Block 3704, lot 068
989 Market St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 6
- Units
- 3
- Rooms
- 14 bathrooms
- Building
- 113,026 sq ft
- Lot
- 16,745 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
143 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 2, 2024 | Completed final sign-off Aug 2024 | 989 Market St | Western Waterproofing/Brisk Wp | installation of steel channel to reinforce corroded column. west facade only was 100 percent tuckpointed.Details
installation of steel channel to reinforce corroded column. west facade only was 100 percent tuckpointed. | $717,000 |
| Apr 27, 2023 | Completed final sign-off Apr 2024 | 989 Market St | Everon Llc | elevator modernization project: add 1 control relay for elevator hat function.Details
elevator modernization project: add 1 control relay for elevator hat function. | $800 |
| Nov 4, 2019 | Completed final sign-off Apr 2024 | 989 Market St | Red Hawk Fire & Security Ca Llc | fire alarm ti add 1 horn strobe, relocated 1 e horn strobe, add 3 relay for door access and 1 relay for turnstileDetails
fire alarm ti add 1 horn strobe, relocated 1 e horn strobe, add 3 relay for door access and 1 relay for turnstile | $3,000 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 989 Market St | Red Hawk Fire & Security Ca Llc | 6th floor: fire alarm as built for requested by sfeid capture control relay for a shut downDetails
6th floor: fire alarm as built for requested by sfeid capture control relay for a shut down | |
| Oct 8, 2019 | Completed final sign-off Mar 2020 | 989 Market St | Red Hawk Fire & Security Ca Llc | fa ti on 3rd. add 1 power supply, 30 horn/strobes, 2 ceiling horn/strobes, 18 strobes only. 1 relay for security door release, 1 relay for sml curtaind, 1 duict det with control for fsd & 5 duct det with control for dan coil units. ref 201908078134Details
fa ti on 3rd. add 1 power supply, 30 horn/strobes, 2 ceiling horn/strobes, 18 strobes only. 1 relay for security door release, 1 relay for sml curtaind, 1 duict det with control for fsd & 5 duct det with control for dan coil units. ref 201908078134 | $17,000 |
| Sep 17, 2019 | Completed final sign-off Mar 2020 | 989 Market St | Ayoob & Peery Plumbing Co Inc | 3rd fl - add 20, relocate 55, change out 8 and plug 13 sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa 2019-0807-8134Details
3rd fl - add 20, relocate 55, change out 8 and plug 13 sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa 2019-0807-8134 | $24,675 |
| Sep 5, 2019 | Completed final sign-off Jul 2020 | 989 Market St | Novo Construction Inc | mech & ele work for ti on 3rd ref 201908078134Details
mech & ele work for ti on 3rd ref 201908078134 | $175,000 |
| Aug 12, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | t.i. on ground floor lobby including new finishes millwork and lighting.Details
t.i. on ground floor lobby including new finishes millwork and lighting. | $100,000 |
| Aug 7, 2019 | Completed final sign-off Jul 2020 | 989 Market St | Novo Construction Inc | 3rd floor: full floor t.i. to include non-structural partitions, new interior ceilings. new restrooms. mep, life safety, fire sprinkler under seperate permit. n/a for maherDetails
3rd floor: full floor t.i. to include non-structural partitions, new interior ceilings. new restrooms. mep, life safety, fire sprinkler under seperate permit. n/a for maher | $950,000 |
| Aug 6, 2019 | Completed final sign-off Sep 2019 | 989 Market St | Red Hawk Fire & Security Ca Llc | 6th fl - fire alarm add 26 horn/strobes, 24 strobes, 1 smoke detector, 1 control relay for security interface, 1 control relay for smoke curtains, 4 duct detectors with relays for fan coil & replace 2 existing duct detectors w/control for existing fsds ref pa 2019-0327-6326Details
6th fl - fire alarm add 26 horn/strobes, 24 strobes, 1 smoke detector, 1 control relay for security interface, 1 control relay for smoke curtains, 4 duct detectors with relays for fan coil & replace 2 existing duct detectors w/control for existing fsds ref pa 2019-0327-6326 | $30,000 |
| Jul 18, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | demolition on the 3rd fl. per ab-017.Details
demolition on the 3rd fl. per ab-017. | $5,000 |
| Jul 8, 2019 | Completed final sign-off Feb 2020 | 989 Market St | Red Hawk Fire & Security Ca Llc | 2nd floor: fire alarm as built drawing for app#201904168138 per field inspector's notes. n/a for maherDetails
2nd floor: fire alarm as built drawing for app#201904168138 per field inspector's notes. n/a for maher | |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 989 Market St | Ayoob & Peery Plumbing Co Inc | 6th fl - add 42 and relocate 66 sprinklers to conform with the new wall/ceiling layout at the tenant improvement. ref pa 2019-0327-6326Details
6th fl - add 42 and relocate 66 sprinklers to conform with the new wall/ceiling layout at the tenant improvement. ref pa 2019-0327-6326 | $36,900 |
| Jun 3, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | ref arch # 201903276326: mechanical and electrical for tenant improvement on the 6th floor.Details
ref arch # 201903276326: mechanical and electrical for tenant improvement on the 6th floor. | $175,000 |
| Apr 16, 2019 | Completed final sign-off Feb 2020 | 989 Market St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 2nd fl - add 16 mount horn/strobes, 24 wall mount strobe, 2 smoke detectors, 1 control relay for security interface, 4 duct detectors for new fan coil units with control relay, & replace 3 existing duct detectors for existing fsd. ref pa #201902072322. n/a for maher.Details
