Branagh Incorporation
- Based in
- Oakland
- On San Francisco permits
- Mar 2007 to Nov 2022
- Last 24 months
- 0 permits filed
14 permits since 2000: 10 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2022 | Completed final sign-off Jan 2023 | 711 Eddy St | revision to pa# 201808086727, 201804025235, & 202106152499. revision of t-24 report. removal of indoor lighting requirement based on.Details
revision to pa# 201808086727, 201804025235, & 202106152499. revision of t-24 report. removal of indoor lighting requirement based on. | |
| Sep 2, 2022 | Completed final sign-off Oct 2023 | 711 Eddy St | selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.Details
selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level. | $50,000 |
| Jul 19, 2022 | Completed final sign-off Nov 2022 | 711 Eddy St | 8/f: new guardrail at patio. approx. 6' length.Details
8/f: new guardrail at patio. approx. 6' length. | $10,000 |
| Jun 24, 2022 | Completed final sign-off Nov 2022 | 711 Eddy St | 13th fl l roof: new guardrail/handrails for floor.Details
13th fl l roof: new guardrail/handrails for floor. | $80,000 |
| Feb 17, 2022 | Never finaled issued Feb 2022, no final | 711 Eddy St | ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891.Details
ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891. | $5,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2023 | 711 Eddy St | revision to pa #201808086727 due to changes in the associated permit changes in the field.Details
revision to pa #201808086727 due to changes in the associated permit changes in the field. | |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 711 Eddy St | street spaceDetails
street space | |
| Feb 19, 2019 | Completed final sign-off Dec 2022 | 711 Eddy St | replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permitDetails
replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit | |
| Aug 8, 2018 | Completed final sign-off Dec 2022 | 711 Eddy St | window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgradesDetails
window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgrades | $27,000,000 |
| May 8, 2018 | Completed final sign-off Jun 2019 | 711 Eddy St | 1st fl, unit c, apt# 1-d - demo of walls, doors, exterior windows, plumbing fixt and accessories, floring, wall base, adding new rated shaft walls, new bathroom whoer, plumbing fixtures and acc., new finishes, wall base, limited plumbing & electrical upgrade///vif eer windows to be compliant 1030Details
1st fl, unit c, apt# 1-d - demo of walls, doors, exterior windows, plumbing fixt and accessories, floring, wall base, adding new rated shaft walls, new bathroom whoer, plumbing fixtures and acc., new finishes, wall base, limited plumbing & electrical upgrade///vif eer windows to be compliant 1030 | $161,004 |
| Apr 2, 2018 | Never finaled issued Apr 2020, no final | 711 Eddy St | selective demo of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a **Details
selective demo of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a ** | $148,281 |
| Feb 17, 2009 | Expired or cancelled withdrawn Apr 2009 | 4800 03rd St | revision to pa# 2007-0314-6192 (s2)-manufactures roof trusses with load calcs on each sheet. drawings from truss designer show location of trusses & design of each trussDetails
revision to pa# 2007-0314-6192 (s2)-manufactures roof trusses with load calcs on each sheet. drawings from truss designer show location of trusses & design of each truss | $10,000 |
| Dec 1, 2008 | Completed final sign-off Dec 2009 | 4800 03rd St | revision to appl #200703146192 for the construction of two interior exit stairs. vertical load calculations & detail as requested by plan checker for the stair & connectors have been provided.Details
revision to appl #200703146192 for the construction of two interior exit stairs. vertical load calculations & detail as requested by plan checker for the stair & connectors have been provided. | |
| Mar 14, 2007 | Completed final sign-off Dec 2009 | 4800 03rd St | to erect 4 stories, 18 dwelling units new building.Details
to erect 4 stories, 18 dwelling units new building. |