Oscar Tune Louie
- Listed as
- engineer
- Firm
- Zeiger Engineers Inc.
- Based in
- Oakland
- On San Francisco permits
- Dec 2007 to Sep 2022
7 permits since 2000 (engineer on 7 permits): 7 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2022 | Completed final sign-off Oct 2023 | 711 Eddy St | Branagh Incorporation | selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.Details
selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level. | $50,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2023 | 711 Eddy St | Branagh Incorporation | revision to pa #201808086727 due to changes in the associated permit changes in the field.Details
revision to pa #201808086727 due to changes in the associated permit changes in the field. | |
| Feb 19, 2019 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permitDetails
replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit | |
| Aug 8, 2018 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgradesDetails
window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgrades | $27,000,000 |
| Jul 11, 2017 | Completed final sign-off Jul 2018 | 240 Shotwell St | Roebuck Construction | relocate outlets, switches and some lights from demo walls to new walls, install additional outlets in reconfigured area, remove then reinstall (e) lights, most in same location to accommodate ceiling remodel. n/a ordinance #155-13Details
relocate outlets, switches and some lights from demo walls to new walls, install additional outlets in reconfigured area, remove then reinstall (e) lights, most in same location to accommodate ceiling remodel. n/a ordinance #155-13 | |
| Dec 18, 2015 | Completed final sign-off Jan 2017 | 5 Embarcadero Center | Marchetti Group | remodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outletsDetails
remodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outlets | $88,000 |
| Dec 28, 2007 | Completed final sign-off Feb 2011 | 1833 Fillmore St | West Coast Contractors Inc., Pankow Special Projects Lp | limited ti to 2nd floor and basement for medical office. demo a few walls to make rooms bigger, new floor finishes and paint, change of use of storage to basement convert to legal b occupancy, no mep in this app,arch only. sep permit for mepDetails
limited ti to 2nd floor and basement for medical office. demo a few walls to make rooms bigger, new floor finishes and paint, change of use of storage to basement convert to legal b occupancy, no mep in this app,arch only. sep permit for mep | $215,000 |