Permit GraphShortlistSan Francisco building permits since 2000

George Josephs

License
31807
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, engineer
Based in
Tempe
On San Francisco permits
Mar 2005 to Nov 2022

17 permits since 2000 (architect on 13 permits, engineer on 4 permits): 14 completed, 1 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Custom Cooling Of California Llc (2), Swinerton Builders (2), Bevilacqua & Sons, D A Pope Inc, Dome Construction Corp, Hathaway Dinwiddie Co., Mattson Construction-West Inc, Novo Construction Inc, Peacock Construction, Peacock Construction Inc, Principal Builders Inc., Reeve-Knight Construction Inc., Rossi Builders Inc., Skyline Construction
Architects
Lance Baker, Robert Brown
Engineers
Whitney Marr, Woodward Engineering

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 17, 2022Completed
final sign-off Mar 2024
565 Buckingham WyReeve-Knight Construction Inc.t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05.
Details
Permit
202211176778
Permit issued
Jun 5, 2023
Final sign-off
Mar 12, 2024

t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05.

Open the permit page

$950,000
Apr 19, 2022Never finaled
issued Apr 2022, no final
2300 16th StCustom Cooling Of California Llchvac - 4 unit like for like replacement.
Details
Permit
202204192513
Permit issued
Apr 29, 2022

hvac - 4 unit like for like replacement.

Open the permit page

$78,447
Oct 17, 2018Completed
final sign-off Jun 2019
200 West Portal AvCustom Cooling Of California Llc4 hvac unit replacement. like for like
Details
Permit
201810173437
Permit issued
Oct 24, 2018
Final sign-off
Jun 13, 2019

4 hvac unit replacement. like for like

Open the permit page

$56,064
Nov 17, 2016Expired or cancelled
withdrawn Apr 2017
1180 Post StMattson Construction-West Inctenant improvement of an (e) imaging suite. improvements consist of an additional nuclear modality & (n) read room. minor demo, mechanical & electrical modifications will occur to accomodate (n) equipment. ** maher: n/a **
Details
Permit
201611172947

tenant improvement of an (e) imaging suite. improvements consist of an additional nuclear modality & (n) read room. minor demo, mechanical & electrical modifications will occur to accomodate (n) equipment. ** maher: n/a **

Open the permit page

$40,000
Sep 17, 2015Completed
final sign-off Apr 2016
180 Montgomery StBevilacqua & Sonsrevision to permit 2015-0807-3634 (20th floor) to show product information on fire proofing being installed to repair areas that have fallen off.
Details
Permit
201509177341
Permit issued
Sep 22, 2015
Final sign-off
Apr 18, 2016

revision to permit 2015-0807-3634 (20th floor) to show product information on fire proofing being installed to repair areas that have fallen off.

Open the permit page

Jul 10, 2015Completed
final sign-off Sep 2016
685 Market StSwinerton Buildersdemolition of a roof shed in it's entirety. that to be demolished shed is wood & metal sheathing construction. n/a maher ordinance
Details
Permit
201507101182
Permit issued
May 23, 2016
Final sign-off
Sep 6, 2016

demolition of a roof shed in it's entirety. that to be demolished shed is wood & metal sheathing construction. n/a maher ordinance

Open the permit page

$8,000
Oct 3, 2014Completed
final sign-off Aug 2015
850 Montgomery StDome Construction Corpste #200: modification & expansion of (e) t.i. incl selective const of non load bearing partitions, modifications to ceiling grid & tile, new light fixtures incl re-switching, new conferen rm door & frame. millwork & new sink(s) & new finishes. maher n/a
Details
Permit
201410037992
Permit issued
Oct 20, 2014
Final sign-off
Aug 24, 2015

ste #200: modification & expansion of (e) t.i. incl selective const of non load bearing partitions, modifications to ceiling grid & tile, new light fixtures incl re-switching, new conferen rm door & frame. millwork & new sink(s) & new finishes. maher n/a

