Bert Deviterbo

License
C35090
Look the license up with the state
Listed as
architect, authorized agent-others
Firm
Gensler
Based in
San Francisco
On San Francisco permits
Jun 2006 to Aug 2026

89 permits since 2000 (architect on 83 permits, authorized agent-others on 6 permits): 62 completed, 4 in progress, 15 never finaled, 8 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 20, 2026In progress
issued Sep 2026
645 Harrison StSkyline Constructionlimited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation.
Details
Permit
202608206930
Status
issued
Filed
Aug 20, 2026
Permit issued
Sep 8, 2026
Declared cost
$107,970
Address
645 Harrison St

limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation.

Open the permit page

$107,970
Aug 27, 2025Completed
final sign-off Nov 2025
600 California StNovo Construction Inc2/f: minor ti. health dept correction to pantry. ref permit 2019-1011-4277
Details
Permit
202508274044
Status
complete
Filed
Aug 27, 2025
Permit issued
Oct 20, 2025
Final sign-off
Nov 21, 2025
Declared cost
$109,000
Address
600 California St

2/f: minor ti. health dept correction to pantry. ref permit 2019-1011-4277

Open the permit page

$109,000
Dec 18, 2024In progress
issued Jan 2025
181 Fremont StLevel 10 Construction Lp16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remain
Details
Permit
202412187109
Status
issued
Filed
Dec 18, 2024
Permit issued
Jan 17, 2025
Address
181 Fremont St

16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remain

Open the permit page

Dec 18, 2024In progress
issued Jan 2025
181 Fremont StLevel 10 Construction Lp18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remain
Details
Permit
202412187111
Status
issued
Filed
Dec 18, 2024
Permit issued
Jan 21, 2025
Address
181 Fremont St

18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remain

Open the permit page

Sep 9, 2024In progress
issued Sep 2024
181 Fremont StLevel 10 Construction Lp17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048.
Details
Permit
202409090372
Status
issued
Filed
Sep 9, 2024
Permit issued
Sep 11, 2024
Address
181 Fremont St

17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048.

Open the permit page

Aug 20, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lprevision to 202406104048, work includes the addition of new card readers and ceiling addition
Details
Permit
202408209070
Status
complete
Filed
Aug 20, 2024
Permit issued
Aug 29, 2024
Final sign-off
Oct 1, 2024
Address
181 Fremont St

revision to 202406104048, work includes the addition of new card readers and ceiling addition

Open the permit page

Jul 30, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lp18th fl revision to pa # 2024-0610-4048 addition of new card readers
Details
Permit
202407307548
Status
complete
Filed
Jul 30, 2024
Permit issued
Aug 14, 2024
Final sign-off
Oct 1, 2024
Address
181 Fremont St

18th fl revision to pa # 2024-0610-4048 addition of new card readers

Open the permit page

Jun 10, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lpconstruction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl.
Details
Permit
202406104048
Status
complete
Filed
Jun 10, 2024
Permit issued
Jul 1, 2024
Final sign-off
Oct 1, 2024
Declared cost
$331,360
Address
181 Fremont St

construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl.

Open the permit page

$331,360
Jun 10, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lpconstruction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl.
Details
Permit
202406104047
Status
complete
Filed
Jun 10, 2024
Permit issued
Jul 1, 2024
Final sign-off
Oct 1, 2024
Declared cost
$232,309
Address
181 Fremont St

construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl.

Open the permit page

$232,309
Apr 25, 2024Completed
final sign-off Oct 2024
101 California StNovo Construction Inc27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting
Details
Permit
202404250708
Status
complete
Filed
Apr 25, 2024
Permit issued
May 6, 2024
Final sign-off
Oct 30, 2024
Declared cost
$1,967,498
Address
101 California St

27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting

Open the permit page

$1,967,498
Nov 14, 2023Completed
final sign-off Feb 2025
1 California StSwinerton Builders19th fl: revision to 202212289252. tenant build out of 19th fl. reduction of sf footage to 7000 sf. flooring, partitions, mep, ceiling,ligting.
Details
Permit
202311140764
Status
complete
Filed
Nov 14, 2023
Permit issued
Feb 2, 2024
Final sign-off
Feb 14, 2025
Address
1 California St

19th fl: revision to 202212289252. tenant build out of 19th fl. reduction of sf footage to 7000 sf. flooring, partitions, mep, ceiling,ligting.