fire alarm ti on 2nd fl - add 16 mount horn/strobes, 24 wall mount strobe, 2 smoke detectors, 1 control relay for security interface, 4 duct detectors for new fan coil units with control relay, & replace 3 existing duct detectors for existing fsd. ref pa #201902072322. n/a for maher. | $16,000 |
| Apr 1, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | 2/f: mep for tenant improvement on the 2nd fl ref pa 2019-0207-2322Details
2/f: mep for tenant improvement on the 2nd fl ref pa 2019-0207-2322 | $300,000 |
| Mar 27, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | t.i. improvement on the 6th fl. new non structureal partitions finishes, acoustical ceilings, mep & fire life safety under sep permitDetails
t.i. improvement on the 6th fl. new non structureal partitions finishes, acoustical ceilings, mep & fire life safety under sep permit | $996,088 |
| Mar 7, 2019 | Completed final sign-off Jun 2019 | 989 Market St | Ayoob & Peery Plumbing Co Inc | f/a on 2nd fl: add 15, relocate 59, plug 7, and change out 4 sprinklers in order to conform with the new wall ceiling layout of the ti. ref pa #201902072322Details
f/a on 2nd fl: add 15, relocate 59, plug 7, and change out 4 sprinklers in order to conform with the new wall ceiling layout of the ti. ref pa #201902072322 | $21,150 |
| Feb 7, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | 2nd flr. tenant improvement incl new partitions, new acoustical ceilings. mep, life safety & sprinkler under separateDetails
2nd flr. tenant improvement incl new partitions, new acoustical ceilings. mep, life safety & sprinkler under separate | $1,726,000 |
| Jan 4, 2019 | Completed final sign-off Jan 2019 | 989 Market St | Bilcor Inc | as built to 201811085350 install 2 duct det and 2 control relays for fsd 1 on the 4th and 5th flrs. sequence of operation to reflect field observations maher naDetails
as built to 201811085350 install 2 duct det and 2 control relays for fsd 1 on the 4th and 5th flrs. sequence of operation to reflect field observations maher na | $2,400 |
| Dec 20, 2018 | Never finaled issued Jan 2019, no final | 989 Market St | Novo Construction Inc | 2nd and 6th flr. interior demo on 2nd & 6th floor ab-017Details
2nd and 6th flr. interior demo on 2nd & 6th floor ab-017 | $75,000 |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 989 Market St | Ayoob & Peery Plumbing Co Inc | 5th fl - add 16, relocate 40 and plug 4 sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa 2018-0803-6362 job #18-691Details
5th fl - add 16, relocate 40 and plug 4 sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa 2018-0803-6362 job #18-691 | $17,400 |
| Nov 30, 2018 | Completed final sign-off Dec 2018 | 989 Market St | Ayoob & Peery Plumbing Co Inc | 4th flr - add 26, relocate 39, plug 0 to conform with the new layout. sprinkler to confirm with new wall/ceiling layout of ti ref pa 2018-0803-6355Details
4th flr - add 26, relocate 39, plug 0 to conform with the new layout. sprinkler to confirm with new wall/ceiling layout of ti ref pa 2018-0803-6355 | $17,000 |
| Nov 26, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Novo Construction Inc | 5th fl - renovation of restrooms to include non-structural partitions, new accoustical ceiling. barrier removal mepDetails
5th fl - renovation of restrooms to include non-structural partitions, new accoustical ceiling. barrier removal mep | $43,750 |
| Nov 26, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Novo Construction Inc | 4th fl - renovation of restrooms to include non-structural partitions, new accoustical ceiling. mep under separate permitDetails
4th fl - renovation of restrooms to include non-structural partitions, new accoustical ceiling. mep under separate permit | $43,750 |
| Nov 8, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Bilcor Inc | fire alarm ti for 4th & 5th fl: install 45 wall mont strobes, install 24 wall mount horn-strobes, install 2 cieling mount horn-strobes, install 4 smoke detector with base, install 6 duct detector with sample tube, install 6 control relay. ref ti 4th fl #201808036355 & 5th fl #201808036362.Details
fire alarm ti for 4th & 5th fl: install 45 wall mont strobes, install 24 wall mount horn-strobes, install 2 cieling mount horn-strobes, install 4 smoke detector with base, install 6 duct detector with sample tube, install 6 control relay. ref ti 4th fl #201808036355 & 5th fl #201808036362. | $52,200 |
| Aug 7, 2018 | Completed final sign-off Feb 2019 | 989 Market St | Novo Construction Inc | mechanical work on the 5th fl. new vrf condensing units, vrg coil units, exhaust fans & electrical work. ref pa #201808036362.Details
mechanical work on the 5th fl. new vrf condensing units, vrg coil units, exhaust fans & electrical work. ref pa #201808036362. | |
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Novo Construction Inc | mechanical work on the 4th fl. new vrf fan coil units, new vav erminal units, ductwork and thermostats. new. ref pa #201808036355.Details
mechanical work on the 4th fl. new vrf fan coil units, new vav erminal units, ductwork and thermostats. new. ref pa #201808036355. | |
| Aug 3, 2018 | Completed final sign-off Feb 2019 | 989 Market St | Novo Construction Inc | 5th flr. tenant improvement. demo of non-structural partitions. new non-structural partions ceilings, millwork w/finishes. mep and fire life safety under separate permit. maher n/aDetails
