John Kabak
- Listed as
- engineer
- Firm
- Gpd Group Inc
- Based in
- Akron
- On San Francisco permits
- Mar 2018 to Jul 2025
11 permits since 2000 (engineer on 11 permits): 9 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 5 Embarcadero Center | Metropolitan Electrical Construction | installation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment.Details
installation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment. | $25,000 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | install one non-illuminated sign, non electric single faced sign; h-frame ev charging sign "shell recharge electric vechicle charging".Details
install one non-illuminated sign, non electric single faced sign; h-frame ev charging sign "shell recharge electric vechicle charging". | $10,000 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | install one ground electric sign, double faced sign next to exit; "shell recharging" monument signDetails
install one ground electric sign, double faced sign next to exit; "shell recharging" monument sign | $10,000 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | install one non-illuminated sign, non electric single faced sign on pollard; "30 min max".Details
install one non-illuminated sign, non electric single faced sign on pollard; "30 min max". | $3,333 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | install one non-illuminated sign, non electric single faced sign by drive way exit; "do not enter".Details
install one non-illuminated sign, non electric single faced sign by drive way exit; "do not enter". | $3,333 |
| Aug 26, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | install one non-illuminated sign, non electric single faced sign on pole; "30 min max".Details
install one non-illuminated sign, non electric single faced sign on pole; "30 min max". | $3,333 |
| Jul 15, 2024 | Completed final sign-off Feb 2025 | 5 Embarcadero Center | Metropolitan Electrical Construction | remove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etcDetails
remove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etc | $25,000 |
| May 14, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453Details
chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453 | $2,750,000 |
| Dec 14, 2021 | Expired or cancelled cancelled Jan 2026 | 155 De Haro St | barrier removal work; designating accessible parking -install 12 volta evcs on ground floor parking lot.Details
barrier removal work; designating accessible parking -install 12 volta evcs on ground floor parking lot. | $300,000 | |
| Dec 11, 2018 | Completed final sign-off Jul 2019 | 1465 25th St | Metropolitan Electrical Construction | sprint to r&r 3 antennas, add 3 new rrus and remove (e) 36" faux vent and replace with new 40" faux ventDetails
sprint to r&r 3 antennas, add 3 new rrus and remove (e) 36" faux vent and replace with new 40" faux vent | $20,000 |
| Mar 23, 2018 | Expired or cancelled withdrawn Mar 2023 | 3252 Pierce St | sprint - replace (e) antenna with new antenna add 3 rrus, relocate wirless pole to new location on parking structure maher naDetails
sprint - replace (e) antenna with new antenna add 3 rrus, relocate wirless pole to new location on parking structure maher na | $45,000 |