1881 Post St
- City’s use
- Commercial Misc
- Built
- 1967
- Stories
- 1
- Units
- 1
- Building
- 63,000 sq ft
- Lot
- 27,102 sq ft
- Zoning
- NC3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
54 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 1881 Post St | a modification of an (e) verizon wireless: removing 8 (e) antennas, 4 (e) radio 4449 units @ antennas, 4 (e) readio 8843 units @ antennas, all (e) cdma equipments cabinets & all other (e) cdma related equipment from eq. room. installing: 8 (n) antennas on (e) ant. mounting pipes and 4 (n) radio 449Details
a modification of an (e) verizon wireless: removing 8 (e) antennas, 4 (e) radio 4449 units @ antennas, 4 (e) readio 8843 units @ antennas, all (e) cdma equipments cabinets & all other (e) cdma related equipment from eq. room. installing: 8 (n) antennas on (e) ant. mounting pipes and 4 (n) radio 449 | $80,000 | |
| Sep 10, 2025 | In progress issued Sep 2026 | 1881 Post St | High Band Construction Inc | at&t modification of an existing wireless facility consisting of removal six rru's; add 3 rru & 3 air antennas; lower 3 air 6449 antennas; install rf signage, stripping & barricades; r/r one power plant; r/r 20 batteries; r/r rectifiers; install 11 -58v converters; install one 15 amp dcDetails
at&t modification of an existing wireless facility consisting of removal six rru's; add 3 rru & 3 air antennas; lower 3 air 6449 antennas; install rf signage, stripping & barricades; r/r one power plant; r/r 20 batteries; r/r rectifiers; install 11 -58v converters; install one 15 amp dc | $80,200 |
| Mar 18, 2025 | In progress filed Mar 2025, not yet issued | 1881 Post St | install 4 new antenna and (1) antena mounted at an existing verizon wireless facility. elevate 3 (e) antenna.Details
install 4 new antenna and (1) antena mounted at an existing verizon wireless facility. elevate 3 (e) antenna. | $35,000 | |
| Oct 12, 2023 | In progress issued Feb 2024 | 1881 Post St | Ares Holdings Llc | replace 1 like for like rtuDetails
replace 1 like for like rtu | $35,000 |
| May 30, 2023 | Completed final sign-off Feb 2024 | 1881 Post St | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf82xc055.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: sf82xc055. | $8,300 |
| May 30, 2023 | Completed final sign-off Feb 2024 | 1881 Post St | The Cbr Group | removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of all telecom equipment. sprint project: fs04xc007.Details
removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of all telecom equipment. sprint project: fs04xc007. | $8,300 |
| Apr 6, 2022 | Completed final sign-off Sep 2023 | 1881 Post St | Ericsson Inc Dba E U S Inc | verizon: replace 8/add 6 ant, add 8 rrus/3 ovps remove 6 diplexers, add 3 combiners, remove 4 coax runs, install 3 hybrud cables, relocate 2 & add 5 ant mounts, add 1 cable tray/3 unistrut fames and add roof pavers, at equip remove 12 rrus, 6 diplexers, 6 triplexers and 3 ovpsDetails
verizon: replace 8/add 6 ant, add 8 rrus/3 ovps remove 6 diplexers, add 3 combiners, remove 4 coax runs, install 3 hybrud cables, relocate 2 & add 5 ant mounts, add 1 cable tray/3 unistrut fames and add roof pavers, at equip remove 12 rrus, 6 diplexers, 6 triplexers and 3 ovps | $75,000 |
| Mar 24, 2022 | Completed final sign-off Apr 2024 | 1881 Post St | Invertice Inc | at&t: modification of unmanned telecom facility consisting: remove & replace 6 antennas. (n) rf safety signs on roof. remove (e) 2v battery system. install 1 (n) 6648 baseband unit in (e) rack. 1 (n) converter & 1 (n) rectifier in (e) power plant. install 20 (n) batteries in 1 (n) battery rack.Details
at&t: modification of unmanned telecom facility consisting: remove & replace 6 antennas. (n) rf safety signs on roof. remove (e) 2v battery system. install 1 (n) 6648 baseband unit in (e) rack. 1 (n) converter & 1 (n) rectifier in (e) power plant. install 20 (n) batteries in 1 (n) battery rack. | $65,000 |
| Apr 15, 2021 | Completed final sign-off May 2022 | 1881 Post St | V & T Carbonic Inc | revision to pa# 201907246761. sheet # pe1. paragraph 2 "not to tie into fire alarm system". this is correct. incorrect: permit scope of work: new co2 monitoring system to tie into building alarm.Details
revision to pa# 201907246761. sheet # pe1. paragraph 2 "not to tie into fire alarm system". this is correct. incorrect: permit scope of work: new co2 monitoring system to tie into building alarm. | $20,000 |