5th flr. tenant improvement. demo of non-structural partitions. new non-structural partions ceilings, millwork w/finishes. mep and fire life safety under separate permit. maher n/a | $1,725,000 |
| Aug 3, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Novo Construction Inc | 4th flr. tenant improvement. demo of non-structural partitions. new non-structural partitions ceilings, millwork w/ finishes. mep and fire life safety under separate permit. maher n/aDetails
4th flr. tenant improvement. demo of non-structural partitions. new non-structural partitions ceilings, millwork w/ finishes. mep and fire life safety under separate permit. maher n/a | $1,726,000 |
| Jul 11, 2018 | Completed final sign-off Jan 2019 | 989 Market St | Novo Construction Inc | interior demo on the 4th & 5th floor to include removal of existing ceiling grid, tile & lighting and non-structural partitions. ab017Details
interior demo on the 4th & 5th floor to include removal of existing ceiling grid, tile & lighting and non-structural partitions. ab017 | $70,000 |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 989 Market St | street spaceDetails
street space | ||
| May 22, 2018 | Never finaled issued May 2018, no final | 989 Market St | street spaceDetails
street space | ||
| Apr 23, 2018 | Never finaled issued Apr 2018, no final | 989 Market St | Rainbow Waterproofing & Restor | street spaceDetails
street space | |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 989 Market St | street spaceDetails
street space | ||
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 989 Market St | Rainbow Waterproofing & Restor | street spaceDetails
street space | |
| Dec 18, 2017 | Never finaled issued Dec 2017, no final | 989 Market St | street spaceDetails
street space | ||
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 989 Market St | street space permitDetails
street space permit | ||
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 989 Market St | brick re-pointing 1500 sq. ft. n/a for maher.Details
brick re-pointing 1500 sq. ft. n/a for maher. | $200,000 | |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 989 Market St | street spaceDetails
street space | ||
| Sep 8, 2017 | Never finaled issued Sep 2017, no final | 989 Market St | street spaceDetails
street space | ||
| May 15, 2017 | Never finaled issued May 2017, no final | 989 Market St | street spaceDetails
street space | ||
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 989 Market St | street space prmitDetails
street space prmit | ||
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 989 Market St | street spaceDetails
street space | ||
| Mar 3, 2017 | Completed final sign-off Jun 2017 | 989 Market St | Rainbow Waterproofing & Restor | repairs to southwest corner of bld where there is significant crack and missing mortor. steel brackets to be installed to steel structural column and surrounding bricks tied to column with a continous steel wire. all mortor and masonry replaced in kind where necessary maher naDetails
repairs to southwest corner of bld where there is significant crack and missing mortor. steel brackets to be installed to steel structural column and surrounding bricks tied to column with a continous steel wire. all mortor and masonry replaced in kind where necessary maher na | $73,816 |
| Jan 17, 2017 | Never finaled issued Jan 2017, no final | 989 Market St | street spaceDetails
street space | ||
| Dec 2, 2016 | Never finaled issued Dec 2016, no final | 989 Market St | street spaceDetails
street space | ||
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 989 Market St | Principal Builders Inc. | 5th floor - (3) new evacuation signs. n/a maher ordinanceDetails
5th floor - (3) new evacuation signs. n/a maher ordinance | $3,000 |
| Aug 24, 2016 | Completed final sign-off Apr 2017 | 989 Market St | Matrix Hg Inc | replacement of 1 boiler and 2 pumps and associated structural. maher naDetails
replacement of 1 boiler and 2 pumps and associated structural. maher na | $58,975 |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 989 Market St | Golden Gate Fire Protection Inc | fire sprinkler only - add 1 sprinkler pendent in phone room on the 2nd floor. ref pa 2015-1210-4767Details
fire sprinkler only - add 1 sprinkler pendent in phone room on the 2nd floor. ref pa 2015-1210-4767 | $500 |
| Jun 15, 2016 | Completed final sign-off Nov 2016 | 989 Market St | Principal Builders Inc. | 5th floor: mechanical title 24 to add new equipment. see ref pa 2016 0512 7279 maher naDetails
5th floor: mechanical title 24 to add new equipment. see ref pa 2016 0512 7279 maher na | $37,000 |
| Jun 7, 2016 | Completed final sign-off Jun 2016 | 989 Market St | Bilcor Inc | 5th floor fire alarm tenant improvement - install 3 ceiling mount horn/strobes, install 4 wall mount strobes. n/a maher ordinanceDetails
5th floor fire alarm tenant improvement - install 3 ceiling mount horn/strobes, install 4 wall mount strobes. n/a maher ordinance | $4,800 |
| May 25, 2016 | Completed final sign-off Jun 2016 | 989 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti - relocate 2 heads, add 2 heads, plug 1 head. ref pa 2015-0512-7279. maher naDetails
fire sprinkler ti - relocate 2 heads, add 2 heads, plug 1 head. ref pa 2015-0512-7279. maher na | $2,400 |
| May 23, 2016 | Completed final sign-off Nov 2016 | 989 Market St | Principal Builders Inc. | 5th floor: t-24 lighting and power to install new fixtures and outlets on 5th floor. ref pa 2016-0512-7279 for tiDetails
5th floor: t-24 lighting and power to install new fixtures and outlets on 5th floor. ref pa 2016-0512-7279 for ti | $18,045 |
