Block 7080, lot 024
1111 Junipero Serra Blvd
- City’s use
- Commercial Misc
- Built
- 1953
- Stories
- 2
- Rooms
- 2 bathrooms
- Lot
- 36,146 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2024 | Completed final sign-off Mar 2025 | 1111 Junipero Serra Bl | Mastec Network Solutions Inc | t-mobile remove (3) (e) antennas all rrvs (e) cabinet. istall 6(n) antennas 6(n) rrvbs , 2(n) cabinets, 12 (n) batteries, (n) 125a and 15a breaker.Details
t-mobile remove (3) (e) antennas all rrvs (e) cabinet. istall 6(n) antennas 6(n) rrvbs , 2(n) cabinets, 12 (n) batteries, (n) 125a and 15a breaker. | $65,000 |
| Aug 29, 2023 | Completed final sign-off Mar 2024 | 1111 Junipero Serra Bl | General Dynamics Inf Tech Inc | revision to pa# 202206025416, install 1 article 202 optional standby deisel generator with ul-142 base fuel tank anchored to (e) concrete foudnation.install cmv compound expansion area and 200a ats/camlock near (e) at&t equipment area. intergrate new generator w/(e) service.Details
revision to pa# 202206025416, install 1 article 202 optional standby deisel generator with ul-142 base fuel tank anchored to (e) concrete foudnation.install cmv compound expansion area and 200a ats/camlock near (e) at&t equipment area. intergrate new generator w/(e) service. | $35,000 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 1111 Junipero Serra Bl | Uos Construction Inc. | install 3 antennas (1/sect), 6 rru's (2/sect) & equip cabinets on roof.1 sect at 1 location on roof, antennas concealed w/in frp screening.power lines & fiber lines will be placed in new hybrid cable on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match.Details
install 3 antennas (1/sect), 6 rru's (2/sect) & equip cabinets on roof.1 sect at 1 location on roof, antennas concealed w/in frp screening.power lines & fiber lines will be placed in new hybrid cable on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match. | $68,000 |
| Jun 2, 2022 | Completed final sign-off Mar 2024 | 1111 Junipero Serra Bl | General Dynamics Inf Tech Inc | at&t: install 1 standby diesel generator w/ case fuel tank on concrete pad & 200a ats/ camlock. interate (n) generator. install pull string in each conduit. 1 (n) 2" & 1" electrical conduit with conductors. 2 (n) 1" electrical confuits with conductors to ac panel. 1 (n) 1" alarm conduit & cabling.Details
at&t: install 1 standby diesel generator w/ case fuel tank on concrete pad & 200a ats/ camlock. interate (n) generator. install pull string in each conduit. 1 (n) 2" & 1" electrical conduit with conductors. 2 (n) 1" electrical confuits with conductors to ac panel. 1 (n) 1" alarm conduit & cabling. | $25,000 |
| Dec 20, 2021 | Completed final sign-off Jun 2023 | 1111 Junipero Serra Bl | Ravig Inc Dba Salient Global Technologi | at&t:remove (3)(e)antennas, intall(6)(n) antennas,remove(6)(e) rrus;install(3)(n)rrus;remove & replace(1)(e)battery cabinet;install(8)(n)batteries;no new electrical work.Details
at&t:remove (3)(e)antennas, intall(6)(n) antennas,remove(6)(e) rrus;install(3)(n)rrus;remove & replace(1)(e)battery cabinet;install(8)(n)batteries;no new electrical work. | $52,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2023 | 1111 Junipero Serra Bl | Xclusive Wireless Resources Llc. | removal of sprint equipment, radios, antennas and cabinets.Details
removal of sprint equipment, radios, antennas and cabinets. | $12,000 |
| Oct 28, 2021 | Never finaled filed Oct 2021, never issued | 1111 Junipero Serra Bl | modification of an (e) t mobile telecommunication facility consisting of the following: install 1 new 25kwh diesel generator, 1 new automatic transfer switch mounted on (e) cmu wall, insall 1 new 6 fire extenguisher on mounted (e) cmu wall and 1 new generator e-stop mounted on (e) cmu wall.Details
