Block 0291, lot 007
8 Montgomery St
- City’s use
- Commercial Retail
- Built
- 1967
- Stories
- 3
- Rooms
- 2 bathrooms
- Building
- 20,130 sq ft
- Lot
- 7,562 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2023 | Expired or cancelled cancelled Nov 2024 | 8 Montgomery St | Bcci Construction Company | revision to pa#202208170754. new glass vestibule walls. updated structural.Details
revision to pa#202208170754. new glass vestibule walls. updated structural. | $195,000 |
| Feb 10, 2023 | Completed final sign-off Nov 2024 | 8 Montgomery St | Uos Construction Inc. | de-construction of legacy sprint equipment: panel amtennas, tmas, hardware, rru, telecom cabinets, h frames, coax cabling and sleepersDetails
de-construction of legacy sprint equipment: panel amtennas, tmas, hardware, rru, telecom cabinets, h frames, coax cabling and sleepers | $4,999 |
| Aug 17, 2022 | Expired or cancelled cancelled Nov 2024 | 8 Montgomery St | Bcci Construction Company | 1st/ fl: renavation of the vestibule w/ additional electrical security updates. new visible glass partitions. structural drawings and calcs included.Details
1st/ fl: renavation of the vestibule w/ additional electrical security updates. new visible glass partitions. structural drawings and calcs included. | $195,000 |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 8 Montgomery St | Quality Telecom Consultants | modification of unmanned telecommunications facility, sprint. temporarily relocate listed equip't r&r (e) 2 antennas @ sectors a&b, 4 total; r&r (e) 3 rrus @ sectors a&b, 6 total; r&r (e)(1) gps antenna; install (4)ballast mounts; r&r (e) hybrid run; phase 2 - relocate all listed equip't back to (e)Details
modification of unmanned telecommunications facility, sprint. temporarily relocate listed equip't r&r (e) 2 antennas @ sectors a&b, 4 total; r&r (e) 3 rrus @ sectors a&b, 6 total; r&r (e)(1) gps antenna; install (4)ballast mounts; r&r (e) hybrid run; phase 2 - relocate all listed equip't back to (e) | $15,000 |
| Mar 10, 2016 | Completed final sign-off Apr 2016 | 8 Montgomery St | South Bay Construction | 1st flr: revision to issued permit 201510260768, added 2 sheets for exiting, removed notes from e-000(electrical)Details
1st flr: revision to issued permit 201510260768, added 2 sheets for exiting, removed notes from e-000(electrical) | |
| Oct 26, 2015 | Completed final sign-off Apr 2016 | 8 Montgomery St | South Bay Construction | 1st fl: installation of steel support beams and glass security door. interior non structural demolition and t.i. build out within tenant space only. fire alarm deferred submittal.Details
1st fl: installation of steel support beams and glass security door. interior non structural demolition and t.i. build out within tenant space only. fire alarm deferred submittal. | $120,000 |
| Aug 14, 2012 | Completed final sign-off Aug 2015 | 8 Montgomery St | Overland Contracting Inc | wireless modification: replace (2) panel antennas w/ (4) (n) panel antennas mounted to (e) bldg; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets, run coaxial lines from equipment & antennas. power will stay the same (no change)Details
wireless modification: replace (2) panel antennas w/ (4) (n) panel antennas mounted to (e) bldg; replace (3) (e) equipment cabinets w/ (2) (n) equipment cabinets, run coaxial lines from equipment & antennas. power will stay the same (no change) | $45,000 |
| Mar 16, 2010 | Never finaled issued Mar 2010, no final | 8 Montgomery St | street space permitDetails
street space permit | ||
| Oct 4, 2007 | Completed final sign-off Feb 2009 | 8 Montgomery St | Bcci Construction Company | revision to pa# 2007/05/24/2213 to change details of glass panel attachment. changes are to exterior panels on the ground floor.Details
revision to pa# 2007/05/24/2213 to change details of glass panel attachment. changes are to exterior panels on the ground floor. | $10,000 |
| Sep 25, 2007 | Completed final sign-off May 2009 | 8 Montgomery St | Anderson, Rowe & Buckley, Inc. | 1st fl. - work in satelite bldg (4 stories tall). tenant improvement to the (e) fire sprinkler system (phase 2) - 57 removed, 60 added. work in phase 1 under appl. #200707116485.Details
