e) window to fit the new opening, add new concrete footing under windows.Details
existing front windows sill to be raised up 6" min., replace (e) window to fit the new opening, add new concrete footing under windows. | $2,000 |
| Apr 16, 2013 | Completed final sign-off Sep 2013 | 800 40th Av | renovation of 2nd floor including conversion of dining to new kitchen & kitchen to 3rd bedroom. renovation of two bathrooms.Details
renovation of 2nd floor including conversion of dining to new kitchen & kitchen to 3rd bedroom. renovation of two bathrooms. | $70,000 |
| Apr 16, 2013 | Completed final sign-off Sep 2013 | 800 40th Av | replacement of three aluminum windows on 2nd floor, retain any original wood windows & frames, window visible from front.Details
replacement of three aluminum windows on 2nd floor, retain any original wood windows & frames, window visible from front. | $7,500 |
| Mar 19, 2012 | Completed final sign-off Aug 2012 | 1033 Clement St | t.i. improvement in a 2,600 sq ft space: scope of work show include installation of a passage/ramp connection adjacent elevator lobby with the clinic, installation of interstitial wall describing exam rooms. and ancillary spaces, mechanical/plmg/e infrastructure,& reconfigure storefront entry.Details
t.i. improvement in a 2,600 sq ft space: scope of work show include installation of a passage/ramp connection adjacent elevator lobby with the clinic, installation of interstitial wall describing exam rooms. and ancillary spaces, mechanical/plmg/e infrastructure,& reconfigure storefront entry. | $250,000 |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 1520 Stockton St | revision to 2010-0420-0669. add one unisex toilet room on ground floor. no structural work.Details
revision to 2010-0420-0669. add one unisex toilet room on ground floor. no structural work. | $6,000 |
| Apr 20, 2010 | Completed final sign-off Jun 2011 | 1520 Stockton St | demolition of existing paritions, new work involves non structural remodel of entire 1st fl, except: elevators, (e) stair exits, (e)front entranceDetails
demolition of existing paritions, new work involves non structural remodel of entire 1st fl, except: elevators, (e) stair exits, (e)front entrance | $1,200,000 |
| Aug 4, 2009 | Completed final sign-off Dec 2009 | 172 Escolta Wy | add guest, family, laundr, tool , full bath and half bath rooms om ground floor. enclose (e) light wells, rearrange kitchen and bath room at 2nd fl/ add one full bath room on 2nd flDetails
add guest, family, laundr, tool , full bath and half bath rooms om ground floor. enclose (e) light wells, rearrange kitchen and bath room at 2nd fl/ add one full bath room on 2nd fl | $30,000 |
| Apr 10, 2006 | Never finaled issued Apr 2006, no final | 3951 Mission St | renew for final 200505233201 apt 2Details
renew for final 200505233201 apt 2 | |
| Oct 6, 2005 | Completed final sign-off Oct 2005 | 3886 23rd St | renew pa 200416015735-200406307792-200505253412 for finalDetails
renew pa 200416015735-200406307792-200505253412 for final | |
| Sep 3, 2004 | Completed final sign-off Sep 2004 | 3933 Mission St | replace one window molding, not visible from the streetDetails
replace one window molding, not visible from the street | $200 |
| Jun 30, 2004 | Never finaled issued Sep 2004, no final | 3886 23rd St | interior remodel of (e) 2 family residence; repair street cacade and replace some exterior windowsDetails
interior remodel of (e) 2 family residence; repair street cacade and replace some exterior windows | $125,000 |