| May 14, 2020 | Completed final sign-off Jul 2021 | 1881 Post St | Ericsson Inc Dba E U S Inc | at&t modification: swap (6) (e) antennas, paint to match; remove (9) (e) rrus; install (12) (n) rrus; relocate sector c; remove (2) (e) cabinets; no change to (e) batteries. (this is a secondary location on same site and not related to pa201805239902)Details
at&t modification: swap (6) (e) antennas, paint to match; remove (9) (e) rrus; install (12) (n) rrus; relocate sector c; remove (2) (e) cabinets; no change to (e) batteries. (this is a secondary location on same site and not related to pa201805239902) | $53,000 |
| Dec 17, 2019 | Expired or cancelled withdrawn Oct 2021 | 1881 Post St | modification to unmanned telecommunications facility. remove and replace 6 (e) antennas w/ 6 (n) antennas. remove and replace 9 rru's. relocate 1 mw antenna and remove unused cable trayDetails
modification to unmanned telecommunications facility. remove and replace 6 (e) antennas w/ 6 (n) antennas. remove and replace 9 rru's. relocate 1 mw antenna and remove unused cable tray | $15,000 | |
| Oct 4, 2019 | Expired or cancelled cancelled Jan 2026 | 1881 Post St | Dryco Construction Inc - Dba - Dryco | accessible business entrance program per ordinance 51-16. concrete demo and powerback, bollard install, handrail install. abe #281811282636Details
accessible business entrance program per ordinance 51-16. concrete demo and powerback, bollard install, handrail install. abe #281811282636 | $25,000 |
| Jul 24, 2019 | Never finaled issued Nov 2019, no final | 1881 Post St | V & T Carbonic Inc | provide upgrades to the (e) food service co2 distribution system. to include confirming existing distribution system is in compliance with life safety codes recitfying any items tat are not in compliance. adding new co2 monitoring systems and tying co2 alarm systems into building.Details
provide upgrades to the (e) food service co2 distribution system. to include confirming existing distribution system is in compliance with life safety codes recitfying any items tat are not in compliance. adding new co2 monitoring systems and tying co2 alarm systems into building. | $20,000 |
| Mar 20, 2019 | Completed final sign-off Jun 2019 | 1881 Post St | Alamon Inc | sprint cell site: remove 1 existing radio with ddu and install 1 new radio with ddu.Details
sprint cell site: remove 1 existing radio with ddu and install 1 new radio with ddu. | $8,500 |
| Nov 6, 2018 | Expired or cancelled withdrawn Mar 2022 | 1881 Post St | at*t - swap 6 antennas install 1 new gps antenna. swap (e) rrus-12 for rrus 32 total of 3 install new rrus total of 3Details
at*t - swap 6 antennas install 1 new gps antenna. swap (e) rrus-12 for rrus 32 total of 3 install new rrus total of 3 | $10,000 | |
| Oct 5, 2018 | Expired or cancelled withdrawn Dec 2019 | 1881 Post St | modification to an existing unmaned telecommunications facitlity. remove and replace (3) (e) tri band antennas within (e) radomes. install (3) 2.5 rrh, (1) per sector. install (1) string of (4) batteries in (e) bb4 cabinet. install 2.5 equipment in (e) eebs cabinet. install (3) fiber junction andDetails
modification to an existing unmaned telecommunications facitlity. remove and replace (3) (e) tri band antennas within (e) radomes. install (3) 2.5 rrh, (1) per sector. install (1) string of (4) batteries in (e) bb4 cabinet. install 2.5 equipment in (e) eebs cabinet. install (3) fiber junction and | $15,000 | |
| May 23, 2018 | Expired or cancelled withdrawn Oct 2021 | 1881 Post St | swap (6) antennas for (6) like kind antennas, swap (3) radio units with (3) new radio units,add (3) new remote radio units, add (n) chassis equipment inside equipment areaDetails
swap (6) antennas for (6) like kind antennas, swap (3) radio units with (3) new radio units,add (3) new remote radio units, add (n) chassis equipment inside equipment area | $12,000 | |
| Aug 9, 2017 | Completed final sign-off Aug 2019 | 1881 Post St | Mark Scott Construction Inc | electrical works associated with the replacement & supplimenting parking & conduit system equipment for the garage. park equipments are not part of this permit application.Details
