Block 0262, lot 018
160 Pine St
- City’s use
- Commercial Office
- Built
- 1956
- Stories
- 7
- Building
- 96,082 sq ft
- Lot
- 14,730 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
84 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | Completed final sign-off Sep 2026 | 160 Pine St | C B F Inc | new light (51) lights, new power (22) receptacles. new light controls. ref#: 202603117357Details
new light (51) lights, new power (22) receptacles. new light controls. ref#: 202603117357 | $109,860 |
| Mar 11, 2026 | Completed final sign-off Sep 2026 | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | 7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. bldg is fully sprinklerd.Details
7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. bldg is fully sprinklerd. | $650,000 |
| Dec 11, 2025 | Completed final sign-off May 2026 | 160 Pine St | Bilcor Inc | elevator shaft: install 1 ceiling mount strobe, install 1 smoke detectors. install 1 controle relay module.Details
elevator shaft: install 1 ceiling mount strobe, install 1 smoke detectors. install 1 controle relay module. | $1,998 |
| Sep 19, 2025 | In progress filed Sep 2025, not yet issued | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | 3 standard booths, spaced 4 feet bewtween each unit. 4 securely ancohored to the floorDetails
3 standard booths, spaced 4 feet bewtween each unit. 4 securely ancohored to the floor | $2,800 |
| Apr 21, 2021 | Completed final sign-off Aug 2021 | 160 Pine St | Xclusive Wireless Resources Llc. | removal of (e) sprint wireless equipment from rooftop including antennas, antenna mounts, rru's, cables, cable trays, equipment cabinets and steel platform.Details
removal of (e) sprint wireless equipment from rooftop including antennas, antenna mounts, rru's, cables, cable trays, equipment cabinets and steel platform. | $12,000 |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 160 Pine St | Bilcor Inc | fire alarm suite 350: install 2 ceiling mount strobes, install 7 ceiling mount horn-strobes, remove & install 2 smoke detectors, rmeove & replace 2 wall mount horn-strobes. ref ti #201909050689Details
fire alarm suite 350: install 2 ceiling mount strobes, install 7 ceiling mount horn-strobes, remove & install 2 smoke detectors, rmeove & replace 2 wall mount horn-strobes. ref ti #201909050689 | $7,260 |
| Oct 28, 2019 | Completed final sign-off Mar 2020 | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | ste 350 - modification of existing hvac systems. new power and data for work station & offices. new break room. new lighting & controls ref pa 2019-0905-0689Details
ste 350 - modification of existing hvac systems. new power and data for work station & offices. new break room. new lighting & controls ref pa 2019-0905-0689 | $451,202 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 160 Pine St | Golden Gate Fire Protection Inc | 3rd floor: fire sprinkler only: relocate 18t pendents and 43 uprights for suite # 350 on the 3rd floor.Details
3rd floor: fire sprinkler only: relocate 18t pendents and 43 uprights for suite # 350 on the 3rd floor. | $30,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2020 | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | suite 350 - ti demo of non structural partitions and bld new non structural partitions. mep/fire/life safety under seperat permitDetails
suite 350 - ti demo of non structural partitions and bld new non structural partitions. mep/fire/life safety under seperat permit | $890,000 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 160 Pine St | Field Construction Inc. | 2nd fl suite 250 mech and elec 201809180604Details
2nd fl suite 250 mech and elec 201809180604 | |
