General Dynamics Inf Tech Inc
- Based in
- Needham
- On San Francisco permits
- Jun 2009 to Dec 2025
- Last 24 months
- 1 permit filed
13 permits since 2000: 8 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 30 Rickard St | to obtain final inspection for work approved under pa# 202006178855. all work is complete.Details
to obtain final inspection for work approved under pa# 202006178855. all work is complete. | |
| Aug 29, 2023 | Completed final sign-off Mar 2024 | 1111 Junipero Serra Bl | revision to pa# 202206025416, install 1 article 202 optional standby deisel generator with ul-142 base fuel tank anchored to (e) concrete foudnation.install cmv compound expansion area and 200a ats/camlock near (e) at&t equipment area. intergrate new generator w/(e) service.Details
revision to pa# 202206025416, install 1 article 202 optional standby deisel generator with ul-142 base fuel tank anchored to (e) concrete foudnation.install cmv compound expansion area and 200a ats/camlock near (e) at&t equipment area. intergrate new generator w/(e) service. | $35,000 |
| Jul 22, 2022 | Completed final sign-off Apr 2024 | 1100 Divisadero St | concrete pad and 30kw generacDetails
concrete pad and 30kw generac | $100,000 |
| Jun 2, 2022 | Completed final sign-off Mar 2024 | 1111 Junipero Serra Bl | at&t: install 1 standby diesel generator w/ case fuel tank on concrete pad & 200a ats/ camlock. interate (n) generator. install pull string in each conduit. 1 (n) 2" & 1" electrical conduit with conductors. 2 (n) 1" electrical confuits with conductors to ac panel. 1 (n) 1" alarm conduit & cabling.Details
at&t: install 1 standby diesel generator w/ case fuel tank on concrete pad & 200a ats/ camlock. interate (n) generator. install pull string in each conduit. 1 (n) 2" & 1" electrical conduit with conductors. 2 (n) 1" electrical confuits with conductors to ac panel. 1 (n) 1" alarm conduit & cabling. | $25,000 |
| May 3, 2022 | Expired or cancelled cancelled Nov 2023 | 450 Harrison St | install 1 standby tenant load diesel generator w/ (200 gal total) base fuel tank (e) concrete pad & 200 a ats/camlock near (e) at&t equipment area. integrate (n) generator with (e) service. install pull string w/ conduit 1 (n) 2" & 1 (n) 1" conduit/conductors install from (n) gen to (n) ats. 2 (n)..Details
install 1 standby tenant load diesel generator w/ (200 gal total) base fuel tank (e) concrete pad & 200 a ats/camlock near (e) at&t equipment area. integrate (n) generator with (e) service. install pull string w/ conduit 1 (n) 2" & 1 (n) 1" conduit/conductors install from (n) gen to (n) ats. 2 (n).. | $25,000 |
| Feb 19, 2021 | Never finaled filed Feb 2021, never issued | 711 Potrero Av | addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade within existing compound of permitted and compliant wireless facilityDetails
addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade within existing compound of permitted and compliant wireless facility | $25,000 |
| Feb 2, 2021 | Expired or cancelled cancelled Jul 2024 | 1254 Armistead Rd | addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade within (e) compound of permitted and compliant wireless facilityDetails
addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade within (e) compound of permitted and compliant wireless facility | $25,000 |
| Jul 2, 2020 | Completed final sign-off Mar 2022 | 270 Mcallister St | addition of a 30kw diesel emergency backup generator on a 4x5 slab on grade.Details
addition of a 30kw diesel emergency backup generator on a 4x5 slab on grade. | $25,000 |
| Jun 30, 2020 | Expired or cancelled withdrawn Nov 2021 | 251 Barneveld Av | addition of a 20kw diesel emergency backup generator on a 4x5 slab on grade.Details
addition of a 20kw diesel emergency backup generator on a 4x5 slab on grade. | $25,000 |
| Jun 17, 2020 | Expired or cancelled expired Jul 2026 | 30 Rickard St | addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade.Details
addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade. | $25,000 |
| May 12, 2020 | Completed final sign-off Jul 2021 | 2300 26th St | addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade within existing compound of permitted and compliant wireless facility.Details
addition of a 30kw diesel emergency backup generator on a 4x10 slab on grade within existing compound of permitted and compliant wireless facility. | $25,000 |
| Sep 17, 2009 | Completed final sign-off Jan 2010 | 1881 Post St | remove & replace 6 existing antennas. install 3 diplexers on parapet wall.Details
remove & replace 6 existing antennas. install 3 diplexers on parapet wall. | $6,750 |
| Jun 17, 2009 | Completed final sign-off Mar 2010 | 1740 Broadway | swap out 6 like for like antennas.Details
swap out 6 like for like antennas. | $4,500 |