Block 0742, lot 014
711 Eddy St
- City’s use
- Multi-Family Residential
- Built
- 1979
- Stories
- 13
- Units
- 202
- Rooms
- 201 bedrooms, 201 bathrooms
- Building
- 171,508 sq ft
- Lot
- 26,434 sq ft
- Zoning
- RC4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off May 2026 | 711 Eddy St | Convergint Technologies Llc | fire only- modification of existing fa system. add 1 new fa control relay. add 1 new input module for epo switch.Details
fire only- modification of existing fa system. add 1 new fa control relay. add 1 new input module for epo switch. | $5,000 |
| Apr 3, 2023 | Completed final sign-off Oct 2023 | 711 Eddy St | Convergint Technologies Llc | fire alarm ti basement fire pump room 202209021794, provide 1 new smoke in existing fire pump room. 3 new modules for monitoring and control of men fsds provide 2 new monitoring points for new fire pump controllerDetails
fire alarm ti basement fire pump room 202209021794, provide 1 new smoke in existing fire pump room. 3 new modules for monitoring and control of men fsds provide 2 new monitoring points for new fire pump controller | $5,000 |
| Nov 10, 2022 | Completed final sign-off Jan 2023 | 711 Eddy St | Branagh Incorporation | revision to pa# 201808086727, 201804025235, & 202106152499. revision of t-24 report. removal of indoor lighting requirement based on.Details
revision to pa# 201808086727, 201804025235, & 202106152499. revision of t-24 report. removal of indoor lighting requirement based on. | |
| Sep 28, 2022 | Completed final sign-off Oct 2022 | 711 Eddy St | Convergint Technologies Llc | reference pa #202010307891 as-built record drawing. fire alarmDetails
reference pa #202010307891 as-built record drawing. fire alarm | |
| Sep 2, 2022 | Completed final sign-off Sep 2022 | 711 Eddy St | Pye-Barker Fire & Safety | as built to show descope of fire pump room. original permit 202001091569 no longer has fire pump room scope of work.Details
as built to show descope of fire pump room. original permit 202001091569 no longer has fire pump room scope of work. | $940,000 |
| Sep 2, 2022 | Completed final sign-off Oct 2023 | 711 Eddy St | Branagh Incorporation | selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.Details
selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level. | $50,000 |
| Jul 19, 2022 | Completed final sign-off Nov 2022 | 711 Eddy St | Branagh Incorporation | 8/f: new guardrail at patio. approx. 6' length.Details
8/f: new guardrail at patio. approx. 6' length. | $10,000 |
| Jun 24, 2022 | Completed final sign-off Nov 2022 | 711 Eddy St | Branagh Incorporation | 13th fl l roof: new guardrail/handrails for floor.Details
13th fl l roof: new guardrail/handrails for floor. | $80,000 |
| Feb 17, 2022 | Never finaled issued Feb 2022, no final | 711 Eddy St | Branagh Incorporation | ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891.Details
ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891. | $5,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2023 | 711 Eddy St | Branagh Incorporation | revision to pa #201808086727 due to changes in the associated permit changes in the field.Details
revision to pa #201808086727 due to changes in the associated permit changes in the field. | |
| Jan 26, 2021 | Completed final sign-off Nov 2022 | 711 Eddy St | Pye-Barker Fire & Safety | revision to existing permit # 20200617-148 ol (included for reference). garage - demo existing diesel fire pump piping connections. replace eisting electric fire pump controller with new ats controller. replace existing electric jockey pump controller with new controller. replace all sensing lines..Details
revision to existing permit # 20200617-148 ol (included for reference). garage - demo existing diesel fire pump piping connections. replace eisting electric fire pump controller with new ats controller. replace existing electric jockey pump controller with new controller. replace all sensing lines.. | |
| Jan 14, 2021 | Never finaled issued Mar 2021, no final | 711 Eddy St | Sierra Electric Co | install emergency responder radio coverage systemDetails
install emergency responder radio coverage system | $50,000 |
| Oct 30, 2020 | Completed final sign-off Oct 2022 | 711 Eddy St | Convergint Technologies Llc | fire alarm replacement of existing devices in cosmetically upgraded areas znd new layouts. existing voice evacuation, per floor. existing panel to be tied intp replacement panel during construction.Details
fire alarm replacement of existing devices in cosmetically upgraded areas znd new layouts. existing voice evacuation, per floor. existing panel to be tied intp replacement panel during construction. | $350,000 |
| May 14, 2020 | Never finaled issued May 2020, no final | 711 Eddy St | street spaceDetails
street space | ||
| Jan 9, 2020 | Completed final sign-off Sep 2022 | 711 Eddy St | Aegis Enterprises Inc | garage: relocate/add sprinklers to accomodate for plan revs & replace all bracing on (e) 4" bulk main. 1st-13th flrs: relocate/add sprinklers to accomodate for plan revs & replace all (e) copper pipe w/ cvc pipe post fcv @each combination stp. roof: replace (e) copper pipe w/ black sched 40 pipe.Details