Open the permit page

$122,500
Sep 26, 2014Completed
final sign-off Jan 2015
731 Market StPeacock Constructionmodification ot existing building lobby to include construction of non structural partition, modification to ceiling, moulding, light fixture.(sprinklers under separate permit)
Details
Permit
201409267476
Permit issued
Sep 26, 2014
Final sign-off
Jan 12, 2015

modification ot existing building lobby to include construction of non structural partition, modification to ceiling, moulding, light fixture.(sprinklers under separate permit)

Open the permit page

$27,000
Jun 19, 2012Completed
final sign-off Dec 2013
180 Montgomery StHathaway Dinwiddie Co.relocate/provide new plumbing fixtures & toilet partitions to remove accessibility barriers at restrooms on 2nd, 3rd and 4th floor.
Details
Permit
201206192878
Permit issued
Jul 3, 2012
Final sign-off
Dec 30, 2013

relocate/provide new plumbing fixtures & toilet partitions to remove accessibility barriers at restrooms on 2nd, 3rd and 4th floor.

Open the permit page

$60,000
Dec 19, 2011Completed
final sign-off Feb 2012
165 Post StSwinerton Buildersste 300 minor renovation ot existing tenant improvement, elec, mech & life safety under separate permit. demolition of existing offices & conversion of 1 office to a conf. room.
Details
Permit
201112190952
Permit issued
Dec 23, 2011
Final sign-off
Feb 8, 2012

ste 300 minor renovation ot existing tenant improvement, elec, mech & life safety under separate permit. demolition of existing offices & conversion of 1 office to a conf. room.

Open the permit page

$115,000
Dec 7, 2011Completed
final sign-off Mar 2012
1 Front StPrincipal Builders Inc.14th floor minor renovation to an existing tenant suite, scope includes demo & construction of non-load bearing partitions, ceiling patch, minor millwork, lighting & finishes.
Details
Permit
201112070276
Permit issued
Jan 17, 2012
Final sign-off
Mar 9, 2012

14th floor minor renovation to an existing tenant suite, scope includes demo & construction of non-load bearing partitions, ceiling patch, minor millwork, lighting & finishes.

Open the permit page

$250,000
Jul 29, 2011Completed
final sign-off Aug 2011
150 Spear StRossi Builders Inc.16th floor modifications to existing suite to include demo & construction of non-load bearing walls & new interior finishes.
Details
Permit
201107291371
Permit issued
Aug 9, 2011
Final sign-off
Aug 29, 2011

16th floor modifications to existing suite to include demo & construction of non-load bearing walls & new interior finishes.

Open the permit page

$30,000
Jul 29, 2011Completed
final sign-off Feb 2012
150 Spear StPeacock Construction Inc7th floor modifications to existing elevator lobby space to include demo & construction of new suspended ceiling grid & tile & new finishes.
Details
Permit
201107291372
Permit issued
Aug 9, 2011
Final sign-off
Feb 15, 2012

7th floor modifications to existing elevator lobby space to include demo & construction of new suspended ceiling grid & tile & new finishes.

Open the permit page

$50,400
Jul 26, 2011Expired or cancelled
cancelled Jan 2026
88 Kearny St
Details
Permit
201107261087

Open the permit page

$500,000
Apr 7, 2011Completed
final sign-off Nov 2011
300 California StD A Pope Inc7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor.
Details
Permit
201104073676
Permit issued
Apr 13, 2011
Final sign-off
Nov 4, 2011

7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor.

Open the permit page

$50,000
Apr 5, 2011Completed
final sign-off Jun 2011
600 Harrison StSkyline Construction#600 - demo and construction of non load bearing partitions, millwork and finishes. mech, elec, plumbing sep permit
Details
Permit
201104053526
Permit issued
Apr 7, 2011
Final sign-off
Jun 29, 2011

#600 - demo and construction of non load bearing partitions, millwork and finishes. mech, elec, plumbing sep permit

Open the permit page

$650,000
Mar 17, 2005Completed
final sign-off Jun 2005
88 Kearny StNovo Construction Incoti-1, 14th floor, el, me, ls, sp.
Details
Permit
200503177735
Permit issued
Apr 12, 2005
Final sign-off
Jun 24, 2005

oti-1, 14th floor, el, me, ls, sp.

Open the permit page

$45,000