93 permits since 2000 (architect on 92 permits, engineer on 1 permit): 60 completed, 24 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2015 | Completed final sign-off Oct 2015 | 345 Stockton St | Pacific Inland & Associates Inc Dba Moti | modify (e) unmanned telecom facility, remove/replace (1) site support equipment rack with (1) new od-62dd equipment rack mounted in same location on concrete floor at 34/f mechanical room. no change to (e) antennas, no batteries in this installation.Details
modify (e) unmanned telecom facility, remove/replace (1) site support equipment rack with (1) new od-62dd equipment rack mounted in same location on concrete floor at 34/f mechanical room. no change to (e) antennas, no batteries in this installation. | $6,000 |
| Mar 20, 2015 | Completed final sign-off Jun 2015 | 706 Polk St | Overland Contracting Inc | rev to 2012 0830 8604: addtl structural framing to meet antenna & rru loading needs. (e) parapet & bracing, ac unit on roof added. revised location of apprvd antenna tripod mounts, rru h frames, cabinet location...Details
rev to 2012 0830 8604: addtl structural framing to meet antenna & rru loading needs. (e) parapet & bracing, ac unit on roof added. revised location of apprvd antenna tripod mounts, rru h frames, cabinet location... | $10,000 |
| Dec 10, 2014 | Never finaled issued Dec 2014, no final | 81 09th St | Electric Tech Construction Inc | sprint - relocation of (1) microwave antenna form se penthouse wall to sw penthouse wall. installation of mounting pipe & brackets as needed. painted to match wall surface.Details
sprint - relocation of (1) microwave antenna form se penthouse wall to sw penthouse wall. installation of mounting pipe & brackets as needed. painted to match wall surface. | $4,000 |
| Mar 20, 2014 | Completed final sign-off May 2015 | 601 California St | Overland Contracting Inc | (3) (e) panel antennas to be hotswapped with (3) new panel antennas (1 per sector) (e) frp shrouds to be removed & replaced w/new frp shrouds to accomodate new antennas & 6 rrus (2 per sector) to be installed. (2)(e) equipment cabinets to be hots wapped w/(2) new cabs.Details
(3) (e) panel antennas to be hotswapped with (3) new panel antennas (1 per sector) (e) frp shrouds to be removed & replaced w/new frp shrouds to accomodate new antennas & 6 rrus (2 per sector) to be installed. (2)(e) equipment cabinets to be hots wapped w/(2) new cabs. | $40,000 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 345 Stockton St | Bothwell Construction Corp | installation of new wireless telecommunication facility, 3 panel antennas mounted to penthouse and 1 equipment cabinet in existing beer room with associated connecting cables. no batteries.Details
installation of new wireless telecommunication facility, 3 panel antennas mounted to penthouse and 1 equipment cabinet in existing beer room with associated connecting cables. no batteries. | $30,000 |
| Jun 19, 2013 | Completed final sign-off Apr 2015 | 890 Taraval St | Overland Contracting Inc | (3) existing iden panel antennas to be replaced with (3) new panel ant. mounted to (e) antenna frame & (9) existing panel antennas to be removed. (1) existing equipment cabinet to be removed & (2) new indoor equipment to be installed.Details
(3) existing iden panel antennas to be replaced with (3) new panel ant. mounted to (e) antenna frame & (9) existing panel antennas to be removed. (1) existing equipment cabinet to be removed & (2) new indoor equipment to be installed. | $45,000 |
| May 3, 2013 | Completed final sign-off Apr 2015 | 2543 Noriega St | Overland Contracting Inc | remove 3 antennas and 2 cabinets. install 3 new antennas 6 rrus and 2 cabinets.Details
remove 3 antennas and 2 cabinets. install 3 new antennas 6 rrus and 2 cabinets. | $45,000 |
| Mar 12, 2013 | Never finaled issued Mar 2013, no final | 450 Harrison St | Pinnacle Wireless Usa Inc. | installation of one (1) new microwave rooftop antenna.Details
installation of one (1) new microwave rooftop antenna. | $10,000 |
| Mar 12, 2013 | Never finaled issued Mar 2013, no final | 101 California St | Pinnacle Wireless Usa Inc. | installation of one (1) new microwave rooftop antenna.Details
installation of one (1) new microwave rooftop antenna. | $10,000 |
| Mar 4, 2013 | Completed final sign-off Feb 2014 | 2386 Lombard St | Metropolitan Electrical Construction | installation of one omni directional antenna & associated equipment cabinet for emergency 911.Details
installation of one omni directional antenna & associated equipment cabinet for emergency 911. | $5,000 |
| Feb 19, 2013 | Completed final sign-off Mar 2014 | 865 Market St | Metropolitan Electrical Construction | installation of an umanned wireless facility consisting of 1 new onmi directional antenna & 1 associated equipment cabinet.Details
installation of an umanned wireless facility consisting of 1 new onmi directional antenna & 1 associated equipment cabinet. | $2,500 |
| Feb 11, 2013 | Completed final sign-off Apr 2015 | 4131 Geary Bl | Overland Contracting Inc | sprint proposes to modify (e) unmanned telecommunications facility. 4 (e) panel antennas to be removed. 3 (e) new panel antennas mounted on (e) building. 3 (e) equipment cabinets to be remove & 2 (e) new equipment cabinets to be installed at (e) equipment room.Details
sprint proposes to modify (e) unmanned telecommunications facility. 4 (e) panel antennas to be removed. 3 (e) new panel antennas mounted on (e) building. 3 (e) equipment cabinets to be remove & 2 (e) new equipment cabinets to be installed at (e) equipment room. | $45,000 |