| Nov 30, 2018 | Completed final sign-off Dec 2018 | 160 Pine St | Bilcor Inc | fire alarm ti: remove and replace 15 control relays, r/r 13 dual monitor relays, r/r 36 pull stations, r/r 19 smoke detectors w/base, r/r 11 duct detectors, r/r fire alarm control panel.Details
fire alarm ti: remove and replace 15 control relays, r/r 13 dual monitor relays, r/r 36 pull stations, r/r 19 smoke detectors w/base, r/r 11 duct detectors, r/r fire alarm control panel. | $56,400 |
| Nov 8, 2018 | Completed final sign-off Nov 2018 | 160 Pine St | Bilcor Inc | fire alarm ti suite 250: install 4 ceiling mount horn-strobes, install 5 cieling mount strobes. ref ti #201809180604.Details
fire alarm ti suite 250: install 4 ceiling mount horn-strobes, install 5 cieling mount strobes. ref ti #201809180604. | $8,100 |
| Nov 8, 2018 | Completed final sign-off Nov 2018 | 160 Pine St | Bilcor Inc | fire alarm ti: install 5 ceiling mount horn-strobes, install 5 ceiling mount strobes. ref ti #201809180601.Details
fire alarm ti: install 5 ceiling mount horn-strobes, install 5 ceiling mount strobes. ref ti #201809180601. | $6,000 |
| Nov 6, 2018 | Completed final sign-off Mar 2019 | 160 Pine St | Field Construction Inc. | demo low pressure ductwork per plans. install low pressure ductwork. install new exhaust fan. install new lighting and power ref 201809180601Details
demo low pressure ductwork per plans. install low pressure ductwork. install new exhaust fan. install new lighting and power ref 201809180601 | $190,000 |
| Nov 6, 2018 | Expired or cancelled cancelled Jan 2026 | 160 Pine St | Field Construction Inc. | demo and relocate duct and quipment as shown. install new duct and equipment as shown. install new lighting and outlets throughout suite ref 201809180604Details
demo and relocate duct and quipment as shown. install new duct and equipment as shown. install new lighting and outlets throughout suite ref 201809180604 | $320,000 |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 160 Pine St | R L H Fire Protection Inc | 2nd fl - fire sprinkler permit. relocate 55, and 1 and delete 5 sprinklers. ref pa 2018-0918-0604Details
2nd fl - fire sprinkler permit. relocate 55, and 1 and delete 5 sprinklers. ref pa 2018-0918-0604 | $22,400 |
| Oct 5, 2018 | Completed final sign-off Nov 2018 | 160 Pine St | R L H Fire Protection Inc | 5th fl - fire sprinkler permits. relocate 40, add 5 and delete 8 sprinklers. ref pa 2018-0918-0601Details
5th fl - fire sprinkler permits. relocate 40, add 5 and delete 8 sprinklers. ref pa 2018-0918-0601 | $18,000 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 160 Pine St | Peacock Construction | 7th floor: t-24 mechanical for work under app#201808248228. n/a for maherDetails
7th floor: t-24 mechanical for work under app#201808248228. n/a for maher | |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 160 Pine St | Bilcor Inc | 7th fl - fire alarm ti - install 5 ceiling mount horn-strobes, install 1 ceiling mount strobe. ref pa 2018-0824-8228Details
7th fl - fire alarm ti - install 5 ceiling mount horn-strobes, install 1 ceiling mount strobe. ref pa 2018-0824-8228 | $3,000 |
| Sep 18, 2018 | Completed final sign-off Feb 2019 | 160 Pine St | Field Construction Inc. | 2nd floor: suite 250 t.i. includes demo of non structural partitions and build new non str partitions. all new or revised. mep, life safety and sprinklers under seperate permit. n/a for maherDetails
2nd floor: suite 250 t.i. includes demo of non structural partitions and build new non str partitions. all new or revised. mep, life safety and sprinklers under seperate permit. n/a for maher | $734,000 |
| Sep 18, 2018 | Completed final sign-off Mar 2019 | 160 Pine St | Field Construction Inc. | 5th floor: suite 510: t.i. includes demo of non structural partitions and build new non str partitions. all new or revised. mep, life safety and sprinklers under seperate permit. n/a for maherDetails