Open the permit page

Aug 1, 2023Never finaled
filed Aug 2023, never issued
360 Spear StHitt Contracting Inc.revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538
Details
Permit
202308013499
Status
filed
Filed
Aug 1, 2023
Address
360 Spear St

revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538

Open the permit page

Jul 26, 2023Completed
final sign-off Sep 2023
360 Spear StHitt Contracting Inc.3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope.
Details
Permit
202307263013
Status
complete
Filed
Jul 26, 2023
Permit issued
Jul 28, 2023
Final sign-off
Sep 13, 2023
Address
360 Spear St

3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope.

Open the permit page

Jun 8, 2023Expired or cancelled
cancelled Jan 2026
101 Spear StNovo Construction Incseismic anchorage for phone booths on the 4th and 5th floors. fire sprinkler under separate permit
Details
Permit
202306089525
Status
cancelled
Filed
Jun 8, 2023
Declared cost
$75,000
Address
101 Spear St

seismic anchorage for phone booths on the 4th and 5th floors. fire sprinkler under separate permit

Open the permit page

$75,000
Jun 8, 2023Completed
final sign-off Aug 2023
221 Main StPrincipal Builders Inc.9f, 14f, 15f - minor ti to (e) 9f, 14f, 15f pantry & support areas for sfdph & safety compliance
Details
Permit
202306089571
Status
complete
Filed
Jun 8, 2023
Permit issued
Jun 27, 2023
Final sign-off
Aug 14, 2023
Declared cost
$120,000
Address
221 Main St

9f, 14f, 15f - minor ti to (e) 9f, 14f, 15f pantry & support areas for sfdph & safety compliance

Open the permit page

$120,000
Jan 31, 2023Never finaled
issued Feb 2023, no final
525 Market StSkyline Construction20/flr: change from conference room to video production room, limited demolition & new construction only to the single room.
Details
Permit
202301311040
Status
issued
Filed
Jan 31, 2023
Permit issued
Feb 23, 2023
Declared cost
$90,000
Address
525 Market St

20/flr: change from conference room to video production room, limited demolition & new construction only to the single room.

Open the permit page

$90,000
Dec 28, 2022Completed
final sign-off Mar 2025
1 California StBcci Construction Company, Swinerton Builders19th floor office t.i. to include new partitions, ceilings, finishes & mep.
Details
Permit
202212289252
Status
complete
Filed
Dec 28, 2022
Permit issued
Jan 17, 2023
Final sign-off
Mar 18, 2025
Declared cost
$345,000
Address
1 California St

19th floor office t.i. to include new partitions, ceilings, finishes & mep.

Open the permit page

$345,000
Nov 8, 2022Completed
final sign-off Jun 2023
475 Sansome StBcci Construction Company5th fl - revision to pa arch & mep permit. proposed millwork planters to be omitted ref pa 2022-0719-8832 adding light fixture and wall furing, changeing wall type and realigning glass partition at rm. #504 patch and repair as noted.
Details
Permit
202211086111
Status
complete
Filed
Nov 8, 2022
Permit issued
Nov 10, 2022
Final sign-off
Jun 13, 2023
Address
475 Sansome St

5th fl - revision to pa arch & mep permit. proposed millwork planters to be omitted ref pa 2022-0719-8832 adding light fixture and wall furing, changeing wall type and realigning glass partition at rm. #504 patch and repair as noted.