| Jan 3, 2013 | Completed final sign-off Oct 2013 | 1777 Yosemite Av | Metropolitan Electrical Construction | install one (1) (n) omni-directional antenna & (1) one (n) equipment to the (e) concrete rooftop penthouse for e-911.Details
install one (1) (n) omni-directional antenna & (1) one (n) equipment to the (e) concrete rooftop penthouse for e-911. | $5,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2014 | 1501 Lincoln Wy | Metropolitan Electrical Construction | installation of 1 new omni directional antenna & associated equipment for nextnav.Details
installation of 1 new omni directional antenna & associated equipment for nextnav. | $15,000 |
| Dec 4, 2012 | Completed final sign-off Jan 2015 | 1060 Hyde St | Overland Contracting Inc | sprint wireless modification: replace 3 (e) panel antennas with 3 new panel antennas within 3 new radomes on roof. add 6 new rru's on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets in (e) sprint lease area.Details
sprint wireless modification: replace 3 (e) panel antennas with 3 new panel antennas within 3 new radomes on roof. add 6 new rru's on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets in (e) sprint lease area. | $45,000 |
| Nov 30, 2012 | Completed final sign-off Mar 2015 | 570 Beale St | Overland Contracting Inc | sprint modification: replace 3 existing antennas w/ 3 new anntennas inside frp screens on roof; add 6 new rrus on roof; replace 4 existing equipment cabinets w/ 2 new equipment cabinets in basement.Details
sprint modification: replace 3 existing antennas w/ 3 new anntennas inside frp screens on roof; add 6 new rrus on roof; replace 4 existing equipment cabinets w/ 2 new equipment cabinets in basement. | $45,000 |
| Nov 30, 2012 | Never finaled issued Feb 2013, no final | 470 West Portal Av | Overland Contracting Inc | remove 3 sprint antennas. install 3 new antennas on roof top in a radome. remove & replace 2 cabinets in (e) lease area on roof top.Details
remove 3 sprint antennas. install 3 new antennas on roof top in a radome. remove & replace 2 cabinets in (e) lease area on roof top. | $45,000 |
| Nov 29, 2012 | Never finaled issued Mar 2013, no final | 121 Spear St | Overland Contracting Inc | sprint proposed to modify an (e) unmanned telecommunications facility. 2 (e) panel antennas to be removed & replaced with 2 new panel antennas mounted behind steal thing 2 (e) cabinets to be removed & replaced with 2 new equipment cabinets.Details
sprint proposed to modify an (e) unmanned telecommunications facility. 2 (e) panel antennas to be removed & replaced with 2 new panel antennas mounted behind steal thing 2 (e) cabinets to be removed & replaced with 2 new equipment cabinets. | $45,000 |
| Oct 30, 2012 | Completed final sign-off Oct 2013 | 2595 Mission St | Metropolitan Electrical Construction | installation of an unmanned telecommunications facility consisting of 1 omni directional antenna & 1 equipment.Details
installation of an unmanned telecommunications facility consisting of 1 omni directional antenna & 1 equipment. | $5,000 |
| Oct 30, 2012 | Completed final sign-off Oct 2013 | 1100 Oak St | Metropolitan Electrical Construction | installation of an unmanned telecommunications facility consisting of 1 omni directional antenna & 1 new equipment on existing penthouse.Details
installation of an unmanned telecommunications facility consisting of 1 omni directional antenna & 1 new equipment on existing penthouse. | $5,000 |
| Oct 30, 2012 | Completed final sign-off Oct 2013 | 4770 Mission St | Metropolitan Electrical Construction | installation of an unmanned wireless facility consisting of 1 omni directional antenna & 1 equipment. work in common area on rooftop.Details
installation of an unmanned wireless facility consisting of 1 omni directional antenna & 1 equipment. work in common area on rooftop. | $5,000 |
| Oct 29, 2012 | Expired or cancelled expired Nov 2018 | 1465 25th St | Overland Contracting Inc, Slc Inc | sprint pcs proposes to remove (e) panel antennas (3) & install new panel antennas mounted within new frp simulated vent to (e) bldg. (e) equip cabinets to be removed (2) & (2) new equip cabinets to be installed at ground level.Details
sprint pcs proposes to remove (e) panel antennas (3) & install new panel antennas mounted within new frp simulated vent to (e) bldg. (e) equip cabinets to be removed (2) & (2) new equip cabinets to be installed at ground level. | $45,000 |
| Oct 23, 2012 | Completed final sign-off May 2016 | 86 03rd St | W M Wireless Inc | modify (e) t-mobile wireless facility. replace 5 (e) antennas w/ 5 (n) antennas on main roof.Details
modify (e) t-mobile wireless facility. replace 5 (e) antennas w/ 5 (n) antennas on main roof. | $19,000 |
| Oct 22, 2012 | Never finaled issued Nov 2012, no final | 3234 Pierce St | Overland Contracting Inc | sprint wireless modification on parking garage roof: replace 3 (e) panel antenna on (e) light standard with 3 new panel antennas on a new light standard on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on 3rd level of parking garage.Details
sprint wireless modification on parking garage roof: replace 3 (e) panel antenna on (e) light standard with 3 new panel antennas on a new light standard on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on 3rd level of parking garage. | $45,000 |
| Oct 12, 2012 | Completed final sign-off Nov 2013 | 101 Point Lobos Av | Metropolitan Electrical Construction | installation of 1 omni antenna on the roof & 1 equipment cabinet on the roof of the (e) building.Details