| May 12, 2016 | Completed final sign-off Nov 2016 | 989 Market St | Principal Builders Inc. | project consists of a t.i. on an existing single tenant 5/f. the tenant space is currently unoccupied, new scope includes demolition of non-structural office partitions, new finishes, relocated lighting. mep. & life safety modification will be submitted under a seperate permit as needed. n/a maherDetails
project consists of a t.i. on an existing single tenant 5/f. the tenant space is currently unoccupied, new scope includes demolition of non-structural office partitions, new finishes, relocated lighting. mep. & life safety modification will be submitted under a seperate permit as needed. n/a maher | $101,247 |
| Dec 10, 2015 | Completed final sign-off Aug 2016 | 989 Market St | Novo Construction Inc | ti to include new non-structural partitions, new accoustical grid & tile and gypsum board ceilings and finishes throughout. maher naDetails
ti to include new non-structural partitions, new accoustical grid & tile and gypsum board ceilings and finishes throughout. maher na | $35,000 |
| Sep 22, 2015 | Completed final sign-off Oct 2015 | 989 Market St | Johnson Controls Security Solutions Llc | 4th floor fire alarm - relocate 1 horn strobe. n/a maher ordinance. ref ti 2015-0519-6684.Details
4th floor fire alarm - relocate 1 horn strobe. n/a maher ordinance. ref ti 2015-0519-6684. | $4,000 |
| Jun 30, 2015 | Completed final sign-off Dec 2015 | 989 Market St | Principal Builders Inc. | 4th flr: new title 24 power (no lighting) for ti space; upgrades to existing space; maher n/aDetails
4th flr: new title 24 power (no lighting) for ti space; upgrades to existing space; maher n/a | $11,250 |
| May 19, 2015 | Never finaled issued May 2015, no final | 989 Market St | Principal Builders Inc. | minor demo of work stations, millwork, door & finishes. construction of new partitions and doors, millwork, finishes & upgrade of breakroom sink to meet accessibility req's. all fire/life/safety under sep permit. maher naDetails
minor demo of work stations, millwork, door & finishes. construction of new partitions and doors, millwork, finishes & upgrade of breakroom sink to meet accessibility req's. all fire/life/safety under sep permit. maher na | $125,000 |
| Mar 31, 2015 | Never finaled issued May 2015, no final | 989 Market St | Gci, Inc | lower level: construction of fire rated corridor only. new fire rated partition, fire rated doors/frames/hardward. (e) ceiling to remain. no change to lighting, (e) mechanical to remain. no structural work. maher - not req'dDetails
lower level: construction of fire rated corridor only. new fire rated partition, fire rated doors/frames/hardward. (e) ceiling to remain. no change to lighting, (e) mechanical to remain. no structural work. maher - not req'd | $55,000 |
| Oct 14, 2014 | Completed final sign-off Jan 2015 | 989 Market St | Johnson Controls Security Solutions Llc | 3rd floor: additional notication appliance of horn/strobe and one new strobe. ref. appl. 201410038011. maher n/a.Details
3rd floor: additional notication appliance of horn/strobe and one new strobe. ref. appl. 201410038011. maher n/a. | $1,300 |
| Oct 7, 2014 | Completed final sign-off Nov 2014 | 989 Market St | Cisco Fire Sprinklers, Inc. | add 10 new 155* pendent sprinklers in new ceilings and relocate 4 155* uprights to cover new walls. t.i. pa#201410038011. n/a ordinance #155-13Details
add 10 new 155* pendent sprinklers in new ceilings and relocate 4 155* uprights to cover new walls. t.i. pa#201410038011. n/a ordinance #155-13 | $5,000 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 989 Market St | 3rd floor: t.i. project to extg tenant space. scope of work includes construction of 1 conf. room, 1 office, and 1 storage room. restroom upgrade. no plumbing. n/a for the maherDetails
3rd floor: t.i. project to extg tenant space. scope of work includes construction of 1 conf. room, 1 office, and 1 storage room. restroom upgrade. no plumbing. n/a for the maher | $75,000 | |
| Jul 8, 2013 | Never finaled issued Jul 2013, no final | 989 Market St | street space permitDetails
street space permit | ||
| Jul 1, 2013 | Completed final sign-off Dec 2013 | 989 Market St | Blue's Roofing Co | reroofingDetails
reroofing | $204,000 |
| Oct 19, 2012 | Completed final sign-off Nov 2012 | 989 Market St | B B J Electric, Inc | 4th floor:add 5 horn strobes and 3 strobes to extg fire alarm system, extg power supply. t.i. 201208298511Details
4th floor:add 5 horn strobes and 3 strobes to extg fire alarm system, extg power supply. t.i. 201208298511 | $7,500 |
| Aug 29, 2012 | Completed final sign-off Feb 2013 | 989 Market St | P 3 Construction & Remodeling Inc | revision 201205100245. additonal demo and ti work under app#2012-0412-8205. no struct work, mep separate permit. project consists of t.i. on an (e) 2 tenant 4/f which is currently unoccupied. new scope includes new non-structural office partition, new finishes and millwork, new power and lighting.Details
revision 201205100245. additonal demo and ti work under app#2012-0412-8205. no struct work, mep separate permit. project consists of t.i. on an (e) 2 tenant 4/f which is currently unoccupied. new scope includes new non-structural office partition, new finishes and millwork, new power and lighting. | $80,000 |
| Aug 17, 2012 | Completed final sign-off Dec 2012 | 989 Market St | Madden Plumbing, Llc | 4th floor install seven (7) new heads below t-bar ceiling. t.i. pa #2012.05.10.0245Details