electrical works associated with the replacement & supplimenting parking & conduit system equipment for the garage. park equipments are not part of this permit application. | $115,450 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 1881 Post St | Coast Sign Incorporated | install (1) illuminated wall sign "amc"Details
install (1) illuminated wall sign "amc" | $7,000 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 1881 Post St | Coast Sign Incorporated | install (1) illuminated wall sign "amc"Details
install (1) illuminated wall sign "amc" | $5,000 |
| Jun 15, 2017 | Never finaled issued Jun 2017, no final | 1881 Post St | Alpha Bay Builders, Inc. | cap fire sprinkler heads, currently not required. hvac on sep permit. relocate 3, cap 3 only. ref mech pa201503261942.Details
cap fire sprinkler heads, currently not required. hvac on sep permit. relocate 3, cap 3 only. ref mech pa201503261942. | $1,200 |
| Jun 29, 2015 | Expired or cancelled withdrawn Sep 2021 | 1881 Post St | install 3 rrus12 inside (e) equipment room (basement level). verizon wireless macro wts facility. relocate both gps antennas.Details
install 3 rrus12 inside (e) equipment room (basement level). verizon wireless macro wts facility. relocate both gps antennas. | $15,000 | |
| Jun 11, 2015 | Never finaled filed Jun 2015, never issued | 1881 Post St | remove (6) existing antennas, install (12) new antennas with (12) cable shrouds, add (15) rrus, (2)new surce protectors, (4) new dual diplexers, (1) new cable traus, and (6) new antenna mounts. verizon wireless macro wts facility.Details
remove (6) existing antennas, install (12) new antennas with (12) cable shrouds, add (15) rrus, (2)new surce protectors, (4) new dual diplexers, (1) new cable traus, and (6) new antenna mounts. verizon wireless macro wts facility. | $40,000 | |
| Mar 26, 2015 | Completed final sign-off Oct 2017 | 1881 Post St | Alpha Bay Builders, Inc. | improvements to the hvac system & upgrade the carbon monoxide detection system. there will also be electrifdal work to power the (n) fans & controls.Details
improvements to the hvac system & upgrade the carbon monoxide detection system. there will also be electrifdal work to power the (n) fans & controls. | $300,000 |
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 1881 Post St | street spaceDetails
street space | ||
| Sep 19, 2013 | Completed final sign-off Apr 2014 | 1881 Post St | Cal-West Lighting & Signal Maint. Inc. | install 5 wi-fi antennas at locations shown on plans. install related wi-fi equipment within existing at&t equipment room in basement.Details
install 5 wi-fi antennas at locations shown on plans. install related wi-fi equipment within existing at&t equipment room in basement. | $20,000 |
| Jun 21, 2013 | Expired or cancelled cancelled Oct 2017 | 1881 Post St | Quality Telecom Consultants | existing verizon wireless panel antennas to be removed. 3 antennas to be installed. 6 new vw rrus 12 and 6 new vw 7000 rrus. 4 new vw raycap surge protectors. 2 new vw hybrid cables. new homerun ret cables 6 new vw 1-5/8" cozx cable. existing coax cables to remain.Details
existing verizon wireless panel antennas to be removed. 3 antennas to be installed. 6 new vw rrus 12 and 6 new vw 7000 rrus. 4 new vw raycap surge protectors. 2 new vw hybrid cables. new homerun ret cables 6 new vw 1-5/8" cozx cable. existing coax cables to remain. | $40,000 |
| Apr 26, 2012 | Never finaled issued Jun 2012, no final | 1881 Post St | Overland Contracting Inc | sprint wireless modification: swap (6) (e) panel antennas w/ (3) (n) panel antennas within (e) radome on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets in (e) lease area in basement.Details
sprint wireless modification: swap (6) (e) panel antennas w/ (3) (n) panel antennas within (e) radome on roof; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets in (e) lease area in basement. | $45,000 |
| Aug 8, 2011 | Completed final sign-off Feb 2012 | 1881 Post St | reroofingDetails
reroofing | $170,389 | |
| Mar 3, 2011 | Completed final sign-off Mar 2011 | 1881 Post St | Tyco Integrated Security | to obtain final inspection for work approved under app#200609152512. all work is complete.Details
to obtain final inspection for work approved under app#200609152512. all work is complete. | |
| Mar 3, 2011 | Completed final sign-off Mar 2011 | 1881 Post St | Tyco Integrated Security | revised fire alarm plans to reflect the job sit on pa #201004281245 -sundance cinemas phase ii as builts.Details