Open the permit page

Oct 13, 2022Completed
final sign-off Apr 2026
100 Pine StBcci Construction Company32nd fl - revision to change configuration of men's restroom. electrical & plumbing & drawings included. ref 2022-0420-2653
Details
Permit
202210134296
Status
complete
Filed
Oct 13, 2022
Permit issued
Oct 18, 2022
Final sign-off
Apr 13, 2026
Declared cost
$5,000
Address
100 Pine St

32nd fl - revision to change configuration of men's restroom. electrical & plumbing & drawings included. ref 2022-0420-2653

Open the permit page

$5,000
Sep 13, 2022Completed
final sign-off Sep 2023
360 Spear StHitt Contracting Inc.revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl.
Details
Permit
202209132365
Status
complete
Filed
Sep 13, 2022
Permit issued
Dec 22, 2022
Final sign-off
Sep 13, 2023
Address
360 Spear St

revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl.

Open the permit page

Aug 17, 2022Expired or cancelled
expired Apr 2026
510 Townsend StBcci Construction Company7th fl new non structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred.
Details
Permit
202208170721
Status
expired
Filed
Aug 17, 2022
Permit issued
Aug 30, 2022
Declared cost
$350,000
Address
510 Townsend St

7th fl new non structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred.

Open the permit page

$350,000
Aug 10, 2022Completed
final sign-off Aug 2023
360 Spear StHitt Contracting Inc.3/f: revise island layout @ catering kitchen. ref bpa#202201246538
Details
Permit
202208100286
Status
complete
Filed
Aug 10, 2022
Permit issued
Aug 29, 2022
Final sign-off
Aug 23, 2023
Address
360 Spear St

3/f: revise island layout @ catering kitchen. ref bpa#202201246538

Open the permit page

Aug 1, 2022Completed
final sign-off Oct 2022
1 Sansome StHp Build34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a.
Details
Permit
202208019629
Status
complete
Filed
Aug 1, 2022
Permit issued
Sep 2, 2022
Final sign-off
Oct 12, 2022
Address
1 Sansome St

34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a.

Open the permit page

Jul 28, 2022Completed
final sign-off Aug 2023
510 Townsend StBcci Construction Company3rd fl: new non-structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred.
Details
Permit
202207289493
Status
complete
Filed
Jul 28, 2022
Permit issued
Oct 5, 2022
Final sign-off
Aug 11, 2023
Declared cost
$375,000
Address
510 Townsend St

3rd fl: new non-structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred.

Open the permit page

$375,000
Jul 28, 2022Completed
final sign-off Sep 2023
510 Townsend StBcci Construction Company5th fl: office remodel, new partitions & conference rooms, mep def. new micro kitchen.
Details
Permit
202207289462
Status
complete
Filed
Jul 28, 2022
Permit issued
Oct 6, 2022
Final sign-off
Sep 8, 2023
Declared cost
$190,000
Address
510 Townsend St

5th fl: office remodel, new partitions & conference rooms, mep def. new micro kitchen.

Open the permit page

$190,000
Jul 27, 2022Completed
final sign-off Sep 2023
510 Townsend StBcci Construction Company4th fl - office ti new partitions & conference rooms. mep/fa/fs deferred.
Details
Permit
202207279365
Status
complete
Filed
Jul 27, 2022
Permit issued
Oct 5, 2022
Final sign-off
Sep 8, 2023
Declared cost
$3,000,000
Address
510 Townsend St

4th fl - office ti new partitions & conference rooms. mep/fa/fs deferred.

Open the permit page

$3,000,000
Jul 19, 2022Completed
final sign-off Jun 2023
475 Sansome StBcci Construction Company5/f: new non-structural partitions, doors, and associated mep. demo permit 202205254994. structural drawings included.
Details
Permit
202207198832
Status
complete
Filed
Jul 19, 2022
Permit issued
Jul 27, 2022
Final sign-off
Jun 13, 2023
Declared cost
$2,700,000
Address
475 Sansome St

5/f: new non-structural partitions, doors, and associated mep. demo permit 202205254994. structural drawings included.

Open the permit page

$2,700,000
Jul 18, 2022Never finaled
issued Oct 2022, no final
510 Townsend StBcci Construction Company2/f: new non-structural partitions, acoustical grid & tile, ceiling, light fixtures, millwork and finishes. mep/fa/fs deferred.
Details
Permit
202207188709
Status
issued
Filed
Jul 18, 2022
Permit issued
Oct 5, 2022
Declared cost
$400,000
Address
510 Townsend St

2/f: new non-structural partitions, acoustical grid & tile, ceiling, light fixtures, millwork and finishes. mep/fa/fs deferred.

