Nasib Pandey
- Listed as
- engineer
- Firm
- P&D Engineering Solutions
- Based in
- Walnut Creek
- On San Francisco permits
- Jun 2022 to Jan 2026
15 permits since 2000 (engineer on 15 permits): 8 completed, 2 in progress, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2026 | In progress filed Jan 2026, not yet issued | 949 Hampshire St | revision 202512010666-lateral reinforcement design changesDetails
revision 202512010666-lateral reinforcement design changes | ||
| Dec 1, 2025 | In progress issued Dec 2025 | 949 Hampshire St | Be Home Remodeling Inc | 2nd floor remodeling. adding of interior staircase between 1st and 2nd floor.Details
2nd floor remodeling. adding of interior staircase between 1st and 2nd floor. | $25,000 |
| Nov 20, 2025 | Completed final sign-off Jun 2026 | 1612 Anza St | revision 202507251643-additon of a non-bearing wall in the bathroom for a tub surround and niche and removal of 2 walls in kitchenDetails
revision 202507251643-additon of a non-bearing wall in the bathroom for a tub surround and niche and removal of 2 walls in kitchen | ||
| Sep 29, 2025 | Expired or cancelled withdrawn Oct 2025 | 336 Guerrero St | wall removal in units 336 and unit 338.Details
wall removal in units 336 and unit 338. | $15,000 | |
| Jul 8, 2025 | Completed final sign-off Dec 2025 | 1789 Oak St | Perez Construction | 1) remove non-working fire place at 3rd floor and attic roof while leaving the 2nd floor and garage level intact. 2)remove kitchen fire place wall at 3rd floor only and install 4x12 beam. 3)install a new footing for 4x6 post at garage level as needed. exterior remove fire place flueDetails
1) remove non-working fire place at 3rd floor and attic roof while leaving the 2nd floor and garage level intact. 2)remove kitchen fire place wall at 3rd floor only and install 4x12 beam. 3)install a new footing for 4x6 post at garage level as needed. exterior remove fire place flue | $9,000 |
| Sep 15, 2023 | Completed final sign-off May 2024 | 1485 Bay Shore Bl | Cbr Construction Services Llc Dba Cbr El | 3-antennas, 3-antenna mounts, 2-antenna standoff/equipment, 6409 wireless colorationDetails
3-antennas, 3-antenna mounts, 2-antenna standoff/equipment, 6409 wireless coloration | $38,000 |
| Jun 5, 2023 | Completed final sign-off Sep 2024 | 5000 Geary Bl | The Cbr Group | removal of (e) sprint equipment due to merger w/ t-mobile: removing spriny antennas, radio cabinets, & associcated equipmentsDetails
removal of (e) sprint equipment due to merger w/ t-mobile: removing spriny antennas, radio cabinets, & associcated equipments | $8,300 |
| May 30, 2023 | Never finaled issued Jun 2023, no final | 300 02nd Av | The Cbr Group | removal of existing t-mobile telecom equipment due to merger w/sprint/t-mobile. scope includes removal of all t-mobile equipment (antenna, radio, cabinets, etc.) t-mobile id # sf131.Details
removal of existing t-mobile telecom equipment due to merger w/sprint/t-mobile. scope includes removal of all t-mobile equipment (antenna, radio, cabinets, etc.) t-mobile id # sf131. | $8,300 |
| May 30, 2023 | Completed final sign-off Feb 2024 | 1881 Post St | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of all telecom equipment. sprint project: fs04xc007.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of all telecom equipment. sprint project: fs04xc007. | $8,300 |
| May 30, 2023 | Completed final sign-off Jan 2024 | 4131 Geary Bl | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf36xc067.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf36xc067. | $8,300 |
| May 30, 2023 | Never finaled issued Jun 2023, no final | 380 Clementina St | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas and radio cabinets. sprint project: sf52xc490.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas and radio cabinets. sprint project: sf52xc490. | $8,300 |
| May 30, 2023 | Completed final sign-off Feb 2024 | 1881 Post St | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf82xc055.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf82xc055. | $8,300 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 510 26th Av | Advanced Wireless & Logistics Inc | revision to pa# 202208301538, fiber design added w/ revised platform and frame, 2022 bid codes, updaed structurals.Details
revision to pa# 202208301538, fiber design added w/ revised platform and frame, 2022 bid codes, updaed structurals. | $38,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 510 Frederick St | Advanced Wireless & Logistics Inc | revision to pa# 202208301540, revision to as-built structural correction needed.Details
revision to pa# 202208301540, revision to as-built structural correction needed. | $38,000 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 1111 Junipero Serra Bl | Uos Construction Inc. | install 3 antennas (1/sect), 6 rru's (2/sect) & equip cabinets on roof.1 sect at 1 location on roof, antennas concealed w/in frp screening.power lines & fiber lines will be placed in new hybrid cable on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match.Details
install 3 antennas (1/sect), 6 rru's (2/sect) & equip cabinets on roof.1 sect at 1 location on roof, antennas concealed w/in frp screening.power lines & fiber lines will be placed in new hybrid cable on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match. | $68,000 |