4th floor install seven (7) new heads below t-bar ceiling. t.i. pa #2012.05.10.0245 | $1,500 |
| Jul 25, 2012 | Completed final sign-off Sep 2012 | 989 Market St | Carter Brothers Fire & Life Safety | fire alarm as-builts per inspectors request for 4th, 5th, and 6th fl. revision to 201207124708Details
fire alarm as-builts per inspectors request for 4th, 5th, and 6th fl. revision to 201207124708 | |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 989 Market St | Carter Brothers Fire & Life Safety | install new fire alarm devices in new ti space on 4th, 5th, and 6th floors. all devices added to an existing fire alarm system. includes 4 smoke detectors, 36 horn strobes, 23 strobesDetails
install new fire alarm devices in new ti space on 4th, 5th, and 6th floors. all devices added to an existing fire alarm system. includes 4 smoke detectors, 36 horn strobes, 23 strobes | $21,800 |
| May 22, 2012 | Completed final sign-off Jul 2012 | 989 Market St | Anderson, Rowe & Buckley, Inc. | fire sprnkler system. t.i. on 4th,5th, and 6th floor. 6th floor:87 new sprinklers 5th floor:85 new sprinklers 4th floor: 49 new sprinklers.Details
fire sprnkler system. t.i. on 4th,5th, and 6th floor. 6th floor:87 new sprinklers 5th floor:85 new sprinklers 4th floor: 49 new sprinklers. | $110,500 |
| May 18, 2012 | Completed final sign-off Nov 2012 | 989 Market St | Principal Builders Inc. | m.e.p. for floor 6-ti approved under app# 201204269176Details
m.e.p. for floor 6-ti approved under app# 201204269176 | $200,000 |
| May 14, 2012 | Completed final sign-off Nov 2012 | 989 Market St | Principal Builders Inc. | m.e.p. for floors 4 & 5-ti approved under app# 201205100245Details
m.e.p. for floors 4 & 5-ti approved under app# 201205100245 | $375,000 |
| May 10, 2012 | Completed final sign-off Feb 2013 | 989 Market St | interior tenant improvement on floors 4 and 5. all mep under separate permitDetails
interior tenant improvement on floors 4 and 5. all mep under separate permit | $525,000 | |
| Apr 27, 2012 | Completed final sign-off Dec 2012 | 989 Market St | Madden Plumbing, Llc | remove pendent & install upright head. (4) on 2nd floor kitchen, (50) on 4th floor unoccpupied spaces.Details
remove pendent & install upright head. (4) on 2nd floor kitchen, (50) on 4th floor unoccpupied spaces. | $6,000 |
| Apr 26, 2012 | Completed final sign-off Nov 2012 | 989 Market St | interior non structural t.i. of the 6th floor. mep, fire safety under seperate permit.Details
interior non structural t.i. of the 6th floor. mep, fire safety under seperate permit. | $325,000 | |
| Apr 12, 2012 | Completed final sign-off Nov 2012 | 989 Market St | demolition of interior partitions, finishes, ceiling grid and light fixtures. all work to comply with ab-017. construction, mechancial, electrical, life safety under separate permit.Details
demolition of interior partitions, finishes, ceiling grid and light fixtures. all work to comply with ab-017. construction, mechancial, electrical, life safety under separate permit. | $60,000 | |
| Feb 10, 2012 | Completed final sign-off Mar 2012 | 989 Market St | Carter Brothers Fire & Life Safety | add 12 new horn strobes and 3 strobes to existing fire alarm system in a new ti space. (ti 201112201039)Details
add 12 new horn strobes and 3 strobes to existing fire alarm system in a new ti space. (ti 201112201039) | $7,240 |
| Dec 20, 2011 | Completed final sign-off Feb 2012 | 989 Market St | P 3 Construction & Remodeling Inc | 2nd floor - demolition of existing non-structural walls interior ceiling height walls & associated power & data. new selective elec. new finishes & millwork. mep work is design /build.Details
2nd floor - demolition of existing non-structural walls interior ceiling height walls & associated power & data. new selective elec. new finishes & millwork. mep work is design /build. | $131,800 |
| Aug 31, 2011 | Completed final sign-off Dec 2011 | 989 Market St | 4th fl t.i.: add new lighting, kitchenette, column covers, minor upgrade to existing restrooms for accessibilityDetails
4th fl t.i.: add new lighting, kitchenette, column covers, minor upgrade to existing restrooms for accessibility | $20,000 | |
| Jul 15, 2011 | Completed final sign-off Aug 2011 | 989 Market St | Carter Brothers Fire & Life Safety | add (n) fire alarm devices in a new 3rd. flr. t.i. space. devices will be added to a (e) fa system. 5-(n) strobes (t.i.#201105317062).Details
add (n) fire alarm devices in a new 3rd. flr. t.i. space. devices will be added to a (e) fa system. 5-(n) strobes (t.i.#201105317062). | $8,200 |
| Jul 8, 2011 | Completed final sign-off Aug 2011 | 989 Market St | Aegis Fire Systems Technology Inc | 3rd floor-add 3 sprinkler heads & relocated 2 pendent fire sprinklers, add 3 upright fire sprinkler to new phone booth & office to accomodate tenant improvement changesDetails
3rd floor-add 3 sprinkler heads & relocated 2 pendent fire sprinklers, add 3 upright fire sprinkler to new phone booth & office to accomodate tenant improvement changes | $2,500 |
| May 31, 2011 | Completed final sign-off Aug 2011 | 989 Market St | D A Pope Inc | office ti on the 3rd fl. renov. of(e) conf rm to 1 conf rm and office. renov of work rm into 3 offices, store rm to employer break rm. add 4 phone rooms.Details
office ti on the 3rd fl. renov. of(e) conf rm to 1 conf rm and office. renov of work rm into 3 offices, store rm to employer break rm. add 4 phone rooms. | $98,914 |
