Back to pergola or trellis contractors
Net-Com Services Inc
- Based in
- Pleasanton
- On San Francisco permits
- May 2004 to Sep 2008
- Last 24 months
- 0 permits filed
18 permits since 2000: 15 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
1 pergola or trellis permit: 1 expired or cancelled. Typically 23 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2006 | Expired or cancelled expired May 2010 | 555 De Haro St | revision to pa# 2005/12/16/0524. revision to pages: a-2, a-3, a-5, a-6, a-7, s-2, s-3, s-4. redesign of trellis structure. equipment @ slab bolt call out corrected. modified wall blocking framing @ roof pent house/ant. includes additional calcs.Details
revision to pa# 2005/12/16/0524. revision to pages: a-2, a-3, a-5, a-6, a-7, s-2, s-3, s-4. redesign of trellis structure. equipment @ slab bolt call out corrected. modified wall blocking framing @ roof pent house/ant. includes additional calcs. | $2,500 |