5th floor: suite 510: t.i. includes demo of non structural partitions and build new non str partitions. all new or revised. mep, life safety and sprinklers under seperate permit. n/a for maher | $646,000 |
| Sep 11, 2018 | Completed final sign-off Nov 2018 | 160 Pine St | Peacock Construction | t-24 electrical for work under pa 201808248228Details
t-24 electrical for work under pa 201808248228 | $24,500 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 160 Pine St | Anderson, Rowe & Buckley, Inc. | 7th fl: existing fire sprinkler - tenant improvements. 5 relocated sprinklers, 5 added sprinklers. arch #201808248228.Details
7th fl: existing fire sprinkler - tenant improvements. 5 relocated sprinklers, 5 added sprinklers. arch #201808248228. | $5,000 |
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 160 Pine St | Peacock Construction | 7/f: demo of select non-structural partitions, new non-structural partitions, doors, millwork on 7th floor only. mep-life safety-sprinklers under seperate permit.Details
7/f: demo of select non-structural partitions, new non-structural partitions, doors, millwork on 7th floor only. mep-life safety-sprinklers under seperate permit. | $183,000 |
| Jul 23, 2018 | Never finaled issued Aug 2018, no final | 100 Battery St | Thomas Swan Sign Co Inc | new sign lens crafters: electric wall sign, double faced interior maher naDetails
new sign lens crafters: electric wall sign, double faced interior maher na | $5,000 |
| Jul 23, 2018 | Never finaled issued Aug 2018, no final | 100 Battery St | Thomas Swan Sign Co Inc | change sign lens crafters: electric wall sign, single faced maher naDetails
change sign lens crafters: electric wall sign, single faced maher na | $10,000 |
| Jan 31, 2018 | Completed final sign-off Mar 2019 | 160 Pine St | Electric Tech Construction Inc | remove & replace (2) antennas. remove & replace (2) 24" raydomes. add (2) new rru's on new mount (800 mhz). add (2) new rru's on new mount (2400 mhz).Details
remove & replace (2) antennas. remove & replace (2) 24" raydomes. add (2) new rru's on new mount (800 mhz). add (2) new rru's on new mount (2400 mhz). | $25,000 |
| Dec 28, 2015 | Completed final sign-off Jan 2016 | 120 Battery St | Bilcor Inc | 1st floor: fire alarm t.i. install 2 ceiling mount horn-strobes. install 1 ceiling mount strobe. install 1 wall mount horn-strobes. install 1 wall mount strobe. as built to show 2nd (e) heat pump with duct detector. ref. t.i. 201510210406. n/a for maherDetails
1st floor: fire alarm t.i. install 2 ceiling mount horn-strobes. install 1 ceiling mount strobe. install 1 wall mount horn-strobes. install 1 wall mount strobe. as built to show 2nd (e) heat pump with duct detector. ref. t.i. 201510210406. n/a for maher | $2,500 |
| Dec 28, 2015 | Completed final sign-off Jan 2016 | 120 Battery St | Bilcor Inc | ground floor: fire alarm t.i. install 1 ceiling mount horn-strobe, install 1 wall mount horn-strobe, install 11 ceiling mount strobes, install 1 booster panel, relocate 1 pull station. n/a for maher. as built-new booster panel is located in the fcc room.Details
ground floor: fire alarm t.i. install 1 ceiling mount horn-strobe, install 1 wall mount horn-strobe, install 11 ceiling mount strobes, install 1 booster panel, relocate 1 pull station. n/a for maher. as built-new booster panel is located in the fcc room. | $7,000 |
| Dec 14, 2015 | Expired or cancelled cancelled Aug 2023 | 120 Battery St | Bilcor Inc | ground floor fire alarm as built - ref ti #201412042997 & #201507282721 - as-built to reflect on plane location of new booster panel. n/a maher ordinanceDetails
