34 permits since 2000: 30 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2017 | Completed final sign-off Aug 2017 | 355 Berry St | electrical revision to east courtyard permit #201611183131. redesign spa equipment shed to an enclosure.Details
electrical revision to east courtyard permit #201611183131. redesign spa equipment shed to an enclosure. | |
| Aug 29, 2016 | Completed final sign-off Feb 2017 | 300 Post St | revision to 201501206143 as builts. scope includes addition of 1 fd's @ b2 & b3. 2 - grillers @ bc coffee room. 3 - ef & hood for paint shop. 4 - bdd @ exhaust to paint shop and to b4Details
revision to 201501206143 as builts. scope includes addition of 1 fd's @ b2 & b3. 2 - grillers @ bc coffee room. 3 - ef & hood for paint shop. 4 - bdd @ exhaust to paint shop and to b4 | $20,000 |
| Aug 19, 2016 | Never finaled issued May 2017, no final | 355 Berry St | revision to ref pa 201511183003: structural drawings & calcs to lobby & courtyard, mailroom, hallway & kitchenette, material finishes only. shimmer screen added to lobby, t24 maher na revised irragation/landscapingDetails
revision to ref pa 201511183003: structural drawings & calcs to lobby & courtyard, mailroom, hallway & kitchenette, material finishes only. shimmer screen added to lobby, t24 maher na revised irragation/landscaping | |
| May 2, 2016 | Completed final sign-off Aug 2016 | 300 Post St | to obtain a final inspection for work approved under pa#201412173943 & pa#201502198808. al work is complete.Details
to obtain a final inspection for work approved under pa#201412173943 & pa#201502198808. al work is complete. | |
| May 2, 2016 | Completed final sign-off Aug 2016 | 300 Post St | to obtain a final inspection for work approved under pa#201411040678 & pa#201411040680 & pa#201411191906. all work is complete.Details
to obtain a final inspection for work approved under pa#201411040678 & pa#201411040680 & pa#201411191906. all work is complete. | |
| Apr 28, 2016 | Completed final sign-off Apr 2016 | 300 Post St | administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, added per pa#m683347; applicable bpa #'s include: 201312164258, 201406027261, 201411040678, 201411040680, 201411191906, 201501206143, 201502198808, 201507272538, 201509177303,Details
administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, added per pa#m683347; applicable bpa #'s include: 201312164258, 201406027261, 201411040678, 201411040680, 201411191906, 201501206143, 201502198808, 201507272538, 201509177303, | |
| Apr 28, 2016 | Completed final sign-off Aug 2016 | 300 Post St | administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, per pa#m683347; applicable bpa #'s include: 201601086713, 201601086714, 201602048892, 201602058940, 201602058981, 201602119381, 201602169708, 201602169710, 201602220212Details
administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, per pa#m683347; applicable bpa #'s include: 201601086713, 201601086714, 201602048892, 201602058940, 201602058981, 201602119381, 201602169708, 201602169710, 201602220212 | |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to pa 2013-1216-4256/s5 to coordinate structural supports to video wall.Details
revision to pa 2013-1216-4256/s5 to coordinate structural supports to video wall. | |
| Mar 16, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to pa 2013-1216-4258 (s5) to coordinate structural support and attachment details for mech equipment under pa 2013-1216-4258 (s7)Details
revision to pa 2013-1216-4258 (s5) to coordinate structural support and attachment details for mech equipment under pa 2013-1216-4258 (s7) | |
| Feb 22, 2016 | Never finaled issued Apr 2016, no final | 345 Stockton St | to erect one polished stainless steel logo sign attached onto steel cladding.Details
to erect one polished stainless steel logo sign attached onto steel cladding. | $2,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 345 Stockton St | install ground, non-electric single faced signDetails
install ground, non-electric single faced sign | $15,000 |
| Feb 16, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | installation of steel wall & canopy panels on exterior & interior. revision to permit app # 201312164258 s4 architecturalsDetails
installation of steel wall & canopy panels on exterior & interior. revision to permit app # 201312164258 s4 architecturals | $70,000 |
| Feb 11, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | mobile storage shelving system for (n) apple store.Details
mobile storage shelving system for (n) apple store. | $30,000 |
| Feb 5, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | installation of new 50 kw photo voltic array in association with new apple retail store under app#201312164258Details
installation of new 50 kw photo voltic array in association with new apple retail store under app#201312164258 | $600,000 |
| Feb 5, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to pa 2016 0108 6713. scope is revision to framing to avenue wall & fic for cut studs.Details
revision to pa 2016 0108 6713. scope is revision to framing to avenue wall & fic for cut studs. | |
| Feb 4, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | supply stair #6 only with guardrail for apple storeDetails
supply stair #6 only with guardrail for apple store | $5,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | design build metal pan stairs for extg and new retail spaces stair #'s 3,4,5,6, & 7 on plans.Details
design build metal pan stairs for extg and new retail spaces stair #'s 3,4,5,6, & 7 on plans. | $20,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | interior and exterior light guage framing for apple store.Details
interior and exterior light guage framing for apple store. | $20,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | vertical support and seismic bracing for ceilings at 2nd and roof levels at retail store.Details
vertical support and seismic bracing for ceilings at 2nd and roof levels at retail store. | $20,000 |
