Net-Com Services Inc
- Based in
- Pleasanton
- On San Francisco permits
- May 2004 to Sep 2008
- Last 24 months
- 0 permits filed
18 permits since 2000: 15 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2008 | Completed final sign-off Oct 2008 | 1881 Post St | revision to pa# 2008/03/07/6659. air duct relocation as per fire marshals request.Details
revision to pa# 2008/03/07/6659. air duct relocation as per fire marshals request. | $6,000 |
| Aug 31, 2007 | Expired or cancelled cancelled Aug 2016 | 201 Filbert St | install six (6) panel antennas mounted on roof top. install four (4) correcsponding bts equip. cabinets mounted at exist. roof. antenna coaxial transmission lines to be run from bts cabinets to antennas.Details
install six (6) panel antennas mounted on roof top. install four (4) correcsponding bts equip. cabinets mounted at exist. roof. antenna coaxial transmission lines to be run from bts cabinets to antennas. | $100,000 |
| Mar 8, 2007 | Completed final sign-off Apr 2007 | 1580 Valencia St | rev. for antenna sleeper mounts, rev. to pa#2005/08/08/9719Details
rev. for antenna sleeper mounts, rev. to pa#2005/08/08/9719 | |
| Feb 14, 2007 | Completed final sign-off Apr 2007 | 1580 Valencia St | revision 200508089719 for antenna sleeper mountsDetails
revision 200508089719 for antenna sleeper mounts | |
| Nov 21, 2006 | Expired or cancelled expired May 2010 | 555 De Haro St | revision to pa# 2005/12/16/0524. revision to pages: a-2, a-3, a-5, a-6, a-7, s-2, s-3, s-4. redesign of trellis structure. equipment @ slab bolt call out corrected. modified wall blocking framing @ roof pent house/ant. includes additional calcs.Details
revision to pa# 2005/12/16/0524. revision to pages: a-2, a-3, a-5, a-6, a-7, s-2, s-3, s-4. redesign of trellis structure. equipment @ slab bolt call out corrected. modified wall blocking framing @ roof pent house/ant. includes additional calcs. | $2,500 |
| Nov 13, 2006 | Completed final sign-off Nov 2007 | 1111 Junipero Serra Bl | install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound.Details
install 3 antennas within a steeple behind faux panels(painted to match). 4 bts equipment cabinets will be located in outdoor area in fenced compound. | $80,000 |
| Nov 7, 2006 | Completed final sign-off Feb 2007 | 555 De Haro St | revision to appl#200512160524 page s1 raised slab 6" higher than original slab height.Details
revision to appl#200512160524 page s1 raised slab 6" higher than original slab height. | |
| Jun 30, 2006 | Completed final sign-off Mar 2007 | 1501 Sutter St | installation of new microcell panel antenna enclosed within new concealment box installation of associated equipment cabinets cabling and cable traysDetails
installation of new microcell panel antenna enclosed within new concealment box installation of associated equipment cabinets cabling and cable trays | $25,000 |
| Mar 30, 2006 | Completed final sign-off Nov 2006 | 3888 Noriega St | install new micro antenna and associated equipment for t-mobile network. all on existing building's roof.Details
install new micro antenna and associated equipment for t-mobile network. all on existing building's roof. | $25,000 |
| Mar 29, 2006 | Completed final sign-off Mar 2007 | 2201 Powell St | installation of micro antenna within faux vent at roof and installation of cabinets. power and telephone service to be provided from existing sources.Details
installation of micro antenna within faux vent at roof and installation of cabinets. power and telephone service to be provided from existing sources. | $25,000 |
| Feb 13, 2006 | Completed final sign-off Dec 2006 | 2097 Turk Bl | wireless telecommunication facility, consists of 1 panel antennas and 2 cabinets. no batteries.Details
wireless telecommunication facility, consists of 1 panel antennas and 2 cabinets. no batteries. | $25,000 |
| Dec 19, 2005 | Completed final sign-off Feb 2007 | 2045 Divisadero St | installation of 1 new microcell panel antenna- enclosed within new false chimney on middle of roof - install accompanying equipment cabinets, wiring and cable trya. install new access ladder at rear of building.Details
installation of 1 new microcell panel antenna- enclosed within new false chimney on middle of roof - install accompanying equipment cabinets, wiring and cable trya. install new access ladder at rear of building. | $25,000 |
| Dec 16, 2005 | Completed final sign-off Feb 2007 | 555 De Haro St | install 3 panel antennas enclosed within new 4 chimney painted to match (e)sprint chimneys.install equipment cabinets & new concrete pad adjacent to (e)sprint enclosure.install new wood equipment enclosure indentical to (e) enclosure.install new wiring & cable tray connecting equip to antennas.Details
install 3 panel antennas enclosed within new 4 chimney painted to match (e)sprint chimneys.install equipment cabinets & new concrete pad adjacent to (e)sprint enclosure.install new wood equipment enclosure indentical to (e) enclosure.install new wiring & cable tray connecting equip to antennas. | $75,000 |
| Dec 13, 2005 | Completed final sign-off Dec 2006 | 1094 Revere Av | wireless telecommunications facility. 6 antennas & 4 equipemnt cabinets on roof.Details
wireless telecommunications facility. 6 antennas & 4 equipemnt cabinets on roof. | $70,000 |
| Sep 30, 2005 | Completed final sign-off Nov 2006 | 1399 43rd Av | installation of (n) micro cellular antenae on southside, top of (e) chimney, which will be concealed by a (n) transparent box.repaint entire chinney and (n) screening box to match whit bldg. installation of (2) microcell equipment cabinets on north facing wall behind chinney. (1) power ppc cabinietDetails
installation of (n) micro cellular antenae on southside, top of (e) chimney, which will be concealed by a (n) transparent box.repaint entire chinney and (n) screening box to match whit bldg. installation of (2) microcell equipment cabinets on north facing wall behind chinney. (1) power ppc cabiniet | $25,000 |
| Aug 8, 2005 | Completed final sign-off Apr 2007 | 1580 Valencia St | construct unmanned wireleess telecommunications facility for nextal communications.Details
construct unmanned wireleess telecommunications facility for nextal communications. | $60,000 |
| Jun 3, 2005 | Never finaled issued Mar 2006, no final | 1881 Post St | t.i. in basement-antennas on facade.Details
t.i. in basement-antennas on facade. | $100,000 |
| May 10, 2004 | Completed final sign-off Jul 2004 | 2001 Union St | telecom equipment & antenna installed on roof. revision to#200311240970Details
telecom equipment & antenna installed on roof. revision to#200311240970 |