Open the permit page

$400,000
Jul 18, 2022Expired or cancelled
expired Aug 2026
510 Townsend StBcci Construction Companynon structural partition acoustical grid and tile, light fixtures millwork and finishes, mep deferred.
Details
Permit
202207188695
Status
expired
Filed
Jul 18, 2022
Permit issued
Oct 5, 2022
Declared cost
$1,250,000
Address
510 Townsend St

non structural partition acoustical grid and tile, light fixtures millwork and finishes, mep deferred.

Open the permit page

$1,250,000
Jul 12, 2022Expired or cancelled
expired Apr 2026
510 Townsend StBcci Construction Companybasement: new non-structural partitions, doors, card readers, and finishes. mep deferred.
Details
Permit
202207128306
Status
expired
Filed
Jul 12, 2022
Permit issued
Jul 15, 2022
Declared cost
$175,000
Address
510 Townsend St

basement: new non-structural partitions, doors, card readers, and finishes. mep deferred.

Open the permit page

$175,000
Jun 27, 2022Completed
final sign-off Apr 2023
510 Townsend StBcci Construction Companyfloor 1-6 floor demo only. ceiling will remain. ab-017 applies
Details
Permit
202206277148
Status
complete
Filed
Jun 27, 2022
Permit issued
Jun 27, 2022
Final sign-off
Apr 19, 2023
Declared cost
$110,000
Address
510 Townsend St

floor 1-6 floor demo only. ceiling will remain. ab-017 applies

Open the permit page

$110,000
Jun 9, 2022Completed
final sign-off Aug 2023
360 Spear StHitt Contracting Inc.revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room.
Details
Permit
202206096006
Status
complete
Filed
Jun 9, 2022
Permit issued
Jun 30, 2022
Final sign-off
Aug 23, 2023
Address
360 Spear St

revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room.

Open the permit page

Jun 2, 2022Never finaled
issued Jun 2022, no final
333 Bush StSkyline Construction32nd fl: administrative permit to obtain sffd assembly occupancy load stamps. no changes to egress and life safety. no work under this permit.
Details
Permit
202206025493
Status
issued
Filed
Jun 2, 2022
Permit issued
Jun 2, 2022
Address
333 Bush St

32nd fl: administrative permit to obtain sffd assembly occupancy load stamps. no changes to egress and life safety. no work under this permit.

Open the permit page

May 25, 2022Completed
final sign-off Jul 2022
475 Sansome StBcci Construction Company5th fl: demo only permit to remove (e) partitions, ceiling, and mep elements per ab-017. sprinkler pa# 202205234804.
Details
Permit
202205254994
Status
complete
Filed
May 25, 2022
Permit issued
May 26, 2022
Final sign-off
Jul 25, 2022
Declared cost
$50,000
Address
475 Sansome St

5th fl: demo only permit to remove (e) partitions, ceiling, and mep elements per ab-017. sprinkler pa# 202205234804.

Open the permit page

$50,000
Apr 27, 2022Completed
final sign-off Feb 2023
505 Montgomery StPrincipal Builders Inc.4th floor t.i. demo of portion of extg hi-density file cabinet storage are construction of an enclosed moot court. improvements include construction of new non-load bearing partitions, doors, electrical, mechanical air distribution ceiling, and lighting elements.
Details
Permit
202204273149
Status
complete
Filed
Apr 27, 2022
Permit issued
May 6, 2022
Final sign-off
Feb 8, 2023
Declared cost
$250,000
Address
505 Montgomery St

4th floor t.i. demo of portion of extg hi-density file cabinet storage are construction of an enclosed moot court. improvements include construction of new non-load bearing partitions, doors, electrical, mechanical air distribution ceiling, and lighting elements.

Open the permit page

$250,000
Apr 22, 2022Completed
final sign-off Jun 2023
555 Mission StBcci Construction Company32nd floor tenant improvement of office space, conference rooms, break rarea and supporting space. mep included in set.
Details
Permit
202204222811
Status
complete
Filed
Apr 22, 2022
Permit issued
Apr 27, 2022
Final sign-off
Jun 6, 2023
Declared cost
$1,900,000
Address
555 Mission St

32nd floor tenant improvement of office space, conference rooms, break rarea and supporting space. mep included in set.