modification of an (e) t mobile telecommunication facility consisting of the following: install 1 new 25kwh diesel generator, 1 new automatic transfer switch mounted on (e) cmu wall, insall 1 new 6 fire extenguisher on mounted (e) cmu wall and 1 new generator e-stop mounted on (e) cmu wall. | $40,000 | |
| Dec 31, 2019 | Completed final sign-off Jul 2020 | 1111 Junipero Serra Bl | L.D. Strobel Co Ltd | to obtain final inspection for work approved under pa #201506290191, 201701066666. all work is complete.Details
to obtain final inspection for work approved under pa #201506290191, 201701066666. all work is complete. | |
| Dec 18, 2018 | Completed final sign-off Dec 2019 | 1111 Junipero Serra Bl | Electric Tech Construction Inc | att modification: r+r 6 (e) antennas w/ 6 (n) antennas; remove 3 (e) antennas; install 6 (n) rrus; remove 3 (e) rrus; remove 3 (e) strings of batteries, install other small equipDetails
att modification: r+r 6 (e) antennas w/ 6 (n) antennas; remove 3 (e) antennas; install 6 (n) rrus; remove 3 (e) rrus; remove 3 (e) strings of batteries, install other small equip | $27,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 1111 Junipero Serra Bl | Electric Tech Construction Inc | at&t modification install 3 new antennas, 6 new rrys, frp screens, purce;; cabinets, other sm equip; relocate e antenna, 2 e rrus-11, remove 3(e) frp screen, 2(e) dus-41 maher naDetails
at&t modification install 3 new antennas, 6 new rrys, frp screens, purce;; cabinets, other sm equip; relocate e antenna, 2 e rrus-11, remove 3(e) frp screen, 2(e) dus-41 maher na | $45,000 |
| Jan 6, 2017 | Expired or cancelled expired May 2019 | 1111 Junipero Serra Bl | L.D. Strobel Co Ltd, Nu Rev Communications Inc. | revision to pa 2015-0629-0191, modification to (e) t-mobile wts consisting of adding 3 new frp screen boxesDetails
revision to pa 2015-0629-0191, modification to (e) t-mobile wts consisting of adding 3 new frp screen boxes | $25,000 |
| Jun 20, 2016 | Completed final sign-off Jun 2016 | 1111 Junipero Serra Bl | Stc Netcom Inc. | to obtain final inspection for work approved under pa#201208248242. all work is complete.Details
to obtain final inspection for work approved under pa#201208248242. all work is complete. | |
| Aug 4, 2015 | Completed final sign-off Apr 2016 | 1111 Junipero Serra Bl | Triton Tower Inc | modification to an (e) at&t mobility wts facility included: r&r 3 (e) antennas w/3 (n) antennas on chruch steeple. r&r 3 (e) rrus & mofing (n) rrus to steeple, r&r 1 (e) equip cabinet w/1 (n) equipment cabinet, install 2 (n) surge suppressors & 1(n) hoffman box. n/a maher ordinance.Details
modification to an (e) at&t mobility wts facility included: r&r 3 (e) antennas w/3 (n) antennas on chruch steeple. r&r 3 (e) rrus & mofing (n) rrus to steeple, r&r 1 (e) equip cabinet w/1 (n) equipment cabinet, install 2 (n) surge suppressors & 1(n) hoffman box. n/a maher ordinance. | $30,000 |
| Jul 14, 2015 | Never finaled issued Jul 2015, no final | 1111 Junipero Serra Bl | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 29, 2015 | Expired or cancelled expired Jun 2019 | 1111 Junipero Serra Bl | Nu Rev Communications Inc. | t-mobile wireless proses to modify an (e) wireless communication site. remove (3)(e) antennas, install (3)(n) antennas in place, install (3)(n) rrus in the (e) equipment area. n/a for maher ordinance. shroud cabling at base of steeple & remove entire metropcs facility (merger).Details