| Jan 10, 2011 | Completed final sign-off Oct 2011 | 989 Market St | Young Electric Sign Co. | erect non electric sign for projecting, double faced.Details
erect non electric sign for projecting, double faced. | $2,000 |
| Oct 5, 2010 | Completed final sign-off Dec 2010 | 989 Market St | Carter Brothers Fire & Life Safety | replace dysfunctional fire alarm panel. all field devices are 100 % compatible and will remain without modificationDetails
replace dysfunctional fire alarm panel. all field devices are 100 % compatible and will remain without modification | $6,000 |
| Sep 29, 2010 | Completed final sign-off Oct 2010 | 989 Market St | Cci Com'l Constr & Improv**See 985808*** | to comply w/n.o.v. #201063148 dated 08/16/10. reference to pa #201004069721 installation of new shelves, display cases & counters.Details
to comply w/n.o.v. #201063148 dated 08/16/10. reference to pa #201004069721 installation of new shelves, display cases & counters. | |
| Jul 28, 2010 | Completed final sign-off Sep 2010 | 989 Market St | Young Electric Sign Co. | install (1) non illuminated paint tube above business entry for " blick art materials"Details
install (1) non illuminated paint tube above business entry for " blick art materials" | $4,000 |
| Jul 22, 2010 | Expired or cancelled withdrawn Oct 2011 | 989 Market St | Young Electric Sign Co. | to erect non-electric, projecting, double faced sign. install 1-non-illuminated paint tube sign for "blick art materials".Details
to erect non-electric, projecting, double faced sign. install 1-non-illuminated paint tube sign for "blick art materials". | $4,000 |
| Jun 9, 2010 | Expired or cancelled expired Dec 2011 | 989 Market St | Young Electric Sign Co. | to erect electric, wall, single faced sign. blick art materials. install 2 illuminated wall signs. one on market st side and one stevenson st sideDetails
to erect electric, wall, single faced sign. blick art materials. install 2 illuminated wall signs. one on market st side and one stevenson st side | $12,000 |
| Jun 9, 2010 | Completed final sign-off Aug 2010 | 989 Market St | Young Electric Sign Co. | blick art materials. install one non-illuminated double faced banners on stevensin st elevationDetails
blick art materials. install one non-illuminated double faced banners on stevensin st elevation | $3,000 |
| Jun 8, 2010 | Completed final sign-off Aug 2010 | 989 Market St | Incom Mechanical Inc | fire sprinkler ti on the 1st and basement floor. provide design and install of the modification of the existing automatic wet sprinkler system in accordance with nfpa 13, 2002. adding 6 heads, relocate 6, new piping.Details
fire sprinkler ti on the 1st and basement floor. provide design and install of the modification of the existing automatic wet sprinkler system in accordance with nfpa 13, 2002. adding 6 heads, relocate 6, new piping. | $5,200 |
| Apr 30, 2010 | Completed final sign-off Oct 2010 | 989 Market St | Carter Brothers Fire & Life Safety | basement, 1st floor & mezz: add to an (e) fire alarm system devices in new t.i. space (t.i. pa# 201004069721). this includes 4 smokes, 2 pull stations, 4 strobes, 18 horn strobes & 4 control modulesDetails
basement, 1st floor & mezz: add to an (e) fire alarm system devices in new t.i. space (t.i. pa# 201004069721). this includes 4 smokes, 2 pull stations, 4 strobes, 18 horn strobes & 4 control modules | $5,800 |
| Apr 6, 2010 | Completed final sign-off Oct 2010 | 989 Market St | Cci Com'l Constr & Improv**See 985808*** | ground floor retail tenant improvement. install (n) freight elevator and stairs to basement. install (n) accessible wheelchair lift to (e) mezzanine. hvac & lighting under separate permit.Details
ground floor retail tenant improvement. install (n) freight elevator and stairs to basement. install (n) accessible wheelchair lift to (e) mezzanine. hvac & lighting under separate permit. | $450,000 |
| Mar 29, 2010 | Completed final sign-off Aug 2010 | 989 Market St | Cci Com'l Constr & Improv**See 985808*** | replace (e) tenant entry with glass store front to match adjacent. provide (n) mtl roll up door in (n) openoing. (n) mtl roll up door in (e) opening and (n) aluminum store front tenant entry.Details
replace (e) tenant entry with glass store front to match adjacent. provide (n) mtl roll up door in (n) openoing. (n) mtl roll up door in (e) opening and (n) aluminum store front tenant entry. | $30,000 |
| Mar 10, 2010 | Never finaled issued Mar 2010, no final | 989 Market St | Cci Com'l Constr & Improv**See 985808*** | interior soft demo as noted per ab-017 @ ground flr.Details
interior soft demo as noted per ab-017 @ ground flr. | $10,000 |
| Aug 31, 2007 | Expired or cancelled expired Jun 2009 | 989 Market St | Aquamatic Fire Protection | suite #420 - relocate (9) sprinkler heads.Details
suite #420 - relocate (9) sprinkler heads. | $5,450 |
| Aug 27, 2007 | Never finaled filed Aug 2007, never issued | 989 Market St | Aeco Systems, Inc | fire alarm modification for tenant improvement. 8 total devicesDetails
fire alarm modification for tenant improvement. 8 total devices | $7,500 |
| Aug 27, 2007 | Completed final sign-off Oct 2007 | 989 Market St | Aeco Systems, Inc | fire alarm modification for tenant inprovement. * devices total.Details
fire alarm modification for tenant inprovement. * devices total. | $7,500 |
| Aug 10, 2007 | Completed final sign-off Oct 2007 | 989 Market St | R L H Fire Protection Inc | revision to fire sprinkler plan. revised pa# 2007/06/04/2932 to reflect field layout for inspection.Details
revision to fire sprinkler plan. revised pa# 2007/06/04/2932 to reflect field layout for inspection. | $1,000 |