Open the permit page

$1,900,000
Apr 20, 2022Completed
final sign-off Apr 2023
100 Pine StBcci Construction Company32nd flr ste 3200: arch only. office t.i new partitions, offices and conference rooms. mep/life safety deferred. ref 202204182415/202204152322.
Details
Permit
202204202653
Status
complete
Filed
Apr 20, 2022
Permit issued
Apr 27, 2022
Final sign-off
Apr 14, 2023
Declared cost
$2,505,780
Address
100 Pine St

32nd flr ste 3200: arch only. office t.i new partitions, offices and conference rooms. mep/life safety deferred. ref 202204182415/202204152322.

Open the permit page

$2,505,780
Apr 18, 2022Never finaled
issued Apr 2022, no final
100 Pine StBcci Construction Company32nd fl: demo only permit per ab-017. remove non-structural partitions and ceilings. sprinkler permit: pa# 202204152322
Details
Permit
202204182415
Status
issued
Filed
Apr 18, 2022
Permit issued
Apr 18, 2022
Declared cost
$100,000
Address
100 Pine St

32nd fl: demo only permit per ab-017. remove non-structural partitions and ceilings. sprinkler permit: pa# 202204152322

Open the permit page

$100,000
Mar 8, 2022Never finaled
issued Mar 2022, no final
4 Embarcadero CenterSkyline Constructionste 3500: demolition of (e) partitions, restrooms, associated mep and finishes. demo ref pa# 202202027136. "no ceiling work"
Details
Permit
202203089424
Status
issued
Filed
Mar 8, 2022
Permit issued
Mar 9, 2022
Declared cost
$50,000
Address
4 Embarcadero Center

ste 3500: demolition of (e) partitions, restrooms, associated mep and finishes. demo ref pa# 202202027136. "no ceiling work"

Open the permit page

$50,000
Feb 28, 2022Completed
final sign-off Jun 2022
101 Spear StNovo Construction Inc4th floor fire only permit to obatain assembly permit required stamps for flex work 0457/lounge 0403/roof deck 0456. ref pa #202105140410 and 202108267170
Details
Permit
202202288811
Status
complete
Filed
Feb 28, 2022
Permit issued
Feb 28, 2022
Final sign-off
Jun 6, 2022
Address
101 Spear St

4th floor fire only permit to obatain assembly permit required stamps for flex work 0457/lounge 0403/roof deck 0456. ref pa #202105140410 and 202108267170

Open the permit page

Feb 25, 2022Completed
final sign-off Jun 2022
101 Spear StNovo Construction Inc5th fl: fire only permit to obtain assembly permit required stamps for game room 0502 / flex work 0536 / break room 0551 / solarium 0552.
Details
Permit
202202258748
Status
complete
Filed
Feb 25, 2022
Permit issued
Feb 28, 2022
Final sign-off
Jun 6, 2022
Address
101 Spear St

5th fl: fire only permit to obtain assembly permit required stamps for game room 0502 / flex work 0536 / break room 0551 / solarium 0552.

Open the permit page

Jan 25, 2022Completed
final sign-off May 2022
1 Sansome StPrincipal Builders Inc.34/f: interior t.i. work includes non-load bearing partitionis, doors & associated finishes and mep.
Details
Permit
202201256588
Status
complete
Filed
Jan 25, 2022
Permit issued
Feb 2, 2022
Final sign-off
May 19, 2022
Declared cost
$800,000
Address
1 Sansome St

34/f: interior t.i. work includes non-load bearing partitionis, doors & associated finishes and mep.

Open the permit page

$800,000
Jan 24, 2022Completed
final sign-off Sep 2023
360 Spear StHitt Contracting Inc.3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.
Details
Permit
202201246538
Status
complete
Filed
Jan 24, 2022
Permit issued
May 18, 2022
Final sign-off
Sep 13, 2023
Declared cost
$5,000,000
Address
360 Spear St

3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.

