Michael Cefaratti
- License
- 93978
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Gpd Group
- Based in
- Akron
- On San Francisco permits
- Jul 2023 to Jan 2025
4 permits since 2000 (architect on 2 permits, engineer on 2 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Swinerton Builders (3), Diablo Telecom & Construction Inc
- Engineers
- John Kabak, Steven Schaub
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 1500 19th Av | Swinerton Builders | revision to 202403278722 for plumbing review of proposed drainage within property line, connecting to existing sanitary service lateral. installation of 2 catch basins, 1 manhole, associated storm pipes.Details
revision to 202403278722 for plumbing review of proposed drainage within property line, connecting to existing sanitary service lateral. installation of 2 catch basins, 1 manhole, associated storm pipes. | |
| May 14, 2024 | Completed final sign-off Jun 2025 | 1500 19th Av | Swinerton Builders | chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453Details
chnge of use & occupancy from auto shop to ev chrging facilty. install of (5) zerdova power cabinets & (6) gen 305 charging dispensers and necessary electrical infrastructure. addition 12 ev charging stations inclds 2 accessible evcs. install new retaining wall. demo of (e) bldg undr pa 202402075453 | $2,750,000 |
| Feb 7, 2024 | Completed final sign-off Oct 2024 | 1500 19th Av | Swinerton Builders | to demolish 1-story, type v-b, occupancy s-1 & b, auto repair shop.Details
to demolish 1-story, type v-b, occupancy s-1 & b, auto repair shop. | $59,580 |
| Jul 26, 2023 | Completed final sign-off Oct 2023 | 695 33rd Av | Diablo Telecom & Construction Inc | temporary addition of 2 24" mw dish mounted to tripod mountsDetails
temporary addition of 2 24" mw dish mounted to tripod mounts | $20,000 |