Block 1446, lot 024
5010 Geary Blvd
- City’s use
- Commercial Retail
- Built
- 1918
- Stories
- 3
- Units
- 5
- Rooms
- 5 bathrooms
- Lot
- 5,000 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2025 | Completed final sign-off Jun 2025 | 5010 Geary Bl | Poza Construction | revision to 202402286724 for bathroom, kitchens and hot water heater layouts.Details
revision to 202402286724 for bathroom, kitchens and hot water heater layouts. | |
| Jan 17, 2025 | In progress issued Jan 2025 | 399 14th Av | per pim, add address 399 14th ave to apn 1446/024.Details
per pim, add address 399 14th ave to apn 1446/024. | ||
| Feb 28, 2024 | Completed final sign-off Jun 2025 | 5010 Geary Bl | Poza Construction | renovation of 4 existing units. selective demo. remodel bathrooms, kitchens, living rooms, bedroomsDetails
renovation of 4 existing units. selective demo. remodel bathrooms, kitchens, living rooms, bedrooms | $75,000 |
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 5020 Geary Bl | to comply with awning amnesty program, illegal awning previously removed. to abate planning complaint # 2022-011926enf.Details
to comply with awning amnesty program, illegal awning previously removed. to abate planning complaint # 2022-011926enf. | ||
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 5020 Geary Bl | no construction- legalize (e) sign iluminated double faced sign, "ampawa" under awning amnesty programDetails
no construction- legalize (e) sign iluminated double faced sign, "ampawa" under awning amnesty program | ||
| Jun 5, 2023 | Completed final sign-off Sep 2024 | 5000 Geary Bl | The Cbr Group | removal of (e) sprint equipment due to merger w/ t-mobile: removing spriny antennas, radio cabinets, & associcated equipmentsDetails
removal of (e) sprint equipment due to merger w/ t-mobile: removing spriny antennas, radio cabinets, & associcated equipments | $8,300 |
| Feb 23, 2022 | Expired or cancelled withdrawn Dec 2023 | 5000 Geary Bl | t-mobile: remove 3 antennas, remove 2 cabinets, remove 1 (e) radome, install 6 new antennas, install 6 new radios, install 2 new radomes, install 2 new cabinets.Details
t-mobile: remove 3 antennas, remove 2 cabinets, remove 1 (e) radome, install 6 new antennas, install 6 new radios, install 2 new radomes, install 2 new cabinets. | $30,000 | |
| Oct 6, 2020 | Never finaled issued Nov 2020, no final | 5010 Geary Bl | per sf disability accesseable program, add addresses to block 1446, lot 024; 5010, 5014 geary blvd.Details
per sf disability accesseable program, add addresses to block 1446, lot 024; 5010, 5014 geary blvd. | ||
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 5000 Geary Bl | Kerley Construction Inc | repair dryrot, replace sectional garage door in kind, repair stucco in kindDetails
repair dryrot, replace sectional garage door in kind, repair stucco in kind | $15,000 |
| Mar 4, 2016 | Never finaled issued Mar 2016, no final | 5000 Geary Bl | street spaceDetails
street space | ||
| Apr 29, 2015 | Completed final sign-off Dec 2015 | 5000 Geary Bl | Electric Tech Construction Inc | sprint remove & replace (e) nv panels antennas. 1 each @ all sectors. add 3 triband panel antennas. 1 ea @ all sectors. add 3-2.5 rrh, 1 @ ea all sectors. add new coax jumper lines from rrhs to new antennas. reuse (e) hybrid cables or install new as needed. add new 2.5 equipment inside (e) cabinet.Details
sprint remove & replace (e) nv panels antennas. 1 each @ all sectors. add 3 triband panel antennas. 1 ea @ all sectors. add 3-2.5 rrh, 1 @ ea all sectors. add new coax jumper lines from rrhs to new antennas. reuse (e) hybrid cables or install new as needed. add new 2.5 equipment inside (e) cabinet. | $20,000 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 5000 Geary Bl | Abc Roofing Inc | reroofingDetails