installation of 1 omni antenna on the roof & 1 equipment cabinet on the roof of the (e) building. | $5,000 |
| Oct 12, 2012 | Completed final sign-off Feb 2014 | 2550 Sloat Bl | Metropolitan Electrical Construction | installation of 1 omni antenna & 1 equipment cabinet on the roof of the (e) building.Details
installation of 1 omni antenna & 1 equipment cabinet on the roof of the (e) building. | $5,000 |
| Oct 11, 2012 | Never finaled issued Nov 2012, no final | 5 Embarcadero Center | Overland Contracting Inc | sprint wireless modification: replace (6) existing panel antennas with (3) new antennas on roof; replace (2) existing equipment cabinets with (2) equipment cabinets within (e) lease area on roof.Details
sprint wireless modification: replace (6) existing panel antennas with (3) new antennas on roof; replace (2) existing equipment cabinets with (2) equipment cabinets within (e) lease area on roof. | $45,000 |
| Oct 1, 2012 | Completed final sign-off Jul 2015 | 112 07th St | sprint wireless modification: replace 2 (e) panel antennas with 2 new panel antennas. remove radome (e) & install 2 new radomes on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets in (e) equipment shelter on basement floor.Details
sprint wireless modification: replace 2 (e) panel antennas with 2 new panel antennas. remove radome (e) & install 2 new radomes on roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets in (e) equipment shelter on basement floor. | $45,000 | |
| Oct 1, 2012 | Completed final sign-off Jan 2015 | 455 Irwin St | Overland Contracting Inc | (e) sprint / nextel site mod: install 6 new antennas & 6 rrus at roof top. frp shroud to be expanded. install 2 new cabinets at (e) equipment compound.Details
(e) sprint / nextel site mod: install 6 new antennas & 6 rrus at roof top. frp shroud to be expanded. install 2 new cabinets at (e) equipment compound. | $45,000 |
| Sep 24, 2012 | Completed final sign-off Dec 2017 | 310 Townsend St | Overland Contracting Inc | three (e) panel antennas to be removed and replaced with three new antennas. four (e) equipment cabinets to be replaced with two new cabinets. rru and fiber install.(e) 100 amp ppc to be upgraded to 200 amp.Details
three (e) panel antennas to be removed and replaced with three new antennas. four (e) equipment cabinets to be replaced with two new cabinets. rru and fiber install.(e) 100 amp ppc to be upgraded to 200 amp. | $45,000 |
| Sep 20, 2012 | Completed final sign-off Mar 2015 | 1212 Geary Bl | Overland Contracting Inc | remove 3 (e) sprint panel antennas. installed 3 new panel antennas inside church steeple. install 6 rrus at antennas. replace 2 equipment cabinets with 2 new equipment cabinets inside equipment room in basement.Details
remove 3 (e) sprint panel antennas. installed 3 new panel antennas inside church steeple. install 6 rrus at antennas. replace 2 equipment cabinets with 2 new equipment cabinets inside equipment room in basement. | $45,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2014 | 3999 Mission St | Overland Contracting Inc | sprint wireless modification. remove & replace (3) (e) panel antennas w/ (3) (n) panel antennas on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets within (e) equipment shelter on ground level.Details
sprint wireless modification. remove & replace (3) (e) panel antennas w/ (3) (n) panel antennas on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets within (e) equipment shelter on ground level. | $45,000 |
| Sep 10, 2012 | Expired or cancelled expired Jun 2014 | 2000 Van Ness Av | Overland Contracting Inc | remove 3 existing sprint antennas, install 3 new antennas on penthouse and 6 rru's. remove 4 existing cabinets from equipment platform on roof top and install 2 new cabinets.Details
remove 3 existing sprint antennas, install 3 new antennas on penthouse and 6 rru's. remove 4 existing cabinets from equipment platform on roof top and install 2 new cabinets. | $45,000 |
| Sep 10, 2012 | Completed final sign-off Apr 2015 | 555 De Haro St | Overland Contracting Inc | sprint wireless modification. replace (4) (e) panel antennas w/ (3) (n) antennas within (e) radome on roof; replace (3) (e) equipment cabinets with (2) (n) equipment cabinets in (e) equipment shelter on ground level.Details
sprint wireless modification. replace (4) (e) panel antennas w/ (3) (n) antennas within (e) radome on roof; replace (3) (e) equipment cabinets with (2) (n) equipment cabinets in (e) equipment shelter on ground level. | $45,000 |
| Sep 7, 2012 | Completed final sign-off Jul 2015 | 512 Van Ness Av | Overland Contracting Inc | remove (3) antennas, install (6) (n) antennas at roof top section of (e) parapet in front of (3) antennas to be reconstructed in rf-transparent material (color & texture to match). (3) equipment cabinets to be removed & replaced w/ (2) (n) cabinets. install telco backboard in equipment room.Details
remove (3) antennas, install (6) (n) antennas at roof top section of (e) parapet in front of (3) antennas to be reconstructed in rf-transparent material (color & texture to match). (3) equipment cabinets to be removed & replaced w/ (2) (n) cabinets. install telco backboard in equipment room. | $45,000 |
| Sep 4, 2012 | Completed final sign-off Oct 2013 | 389 09th Av | Roebbelen Contracting Inc | (e) t-mobile facility. replace (6) antennas w/ (6) (n) antennas at same locations.Details
(e) t-mobile facility. replace (6) antennas w/ (6) (n) antennas at same locations. | $19,000 |