ground floor fire alarm as built - ref ti #201412042997 & #201507282721 - as-built to reflect on plane location of new booster panel. n/a maher ordinance | |
| Oct 21, 2015 | Completed final sign-off Jan 2016 | 160 Pine St | Bilcor Inc | 1st floor, fire alarm ti: install 2 ceiling mount horn strobes, install 1 ceiling mount strobe, install 1 wall mount horn/strobe. install 1 wall mount strobe. ti 2015-0213-8389Details
1st floor, fire alarm ti: install 2 ceiling mount horn strobes, install 1 ceiling mount strobe, install 1 wall mount horn/strobe. install 1 wall mount strobe. ti 2015-0213-8389 | $2,400 |
| Sep 21, 2015 | Completed final sign-off Oct 2016 | 160 Pine St | I C Inke Image Co Inc Dba Harbor Signs | install one set of 18" internally led illuminated channel letters. electrical sign. n/a for maher.Details
install one set of 18" internally led illuminated channel letters. electrical sign. n/a for maher. | $5,000 |
| Aug 21, 2015 | Completed final sign-off Nov 2015 | 160 Pine St | Pioneer Fire Inc. | 1st flr: relocate 6 pendents and remove 1 pendent ti pa 2015 0213 8389 maher naDetails
1st flr: relocate 6 pendents and remove 1 pendent ti pa 2015 0213 8389 maher na | $7,982 |
| Jul 31, 2015 | Never finaled issued Jul 2015, no final | 120 Battery St | Pioneer Fire Inc. | 1st floor: relocate 12 pendents, add 3 pendents and remove 1 pendent. ref. appl. 2014.1204.2997. maher n/a.Details
1st floor: relocate 12 pendents, add 3 pendents and remove 1 pendent. ref. appl. 2014.1204.2997. maher n/a. | $11,962 |
| Jul 28, 2015 | Completed final sign-off Jan 2016 | 120 Battery St | Bilcor Inc | fire alarm t.i., install 1 ceiling mount horn-strobe, 1 wall mount horn-strobe, 11 ceiling mount strobes, 1 smoke detector with base, 1 booster panel & relocate 1 pull station. t.i. pa#201412042997. n/a ordinance #155-13Details
fire alarm t.i., install 1 ceiling mount horn-strobe, 1 wall mount horn-strobe, 11 ceiling mount strobes, 1 smoke detector with base, 1 booster panel & relocate 1 pull station. t.i. pa#201412042997. n/a ordinance #155-13 | $6,400 |
| Jun 16, 2015 | Never finaled issued Jun 2015, no final | 120 Battery St | street spaceDetails
street space | ||
| Feb 13, 2015 | Completed final sign-off Jun 2016 | 160 Pine St | Rafferty Construction Inc | #140b - change of occupancy from vacant retail to a quick service restaurant (1173 s.f.). n/a maher ordinance (ti build out of (e) "m" 1173sf vacant space at main floor of (e) bldg to a quick service restaurant - chahnge of occupancy; no exterior modifications).Details
#140b - change of occupancy from vacant retail to a quick service restaurant (1173 s.f.). n/a maher ordinance (ti build out of (e) "m" 1173sf vacant space at main floor of (e) bldg to a quick service restaurant - chahnge of occupancy; no exterior modifications). | $120,000 |
| Dec 4, 2014 | Completed final sign-off Jan 2016 | 120 Battery St | All Phase Contractors Inc/All Phase Buil | 1st flr: remodeling existing dental office, minor t.i. and modification of ceiling and wall; maher n/aDetails
1st flr: remodeling existing dental office, minor t.i. and modification of ceiling and wall; maher n/a | $293,375 |
| May 8, 2014 | Completed final sign-off Sep 2016 | 160 Pine St | Bilcor Inc | remove and replace 1 booster panel, remove and replace 1 wall mount strobe remove and replace 7 wall mount hornstrobes, install 3 wall mount strobes install 4 wall mount horn strobes, install 1 smoke detector with base. ti 2013-1223-4925Details
remove and replace 1 booster panel, remove and replace 1 wall mount strobe remove and replace 7 wall mount hornstrobes, install 3 wall mount strobes install 4 wall mount horn strobes, install 1 smoke detector with base. ti 2013-1223-4925 | $6,800 |