Open the permit page

$5,000,000
Jan 7, 2022Completed
final sign-off Jun 2022
333 Bush StBcci Construction Company25/f: rev to 202110291487: architectural revisions to t.i.
Details
Permit
202201075579
Status
complete
Filed
Jan 7, 2022
Permit issued
Jan 7, 2022
Final sign-off
Jun 22, 2022
Address
333 Bush St

25/f: rev to 202110291487: architectural revisions to t.i.

Open the permit page

Nov 9, 2021Completed
final sign-off Apr 2022
100 California StSkyline Construction5th floor: demolition of non structural partitons and finishes construction of new non structural partitions, finish touch ups where required. m/e under seperate permit.
Details
Permit
202111092060
Status
complete
Filed
Nov 9, 2021
Permit issued
Dec 8, 2021
Final sign-off
Apr 22, 2022
Declared cost
$150,000
Address
100 California St

5th floor: demolition of non structural partitons and finishes construction of new non structural partitions, finish touch ups where required. m/e under seperate permit.

Open the permit page

$150,000
Oct 29, 2021Completed
final sign-off Jun 2022
333 Bush StBcci Construction Company25th fl demo and build bac of non structural partitons, ceilings, and finishes. mep included
Details
Permit
202110291487
Status
complete
Filed
Oct 29, 2021
Permit issued
Nov 22, 2021
Final sign-off
Jun 22, 2022
Declared cost
$328,000
Address
333 Bush St

25th fl demo and build bac of non structural partitons, ceilings, and finishes. mep included

Open the permit page

$328,000
Sep 15, 2021Completed
final sign-off Aug 2022
555 California StBcci Construction Companyfire only administrative permit to revise assembly space occupancy calculations to obtain assembly stamp. ref pa 2021-0510-0074
Details
Permit
202109158492
Status
complete
Filed
Sep 15, 2021
Permit issued
Sep 15, 2021
Final sign-off
Aug 24, 2022
Address
555 California St

fire only administrative permit to revise assembly space occupancy calculations to obtain assembly stamp. ref pa 2021-0510-0074

Open the permit page

Aug 26, 2021Completed
final sign-off Mar 2022
101 Spear StNovo Construction Inc4th fl - revision to 2021-0514-0410 per field inspector to modify card readers and obtain an assembly permit for existing roof deck
Details
Permit
202108267170
Status
complete
Filed
Aug 26, 2021
Permit issued
Aug 31, 2021
Final sign-off
Mar 9, 2022
Address
101 Spear St

4th fl - revision to 2021-0514-0410 per field inspector to modify card readers and obtain an assembly permit for existing roof deck

Open the permit page

Aug 23, 2021Never finaled
issued Sep 2021, no final
615 Battery StSkyline Constructionrevision to 2021 0621 2851 to provide revised reflected ceiling plan to remove comdor froom scope & revise previously approved light fixture
Details
Permit
202108236922
Status
issued
Filed
Aug 23, 2021
Permit issued
Sep 13, 2021
Address
615 Battery St

revision to 2021 0621 2851 to provide revised reflected ceiling plan to remove comdor froom scope & revise previously approved light fixture

Open the permit page

Aug 17, 2021Never finaled
issued Aug 2021, no final
333 Bush StSkyline Constructionadministrative permit to establish occupant loads in response to sffd nov 2107-0093.
Details
Permit
202108176554
Status
issued
Filed
Aug 17, 2021
Permit issued
Aug 30, 2021
Address
333 Bush St

administrative permit to establish occupant loads in response to sffd nov 2107-0093.

Open the permit page

Jul 22, 2021Completed
final sign-off Sep 2022
555 California StBcci Construction Company29th floor: replacement of food service equipment in existing pantry area. electrical drawing included.
Details
Permit
202107224920
Status
complete
Filed
Jul 22, 2021
Permit issued
Aug 11, 2021
Final sign-off
Sep 8, 2022
Declared cost
$50,000
Address
555 California St

29th floor: replacement of food service equipment in existing pantry area. electrical drawing included.

