Mar 2018 to Jul 2025

11 permits since 2000 (engineer on 11 permits): 9 completed, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Swinerton Builders (6), Metropolitan Electrical Construction (3)
Architects
Michael Cefaratti
Engineers
John Kabak, Steven Schaub, Steven Schaub

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 9, 2025Completed
final sign-off Jan 2026
5 Embarcadero CenterMetropolitan Electrical Constructioninstallation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment.
Details
Permit
202507090424
Permit issued
Jul 31, 2025
Final sign-off
Jan 15, 2026

installation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment.

Open the permit page

$25,000
Aug 26, 2024Completed
final sign-off Jun 2025
1500 19th AvSwinerton Buildersinstall one non-illuminated sign, non electric single faced sign; h-frame ev charging sign "shell recharge electric vechicle charging".
Details
Permit
202408269465
Permit issued
Oct 24, 2024
Final sign-off
Jun 20, 2025

install one non-illuminated sign, non electric single faced sign; h-frame ev charging sign "shell recharge electric vechicle charging".

Open the permit page

$10,000
Aug 26, 2024Completed
final sign-off Jun 2025
1500 19th AvSwinerton Buildersinstall one ground electric sign, double faced sign next to exit; "shell recharging" monument sign
Details
Permit
202408269467
Permit issued
Oct 24, 2024
Final sign-off
Jun 23, 2025

install one ground electric sign, double faced sign next to exit; "shell recharging" monument sign

Open the permit page

$10,000
Aug 26, 2024Completed
final sign-off Jun 2025
1500 19th AvSwinerton Buildersinstall one non-illuminated sign, non electric single faced sign on pollard; "30 min max".
Details
Permit
202408269454
Permit issued
Oct 24, 2024
Final sign-off
Jun 20, 2025

install one non-illuminated sign, non electric single faced sign on pollard; "30 min max".

Open the permit page

$3,333
Aug 26, 2024Completed
final sign-off Jun 2025
1500 19th AvSwinerton Buildersinstall one non-illuminated sign, non electric single faced sign by drive way exit; "do not enter".
Details
Permit
202408269466
Permit issued
Oct 24, 2024
Final sign-off
Jun 4, 2025

install one non-illuminated sign, non electric single faced sign by drive way exit; "do not enter".

Open the permit page

$3,333
Aug 26, 2024Completed
final sign-off Jun 2025
1500 19th AvSwinerton Buildersinstall one non-illuminated sign, non electric single faced sign on pole; "30 min max".
Details
Permit
202408269464
Permit issued
Oct 24, 2024
Final sign-off
Jun 4, 2025

install one non-illuminated sign, non electric single faced sign on pole; "30 min max".

Open the permit page

$3,333
Jul 15, 2024Completed
final sign-off Feb 2025
5 Embarcadero CenterMetropolitan Electrical Constructionremove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etc
Details
Permit
202407156433
Permit issued
Nov 14, 2024
Final sign-off
Feb 27, 2025

remove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etc

Open the permit page

$25,000
May 14, 2024Completed
final sign-off Jun 2025
1500 19th AvSwinerton Builderschnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453
Details
Permit
202403278722
Permit issued
Jul 23, 2024
Final sign-off
Jun 26, 2025

chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453

Open the permit page

$2,750,000
Dec 14, 2021Expired or cancelled
cancelled Jan 2026
155 De Haro Stbarrier removal work; designating accessible parking -install 12 volta evcs on ground floor parking lot.
Details
Permit
202112144430

barrier removal work; designating accessible parking -install 12 volta evcs on ground floor parking lot.

Open the permit page

$300,000
Dec 11, 2018Completed
final sign-off Jul 2019
1465 25th StMetropolitan Electrical Constructionsprint to r&r 3 antennas, add 3 new rrus and remove (e) 36" faux vent and replace with new 40" faux vent
Details
Permit
201812118000
Permit issued
Apr 3, 2019
Final sign-off
Jul 16, 2019

sprint to r&r 3 antennas, add 3 new rrus and remove (e) 36" faux vent and replace with new 40" faux vent

Open the permit page

$20,000
Mar 23, 2018Expired or cancelled
withdrawn Mar 2023
3252 Pierce Stsprint - replace (e) antenna with new antenna add 3 rrus, relocate wirless pole to new location on parking structure maher na
Details
Permit
201803234501

sprint - replace (e) antenna with new antenna add 3 rrus, relocate wirless pole to new location on parking structure maher na

Open the permit page

$45,000