| Aug 31, 2012 | Completed final sign-off Feb 2015 | 191 02nd St | Overland Contracting Inc | remove 3 existing antennas & install 3 new. 6 rrus on roof top. remove 4 existing equipment cabinets in the basement install 2 cabinets in same lease space.Details
remove 3 existing antennas & install 3 new. 6 rrus on roof top. remove 4 existing equipment cabinets in the basement install 2 cabinets in same lease space. | $45,000 |
| Aug 31, 2012 | Completed final sign-off Mar 2015 | 260 Sagamore St | Overland Contracting Inc | modification to an existing wireless facility consisting of replacing 3 existing panel antennas w/ 3 new, replacing 3 existing equipment cabinets w/ 2 new cabinets within sprints existing lease space.Details
modification to an existing wireless facility consisting of replacing 3 existing panel antennas w/ 3 new, replacing 3 existing equipment cabinets w/ 2 new cabinets within sprints existing lease space. | $45,000 |
| Aug 30, 2012 | Completed final sign-off Jun 2015 | 706 Polk St | Overland Contracting Inc | modification of (e) sprint wireless facility. remove 2 antennas from facade, install 2 new antennas on roof top in simulation chimmey vents. install 4 rrus near antennas. remove 3 equipment cabinets from basement, install 2 new cabinets.Details
modification of (e) sprint wireless facility. remove 2 antennas from facade, install 2 new antennas on roof top in simulation chimmey vents. install 4 rrus near antennas. remove 3 equipment cabinets from basement, install 2 new cabinets. | $45,000 |
| Aug 30, 2012 | Never finaled issued Oct 2012, no final | 444 Presidio Av | Overland Contracting Inc | remove & replace 4 antennas at roof top, install 8 rrus, replace equipment cabinets inside (e) lease space.Details
remove & replace 4 antennas at roof top, install 8 rrus, replace equipment cabinets inside (e) lease space. | $45,000 |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 160 Pine St | Overland Contracting Inc | modification of (e) sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install (2) (n) cabinets at same lease area on roof top. install 4 rrus on h-frames.Details
modification of (e) sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install (2) (n) cabinets at same lease area on roof top. install 4 rrus on h-frames. | $45,000 |
| Aug 28, 2012 | Expired or cancelled withdrawn Apr 2016 | 417 31st Av | replace 6 (e) antennas w/ 6 (n) antennas at same locations. t-mobile wireless telecommunications facility.Details
replace 6 (e) antennas w/ 6 (n) antennas at same locations. t-mobile wireless telecommunications facility. | $19,000 | |
| Aug 28, 2012 | Completed final sign-off Nov 2014 | 1398 Bryant St | W M Wireless Inc | t-mobile wireless telecommunications facility. replace 6 (e) antennas w/ 6 (n) antennas at same locations.Details
t-mobile wireless telecommunications facility. replace 6 (e) antennas w/ 6 (n) antennas at same locations. | $19,000 |
| Aug 24, 2012 | Expired or cancelled cancelled Mar 2020 | 611 Folsom St | (e) t-mobile wireless site. replaced (4) (e) antennas w/ (4) (n) antennas at same locations.Details
(e) t-mobile wireless site. replaced (4) (e) antennas w/ (4) (n) antennas at same locations. | $19,010 | |
| Aug 24, 2012 | Never finaled issued May 2013, no final | 2696 Geary Bl | (e) t-mobile wireless site. replace (6) (e) antennas w/ (6) (n) antennas at same locations.Details
(e) t-mobile wireless site. replace (6) (e) antennas w/ (6) (n) antennas at same locations. | $19,010 | |
| Aug 23, 2012 | Completed final sign-off Mar 2015 | 291 Duboce Av | Overland Contracting Inc | three (e) panel antennas to be removed and replaced with 3 new panel antennas. 3 (e) equipment cabinets to be removed and replaced with 2 new equipment cabinets. rru and fiber install.Details
three (e) panel antennas to be removed and replaced with 3 new panel antennas. 3 (e) equipment cabinets to be removed and replaced with 2 new equipment cabinets. rru and fiber install. | $45,000 |
| Aug 22, 2012 | Completed final sign-off Feb 2015 | 5000 Geary Bl | Overland Contracting Inc | remove 3 (e) sprint panel antennas & install 3 new panel antennas on roof top. mount 6 rrus behind antennas (2 per antenna). remove 3 equipment cabinets & install 2 new equipment cabinets inside (e) equipment enclosure behind building.Details
remove 3 (e) sprint panel antennas & install 3 new panel antennas on roof top. mount 6 rrus behind antennas (2 per antenna). remove 3 equipment cabinets & install 2 new equipment cabinets inside (e) equipment enclosure behind building. | $45,000 |
| Aug 14, 2012 | Completed final sign-off Feb 2015 | 2130 Ofarrell St | Overland Contracting Inc | sprint wireless modification. replace (3) (e) panel antennas w/ (3) (n) panel antennas on (e) penthouse roof; replace (2) (e) equipment cabinets w/ (2) (n) equipment cabinets on (e) steel beam on roof.Details
sprint wireless modification. replace (3) (e) panel antennas w/ (3) (n) panel antennas on (e) penthouse roof; replace (2) (e) equipment cabinets w/ (2) (n) equipment cabinets on (e) steel beam on roof. | $45,000 |
| Aug 14, 2012 | Completed final sign-off Aug 2015 | 8 Montgomery St | Overland Contracting Inc | wireless modification: replace (2) panel antennas w/ (4) (n) panel antennas mounted to (e) bldg; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets, run coaxial lines from equipment & antennas. power will stay the same (no change)Details
wireless modification: replace (2) panel antennas w/ (4) (n) panel antennas mounted to (e) bldg; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets, run coaxial lines from equipment & antennas. power will stay the same (no change) | $45,000 |