| Dec 23, 2013 | Completed final sign-off Jun 2014 | 160 Pine St | Field Construction Inc. | 6th floor - office tenant improvement of approx 3,855 gross sq ft to include the addition of new non-structural partitions, finishes & millwork upgrades. sprinkler/fire life safety, mechanical & electrical drawings are deferred.Details
6th floor - office tenant improvement of approx 3,855 gross sq ft to include the addition of new non-structural partitions, finishes & millwork upgrades. sprinkler/fire life safety, mechanical & electrical drawings are deferred. | $300,000 |
| Dec 20, 2013 | Completed final sign-off Jan 2014 | 160 Pine St | Overland Contracting Inc | to obtain final inspection for work approved under pa # 201208308659. all work is complete. (description of work: modification of sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & installDetails
to obtain final inspection for work approved under pa # 201208308659. all work is complete. (description of work: modification of sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install | |
| Dec 5, 2013 | Completed final sign-off Jun 2014 | 160 Pine St | 6th fl restroom upgrade. relocate 8 new toilets, new toilet patriton, patch and repair finishesDetails
6th fl restroom upgrade. relocate 8 new toilets, new toilet patriton, patch and repair finishes | $16,000 | |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 160 Pine St | Overland Contracting Inc | modification of (e) sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install (2) (n) cabinets at same lease area on roof top. install 4 rrus on h-frames.Details
modification of (e) sprint wireless facility. remove & replace (2) antennas concealed as flagpoles. remove (3) equipment cabinets & install (2) (n) cabinets at same lease area on roof top. install 4 rrus on h-frames. | $45,000 |
| Mar 2, 2012 | Completed final sign-off Mar 2012 | 160 Pine St | Carter Brothers Fire & Life Safety | basement level-install 1 new horn strobe in basement server roomDetails
basement level-install 1 new horn strobe in basement server room | $4,100 |
| Oct 11, 2011 | Completed final sign-off Mar 2012 | 160 Pine St | Field Construction Inc. | 4th floor tenant improvements - convert office & meeting room to library. demolish coat closet & shelving. mep & fire life safety under separate permits.Details
4th floor tenant improvements - convert office & meeting room to library. demolish coat closet & shelving. mep & fire life safety under separate permits. | $9,800 |
| Aug 25, 2009 | Expired or cancelled cancelled Jun 2013 | 160 Pine St | Metropolitan Electrical Construction | wts facility. instalatin of 3 rf panel antennas and 1 internet service exchange switch antenna and 1 gps antenna, 1 bts equipemnt cabinet. all located on the roof topDetails
wts facility. instalatin of 3 rf panel antennas and 1 internet service exchange switch antenna and 1 gps antenna, 1 bts equipemnt cabinet. all located on the roof top | $45,000 |
| Oct 10, 2008 | Completed final sign-off Dec 2008 | 160 Pine St | Richlen Construction | 6th fl tenant improvement: construction of 1 private office, demolition of 2 walls to create open work areaDetails
6th fl tenant improvement: construction of 1 private office, demolition of 2 walls to create open work area | $18,000 |
| Sep 26, 2008 | Completed final sign-off Oct 2008 | 160 Pine St | Anderson, Rowe & Buckley, Inc. | compliance with high-rise sprinkler ordinace #377-93/umbrella permit. all floors. no work.Details
compliance with high-rise sprinkler ordinace #377-93/umbrella permit. all floors. no work. | |
| Sep 23, 2008 | Completed final sign-off Oct 2008 | 160 Pine St | Anderson, Rowe & Buckley, Inc. | infill of existing fire sprinkler system: 23 new sprinklers, 2 relocated speakers. bsm and floor 1, 2, 3, 4, 5, 6, 7, 8, 9.Details
