Permit GraphShortlistSan Francisco building permits since 2000

Jerry Gabriel

License
C7110
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C7110 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Rmw Architecture & Interiors
On San Francisco permits
Nov 2004 to Apr 2012

15 permits since 2000 (architect on 14 permits, engineer on 1 permit): 13 completed, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Field Construction Inc. (3), City Building Inc. (2), Plant Construction Company Lp (2), Hathaway Dinwiddie Co., Novo Construction Inc, Richlen Construction, Skyline Construction, Source Planning And Construction Inc, Team Commercial Construction Inc., Truebeck Construction
Engineers
James Paskington
Authorized agents
Karen Carlene Letteney

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 13, 2012Completed
final sign-off Jul 2012
505 Montgomery StHathaway Dinwiddie Co.demo new partitions, millwork, break area, new finishes throughout suite 1200. mech, elec, fire sprinkler and life safety under separate permit.
Details
Permit
201204138229
Permit issued
Apr 13, 2012
Final sign-off
Jul 5, 2012

demo new partitions, millwork, break area, new finishes throughout suite 1200. mech, elec, fire sprinkler and life safety under separate permit.

Open the permit page

$200,000
Mar 26, 2012Completed
final sign-off May 2012
505 Montgomery StField Construction Inc.12th floor:revision to app#201112080322. delete single door exit at open office 1230. add double door exit with new soffit at open office 1230. relocate fire extinguisher cabinet and south wall at corridor 12b
Details
Permit
201203266811
Permit issued
Mar 28, 2012
Final sign-off
May 2, 2012

12th floor:revision to app#201112080322. delete single door exit at open office 1230. add double door exit with new soffit at open office 1230. relocate fire extinguisher cabinet and south wall at corridor 12b

Open the permit page

Mar 26, 2012Never finaled
issued Aug 2012, no final
1455 Market StCity Building Inc.3rd & 7th floors - t.i. for sfmta. interior demolition floors 3 & 7. new partitions & doors, windows, millwork & finishes, lighting plan & power, floor 7. new shower rooms with new finishes & ceiling plan and new bike storage cage with new lighting, floor 3. (no exterior work).
Details
Permit
201203266832
Permit issued
Aug 2, 2012

3rd & 7th floors - t.i. for sfmta. interior demolition floors 3 & 7. new partitions & doors, windows, millwork & finishes, lighting plan & power, floor 7. new shower rooms with new finishes & ceiling plan and new bike storage cage with new lighting, floor 3. (no exterior work).

Open the permit page

$5,706,690
Mar 19, 2012Completed
final sign-off May 2014
1455 Market StCity Building Inc.3rd flr accessibility upgrades to path of travel & restrooms. 7th fl accessibility upgrades & new finishes in restrooms. new ceiling grid, lighting & finishes in corridor & elevator lobbies. mep & fire life safety under seperate permit. (no exterior work).
Details
Permit
201203196395
Permit issued
Jun 27, 2012
Final sign-off
May 6, 2014

3rd flr accessibility upgrades to path of travel & restrooms. 7th fl accessibility upgrades & new finishes in restrooms. new ceiling grid, lighting & finishes in corridor & elevator lobbies. mep & fire life safety under seperate permit. (no exterior work).

Open the permit page

$260,000
Feb 23, 2012Completed
final sign-off Jun 2012
475 Sansome StSource Planning And Construction Incti suite 840, minor interior demolition, construct new demising wall, new door & glazing at conference room & office, new millwork & new finishes. mep & fire life safety under separate permit.
Details
Permit
201202234745
Permit issued
Apr 5, 2012
Final sign-off
Jun 22, 2012

ti suite 840, minor interior demolition, construct new demising wall, new door & glazing at conference room & office, new millwork & new finishes. mep & fire life safety under separate permit.

Open the permit page

$50,000
Feb 8, 2012Completed
final sign-off May 2012
201 03rd StField Construction Inc.tenant remodel of extg space on 6th floor: remove gyp.bd. partitions, provide (n) gyp.bd. partitions. relocate doors, frames, hardware & glazing. relocate light fixtures & electrical per (n) partition layout. mep under separate permit.
Details
Permit
201202083776
Permit issued
Mar 1, 2012
Final sign-off
May 21, 2012

tenant remodel of extg space on 6th floor: remove gyp.bd. partitions, provide (n) gyp.bd. partitions. relocate doors, frames, hardware & glazing. relocate light fixtures & electrical per (n) partition layout. mep under separate permit.