t-mobile wireless proses to modify an (e) wireless communication site. remove (3)(e) antennas, install (3)(n) antennas in place, install (3)(n) rrus in the (e) equipment area. n/a for maher ordinance. shroud cabling at base of steeple & remove entire metropcs facility (merger). | $20,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2015 | 1111 Junipero Serra Bl | ground floor: administrative permit to document a daycare center as an e3 occupancy. maher n/a.Details
ground floor: administrative permit to document a daycare center as an e3 occupancy. maher n/a. | ||
| May 22, 2014 | Completed final sign-off May 2016 | 1111 Junipero Serra Bl | Electric Tech Construction Inc | sprint proposes to modify its (e) site by replacing 3 antennas with (3) triband antennas (1) per sector, (3) new rrh, (1) per sector, new coax jumper lines, reuse hybrid cables or install new as needed, new string of battering in (e) cabinet, new 2.5 equipment in (e) mmbs cabinet.Details
sprint proposes to modify its (e) site by replacing 3 antennas with (3) triband antennas (1) per sector, (3) new rrh, (1) per sector, new coax jumper lines, reuse hybrid cables or install new as needed, new string of battering in (e) cabinet, new 2.5 equipment in (e) mmbs cabinet. | $20,000 |
| Nov 20, 2013 | Completed final sign-off Jan 2015 | 1111 Junipero Serra Bl | Electric Tech Construction Inc | modification to an (e) at&t facility including renoving & replacing 3 (e) antennas, installing 3 new rrvs, 3 new surge suppressors inside lower part of steeple. n/a for maher ordinance.Details
modification to an (e) at&t facility including renoving & replacing 3 (e) antennas, installing 3 new rrvs, 3 new surge suppressors inside lower part of steeple. n/a for maher ordinance. | $15,000 |
| Mar 29, 2013 | Completed final sign-off Jun 2015 | 1111 Junipero Serra Bl | Overland Contracting Inc | sprint proposes to notify an unmanned telecommunications facility. (3) (e) panel antenna to be hot swapped. 3 (n) panel antennas to be mounted on (e) steeple. (3) (e) equipment cabinets to be removed. (2) (n) equipment cabinets to be installed @ (e) outdoor equipment area. new shrouds over antennas.Details
sprint proposes to notify an unmanned telecommunications facility. (3) (e) panel antenna to be hot swapped. 3 (n) panel antennas to be mounted on (e) steeple. (3) (e) equipment cabinets to be removed. (2) (n) equipment cabinets to be installed @ (e) outdoor equipment area. new shrouds over antennas. | $45,000 |
| Nov 26, 2012 | Completed final sign-off Jan 2013 | 1111 Junipero Serra Bl | Statewide Roofing Inc. | re-roofingDetails
re-roofing | $13,900 |
| Aug 24, 2012 | Expired or cancelled expired Nov 2014 | 1111 Junipero Serra Bl | Stc Netcom Inc. | remove one (e) 2106 rbs cabinet, install one (n) rba72 cabinet, install two (n) purcell cabinets, install three (n) rrvs, install three (n) dtmas and install three (n) dual duplexers. all work within equipment enclosure at grade.Details
remove one (e) 2106 rbs cabinet, install one (n) rba72 cabinet, install two (n) purcell cabinets, install three (n) rrvs, install three (n) dtmas and install three (n) dual duplexers. all work within equipment enclosure at grade. | $20,000 |
| Feb 18, 2011 | Completed final sign-off Jul 2011 | 1111 Junipero Serra Bl | Empire Engineering & Construction Inc | replace cabinets in kind in 3 classrooms, 2 offices, and storage area in ground floor childcare buildingDetails
replace cabinets in kind in 3 classrooms, 2 offices, and storage area in ground floor childcare building | $8,000 |
| Feb 10, 2011 | Completed final sign-off Nov 2011 | 1111 Junipero Serra Bl | Capital Tower & Communications | remove one (n) t mobile equipment cabinet and replace with one (n) t-mobile equipment cabinet.Details
remove one (n) t mobile equipment cabinet and replace with one (n) t-mobile equipment cabinet. | $3,500 |