| Jun 27, 2007 | Completed final sign-off Oct 2007 | 989 Market St | oti- revision to pa 200705181681. correct corridor change.Details
oti- revision to pa 200705181681. correct corridor change. | $2,000 | |
| Jun 12, 2007 | Never finaled issued Jun 2007, no final | 989 Market St | Rudolph Commercial Interiors Inc, Rci | oti-2 4th floor elDetails
oti-2 4th floor el | $38,000 |
| Jun 4, 2007 | Completed final sign-off Oct 2007 | 989 Market St | R L H Fire Protection Inc | ti upgrade of fire sprinkler system, relocate e upright heads to pendent for new tbar ceilingDetails
ti upgrade of fire sprinkler system, relocate e upright heads to pendent for new tbar ceiling | $4,899 |
| May 18, 2007 | Completed final sign-off Oct 2007 | 989 Market St | atpa, oti-1 4th floor, el, lsDetails
atpa, oti-1 4th floor, el, ls | $40,000 | |
| Apr 5, 2007 | Completed final sign-off Oct 2007 | 989 Market St | Rudolph Commercial Interiors Inc, Rci | oti-1, regis property group, 4th floor, el, ls, sp, me.Details
oti-1, regis property group, 4th floor, el, ls, sp, me. | $135,000 |
| May 22, 2006 | Expired or cancelled expired May 2007 | 979 Market St | Sign & Sign Again | erect electric single faced new sign.Details
erect electric single faced new sign. | |
| Aug 2, 2004 | Never finaled issued Aug 2004, no final | 989 Market St | street spaceDetails
street space | ||
| Jun 21, 2004 | Expired or cancelled expired Sep 2005 | 979 Market St | California Neon | to erect a double-faced electrical projecting wall signDetails
to erect a double-faced electrical projecting wall sign | |
| Sep 16, 2002 | Expired or cancelled expired Jul 2003 | 989 Market St | addition to extg fire alasrm system/addition consists of 2 horn/strobe units and 2 manualDetails
addition to extg fire alasrm system/addition consists of 2 horn/strobe units and 2 manual | $9,000 | |
| Sep 5, 2002 | Expired or cancelled expired Jul 2003 | 989 Market St | Ayoob & Peery Plumbing Co Inc | relocate 20 ssp, add 4 sspDetails
relocate 20 ssp, add 4 ssp | $4,000 |
| May 23, 2002 | Completed final sign-off Jun 2002 | 989 Market St | Skyline Construction | renew app#200106181725 for final inspectionDetails
renew app#200106181725 for final inspection | |
| Jan 10, 2002 | Completed final sign-off Feb 2002 | 989 Market St | partial demo of (e) floor finishesDetails
partial demo of (e) floor finishes | $45,000 | |
| Nov 16, 2001 | Expired or cancelled expired Mar 2003 | 989 Market St | South Bay Construction | level patch&repair floor,relocate storefront,provide ada compliant accessibility improv.200012067246Details
level patch&repair floor,relocate storefront,provide ada compliant accessibility improv.200012067246 | $45,000 |
| Aug 17, 2001 | Completed final sign-off Aug 2001 | 989 Market St | reconfiguration of groun floor entry doors to meet ada compliance/barrier remodel onlyDetails
reconfiguration of groun floor entry doors to meet ada compliance/barrier remodel only | $4,000 | |
| Aug 9, 2001 | Expired or cancelled expired Dec 2001 | 989 Market St | Intelligent Technologies & Services Inc | installation of a detection system for a pre-action fire sprnkl systemDetails
installation of a detection system for a pre-action fire sprnkl system | $900 |
| Jun 18, 2001 | Expired or cancelled expired Dec 2001 | 989 Market St | upgrade to fire/life safety system on floors 5,6, and basementDetails
upgrade to fire/life safety system on floors 5,6, and basement | $16,000 | |
| Jun 6, 2001 | Expired or cancelled expired Jun 2002 | 989 Market St | Ayoob & Peery Plumbing Co Inc | modify exist fire sprinkler systems to accomodate tenant improvements on basement, 5th & 6th floorsDetails
modify exist fire sprinkler systems to accomodate tenant improvements on basement, 5th & 6th floors | $39,500 |
| May 31, 2001 | Completed final sign-off Apr 2002 | 989 Market St | Skyline Construction | oti-2 6th floor, el, meDetails
oti-2 6th floor, el, me | $100,000 |
| May 31, 2001 | Completed final sign-off Apr 2002 | 989 Market St | Skyline Construction | oti-2 5th floor, el, meDetails
oti-2 5th floor, el, me | $100,000 |
| May 7, 2001 | Expired or cancelled expired Jul 2002 | 989 Market St | Skyline Construction | oti-1 basement ltg mech ls sprDetails
oti-1 basement ltg mech ls spr | $112,000 |
| May 7, 2001 | Expired or cancelled expired Jul 2003 | 989 Market St | Skyline Construction | oti-1 5th floor ltg mech ls sprDetails
oti-1 5th floor ltg mech ls spr | $450,000 |
| May 7, 2001 | Expired or cancelled expired Jul 2003 | 989 Market St | Skyline Construction | oti-1 6th floor ltg mech ls spr.Details
oti-1 6th floor ltg mech ls spr. | $450,000 |
| Mar 23, 2001 | Expired or cancelled expired Sep 2001 | 989 Market St | upgrade to the fire / life safety system for the main lobby 1st floor.Details
upgrade to the fire / life safety system for the main lobby 1st floor. | $8,000 | |
| Mar 7, 2001 | Expired or cancelled expired Sep 2001 | 989 Market St | Incom Mechanical Inc | add/remove/relocate fire sprinkler pendant heads for new ceiling layout 1st floor lobby.Details
add/remove/relocate fire sprinkler pendant heads for new ceiling layout 1st floor lobby. | $6,000 |
| Mar 6, 2001 | Completed final sign-off Jun 2001 | 989 Market St | revsions to 3rd/4th fl add strobes update candella rating elev lby strobe upgrd matrix add strobesDetails
revsions to 3rd/4th fl add strobes update candella rating elev lby strobe upgrd matrix add strobes | $1,000 | |
