Robert Brown
- License
- C33929
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Sep 2022 to Nov 2022
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Reeve-Knight Construction Inc. (2)
- Engineers
- George Joseph, Scott Allen Carlson, Whitney Marr, William Ross Welch
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2022 | Completed final sign-off Mar 2024 | 565 Buckingham Wy | Reeve-Knight Construction Inc. | t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05.Details
t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05. | $950,000 |
| Sep 8, 2022 | Completed final sign-off Apr 2023 | 3908 24th St | Reeve-Knight Construction Inc. | ti: ground flr for credit union, vacant space (1490 sf) improvement are archtectural mep.Details
ti: ground flr for credit union, vacant space (1490 sf) improvement are archtectural mep. | $250,000 |