infill of existing fire sprinkler system: 23 new sprinklers, 2 relocated speakers. bsm and floor 1, 2, 3, 4, 5, 6, 7, 8, 9. | $5,600 |
| Aug 23, 2006 | Completed final sign-off Apr 2007 | 160 Pine St | Richlen Construction | oti-2 4th floor elDetails
oti-2 4th floor el | $114,000 |
| Aug 22, 2006 | Completed final sign-off Apr 2007 | 160 Pine St | C B F Inc | life safety system modification @ 160 pine st. 4th fl. rmw office ti-i remote modification power supply, 1 dual sync. module, 8 horn/strobes, 9 stoube lights, 4 smoke detectors .Details
life safety system modification @ 160 pine st. 4th fl. rmw office ti-i remote modification power supply, 1 dual sync. module, 8 horn/strobes, 9 stoube lights, 4 smoke detectors . | $10,000 |
| Jul 7, 2006 | Completed final sign-off Apr 2007 | 160 Pine St | oti-1 4th floor el me ls spDetails
oti-1 4th floor el me ls sp | $150,000 | |
| Jan 14, 2004 | Completed final sign-off Feb 2004 | 160 Pine St | Skyline Construction | modifications to hvac and lighting for copy store on groundfloorDetails
modifications to hvac and lighting for copy store on groundfloor | $30,851 |
| Jan 14, 2004 | Completed final sign-off Feb 2004 | 160 Pine St | Skyline Construction | sprinkler and life safety work to be performed, no increase in office spaceDetails
sprinkler and life safety work to be performed, no increase in office space | $25,000 |
| Jan 6, 2004 | Expired or cancelled expired Aug 2007 | 160 Pine St | 6/f-interior renovation of (e)office space.drywall,mtl stud framing.interior finishes.Details
6/f-interior renovation of (e)office space.drywall,mtl stud framing.interior finishes. | $65,000 | |
| Dec 5, 2003 | Completed final sign-off Feb 2004 | 160 Pine St | Skyline Construction | groundfl ti in vacantshell space.scope of work include replacement of(1) door 1 office, will workDetails
groundfl ti in vacantshell space.scope of work include replacement of(1) door 1 office, will work | $86,017 |
| Oct 22, 2003 | Never finaled issued Oct 2003, no final | 160 Pine St | street spaceDetails
street space | ||
| Oct 2, 2003 | Completed final sign-off Oct 2003 | 140 Pine St | Sign Designs Inc. | to erect a single-faced non-electric wall signDetails
to erect a single-faced non-electric wall sign | |
| May 27, 2003 | Completed final sign-off Nov 2003 | 160 Pine St | C B F Inc | life safety modifications @ 160 pine st. 1st floor: 1 dual sync module, 2 horn strobes, 2 strobesDetails
life safety modifications @ 160 pine st. 1st floor: 1 dual sync module, 2 horn strobes, 2 strobes | $2,500 |
| May 16, 2003 | Completed final sign-off Jan 2004 | 160 Pine St | Donald S. Maclean, Inc | modify existing structural slab to accommodate new compliant curb ramp @pine/battery cornerDetails
modify existing structural slab to accommodate new compliant curb ramp @pine/battery corner | $10,000 |
| May 14, 2003 | Completed final sign-off Nov 2003 | 160 Pine St | R L H Fire Protection Inc | fire sprinkler tenant improvements/relocate 33/replace 6 and add 1 on ground floorDetails
fire sprinkler tenant improvements/relocate 33/replace 6 and add 1 on ground floor | $4,500 |
| May 9, 2003 | Completed final sign-off Nov 2003 | 160 Pine St | Bridge City Builders | retail t.i., path of travel & ada restroom upgrade, fire alarm/sprinkler under seperate permitDetails
retail t.i., path of travel & ada restroom upgrade, fire alarm/sprinkler under seperate permit | $210,000 |
| Jul 24, 2002 | Completed final sign-off Apr 2003 | 160 Pine St | demo of non bearing, non structural walls only, work on 1st floor onlyDetails
demo of non bearing, non structural walls only, work on 1st floor only | $30,000 | |
| May 14, 2002 | Completed final sign-off Jun 2002 | 160 Pine St | Anderson, Rowe & Buckley, Inc. | 3rd fl. restroom- provide tenant fire protectionDetails
3rd fl. restroom- provide tenant fire protection | $1,800 |
