Block 0161, lot 049
728 Pacific Av
- City’s use
- Commercial Retail
- Built
- 1985
- Stories
- 7
- Building
- 1,700 sq ft
- Zoning
- CRNC
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2023 | Completed final sign-off May 2023 | 728 Pacific Av | Safe Assurance Fire Protection | install a new fire supression system to a 19' hood & ductsDetails
install a new fire supression system to a 19' hood & ducts | $6,500 |
| Mar 30, 2023 | Completed final sign-off Apr 2023 | 728 Pacific Av | Project Contractor Inc | modify sprinkler system to acommodate new partitioning per nfpa 13 2022 total relocate (9) add (1) remove (1) sprinkler headsDetails
modify sprinkler system to acommodate new partitioning per nfpa 13 2022 total relocate (9) add (1) remove (1) sprinkler heads | $6,211 |
| Mar 22, 2023 | Never finaled issued Mar 2023, no final | 728 Pacific Av | Da Chung Incorporated | suite 118: revision to permit 202210073992. back-of-house ceilings to change from suspended assembly to painted gyp board. modification includes relocation of proposed fire smoke dampers.Details
suite 118: revision to permit 202210073992. back-of-house ceilings to change from suspended assembly to painted gyp board. modification includes relocation of proposed fire smoke dampers. | |
| Oct 7, 2022 | Completed final sign-off Jun 2023 | 728 Pacific Av | Da Chung Incorporated | additive work to pa# 202204222843. reconfiguration of suites & buildout of restaurant.Details
additive work to pa# 202204222843. reconfiguration of suites & buildout of restaurant. | $500,000 |
| Apr 22, 2022 | Completed final sign-off Jun 2023 | 728 Pacific Av | Da Chung Incorporated | suite 118: subdivision of (e) non-formula restaurant space, t.i. for 460 sq. ft. retail (suite 118a) & 2,300 sq. ft. future restaurant (suite 118). new non-load bearing partitions, casework, accessible toilet rooms, interior mall windows, doors, & mepDetails
suite 118: subdivision of (e) non-formula restaurant space, t.i. for 460 sq. ft. retail (suite 118a) & 2,300 sq. ft. future restaurant (suite 118). new non-load bearing partitions, casework, accessible toilet rooms, interior mall windows, doors, & mep | $100,000 |
| Mar 13, 2020 | Expired or cancelled cancelled Jul 2024 | 728 Pacific Av | suite #118: wall to be infilled. new storefront system with new door. all previous finishes to be removed and replaced with new finishes. light fixtures to be removed and replaced with new light fixtures. new dedicated hvac unit in ceiling space for this space.Details
suite #118: wall to be infilled. new storefront system with new door. all previous finishes to be removed and replaced with new finishes. light fixtures to be removed and replaced with new light fixtures. new dedicated hvac unit in ceiling space for this space. | $20,000 | |
| May 12, 2015 | Completed final sign-off Jan 2016 | 728 Pacific Av | C T W Mechanical | #118: demolish existing kitchen exhaust and make up system. install new dusts and fans. maher n/a.Details
#118: demolish existing kitchen exhaust and make up system. install new dusts and fans. maher n/a. | $35,000 |
| May 9, 2013 | Completed final sign-off Jul 2013 | 728 Pacific Av | C L & Y Construction Inc. | install food service equipment & counters for tea lounge.Details
install food service equipment & counters for tea lounge. | $15,000 |
| Jan 27, 2012 | Never finaled issued Jan 2012, no final | 728 Pacific Av | Exxell Corp. Dba Exxell Fire Systems | this was an upgrade of an existing fire suppression system to a range guard ul 300 system.Details
this was an upgrade of an existing fire suppression system to a range guard ul 300 system. | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Da Chung Incorporated (3), C L & Y Construction Inc., C T W Mechanical, Exxell Corp. Dba Exxell Fire Systems, Project Contractor Inc, Safe Assurance Fire Protection
- Architects
- Henry Kwong (3), Young Wong
- Engineers
- Keith Huen (4), Maria Wahond, Wilson Lee
- Designers
- Richard Xu Chu Lin