Dorek Rusin
- Listed as
- architect
- Firm
- Els
- On San Francisco permits
- Oct 2006 to Aug 2014
4 permits since 2000 (architect on 4 permits): 2 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2014 | Completed final sign-off Mar 2015 | 3251 20th Av | W G Fritz Construction Inc. | exterior structural improvements for future storefront of future blaze pizza. provide structural support for the entry glass wall at and exterior metal stud wallsDetails
exterior structural improvements for future storefront of future blaze pizza. provide structural support for the entry glass wall at and exterior metal stud walls | $90,000 |
| Feb 16, 2007 | Never finaled issued Feb 2007, no final | 1881 Post St | Howard S Wright Construction Co. | 200610306354 r2. revise 4 auditorium entries from 48" to 44" wide. refrence drawing a201 and a202. area is a sloped floor with max 1:20 slope, area not a ramp. 44"min wide @1:20 max slope aisle. 48" min wide @ 1:12 max slope aisle.Details
200610306354 r2. revise 4 auditorium entries from 48" to 44" wide. refrence drawing a201 and a202. area is a sloped floor with max 1:20 slope, area not a ramp. 44"min wide @1:20 max slope aisle. 48" min wide @ 1:12 max slope aisle. | |
| Oct 30, 2006 | Completed final sign-off May 2009 | 1881 Post St | tenant improvement of (e) cinema complex includings 1) revise sloped floors in some auditioriums. 2)replace seats with a reduction of seating/occupant load. 3) improvements to accessible path of travel. 4) structural strengthen at (e) 3rd floor plus russ. 5) mep under seperate permit.Details
tenant improvement of (e) cinema complex includings 1) revise sloped floors in some auditioriums. 2)replace seats with a reduction of seating/occupant load. 3) improvements to accessible path of travel. 4) structural strengthen at (e) 3rd floor plus russ. 5) mep under seperate permit. | $2,500,000 | |
| Oct 26, 2006 | Expired or cancelled expired Mar 2011 | 1881 Post St | non-structural soft demolition at 1st, 2nd & 3rd floors.Details
non-structural soft demolition at 1st, 2nd & 3rd floors. | $30,000 |