| Aug 13, 2012 | Never finaled issued Sep 2012, no final | 370 Grove St | Overland Contracting Inc | sprint wireless modification: replace 3 existing panel antennas with 3 new panel antennas on roof of existing parking garage. replace 4 existing equipment cabinets with 2 new equipment cabinets on roof.Details
sprint wireless modification: replace 3 existing panel antennas with 3 new panel antennas on roof of existing parking garage. replace 4 existing equipment cabinets with 2 new equipment cabinets on roof. | $45,000 |
| Aug 8, 2012 | Expired or cancelled withdrawn May 2018 | 105 Sagamore St | existing site modification consisting of adding three remote radio units inside existing frp chimneys, one 6601 uni inside existing equipment area.Details
existing site modification consisting of adding three remote radio units inside existing frp chimneys, one 6601 uni inside existing equipment area. | $15,000 | |
| Aug 2, 2012 | Completed final sign-off Aug 2013 | 2000 Van Ness Av | Becon Construction Company Inc. | replacing three (e) umts antennas with 3 new umts antennas, adding three new lte antennas all within (e) frp screen boxes. project also includes installation of one rba72 cabinet, one purcell cabinet, 3 (e) rrus will be relocated from (e) equipment at rear to directly beneath antennas. also add 6Details
replacing three (e) umts antennas with 3 new umts antennas, adding three new lte antennas all within (e) frp screen boxes. project also includes installation of one rba72 cabinet, one purcell cabinet, 3 (e) rrus will be relocated from (e) equipment at rear to directly beneath antennas. also add 6 | $25,000 |
| Jul 25, 2012 | Completed final sign-off Mar 2016 | 3004 16th St | Overland Contracting Inc, Slc Inc | wireless facility modification & replace 6 panel antennas with 3 new panel antennas, add 2 new equipment cabinets . no power upgrade.Details
wireless facility modification & replace 6 panel antennas with 3 new panel antennas, add 2 new equipment cabinets . no power upgrade. | $45,000 |
| Jul 25, 2012 | Completed final sign-off Apr 2015 | 353 Bay Shore Bl | Overland Contracting Inc | replace 3 (e) antennas with 3 new antennas on roof; replace 3 (e) equipment cabinets with 2 new equipment cabinets within (e) lease area on ground level.Details
replace 3 (e) antennas with 3 new antennas on roof; replace 3 (e) equipment cabinets with 2 new equipment cabinets within (e) lease area on ground level. | $45,000 |
| Jul 20, 2012 | Completed final sign-off Jun 2015 | 950 Market St | Overland Contracting Inc | sprint. 3 (e) antennas to be removed and replaced with 3 new panel antennas in a new frp chimney. 6 remote radio units (rrus) to be attached to the parapet wall. 3 (e) equipment cabinets to be removed and replaced with 2 new cabinets fiber install.Details
sprint. 3 (e) antennas to be removed and replaced with 3 new panel antennas in a new frp chimney. 6 remote radio units (rrus) to be attached to the parapet wall. 3 (e) equipment cabinets to be removed and replaced with 2 new cabinets fiber install. | $45,000 |
| Jul 19, 2012 | Completed final sign-off Feb 2015 | 450 Harrison St | Overland Contracting Inc | 6 existing panel antennas will be removed and replaced by 3 new panel antennas. 3 equipment cabinets will be removed and replaced by 2 new equipment cabinets. rru and fiber install.Details
6 existing panel antennas will be removed and replaced by 3 new panel antennas. 3 equipment cabinets will be removed and replaced by 2 new equipment cabinets. rru and fiber install. | $45,000 |
| Jul 16, 2012 | Completed final sign-off Apr 2015 | 246 Judah St | Overland Contracting Inc | remove 3 antennas & 3 equip cabinets.install 3 new antenas & 6 rrus screened within a faux frp penthouse on toof top. install 2 new equip cabinets inside (e) shelter on roof top of adjacent garage.Details
remove 3 antennas & 3 equip cabinets.install 3 new antenas & 6 rrus screened within a faux frp penthouse on toof top. install 2 new equip cabinets inside (e) shelter on roof top of adjacent garage. | $45,000 |
| Jul 11, 2012 | Completed final sign-off Apr 2015 | 1100 Oak St | Overland Contracting Inc | wireless facility modification. replace 3 panel antennas with 3 new panel antennas. replace 3 (e) equipment cabinets with 2 new equipment cabinets. no power upgrade.Details
wireless facility modification. replace 3 panel antennas with 3 new panel antennas. replace 3 (e) equipment cabinets with 2 new equipment cabinets. no power upgrade. | $45,000 |
| Jun 29, 2012 | Never finaled issued May 2013, no final | 1334 Van Ness Av | Overland Contracting Inc | 4 (e) panel antennas to be removed and 3 new panel antennas to be installed with blinders. 3 equipment cabinets to be removed and 2 cabinets to be installed.Details
4 (e) panel antennas to be removed and 3 new panel antennas to be installed with blinders. 3 equipment cabinets to be removed and 2 cabinets to be installed. | $45,000 |
| Jun 28, 2012 | Completed final sign-off Jan 2015 | 2300 California St | Overland Contracting Inc | (3) (e) sprint panel antennas to be removed, (3) (n) panel antennas to be installed at roof top. (6) rrus to be installed (3) (e) equipment cabinets to be removed & (2) (n) cabinets to be installed inside same lease space on roof top. antennas & cables painted to match.Details
(3) (e) sprint panel antennas to be removed, (3) (n) panel antennas to be installed at roof top. (6) rrus to be installed (3) (e) equipment cabinets to be removed & (2) (n) cabinets to be installed inside same lease space on roof top. antennas & cables painted to match. | $45,000 |