| Feb 26, 2001 | Expired or cancelled expired Aug 2001 | 989 Market St | South Bay Construction | revision to app#200012067246Details
revision to app#200012067246 | |
| Feb 21, 2001 | Expired or cancelled expired Feb 2002 | 989 Market St | Skyline Construction | demolition-basement, 5th floor, 6th floor, int, non-structural demo of non-bearing paritionsDetails
demolition-basement, 5th floor, 6th floor, int, non-structural demo of non-bearing paritions | $100,000 |
| Feb 15, 2001 | Expired or cancelled expired Mar 2002 | 989 Market St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads at 3rd & 4th floor.Details
add & relocate fire sprinkler heads at 3rd & 4th floor. | $35,500 |
| Feb 2, 2001 | Expired or cancelled expired Jun 2001 | 989 Market St | partial interior demolition at south side of 4th floorDetails
partial interior demolition at south side of 4th floor | $5,000 | |
| Feb 1, 2001 | Completed final sign-off Jun 2001 | 989 Market St | Rudolph Caler/Lumen Electric | electrical tenant improvement, all lighting & power requirements on 3/4th floorsDetails
electrical tenant improvement, all lighting & power requirements on 3/4th floors | $110,000 |
| Jan 30, 2001 | Completed final sign-off Apr 2001 | 989 Market St | South Bay Construction | remodel to rated vestibules adj. to stair well to comply h.c. accessibility on 3rd-6th floorsDetails
remodel to rated vestibules adj. to stair well to comply h.c. accessibility on 3rd-6th floors | $25,000 |
| Dec 19, 2000 | Completed final sign-off Jun 2001 | 989 Market St | upgrade to 3/4 floor to bring fire alarm system life safety system up to code at 3rd and 4th floorDetails
upgrade to 3/4 floor to bring fire alarm system life safety system up to code at 3rd and 4th floor | $14,000 | |
| Dec 6, 2000 | Completed final sign-off Apr 2001 | 989 Market St | relocation and renovation of (e) lobby and retail spaceDetails
relocation and renovation of (e) lobby and retail space | $30,000 | |
| Nov 29, 2000 | Completed final sign-off Apr 2001 | 989 Market St | revise 2000/09/23/1391 and 2000/11/03/4889. details for weld inspection.Details
revise 2000/09/23/1391 and 2000/11/03/4889. details for weld inspection. | ||
| Nov 27, 2000 | Completed final sign-off Dec 2000 | 989 Market St | South Bay Construction | add fire door @ 1st and 2nd floorDetails
add fire door @ 1st and 2nd floor | $7,000 |
| Nov 6, 2000 | Completed final sign-off Apr 2001 | 989 Market St | South Bay Construction | supplemental seismic bracing-voluntary workDetails
supplemental seismic bracing-voluntary work | $45,000 |
| Nov 3, 2000 | Completed final sign-off Jun 2001 | 989 Market St | revise to app #200009231391 t/i for 3/f & 4/f partial demo of (e) interior partitionDetails
revise to app #200009231391 t/i for 3/f & 4/f partial demo of (e) interior partition | ||
| Sep 29, 2000 | Expired or cancelled expired Jan 2001 | 989 Market St | Cupertino Electric Inc. | revision to 9923734: fire alarms plans (matrix)Details
revision to 9923734: fire alarms plans (matrix) | |
| Sep 23, 2000 | Completed final sign-off Jun 2001 | 989 Market St | tenant improvementDetails
tenant improvement | $250,000 | |
| Sep 12, 2000 | Expired or cancelled withdrawn Dec 2000 | 989 Market St | remve/relocte (2) storfrt drs,remve wall/cnstrt 1hr wall, rmve lby flr/concrtDetails
remve/relocte (2) storfrt drs,remve wall/cnstrt 1hr wall, rmve lby flr/concrt | $150,000 | |
| Mar 31, 2000 | Expired or cancelled expired Jul 2000 | 989 Market St | oti-1, el, me, l/s, sp, 2nd floorDetails
oti-1, el, me, l/s, sp, 2nd floor | ||
| Mar 28, 2000 | Expired or cancelled expired Mar 2001 | 989 Market St | Allied Heating & Air Conditioning | t/i duct distribution from existing hvac systemDetails
t/i duct distribution from existing hvac system | $89,307 |
| Mar 13, 2000 | Expired or cancelled expired Sep 2000 | 989 Market St | Cupertino Electric Inc. | modify (e) fire alarm systemDetails
modify (e) fire alarm system | $10,000 |
| Feb 22, 2000 | Expired or cancelled expired Jul 2000 | 989 Market St | Anderson, Rowe & Buckley, Inc. | oti-3 sp 2nd floorDetails
oti-3 sp 2nd floor | $2,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (17), Ayoob & Peery Plumbing Co Inc (8), Principal Builders Inc. (8), Skyline Construction (7), Carter Brothers Fire & Life Safety (6), Red Hawk Fire & Security Ca Llc (6), South Bay Construction (5), Young Electric Sign Co. (5), Cci Com'l Constr & Improv**See 985808*** (4), Anderson, Rowe & Buckley, Inc. (3), Bilcor Inc (3), Rainbow Waterproofing & Restor (3), Aeco Systems, Inc (2), Cupertino Electric Inc. (2), Incom Mechanical Inc (2), Johnson Controls Security Solutions Llc (2), Madden Plumbing, Llc (2), P 3 Construction & Remodeling Inc (2), R L H Fire Protection Inc (2), Rudolph Commercial Interiors Inc, Rci (2), Aegis Fire Systems Technology Inc, Allied Heating & Air Conditioning, Aquamatic Fire Protection, B B J Electric, Inc, Blue's Roofing Co, California Neon, Cisco Fire Sprinklers, Inc., D A Pope Inc, Everon Llc, Gci, Inc, Golden Gate Fire Protection Inc, Intelligent Technologies & Services Inc, Matrix Hg Inc, Rudolph Caler/Lumen Electric, Sign & Sign Again, Western Waterproofing/Brisk Wp
- Architects
- Bert Deviterbo (2), Clement Soga, David Plotkin, Douglas Zucker, Hooks Design, Martha Breed, Megan J Carter, Melissa Pesci, Michael Steiner, Reema Farhat, Richard Vaterlaus, Richard Vaterlaus, Seth Hanley, Troy Kashanipour
- Engineers
- Craig Ristow (2), Alexander Joseph Pacheco, Nicolas John Rodrigues, Sherry Chaumpluke, Timothy Spooner
- Designers
- A D T Commercial Llc