| Apr 24, 2002 | Completed final sign-off Jun 2002 | 160 Pine St | Skyline Construction | oti-2 3/fl. elDetails
oti-2 3/fl. el | $12,000 |
| Apr 9, 2002 | Completed final sign-off Jun 2002 | 160 Pine St | C B F Inc | f/a modification at 160 pine st 3rd floor/remove and replace devices for new ceilingDetails
f/a modification at 160 pine st 3rd floor/remove and replace devices for new ceiling | $1,000 |
| Mar 8, 2002 | Expired or cancelled cancelled May 2002 | 100 Battery St | Anderson, Rowe & Buckley, Inc. | fire protection work for lenscrafters @ ground floor.Details
fire protection work for lenscrafters @ ground floor. | $16,300 |
| Oct 15, 2001 | Expired or cancelled expired Dec 2003 | 160 Pine St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work 5th floor 2 sets 0f calcs fire work only, no buildoutDetails
provide tenant fire protection work 5th floor 2 sets 0f calcs fire work only, no buildout | $26,480 |
| Sep 21, 2001 | Completed final sign-off Jun 2002 | 160 Pine St | oti-1 3rd floor, el, me, ls, spDetails
oti-1 3rd floor, el, me, ls, sp | $60,000 | |
| May 16, 2001 | Expired or cancelled expired May 2002 | 160 Pine St | oti-4 3rd floor meDetails
oti-4 3rd floor me | $35,000 | |
| May 15, 2001 | Expired or cancelled expired Nov 2001 | 160 Pine St | Turner Construction Co | oti-3,3rd flr spDetails
oti-3,3rd flr sp | $17,000 |
| May 10, 2001 | Expired or cancelled expired Dec 2003 | 160 Pine St | Turner Construction Co | oti-2, 3rd floor, el & l/sDetails
oti-2, 3rd floor, el & l/s | $45,000 |
| May 8, 2001 | Expired or cancelled expired Dec 2003 | 160 Pine St | Turner Construction Co | oti-1,3rd flr,ltg,mech,ls & sprDetails
oti-1,3rd flr,ltg,mech,ls & spr | $120,000 |
| May 2, 2001 | Expired or cancelled expired Nov 2001 | 160 Pine St | Turner Construction**See 210639**** | demo interior non structural demo onlyDetails
demo interior non structural demo only | $16,000 |
| Apr 3, 2001 | Expired or cancelled expired Aug 2001 | 160 Pine St | Richlen Construction | oti-2, 2nd floor, spDetails
oti-2, 2nd floor, sp | $1,200 |
| Feb 22, 2001 | Completed final sign-off Apr 2001 | 160 Pine St | City Building Inc. | oti-2 2nd floor, el, me, lsDetails
oti-2 2nd floor, el, me, ls | $6,500 |
| Dec 15, 2000 | Completed final sign-off Oct 2001 | 160 Pine St | revision to application 200009140567 due to equipment location changes only no addition in heightDetails
revision to application 200009140567 due to equipment location changes only no addition in height | ||
| Sep 14, 2000 | Completed final sign-off Oct 2001 | 160 Pine St | one-stop,c.h.,install 3 antennas,mount near the parapet,install radio equipment on 7th flr rooftopDetails
one-stop,c.h.,install 3 antennas,mount near the parapet,install radio equipment on 7th flr rooftop | $40,000 | |
| Aug 17, 2000 | Expired or cancelled expired Mar 2001 | 160 Pine St | Pribuss Engineering Inc | install fire sprinkler system @ ground flDetails
install fire sprinkler system @ ground fl | $11,000 |
| Aug 3, 2000 | Expired or cancelled expired Feb 2001 | 160 Pine St | Pribuss Engineering Inc | fire sprinkler t.i.Details
fire sprinkler t.i. | $14,525 |
| Jul 27, 2000 | Expired or cancelled expired Oct 2001 | 160 Pine St | Pribuss Engineering Inc | fire sprnklr 4th floorDetails
fire sprnklr 4th floor | $28,000 |
| Jul 7, 2000 | Completed final sign-off Apr 2001 | 160 Pine St | oti-1 2nd fl, el, me, lsDetails
oti-1 2nd fl, el, me, ls | $10,000 | |
| Jun 22, 2000 | Expired or cancelled expired Jul 2001 | 160 Pine St | Pribuss Engineering Inc | Details
| $28,000 |
| Jun 13, 2000 | Expired or cancelled expired Mar 2002 | 160 Pine St | oti-1 2nd floor electrical lifesafty sprinklerDetails
oti-1 2nd floor electrical lifesafty sprinkler | $54,950 |