revised fire alarm plans to reflect the job sit on pa #201004281245 -sundance cinemas phase ii as builts. | |
| Apr 28, 2010 | Completed final sign-off Mar 2011 | 1881 Post St | Tyco Integrated Security | sundance cinemas.phase ii: add additional devices to upgrade the theater thru out the floors, connect new devices to existing panel, nfpa 72 central system monitoringDetails
sundance cinemas.phase ii: add additional devices to upgrade the theater thru out the floors, connect new devices to existing panel, nfpa 72 central system monitoring | $10,000 |
| Oct 27, 2009 | Completed final sign-off May 2011 | 1881 Post St | Metropolitan Electrical Construction | sprint. minor mod. installation of (1) equipment rack in parking lot in (e) nextel shelter; (1) gps antenna; (3) rf panel antennas on rooftop on existing mounts as prev appd bp#9720158, case # 97.577c.Details
sprint. minor mod. installation of (1) equipment rack in parking lot in (e) nextel shelter; (1) gps antenna; (3) rf panel antennas on rooftop on existing mounts as prev appd bp#9720158, case # 97.577c. | $45,000 |
| Sep 17, 2009 | Completed final sign-off Jan 2010 | 1881 Post St | N S A Wireless Inc, General Dynamics Inf Tech Inc | remove & replace 6 existing antennas. install 3 diplexers on parapet wall.Details
remove & replace 6 existing antennas. install 3 diplexers on parapet wall. | $6,750 |
| Apr 10, 2009 | Completed final sign-off Mar 2011 | 1881 Post St | Tyco Integrated Security | to obtain final inspection for work approved. under pa#200809171901. all work has been completed.Details
to obtain final inspection for work approved. under pa#200809171901. all work has been completed. | |
| Oct 29, 2008 | Completed final sign-off Mar 2009 | 1881 Post St | Howard S Wright Construction Co. | renew pa# 2007/05/01/0085 to obtain final inspection. all work complete.Details
renew pa# 2007/05/01/0085 to obtain final inspection. all work complete. | |
| Oct 29, 2008 | Completed final sign-off Dec 2008 | 1881 Post St | Howard S Wright Construction Co. | renew pa# 2006/10/26/6182 to obtain final inspection. all work complete.Details
renew pa# 2006/10/26/6182 to obtain final inspection. all work complete. | |
| Oct 29, 2008 | Completed final sign-off Dec 2008 | 1881 Post St | Howard S Wright Construction Co. | renew pa# 2007/02/16/4394 to obtain final inspection. all work complete.Details
renew pa# 2007/02/16/4394 to obtain final inspection. all work complete. | |
| Sep 25, 2008 | Completed final sign-off Oct 2008 | 1881 Post St | Net-Com Services Inc | revision to pa# 2008/03/07/6659. air duct relocation as per fire marshals request.Details
revision to pa# 2008/03/07/6659. air duct relocation as per fire marshals request. | $6,000 |
| Sep 17, 2008 | Expired or cancelled expired Jun 2010 | 1881 Post St | Tyco Integrated Security | final insp for 200609152512 to finalize work.Details
final insp for 200609152512 to finalize work. | |
| Mar 28, 2008 | Completed final sign-off Nov 2008 | 1881 Post St | Arrow Sign Company | install new signs for sundance cinimas facing filmore streetDetails
install new signs for sundance cinimas facing filmore street | |
| Mar 28, 2008 | Completed final sign-off Nov 2008 | 1881 Post St | Arrow Sign Company | erect sign - electric, wall, single faced. install new signs for sundance cinimas facing geary blvdDetails
erect sign - electric, wall, single faced. install new signs for sundance cinimas facing geary blvd | |
| Mar 28, 2008 | Completed final sign-off Nov 2008 | 1881 Post St | Arrow Sign Company | install new signs for sundance cinimas facing post streetDetails
install new signs for sundance cinimas facing post street | |
| Mar 7, 2008 | Completed final sign-off Sep 2008 | 1881 Post St | renew pa#200506034154 to continue work.Details
renew pa#200506034154 to continue work. | $100,000 | |
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 1881 Post St | street space permit & sidewalk permitDetails
street space permit & sidewalk permit | ||
| Jun 20, 2007 | Completed final sign-off Dec 2008 | 1881 Post St | remodel (e) public concession area for bar/restaurant. refinishing lobbies & public corridor. per "cu" application #2006.1516c to upgrade an (e) 3rd floor food concession to bar/restaurant to serve the cinema's patrons. (mep & fire sprinkler under seperate permit.)Details
