Permit GraphShortlistSan Francisco building permits since 2000

Block 3721, lot 022

191 02nd St

City’s use
Commercial Retail
Built
1906
Stories
4
Units
2
Rooms
7 bathrooms
Lot
6,024 sq ft
Zoning
C3OSD
Construction type
C

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

10 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 19, 2022Completed
final sign-off Nov 2022
191 02nd StMastec Network Solutions Incinstall (6) on new mount, remove (2)frp radomes, (6) antenna, (9) rrus, (2) cabinets. install new wood sleepers, (6) new antenna, (6) new cables, new cabinets/battery cabintes, (3) radomes, (3) new tripod mounts, (3) new hybrid cables.
Details
Permit
202201196207
Status
complete
Filed
Jan 19, 2022
Permit issued
Aug 26, 2022
Final sign-off
Nov 28, 2022
Declared cost
$30,000
Address
191 02nd St

install (6) on new mount, remove (2)frp radomes, (6) antenna, (9) rrus, (2) cabinets. install new wood sleepers, (6) new antenna, (6) new cables, new cabinets/battery cabintes, (3) radomes, (3) new tripod mounts, (3) new hybrid cables.

Open the permit page

$30,000
Sep 28, 2021Never finaled
issued Jan 2022, no final
594 Howard StGolden Gate Sign Company Inc.install double faced electric projecting wall sign (igel) 36" x 48"
Details
Permit
202109289277
Status
issued
Filed
Sep 28, 2021
Permit issued
Jan 11, 2022
Declared cost
$5,000
Address
594 Howard St

install double faced electric projecting wall sign (igel) 36" x 48"

Open the permit page

$5,000
Jan 9, 2018Never finaled
issued Mar 2018, no final
594 Howard StAll Signs & Installationsreplace sign copy (double-faced projecting electric wall sign)
Details
Permit
201801098212
Status
issued
Filed
Jan 9, 2018
Permit issued
Mar 13, 2018
Declared cost
$5,000
Address
594 Howard St

replace sign copy (double-faced projecting electric wall sign)

Open the permit page

$5,000
Nov 7, 2014Completed
final sign-off Apr 2016
191 02nd StRon Thorn Construction Incsprint reloc(3)nv800/1900 antennas,add(3)2.5antenas,add(3)2.5rrh,add(n) 2.5 equip.inside(e)mmbs cabinet.add(n)2.5 batteries insied(e)bbu cabinet, add(n)coax jumper lines fr rrhs to(n)antenas,re-use(e)hybrid cables or install(n)as needed.remove(e)radome,add 6(n)radomes.add 5(n)tripop mounts to match.
Details
Permit
201411071038
Status
complete
Filed
Nov 7, 2014
Permit issued
Feb 10, 2016
Final sign-off
Apr 6, 2016
Declared cost
$20,000
Address
191 02nd St

sprint reloc(3)nv800/1900 antennas,add(3)2.5antenas,add(3)2.5rrh,add(n) 2.5 equip.inside(e)mmbs cabinet.add(n)2.5 batteries insied(e)bbu cabinet, add(n)coax jumper lines fr rrhs to(n)antenas,re-use(e)hybrid cables or install(n)as needed.remove(e)radome,add 6(n)radomes.add 5(n)tripop mounts to match.

Open the permit page

$20,000
Aug 31, 2012Completed
final sign-off Feb 2015
191 02nd StOverland Contracting Incremove 3 existing antennas & install 3 new. 6 rrus on roof top. remove 4 existing equipment cabinets in the basement install 2 cabinets in same lease space.
Details
Permit
201208318746
Status
complete
Filed
Aug 31, 2012
Permit issued
Mar 22, 2013
Final sign-off
Feb 26, 2015
Declared cost
$45,000
Address
191 02nd St

remove 3 existing antennas & install 3 new. 6 rrus on roof top. remove 4 existing equipment cabinets in the basement install 2 cabinets in same lease space.

Open the permit page

$45,000
Mar 22, 2011Completed
final sign-off Apr 2011
191 02nd StMelo Willard Tabudlo Dba Dreamt Designtitle-24 calculations & lighting schedule. deference pa #201102170471 for t.i.
Details
Permit
201103222628
Status
complete
Filed
Mar 22, 2011
Permit issued
Apr 1, 2011
Final sign-off
Apr 12, 2011
Declared cost
$33,846
Address
191 02nd St

title-24 calculations & lighting schedule. deference pa #201102170471 for t.i.

Open the permit page

$33,846
Feb 17, 2011Completed
final sign-off Apr 2011
191 02nd StMelo Willard Tabudlo Dba Dreamt Designdemo of e paritions, new partitions. assoc. mech. system, assoc. fir life safety system, main entry door upgrade, ada upgrade 2 unisex single toilet rooms. mep and fire alarm system under separate permit.
Details
Permit
201102170471
Status
complete
Filed
Feb 17, 2011
Permit issued
Feb 18, 2011
Final sign-off
Apr 5, 2011
Declared cost
$224,376
Address
191 02nd St

demo of e paritions, new partitions. assoc. mech. system, assoc. fir life safety system, main entry door upgrade, ada upgrade 2 unisex single toilet rooms. mep and fire alarm system under separate permit.

Open the permit page

$224,376
Oct 5, 2010Expired or cancelled
cancelled May 2018
191 02nd StMetropolitan Electrical Constructionuts facility: installation of: 1 bts equipment cabinet on rooftop, 3 internet servies exchange switch antennas, 3 panel atnennas, and 1 gps antenna.
Details
Permit
201010052336
Status
cancelled
Filed
Oct 5, 2010
Declared cost
$45,000
Address
191 02nd St

uts facility: installation of: 1 bts equipment cabinet on rooftop, 3 internet servies exchange switch antennas, 3 panel atnennas, and 1 gps antenna.

Open the permit page

$45,000
Apr 10, 2008Never finaled
issued Apr 2008, no final
594 Howard Ststreet space & 1 additional address permit.
Details
Permit
M115928
Status
issued
Filed
Apr 10, 2008
Permit issued
Apr 10, 2008
Address
594 Howard St

street space & 1 additional address permit.

Open the permit page

Dec 21, 2001Expired or cancelled
withdrawn Jul 2002
191 02nd Sttelecom facility including 1'x20' equipment shelter room & 2,18" microcell antenna
Details
Permit
200112215779
Status
withdrawn
Filed
Dec 21, 2001
Declared cost
$65,000
Address
191 02nd St

telecom facility including 1'x20' equipment shelter room & 2,18" microcell antenna

Open the permit page

$65,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Melo Willard Tabudlo Dba Dreamt Design (2), All Signs & Installations, Golden Gate Sign Company Inc., Mastec Network Solutions Inc, Metropolitan Electrical Construction, Overland Contracting Inc, Ron Thorn Construction Inc
Architects
Michael Wilk, Richard Sambucetti, Tom Holland

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.