Open the permit page

$50,000
Jul 7, 2021Completed
final sign-off Oct 2022
303 02nd StSkyline Construction3rd fl: renovation of (e) elevator lobby & multi-stall restrooms proposed tenant improvement entils construction of new paint, tile, and wall, covering finishes. including mep.
Details
Permit
202107073856
Status
complete
Filed
Jul 7, 2021
Permit issued
Sep 7, 2021
Final sign-off
Oct 21, 2022
Declared cost
$350,000
Address
303 02nd St

3rd fl: renovation of (e) elevator lobby & multi-stall restrooms proposed tenant improvement entils construction of new paint, tile, and wall, covering finishes. including mep.

Open the permit page

$350,000
Jun 30, 2021Completed
final sign-off Mar 2022
201 03rd StM C S Construction Servicesrev to pa 202103035769 full floor ti updates to new interior non lod bearing partitions, mechanical, plumbing, electrical and finishes.
Details
Permit
202106303515
Status
complete
Filed
Jun 30, 2021
Permit issued
Jul 7, 2021
Final sign-off
Mar 9, 2022
Address
201 03rd St

rev to pa 202103035769 full floor ti updates to new interior non lod bearing partitions, mechanical, plumbing, electrical and finishes.

Open the permit page

Jun 28, 2021Completed
final sign-off Sep 2022
555 California StBcci Construction Company29th floor: demo and build back of non-structural partitions. new walls and finishes. new ceilings. mep included.
Details
Permit
202106283348
Status
complete
Filed
Jun 28, 2021
Permit issued
Jul 14, 2021
Final sign-off
Sep 8, 2022
Declared cost
$100,000
Address
555 California St

29th floor: demo and build back of non-structural partitions. new walls and finishes. new ceilings. mep included.

Open the permit page

$100,000
Mar 24, 2021Completed
final sign-off Oct 2021
303 02nd StSkyline Constructionrevision to pa# 202007019450. to revise the step and ramp at exterior pation on the 9th floor.
Details
Permit
202103247218
Status
complete
Filed
Mar 24, 2021
Permit issued
Jul 8, 2021
Final sign-off
Oct 13, 2021
Declared cost
$20,000
Address
303 02nd St

revision to pa# 202007019450. to revise the step and ramp at exterior pation on the 9th floor.

Open the permit page

$20,000
Mar 10, 2021Never finaled
issued Apr 2021, no final
555 Mission StBcci Construction Companyflrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included.
Details
Permit
202103106230
Status
issued
Filed
Mar 10, 2021
Permit issued
Apr 29, 2021
Declared cost
$700,000
Address
555 Mission St

flrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included.

Open the permit page

$700,000
Mar 9, 2021Never finaled
issued Nov 2021, no final
555 Mission StBcci Construction Company9/f: construction of new partitions, ceiling, light fixtures, millwork and finishes throughout.
Details
Permit
202103096197
Status
issued
Filed
Mar 9, 2021
Permit issued
Nov 18, 2021
Declared cost
$2,000,000
Address
555 Mission St

9/f: construction of new partitions, ceiling, light fixtures, millwork and finishes throughout.

Open the permit page

$2,000,000
Mar 3, 2021Completed
final sign-off Mar 2022
201 03rd StM C S Construction Servicessuite 1200 on 12/f: interior ti includes selective non structural demo, new interior non load bearing partitions, mep and finishes.
Details
Permit
202103035769
Status
complete
Filed
Mar 3, 2021
Permit issued
May 12, 2021
Final sign-off
Mar 9, 2022
Declared cost
$1,600,000
Address
201 03rd St

suite 1200 on 12/f: interior ti includes selective non structural demo, new interior non load bearing partitions, mep and finishes.

Open the permit page

$1,600,000
Feb 16, 2021Completed
final sign-off Apr 2022
650 California StBcci Construction Company31st floor: new non-structural partitions, ceilings and finishes. mep included. life safety deferred.
Details
Permit
202102164700
Status
complete
Filed
Feb 16, 2021
Permit issued
Apr 14, 2021
Final sign-off
Apr 11, 2022
Declared cost
$1,100,000
Address
650 California St

31st floor: new non-structural partitions, ceilings and finishes. mep included. life safety deferred.