| Jun 28, 2012 | Never finaled issued Sep 2012, no final | 667 Portola Dr | Overland Contracting Inc | sprint wireless modification: replace (6) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets on roof.Details
sprint wireless modification: replace (6) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets on roof. | $45,000 |
| Jun 28, 2012 | Completed final sign-off Jun 2015 | 5226 Mission St | Overland Contracting Inc | sprint wireless modification: replace (3) existing antennas with (3) new antennas on existing roof, replace (3) existing equipment cabinets with (2) new equipment cabinets in existing equipment room on 2nd level of building.Details
sprint wireless modification: replace (3) existing antennas with (3) new antennas on existing roof, replace (3) existing equipment cabinets with (2) new equipment cabinets in existing equipment room on 2nd level of building. | $45,000 |
| Jun 27, 2012 | Completed final sign-off Mar 2015 | 2001 Union St | Overland Contracting Inc | sprint wireless modification:replace (5) existing panel antennas with (3) new panel antennas on existing penthouse roof, replace (2) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof.Details
sprint wireless modification:replace (5) existing panel antennas with (3) new panel antennas on existing penthouse roof, replace (2) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof. | $45,000 |
| Jun 27, 2012 | Expired or cancelled expired Oct 2014 | 990 Columbus Av | Overland Contracting Inc | remove (3) sprint panel antennas, install (3) (n) panel antennas on roof top. remove (2) equipment cabinets & install (2) (n) equipment cabinets inside (e) lease space inside basement.Details
remove (3) sprint panel antennas, install (3) (n) panel antennas on roof top. remove (2) equipment cabinets & install (2) (n) equipment cabinets inside (e) lease space inside basement. | $45,000 |
| Jun 27, 2012 | Completed final sign-off Dec 2015 | 700 Jones St | Overland Contracting Inc, Slc Inc | sprint wireless modification:replace (2) existing panel antennas with (2) new panel antennas on roof, replace (2) existing equipment cabinets with (2) new equipment cabinets in basement. remove screenwall on roof.Details
sprint wireless modification:replace (2) existing panel antennas with (2) new panel antennas on roof, replace (2) existing equipment cabinets with (2) new equipment cabinets in basement. remove screenwall on roof. | $45,000 |
| Jun 26, 2012 | Never finaled issued Sep 2012, no final | 720 Moscow St | Overland Contracting Inc | sprint wireless modification: replace (3) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof.Details
sprint wireless modification: replace (3) existing antennas with (3) new antennas on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets within existing lease area on roof. | $45,000 |
| Jun 25, 2012 | Never finaled issued Dec 2014, no final | 955 Potrero Av | Overland Contracting Inc | 3 (e) panel antennas to be hotswapped w/ 3 (n) antennas. 3 (e) equipment cabinets to be removed & replaced w/ 2 (n) equipment cabinets. fiber & rru install.Details
3 (e) panel antennas to be hotswapped w/ 3 (n) antennas. 3 (e) equipment cabinets to be removed & replaced w/ 2 (n) equipment cabinets. fiber & rru install. | $45,000 |
| Jun 21, 2012 | Never finaled issued Mar 2014, no final | 930 Gough St | Overland Contracting Inc | remove 2 sprint panel antennas, install 2 new antennas, 4 rrus on roof top. remove 3 equipment cabinets and install 2 new equipment cabinets.Details
remove 2 sprint panel antennas, install 2 new antennas, 4 rrus on roof top. remove 3 equipment cabinets and install 2 new equipment cabinets. | $45,000 |
| Jun 15, 2012 | Completed final sign-off Mar 2015 | 2199 Fulton St | Overland Contracting Inc | sprint wireless modification. replace 6 (e) antennas with 3 new antennas on (e) roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on (e) steel beam on roof.Details
sprint wireless modification. replace 6 (e) antennas with 3 new antennas on (e) roof. replace 3 (e) equipment cabinets with 2 new equipment cabinets on (e) steel beam on roof. | $45,000 |
| Jun 4, 2012 | Expired or cancelled cancelled Jun 2018 | 601 Duboce Av | 4 sprint panel antennas to be removed from facade, (4) new antennas to be installed on roof (penthouse wall mount). 3 equipment cabinets to be removed & 4 equipment cabinets to be installed in (e) lease space at roof top.Details
4 sprint panel antennas to be removed from facade, (4) new antennas to be installed on roof (penthouse wall mount). 3 equipment cabinets to be removed & 4 equipment cabinets to be installed in (e) lease space at roof top. | $45,000 | |
| Jun 4, 2012 | Completed final sign-off Feb 2016 | 417 31st Av | Overland Contracting Inc | (3) sprint panel antennas to be removed from facade, (3) new antennas to be installed in the same location concealed with frp cover. equipment cabinets to be replaced in same interior lease space (2 cabinets removed, 2 installed).Details
(3) sprint panel antennas to be removed from facade, (3) new antennas to be installed in the same location concealed with frp cover. equipment cabinets to be replaced in same interior lease space (2 cabinets removed, 2 installed). | $45,000 |
| May 31, 2012 | Completed final sign-off Dec 2014 | 1580 Valencia St | Overland Contracting Inc | 3 (e) sprint antennas to be removed, 3 new panel antennas to be installed on (e) penthouse with 6 rrus. 3 equipment cabinets to be removed, 2 new equipment cabinets to be installed in (e) lease space.Details