garage: relocate/add sprinklers to accomodate for plan revs & replace all bracing on (e) 4" bulk main. 1st-13th flrs: relocate/add sprinklers to accomodate for plan revs & replace all (e) copper pipe w/ cvc pipe post fcv @each combination stp. roof: replace (e) copper pipe w/ black sched 40 pipe. | $950,000 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 711 Eddy St | Branagh Incorporation | street spaceDetails
street space | |
| Feb 19, 2019 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permitDetails
replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit | |
| Feb 11, 2019 | Completed final sign-off May 2019 | 711 Eddy St | Golden Gate Sign Company Inc. | install 1 non-illumnated single-faced wall sign.Details
install 1 non-illumnated single-faced wall sign. | $3,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgradesDetails
window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgrades | $27,000,000 |
| May 8, 2018 | Completed final sign-off Jun 2019 | 711 Eddy St | Branagh Incorporation | 1st fl, unit c, apt# 1-d - demo of walls, doors, exterior windows, plumbing fixt and accessories, floring, wall base, adding new rated shaft walls, new bathroom whoer, plumbing fixtures and acc., new finishes, wall base, limited plumbing & electrical upgrade///vif eer windows to be compliant 1030Details
1st fl, unit c, apt# 1-d - demo of walls, doors, exterior windows, plumbing fixt and accessories, floring, wall base, adding new rated shaft walls, new bathroom whoer, plumbing fixtures and acc., new finishes, wall base, limited plumbing & electrical upgrade///vif eer windows to be compliant 1030 | $161,004 |
| Apr 2, 2018 | Never finaled issued Apr 2020, no final | 711 Eddy St | Branagh Incorporation | selective demo of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a **Details
selective demo of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a ** | $148,281 |
| Oct 22, 2013 | Completed final sign-off Dec 2013 | 711 Eddy St | George Martin Construction | remove (e) tubs - replace with new tubs, water proof backing, tile to match original. plumber to replace shower valve & waste connections with new 50 total units, including: 1d, 2,d,3d,6d,7d,1e,2e,3e,6e,7e,8e,9e,10 thru 13e. 1h thru 3h, 1j thru 3j, 1a thru 13a, 1f thru 7f, 1g thru 7g, 8t.Details
remove (e) tubs - replace with new tubs, water proof backing, tile to match original. plumber to replace shower valve & waste connections with new 50 total units, including: 1d, 2,d,3d,6d,7d,1e,2e,3e,6e,7e,8e,9e,10 thru 13e. 1h thru 3h, 1j thru 3j, 1a thru 13a, 1f thru 7f, 1g thru 7g, 8t. | $200,000 |
| Oct 8, 2013 | Completed final sign-off Nov 2013 | 711 Eddy St | George Martin Construction | remove extg tubs, tile at tubs. replace with new tubs water proof backing, tile to match original.plumber to replace shower valve and waste connections with new . 20 total units including 1c,2c,3c,4c,5c,6c,7c. 1b,2b,3b,4b,5b,6b,7b,8b,9b,10b,11b,12b,13bDetails
remove extg tubs, tile at tubs. replace with new tubs water proof backing, tile to match original.plumber to replace shower valve and waste connections with new . 20 total units including 1c,2c,3c,4c,5c,6c,7c. 1b,2b,3b,4b,5b,6b,7b,8b,9b,10b,11b,12b,13b | $134,000 |
| Feb 13, 2013 | Never finaled issued Feb 2013, no final | 711 Eddy St | street space & sidewalkDetails
street space & sidewalk | ||
| Sep 29, 2010 | Never finaled issued Sep 2010, no final | 711 Eddy St | street space for scaffoldDetails
street space for scaffold | ||
| Feb 26, 2010 | Completed final sign-off Mar 2010 | 711 Eddy St | Sky Rider Equip Co Inc | revision to 200910279908. changes to structural details for window washing equipmentDetails
revision to 200910279908. changes to structural details for window washing equipment | |
| Oct 27, 2009 | Completed final sign-off Mar 2010 | 711 Eddy St | Sky Rider Equip Co Inc | roof level-new guardrail system for all areas where (e) parapet is less than 3'-6" orthere is no parpet or column. install safety tiebacks for schedules maintenance work on the building exterior. tiebacks are designed for attachement of a workers safety line & as a secondary tieback for couter weighDetails
roof level-new guardrail system for all areas where (e) parapet is less than 3'-6" orthere is no parpet or column. install safety tiebacks for schedules maintenance work on the building exterior. tiebacks are designed for attachement of a workers safety line & as a secondary tieback for couter weigh | $285,000 |
| May 7, 2001 | Expired or cancelled expired May 2002 | 711 Eddy St | Sierra Electric Co | replace (e) fire alarm system in building for all floorsDetails
replace (e) fire alarm system in building for all floors | $200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Branagh Incorporation (11), Convergint Technologies Llc (4), George Martin Construction (2), Pye-Barker Fire & Safety (2), Sierra Electric Co (2), Sky Rider Equip Co Inc (2), Aegis Enterprises Inc, Golden Gate Sign Company Inc.
- Architects
- Stuart Lyle (8)
- Engineers
- Oscar Tune Louie (4), Gary L Hennings (3), Kevin Morton (2), Mike D Elbanna (2), Randall J. Girouard (2), C.K. Allen Jr, Gary Hennings, Stuart Lowe
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.