| Mar 19, 2010 | Completed final sign-off May 2011 | 1111 Junipero Serra Bl | Pinnacle Wireless Usa Inc. | a modification to an (e)unmanuel telecommunications facility consists remove/replace (3)(e) antennas w/(3)(n) antennas w/new ret's (remote elect tilt).ret powered by iow voltage signal thru (e)coax cable.add a(n) 3106 rbs cabinet,(3)(n)dtma's &(6)(n) runs of coax.remove/replace (e)(e)frp enclosuresDetails
a modification to an (e)unmanuel telecommunications facility consists remove/replace (3)(e) antennas w/(3)(n) antennas w/new ret's (remote elect tilt).ret powered by iow voltage signal thru (e)coax cable.add a(n) 3106 rbs cabinet,(3)(n)dtma's &(6)(n) runs of coax.remove/replace (e)(e)frp enclosures | $25,000 |
| Jun 15, 2009 | Expired or cancelled expired May 2019 | 1111 Junipero Serra Bl | Momentum Services Corp | renew pa# 2006/05/01/0361 to obtain final inspection. all work has been completed.Details
renew pa# 2006/05/01/0361 to obtain final inspection. all work has been completed. | |
| Jan 30, 2009 | Completed final sign-off Feb 2009 | 1111 Junipero Serra Bl | Metropolitan Electrical Construction | to obtain final inspection for work approved under appl#200511309235. all work has been completed.Details
to obtain final inspection for work approved under appl#200511309235. all work has been completed. | |
| Dec 18, 2008 | Completed final sign-off Oct 2009 | 1111 Junipero Serra Bl | L.D. Strobel Co Ltd | modification of extg telecommunications facility :installation of six remote control units to extg antennas and replace coaxial cableDetails
modification of extg telecommunications facility :installation of six remote control units to extg antennas and replace coaxial cable | $5,000 |
| Jan 29, 2008 | Expired or cancelled expired Feb 2009 | 1111 Junipero Serra Bl | Metropolitan Electrical Construction | renew pa#200511309235 for final inspection.Details
renew pa#200511309235 for final inspection. | |
| Nov 13, 2006 | Completed final sign-off Nov 2007 | 1111 Junipero Serra Bl | Net-Com Services Inc | install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound.Details
install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound. | $80,000 |
| May 1, 2006 | Never finaled issued Nov 2006, no final | 1111 Junipero Serra Bl | Momentum Services Corp | install 2 facade mounted microcell antennas with the associated equipment cabinet located on the ground w/ 5'11" high redwood fence.Details
install 2 facade mounted microcell antennas with the associated equipment cabinet located on the ground w/ 5'11" high redwood fence. | $75,000 |
| Nov 30, 2005 | Never finaled issued Mar 2006, no final | 1111 Junipero Serra Bl | Metropolitan Electrical Construction | installation of n cingular wireless communications network including antennas on e steeple and equipment at grade. new installationDetails
installation of n cingular wireless communications network including antennas on e steeple and equipment at grade. new installation | $70,000 |
| Nov 24, 2004 | Completed final sign-off Dec 2004 | 1111 Junipero Serra Bl | A Supreme Roofing | steeple exterior cosmetic repair only for n.o.v. #200455296Details
steeple exterior cosmetic repair only for n.o.v. #200455296 | $5,000 |
| Aug 1, 2002 | Completed final sign-off Aug 2002 | 1111 Junipero Serra Bl | Dura-Spray-Foam Inc | reroofingDetails
reroofing | $19,977 |
| Jun 5, 2002 | Expired or cancelled cancelled Jun 2003 | 1111 Junipero Serra Bl | new at & t panel antennas mounted on (e) church steeple and equipment shelter @ grade levelDetails
new at & t panel antennas mounted on (e) church steeple and equipment shelter @ grade level | $78,000 |