3 (e) sprint antennas to be removed, 3 new panel antennas to be installed on (e) penthouse with 6 rrus. 3 equipment cabinets to be removed, 2 new equipment cabinets to be installed in (e) lease space. | $45,000 |
| May 31, 2012 | Completed final sign-off May 2015 | 510 Frederick St | Overland Contracting Inc | remove 3 sprint antennas, install 3 new panel antennas on roof top. remove 2 equipment cabinets & install 2 new cabinets in (e) lease area in the basement.Details
remove 3 sprint antennas, install 3 new panel antennas on roof top. remove 2 equipment cabinets & install 2 new cabinets in (e) lease area in the basement. | $45,000 |
| May 25, 2012 | Completed final sign-off Oct 2013 | 1015 Ocean Av | Overland Contracting Inc | sprint wireless modification. replace 3 (e) panel antennas with 3 new panel antennas on (e) penthouse roof. replace 2 (e) equipment cabinets with 2 new equipmennt cabinets in (e) equipment room on ground level.Details
sprint wireless modification. replace 3 (e) panel antennas with 3 new panel antennas on (e) penthouse roof. replace 2 (e) equipment cabinets with 2 new equipmennt cabinets in (e) equipment room on ground level. | $45,000 |
| May 21, 2012 | Never finaled issued Jun 2012, no final | 1101 Fillmore St | Overland Contracting Inc | 3 existing sprint antennas to be removed, 3 new panel antennas to be mounted to facade. 4 equipment cabinets to be removed, 2 cabinets to be installed in existing lease space.Details
3 existing sprint antennas to be removed, 3 new panel antennas to be mounted to facade. 4 equipment cabinets to be removed, 2 cabinets to be installed in existing lease space. | $45,000 |
| May 21, 2012 | Completed final sign-off Mar 2015 | 720 La Playa | Overland Contracting Inc | replace 3 sprint panel antennas with 3 new antennas mounted on penthouse roof. replace 2 equipment cabinets with 2 new cabinets within (e) lease space in enclosure on rooftop.Details
replace 3 sprint panel antennas with 3 new antennas mounted on penthouse roof. replace 2 equipment cabinets with 2 new cabinets within (e) lease space in enclosure on rooftop. | $45,000 |
| May 18, 2012 | Never finaled issued Aug 2012, no final | 874 Harrison St | Overland Contracting Inc | remove 3 sprint antennas. install 3 new sprint antennas connected inside existing radome. replace equipment cabinets (remove 3, install 2) inside existing lease space.Details
remove 3 sprint antennas. install 3 new sprint antennas connected inside existing radome. replace equipment cabinets (remove 3, install 2) inside existing lease space. | $45,000 |
| May 18, 2012 | Never finaled issued Jun 2012, no final | 3030 Judah St | Overland Contracting Inc | sprint wireless modification: replace 4 (e) panel antennas with 3 new panel antennas mounted on (e) mounbon (e) building. replace 3 (e) equipment cabinets with 2 new equipment cabinets within (e) equipment room.Details
sprint wireless modification: replace 4 (e) panel antennas with 3 new panel antennas mounted on (e) mounbon (e) building. replace 3 (e) equipment cabinets with 2 new equipment cabinets within (e) equipment room. | $45,000 |
| May 18, 2012 | Completed final sign-off Apr 2015 | 2601 Mission St | Overland Contracting Inc | remove 6 antennas. install 4 antennas, add 8 rrus remove 3 cabinets inside interior lease space. install 4 new equipment cabinets. upgrade 200 amp power service to equipment to 320amp. print antennas and coax to match.Details
remove 6 antennas. install 4 antennas, add 8 rrus remove 3 cabinets inside interior lease space. install 4 new equipment cabinets. upgrade 200 amp power service to equipment to 320amp. print antennas and coax to match. | $45,000 |
| May 17, 2012 | Completed final sign-off Apr 2015 | 1200 Folsom St | Overland Contracting Inc | sprint wireless modification: swap (3) existing panel antennas with (3) new panel anthennas within radome on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets on roof.Details
sprint wireless modification: swap (3) existing panel antennas with (3) new panel anthennas within radome on roof, replace (3) existing equipment cabinets with (2) new equipment cabinets on roof. | $45,000 |
| May 17, 2012 | Completed final sign-off Apr 2015 | 488 Bryant St | Overland Contracting Inc | sprint wireless modification: replace (3) existing panel antennas with (3) new panel antennas on roof. replace (2) existing equipment cabinets with (2) new equipment cabinets within existing equipment room.Details
sprint wireless modification: replace (3) existing panel antennas with (3) new panel antennas on roof. replace (2) existing equipment cabinets with (2) new equipment cabinets within existing equipment room. | $45,000 |
| May 10, 2012 | Completed final sign-off Apr 2015 | 1501 Lincoln Wy | Overland Contracting Inc | remove 3 sprint antennas, install 3 new antennas on penthouse, remove 3 equipment cabinets, install 2 equipment cabinets in same lease space / interior, ground level.Details
remove 3 sprint antennas, install 3 new antennas on penthouse, remove 3 equipment cabinets, install 2 equipment cabinets in same lease space / interior, ground level. | $45,000 |
| Apr 27, 2012 | Completed final sign-off Aug 2015 | 220 Golden Gate Av | Overland Contracting Inc | 3(e) panel antenna to be removed & replaced w/ (3) (n) panel antenna mounted to building walls. 3 (e) equipment cabinets to be removed & replace w/ 2 (n) cabinets mounted inside (e) roof mounted lease area. (e) 100 amp service to remain.Details
3(e) panel antenna to be removed & replaced w/ (3) (n) panel antenna mounted to building walls. 3 (e) equipment cabinets to be removed & replace w/ 2 (n) cabinets mounted inside (e) roof mounted lease area. (e) 100 amp service to remain. | $45,000 |