reroofing | $9,600 |
| Feb 5, 2013 | Never finaled issued Feb 2013, no final | 5000 Geary Bl | revision to app#201301027052.vinyl banner taped to wall on store front.Details
revision to app#201301027052.vinyl banner taped to wall on store front. | $190 | |
| Jan 2, 2013 | Completed final sign-off Jan 2013 | 5000 Geary Bl | vinyl lettering on awning and windowsDetails
vinyl lettering on awning and windows | $286 | |
| Aug 22, 2012 | Completed final sign-off Feb 2015 | 5000 Geary Bl | Overland Contracting Inc | remove 3 (e) sprint panel antennas & install 3 new panel antennas on roof top. mount 6 rrus behind antennas (2 per antenna). remove 3 equipment cabinets & install 2 new equipment cabinets inside (e) equipment enclosure behind building.Details
remove 3 (e) sprint panel antennas & install 3 new panel antennas on roof top. mount 6 rrus behind antennas (2 per antenna). remove 3 equipment cabinets & install 2 new equipment cabinets inside (e) equipment enclosure behind building. | $45,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 5000 Geary Bl | Cornerstone Dba Ag Construction | convert existing closet into ada restroom in retail space. build partiton wallDetails
convert existing closet into ada restroom in retail space. build partiton wall | $20,000 |
| Oct 12, 2011 | Completed final sign-off Dec 2011 | 5020 Geary Bl | New High Protection Roofing | reroofingDetails
reroofing | $3,000 |
| Nov 23, 2010 | Never finaled issued Nov 2010, no final | 5020 Geary Bl | street space and mtaDetails
street space and mta | ||
| Sep 14, 2010 | Completed final sign-off Feb 2012 | 5000 Geary Bl | Transceive Communications Inc. | installation of tower-mounted amplifiers @ an (e) legal t-mobile facility.Details
installation of tower-mounted amplifiers @ an (e) legal t-mobile facility. | $9,000 |
| Aug 5, 2010 | Completed final sign-off Jan 2011 | 5020 Geary Bl | ada barrier removal: entrance door & unisex toilet room serving (e) restaurant. voluntaryDetails
ada barrier removal: entrance door & unisex toilet room serving (e) restaurant. voluntary | $35,000 | |
| Oct 15, 2009 | Completed final sign-off Aug 2010 | 5000 Geary Bl | Metropolitan Electrical Construction | wireless modification: build out (e) entitlements, installation of 1 equipment cabinet inside (e) equipment area on ground level, 3 panel antennas, 1 gps antenna on roof, build out (e) entitlementsDetails
wireless modification: build out (e) entitlements, installation of 1 equipment cabinet inside (e) equipment area on ground level, 3 panel antennas, 1 gps antenna on roof, build out (e) entitlements | $45,000 |
| Dec 13, 2005 | Completed final sign-off Sep 2006 | 5000 Geary Bl | Alta Communication Construction | accessory use. wireless communications facility. 2 micro antennas & 2 equipemnt cabinets.Details
accessory use. wireless communications facility. 2 micro antennas & 2 equipemnt cabinets. | $25,000 |
| Mar 8, 2004 | Never finaled issued Mar 2004, no final | 5000 Geary Bl | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Poza Construction (2), Abc Roofing Inc, Alta Communication Construction, Cornerstone Dba Ag Construction, Electric Tech Construction Inc, Kerley Construction Inc, Metropolitan Electrical Construction, New High Protection Roofing, Overland Contracting Inc, The Cbr Group, Transceive Communications Inc.
- Architects
- Carlton Smith (2), Michael Wilk, Perry Haviland, Richard Sambucetti, Robert Echm, Tom Holland
- Engineers
- Denis Hugh Morgan, Larry Houghtby, Nasib Pandey
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.