Permit GraphShortlistSan Francisco building permits since 2000

Oscar Tune Louie

License
E9642
Look the license up with the state
Listed as
engineer
Firm
Zeiger Engineers Inc.
Based in
Oakland
On San Francisco permits
Dec 2007 to Sep 2022

7 permits since 2000 (engineer on 7 permits): 7 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 2, 2022Completed
final sign-off Oct 2023
711 Eddy StBranagh Incorporationselective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.
Details
Permit
202209021794
Status
complete
Filed
Sep 2, 2022
Permit issued
Mar 9, 2023
Final sign-off
Oct 27, 2023
Declared cost
$50,000
Address
711 Eddy St

selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.

Open the permit page

$50,000
Jun 15, 2021Completed
final sign-off Jan 2023
711 Eddy StBranagh Incorporationrevision to pa #201808086727 due to changes in the associated permit changes in the field.
Details
Permit
202106152499
Status
complete
Filed
Jun 15, 2021
Permit issued
Aug 12, 2022
Final sign-off
Jan 26, 2023
Address
711 Eddy St

revision to pa #201808086727 due to changes in the associated permit changes in the field.

Open the permit page

Feb 19, 2019Completed
final sign-off Dec 2022
711 Eddy StBranagh Incorporationreplacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit
Details
Permit
201902193182
Status
complete
Filed
Feb 19, 2019
Permit issued
Sep 27, 2021
Final sign-off
Dec 12, 2022
Address
711 Eddy St

replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit

Open the permit page

Aug 8, 2018Completed
final sign-off Dec 2022
711 Eddy StBranagh Incorporationwindow replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgrades
Details
Permit
201808086727
Status
complete
Filed
Aug 8, 2018
Permit issued
Sep 30, 2019
Final sign-off
Dec 12, 2022
Declared cost
$27,000,000
Address
711 Eddy St

window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgrades

Open the permit page

$27,000,000
Jul 11, 2017Completed
final sign-off Jul 2018
240 Shotwell StRoebuck Constructionrelocate outlets, switches and some lights from demo walls to new walls, install additional outlets in reconfigured area, remove then reinstall (e) lights, most in same location to accommodate ceiling remodel. n/a ordinance #155-13
Details
Permit
201707111586
Status
complete
Filed
Jul 11, 2017
Permit issued
Dec 13, 2017
Final sign-off
Jul 17, 2018
Address
240 Shotwell St

relocate outlets, switches and some lights from demo walls to new walls, install additional outlets in reconfigured area, remove then reinstall (e) lights, most in same location to accommodate ceiling remodel. n/a ordinance #155-13

Open the permit page

Dec 18, 2015Completed
final sign-off Jan 2017
5 Embarcadero CenterMarchetti Groupremodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outlets
Details
Permit
201512185515
Status
complete
Filed
Dec 18, 2015
Permit issued
Oct 20, 2016
Final sign-off
Jan 12, 2017
Declared cost
$88,000
Address
5 Embarcadero Center

remodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outlets

Open the permit page

$88,000
Dec 28, 2007Completed
final sign-off Feb 2011
1833 Fillmore StWest Coast Contractors Inc., Pankow Special Projects Lplimited ti to 2nd floor and basement for medical office. demo a few walls to make rooms bigger, new floor finishes and paint, change of use of storage to basement convert to legal b occupancy, no mep in this app,arch only. sep permit for mep
Details
Permit
200712281482
Status
complete
Filed
Dec 28, 2007
Permit issued
Jul 22, 2010
Final sign-off
Feb 23, 2011
Declared cost
$215,000
Address
1833 Fillmore St

limited ti to 2nd floor and basement for medical office. demo a few walls to make rooms bigger, new floor finishes and paint, change of use of storage to basement convert to legal b occupancy, no mep in this app,arch only. sep permit for mep

Open the permit page