| Apr 26, 2012 | Completed final sign-off Jan 2015 | 4377 Mission St | Overland Contracting Inc | sprint wireless modification: swap 3 (e) antennas w/ 3 (n) antennas within (e) radime on roof. replace 3 (e) equipment cabinet w/ 2 new equipment cabinets within (e) sprint lease area at ground floor.Details
sprint wireless modification: swap 3 (e) antennas w/ 3 (n) antennas within (e) radime on roof. replace 3 (e) equipment cabinet w/ 2 new equipment cabinets within (e) sprint lease area at ground floor. | $45,000 |
| Apr 26, 2012 | Never finaled issued Jun 2012, no final | 1881 Post St | Overland Contracting Inc | sprint wireless modification: swap (6) (e) panel antennas w/ (3) (n) panel antennas within (e) radome on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets in (e) lease area in basement.Details
sprint wireless modification: swap (6) (e) panel antennas w/ (3) (n) panel antennas within (e) radome on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets in (e) lease area in basement. | $45,000 |
| Apr 19, 2012 | Completed final sign-off Jan 2015 | 3838 California St | Overland Contracting Inc | modification of (e) sprint wireless site involving removal of (4) panel antennas and installtion of (8) new panel antennas, equipment cabinets to be removed and installed within (e) lease space in the basement. antennas coaxial cables to be painted to match.Details
modification of (e) sprint wireless site involving removal of (4) panel antennas and installtion of (8) new panel antennas, equipment cabinets to be removed and installed within (e) lease space in the basement. antennas coaxial cables to be painted to match. | $45,000 |
| Jan 27, 2012 | Never finaled issued Mar 2012, no final | 2 Henry Adams St | Overland Contracting Inc | sprint wireless facility modification: swap (6) extg panel antennas w/ (6) new mounted to exist strue on roof. replace (3) existg equipment cabinets w/ (2) new inside existg equipment rm. run coaxial from antennas to equipment.Details
sprint wireless facility modification: swap (6) extg panel antennas w/ (6) new mounted to exist strue on roof. replace (3) existg equipment cabinets w/ (2) new inside existg equipment rm. run coaxial from antennas to equipment. | $45,000 |
| Jan 5, 2012 | Expired or cancelled cancelled Jun 2016 | 850 Battery St | wireless facility modification: replace 2 (e) sprint panel antennas with 4 new panel antennas on roof; replace 3 (e) equipment cabinets with 2 new equipment cabinet on roof; and run coaxial from equipment to antennas.Details
wireless facility modification: replace 2 (e) sprint panel antennas with 4 new panel antennas on roof; replace 3 (e) equipment cabinets with 2 new equipment cabinet on roof; and run coaxial from equipment to antennas. | $45,000 | |
| Dec 29, 2011 | Never finaled issued Feb 2012, no final | 555 Market St | Overland Contracting Inc, Slc Inc | wireless facility modification: replace 3 panel antennas w/ 6 (n) panel antennas; replace 2 (e) equipment cabinets w/ 2 equipment cabinets in (e) equipment shelter; run coaxial lines from equipment to antennas.Details
wireless facility modification: replace 3 panel antennas w/ 6 (n) panel antennas; replace 2 (e) equipment cabinets w/ 2 equipment cabinets in (e) equipment shelter; run coaxial lines from equipment to antennas. | $45,000 |
| Dec 16, 2011 | Expired or cancelled expired Nov 2015 | 5700 03rd St | Overland Contracting Inc | wireless modification: replace 3 existing sprint panel antennas with 6 new panel antennas on roof. replace 3 existing equipment cabinets with 2 new equipment cabinets, run coaxial lines from equipment and antennas.permit for battery storage is requiredDetails
wireless modification: replace 3 existing sprint panel antennas with 6 new panel antennas on roof. replace 3 existing equipment cabinets with 2 new equipment cabinets, run coaxial lines from equipment and antennas.permit for battery storage is required | $45,000 |
| Nov 30, 2011 | Completed final sign-off Apr 2015 | 222 Front St | Overland Contracting Inc | remove 4 (e) antennas & replace w/ (6) (n) panel antennas at rooftop. equipment cabinets will be replaced in (e) lease area in basement.Details
remove 4 (e) antennas & replace w/ (6) (n) panel antennas at rooftop. equipment cabinets will be replaced in (e) lease area in basement. | $45,000 |
| Nov 30, 2011 | Never finaled issued Jan 2012, no final | 1031 Quesada Av | Overland Contracting Inc | wireless modification to replace 4 (e) panel antennas w/ 4 (n) panel antennas on roof of (e) bldg, replace 3 (e) equipment cabinets w/ 2 (n) equipment cabinets, run coaxial lines frome equipment to antennas.Details
wireless modification to replace 4 (e) panel antennas w/ 4 (n) panel antennas on roof of (e) bldg, replace 3 (e) equipment cabinets w/ 2 (n) equipment cabinets, run coaxial lines frome equipment to antennas. | $45,000 |
| Nov 3, 2011 | Never finaled issued Feb 2012, no final | 209 Post St | Overland Contracting Inc | wireless facility modificatin: replace 6 (e) panel antennas with 6 with panel antennas on (e)roof penthouse; replace 3 (e) equipment cabinets with 2 new equipment cabinets on roof equipment platform, and run coaxial lines from equipment to antennas.Details
wireless facility modificatin: replace 6 (e) panel antennas with 6 with panel antennas on (e)roof penthouse; replace 3 (e) equipment cabinets with 2 new equipment cabinets on roof equipment platform, and run coaxial lines from equipment to antennas. | $45,000 |