Open the permit page

$150,000
Jan 12, 2012Completed
final sign-off Jan 2012
201 03rd StTeam Commercial Construction Inc.6th floor #610 - demolish (1) wall, build full height non-rated partition, minor electrical to be on separate permit.
Details
Permit
201201122114
Permit issued
Jan 12, 2012
Final sign-off
Jan 31, 2012

6th floor #610 - demolish (1) wall, build full height non-rated partition, minor electrical to be on separate permit.

Open the permit page

$20,343
Nov 22, 2011Completed
final sign-off Oct 2013
1355 Market StTruebeck Constructiondemolition of western portion of 9th floor
Details
Permit
201111229463
Permit issued
Dec 23, 2011
Final sign-off
Oct 16, 2013

demolition of western portion of 9th floor

Open the permit page

$125,000
Oct 11, 2011Completed
final sign-off Mar 2012
160 Pine StField Construction Inc.4th floor tenant improvements - convert office & meeting room to library. demolish coat closet & shelving. mep & fire life safety under separate permits.
Details
Permit
201110116521
Permit issued
Oct 11, 2011
Final sign-off
Mar 7, 2012

4th floor tenant improvements - convert office & meeting room to library. demolish coat closet & shelving. mep & fire life safety under separate permits.

Open the permit page

$9,800
Jun 20, 2011Completed
final sign-off Nov 2011
101 Spear StNovo Construction Inc2nd floor #200 ti renovation including: demo work, new breakroom/sink, new lighting throughout, finishes upgrades, convert 2 small rooms to conference, replace stair to (e) mezzanine, new power/data where noted.
Details
Permit
201106208478
Permit issued
Jun 27, 2011
Final sign-off
Nov 4, 2011

2nd floor #200 ti renovation including: demo work, new breakroom/sink, new lighting throughout, finishes upgrades, convert 2 small rooms to conference, replace stair to (e) mezzanine, new power/data where noted.

Open the permit page

$420,000
Jun 12, 2009Completed
final sign-off Sep 2009
1 California StRichlen Construction10th floor office tenant improvement: building & demolition of interior demising partitions. minor mep modification per new layout. mep & life safety will be filed under separate permit.
Details
Permit
200906120390
Permit issued
Jun 17, 2009
Final sign-off
Sep 16, 2009

10th floor office tenant improvement: building & demolition of interior demising partitions. minor mep modification per new layout. mep & life safety will be filed under separate permit.

Open the permit page

$22,600
Jul 29, 2005Completed
final sign-off Dec 2005
999 Brannan StPlant Construction Company Lpt.i.to 3 rooms on 2/f.existing rooms to have new stud wall,ceiling,finishes.no exterior work.
Details
Permit
200507299030
Permit issued
Jul 29, 2005
Final sign-off
Dec 27, 2005

t.i.to 3 rooms on 2/f.existing rooms to have new stud wall,ceiling,finishes.no exterior work.

Open the permit page

$121,000
May 25, 2005Completed
final sign-off Oct 2005
1 California StSkyline Constructionoti-1, 21st floor, el, ls.
Details
Permit
200505253407
Permit issued
May 25, 2005
Final sign-off
Oct 11, 2005

oti-1, 21st floor, el, ls.

Open the permit page

$10,000
May 24, 2005Completed
final sign-off May 2006
999 Brannan StPlant Construction Company Lpinstall generator in basement, construct vents & exhaust though 4 floors penetrating at roof. fuel poit located at ground floor. new partitions throughout.
Details
Permit
200505243232
Permit issued
Nov 7, 2005
Final sign-off
May 10, 2006

install generator in basement, construct vents & exhaust though 4 floors penetrating at roof. fuel poit located at ground floor. new partitions throughout.

Open the permit page

$180,000
Nov 23, 2004Expired or cancelled
expired Sep 2006
1 California Stoti-1 30/f el, me, sp
Details
Permit
200411239909
Permit issued
Nov 23, 2004

oti-1 30/f el, me, sp

Open the permit page

$30,000