1st fl. - work in satelite bldg (4 stories tall). tenant improvement to the (e) fire sprinkler system (phase 2) - 57 removed, 60 added. work in phase 1 under appl. #200707116485. | $9,200 |
| Aug 27, 2007 | Completed final sign-off Dec 2007 | 8 Montgomery St | Golden Gate Sign Company Inc. | erect: electric, wall, single faced, direct new signwith street spaceDetails
erect: electric, wall, single faced, direct new signwith street space | |
| Aug 16, 2007 | Never finaled issued Aug 2007, no final | 8 Montgomery St | street spaceDetails
street space | ||
| Jul 31, 2007 | Completed final sign-off Feb 2009 | 8 Montgomery St | Diversified Fire Products | fire alarm ti for 1st floor, fidelity investments 8 montgomery 1 sd,1cr, 20 spt/stb,1 stbDetails
fire alarm ti for 1st floor, fidelity investments 8 montgomery 1 sd,1cr, 20 spt/stb,1 stb | $36,117 |
| Jul 11, 2007 | Completed final sign-off Jul 2007 | 8 Montgomery St | Anderson, Rowe & Buckley, Inc. | t. i. existing fire sprinkler system. reduce scop of work to 8 relocated heads and 1 removed head. this is a revision to pa # 2007/07/06/6137.Details
t. i. existing fire sprinkler system. reduce scop of work to 8 relocated heads and 1 removed head. this is a revision to pa # 2007/07/06/6137. | |
| Jul 10, 2007 | Completed final sign-off Feb 2009 | 8 Montgomery St | Bcci Construction Company | pre-construction demolition. floor to remain un-occupied in accordance with sfab-017.Details
pre-construction demolition. floor to remain un-occupied in accordance with sfab-017. | $10,000 |
| Jul 6, 2007 | Completed final sign-off May 2009 | 8 Montgomery St | Anderson, Rowe & Buckley, Inc. | 1st floor - t.i. existing fire sprinkler system. 36 relocates, 13 new, 4 remove.Details
1st floor - t.i. existing fire sprinkler system. 36 relocates, 13 new, 4 remove. | $7,200 |
| Jul 6, 2007 | Completed final sign-off Jul 2007 | 8 Montgomery St | Diversified Fire Products | firealarm t.i. ist floor. 3 spkr/strobes, 1 pull stationDetails
firealarm t.i. ist floor. 3 spkr/strobes, 1 pull station | $5,980 |
| Jun 27, 2007 | Completed final sign-off Jul 2007 | 8 Montgomery St | Bcci Construction Company | ground floor temporary lobby space electrical & mechnical work oti-2 (original oti pa 200706133802)Details
ground floor temporary lobby space electrical & mechnical work oti-2 (original oti pa 200706133802) | $12,000 |
| Jun 13, 2007 | Completed final sign-off Jul 2007 | 8 Montgomery St | Bcci Construction Company | oti-1 1st floor, el, ls, sp, meDetails
oti-1 1st floor, el, ls, sp, me | $30,000 |
| May 24, 2007 | Completed final sign-off Feb 2009 | 8 Montgomery St | Bcci Construction Company | 1st floor - tenant improvement. demolition, new partitions, doors upgrade restrooms. mechanical work & lighting & fire sprinkler for ground floor. exterior work to entry door area. no violations noted by applicant.Details
1st floor - tenant improvement. demolition, new partitions, doors upgrade restrooms. mechanical work & lighting & fire sprinkler for ground floor. exterior work to entry door area. no violations noted by applicant. | $1,200,000 |
| Oct 18, 2004 | Completed final sign-off Dec 2004 | 2 Montgomery St | Golden Gate Sign Company Inc. | to erect single faced electric signDetails
to erect single faced electric sign | $6,800 |
| Jan 22, 2002 | Completed final sign-off Mar 2002 | 8 Montgomery St | Swinerton Builders | replace existing doors @ front of buidingDetails
replace existing doors @ front of buiding | $7,500 |
| Mar 10, 2000 | Completed final sign-off Jan 2002 | 8 Montgomery St | one-stop, consists of the installation of radio equip,antennas for sprint wireless telecommunicationDetails
one-stop, consists of the installation of radio equip,antennas for sprint wireless telecommunication | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (7), Anderson, Rowe & Buckley, Inc. (3), Diversified Fire Products (2), Golden Gate Sign Company Inc. (2), South Bay Construction (2), Overland Contracting Inc, Quality Telecom Consultants, Swinerton Builders, Uos Construction Inc.
- Architects
- Chris Brown, Richard Sambucetti, Robert Smith, Thomas Holland
- Engineers
- Kamran Haghighi, Michael Kleim
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.