| Dec 21, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to pa 2013-1216-4258 addn #4. changes in field shown delta 26 on plans.Details
revision to pa 2013-1216-4258 addn #4. changes in field shown delta 26 on plans. | |
| Nov 18, 2015 | Never finaled issued Jun 2016, no final | 355 Berry St | tenant improvement; non-structural; (n) front doors & leasing office lay-out; renovate court yards. to include restroom in leasing office, bbq area, raised hot tub at east courtyard.Details
tenant improvement; non-structural; (n) front doors & leasing office lay-out; renovate court yards. to include restroom in leasing office, bbq area, raised hot tub at east courtyard. | $150,000 |
| Oct 19, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | reroute existing fuel-oil tank vents.Details
reroute existing fuel-oil tank vents. | $25,000 |
| Jul 27, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | reroute exhaust flues serving generator & diesel fire pump. provide (n) fire dampers for outside air & exhaust air for generator room. provide fire wrapping for outside air & exhaust air on level b3.Details
reroute exhaust flues serving generator & diesel fire pump. provide (n) fire dampers for outside air & exhaust air for generator room. provide fire wrapping for outside air & exhaust air on level b3. | $125,000 |
| Jun 11, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | patch and repair interior finishes from construction, iunstallation of new and e doors, replace and install wall coverings, finishes, non structural partitions damaged of removed for construction under 201312164258Details
patch and repair interior finishes from construction, iunstallation of new and e doors, replace and install wall coverings, finishes, non structural partitions damaged of removed for construction under 201312164258 | $100,000 |
| May 28, 2015 | Completed final sign-off Jun 2016 | 345 Stockton St | ti for redwood room in 3rd basement of hotel. work includes new doors, wall coverings operable partitions, finishes, acoustical tile and grid, reinstallation of e light fixturesDetails
ti for redwood room in 3rd basement of hotel. work includes new doors, wall coverings operable partitions, finishes, acoustical tile and grid, reinstallation of e light fixtures | $100,000 |
| Feb 19, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | structural revisions to addendum 5 structral 201312164258 (aka 300 post)Details
structural revisions to addendum 5 structral 201312164258 (aka 300 post) | |
| Jan 20, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | decommission 4/f handler; relocate fan coil units and generator aspiration fan, reroute assoc. duct work, reroute basement 2 & 3 exhaust flue;. provide temp. o. s,a duct on 1/f for riser shaft. reroute piping through 3/f ceiling into 4/f. decommision roof con. unit ; relocate dry air coolerDetails
decommission 4/f handler; relocate fan coil units and generator aspiration fan, reroute assoc. duct work, reroute basement 2 & 3 exhaust flue;. provide temp. o. s,a duct on 1/f for riser shaft. reroute piping through 3/f ceiling into 4/f. decommision roof con. unit ; relocate dry air cooler | $120,000 |
| Dec 17, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | temporary phased egress plan during construction for the hyatt assembly areas at basement level 3 of the hyatt hotel @ 345 stockton aka 300 post. no other work under this permit.Details
temporary phased egress plan during construction for the hyatt assembly areas at basement level 3 of the hyatt hotel @ 345 stockton aka 300 post. no other work under this permit. | |
| Nov 19, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to pa#201312164258-s2 to clarify demolition phasing and sequencing.Details
revision to pa#201312164258-s2 to clarify demolition phasing and sequencing. | |
| Nov 4, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to foundation permit addendum pa 201312164258; changing rebar sizing for the stiffening of structural columns.Details
revision to foundation permit addendum pa 201312164258; changing rebar sizing for the stiffening of structural columns. | |
| Nov 4, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | revision to bar bldg seismic strengthening pa #201406027261; for the addiitions of penetrations in the shear walls for (n) man doors.Details
revision to bar bldg seismic strengthening pa #201406027261; for the addiitions of penetrations in the shear walls for (n) man doors. | |
| Jun 2, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | seismic strengthening of bar building structure. work includes (n) shear walls & moment frames, gravity elements at selected locations for (n) staircase & elevator.Details
seismic strengthening of bar building structure. work includes (n) shear walls & moment frames, gravity elements at selected locations for (n) staircase & elevator. | $179,000 |
| May 30, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | b2,b3,1st,2nd,3rd,4th & lower roof level - interior demo of (e) unoccupied space per ab-17. work includes non-structural elements, partitions, furniture, equipment, restrooms, hvac, electrical, & plumbing. reference site 2013.1216.4258 (not approved)Details
b2,b3,1st,2nd,3rd,4th & lower roof level - interior demo of (e) unoccupied space per ab-17. work includes non-structural elements, partitions, furniture, equipment, restrooms, hvac, electrical, & plumbing. reference site 2013.1216.4258 (not approved) | $20,000 |
| Dec 16, 2013 | Completed final sign-off Aug 2016 | 345 Stockton St | alteration to an (e) shell building work includes: seismic upgrade of impacted elements (n) structural frame, interior structural elements. (n) facade work including (n) structural glazing.Details
alteration to an (e) shell building work includes: seismic upgrade of impacted elements (n) structural frame, interior structural elements. (n) facade work including (n) structural glazing. | $18,500,000 |