remodel (e) public concession area for bar/restaurant. refinishing lobbies & public corridor. per "cu" application #2006.1516c to upgrade an (e) 3rd floor food concession to bar/restaurant to serve the cinema's patrons. (mep & fire sprinkler under seperate permit.) | $200,000 | |
| May 1, 2007 | Never finaled issued May 2007, no final | 1881 Post St | corridor upgrades for prev. approv #2006/10/30/6354.replace(e) carpet&base;paint walls,doors&ceilings.add acoustical wall tiles were indicated&install(n)accessible ramp w/railing.install(n)ramp is barrier removal as per sec.1134b.21 exception #3.6.demo stairs on 1/fl&abadon chair lift in place.Details
corridor upgrades for prev. approv #2006/10/30/6354.replace(e) carpet&base;paint walls,doors&ceilings.add acoustical wall tiles were indicated&install(n)accessible ramp w/railing.install(n)ramp is barrier removal as per sec.1134b.21 exception #3.6.demo stairs on 1/fl&abadon chair lift in place. | $35,000 | |
| Mar 22, 2007 | Expired or cancelled expired Mar 2011 | 1881 Post St | tenant improvements to existing snack bar area at cinema comples-second floor. submittals: electrical & plumbing. reference tenant improvement permit 200610306354 r-2.Details
tenant improvements to existing snack bar area at cinema comples-second floor. submittals: electrical & plumbing. reference tenant improvement permit 200610306354 r-2. | $30,000 | |
| Feb 16, 2007 | Never finaled issued Feb 2007, no final | 1881 Post St | Howard S Wright Construction Co. | 200610306354 r2. revise 4 auditorium entries from 48" to 44" wide. refrence drawing a201 and a202. area is a sloped floor with max 1:20 slope, area not a ramp. 44"min wide @1:20 max slope aisle. 48" min wide @ 1:12 max slope aisle.Details
200610306354 r2. revise 4 auditorium entries from 48" to 44" wide. refrence drawing a201 and a202. area is a sloped floor with max 1:20 slope, area not a ramp. 44"min wide @1:20 max slope aisle. 48" min wide @ 1:12 max slope aisle. | |
| Oct 30, 2006 | Completed final sign-off May 2009 | 1881 Post St | tenant improvement of (e) cinema complex includings 1) revise sloped floors in some auditioriums. 2)replace seats with a reduction of seating/occupant load. 3) improvements to accessible path of travel. 4) structural strengthen at (e) 3rd floor plus russ. 5) mep under seperate permit.Details
tenant improvement of (e) cinema complex includings 1) revise sloped floors in some auditioriums. 2)replace seats with a reduction of seating/occupant load. 3) improvements to accessible path of travel. 4) structural strengthen at (e) 3rd floor plus russ. 5) mep under seperate permit. | $2,500,000 | |
| Oct 26, 2006 | Expired or cancelled expired Mar 2011 | 1881 Post St | non-structural soft demolition at 1st, 2nd & 3rd floors.Details
non-structural soft demolition at 1st, 2nd & 3rd floors. | $30,000 | |
| Apr 27, 2006 | Never finaled issued Apr 2006, no final | 1881 Post St | street spaceDetails
street space | ||
| Jun 3, 2005 | Never finaled issued Mar 2006, no final | 1881 Post St | Net-Com Services Inc | t.i. in basement-antennas on facade.Details
t.i. in basement-antennas on facade. | $100,000 |
| Jun 22, 2004 | Completed final sign-off Sep 2004 | 1881 Post St | Metropolitan Electrical Construction | renew appl#9624821, 9714330, 9920684 for final inspectionDetails
renew appl#9624821, 9714330, 9920684 for final inspection | $97,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tyco Integrated Security (5), Howard S Wright Construction Co. (4), Arrow Sign Company (3), Alpha Bay Builders, Inc. (2), Coast Sign Incorporated (2), Ericsson Inc Dba E U S Inc (2), Metropolitan Electrical Construction (2), Net-Com Services Inc (2), The Cbr Group (2), V & T Carbonic Inc (2), Alamon Inc, Ares Holdings Llc, Cal-West Lighting & Signal Maint. Inc., Dryco Construction Inc - Dba - Dryco, General Dynamics Inf Tech Inc, High Band Construction Inc, Invertice Inc, Mark Scott Construction Inc, N S A Wireless Inc, Overland Contracting Inc, Quality Telecom Consultants
- Architects
- Dorek Rusin (3), Nestor Popowych (3), Mark Sorenson, Michael Wilk, Thomas Holland
- Engineers
- Casey J Steiner (2), Nasib Pandey (2), Alizabeth Cherian, Andrew Haldane, David C Koski, Eric William Karstetter, Glen Hunt, Henry Bellagamba, James R. Spore, Kin Lau, Matt A. Murrell, Steven Terry, Tahzay Ramirez, Zahra Gerami