Open the permit page

$1,100,000
Jan 21, 2021Completed
final sign-off Nov 2021
101 California StSkyline Construction36/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communication. celing systems with new lighting, floor, paint and finishes. maher n/a.
Details
Permit
202101213049
Status
complete
Filed
Jan 21, 2021
Permit issued
Apr 7, 2021
Final sign-off
Nov 1, 2021
Declared cost
$6,000,000
Address
101 California St

36/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communication. celing systems with new lighting, floor, paint and finishes. maher n/a.

Open the permit page

$6,000,000
Jan 21, 2021Completed
final sign-off Nov 2021
101 California StSkyline Construction32/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communicatioin celing systems with new lighting, floor, paint and finishes.
Details
Permit
202101213042
Status
complete
Filed
Jan 21, 2021
Permit issued
Apr 7, 2021
Final sign-off
Nov 2, 2021
Declared cost
$3,000,000
Address
101 California St

32/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communicatioin celing systems with new lighting, floor, paint and finishes.

Open the permit page

$3,000,000
Dec 24, 2020Completed
final sign-off Dec 2021
555 Mission StBcci Construction Company8th fl- construction of non-structural partitions. new acoustical tile and grid and gyp bpard ceilings. new lighting fixtures, millwork and finishes throughout. mep included.
Details
Permit
202012241720
Status
complete
Filed
Dec 24, 2020
Permit issued
Apr 19, 2021
Final sign-off
Dec 13, 2021
Declared cost
$2,000,000
Address
555 Mission St

8th fl- construction of non-structural partitions. new acoustical tile and grid and gyp bpard ceilings. new lighting fixtures, millwork and finishes throughout. mep included.

Open the permit page

$2,000,000
Dec 1, 2020Never finaled
issued Mar 2021, no final
303 02nd StSkyline Constructionrev to pa# 202007019450; to add additional work at patio 965 to add guard rails
Details
Permit
202012019966
Status
issued
Filed
Dec 1, 2020
Permit issued
Mar 9, 2021
Declared cost
$15,000
Address
303 02nd St

rev to pa# 202007019450; to add additional work at patio 965 to add guard rails

Open the permit page

$15,000
Nov 13, 2020Completed
final sign-off Sep 2021
345 Spear StBcci Construction Company1st fl- new wall and door inside existing lobby. ref pa# 201912230295
Details
Permit
202011138796
Status
complete
Filed
Nov 13, 2020
Permit issued
Jan 27, 2021
Final sign-off
Sep 27, 2021
Declared cost
$45,000
Address
345 Spear St

1st fl- new wall and door inside existing lobby. ref pa# 201912230295

Open the permit page

$45,000
Oct 20, 2020Completed
final sign-off Apr 2021
3 Embarcadero CenterBcci Construction Company11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred.
Details
Permit
202010206953
Status
complete
Filed
Oct 20, 2020
Permit issued
Dec 4, 2020
Final sign-off
Apr 28, 2021
Declared cost
$850,000
Address
3 Embarcadero Center

11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred.

Open the permit page

$850,000
Aug 26, 2020Never finaled
issued Sep 2020, no final
4 Embarcadero CenterSource Planning And Construction Incsuite 2100. office partition ( glass w/ door )
Details
Permit
202008262716
Status
issued
Filed
Aug 26, 2020
Permit issued
Sep 2, 2020
Declared cost
$40,000
Address
4 Embarcadero Center

suite 2100. office partition ( glass w/ door )

Open the permit page

$40,000
Feb 24, 2020Expired or cancelled
cancelled Jan 2026
555 California StBcci Construction Company30th fl - revision to pa 2019-1219-0036 to include the expaned scope of work for coffee station @ break area & minor finish changes for the rest of the floor
Details
Permit
202002245188
Status
cancelled
Filed
Feb 24, 2020
Address
555 California St

30th fl - revision to pa 2019-1219-0036 to include the expaned scope of work for coffee station @ break area & minor finish changes for the rest of the floor

Open the permit page

Jan 22, 2020Completed
final sign-off Oct 2021
303 02nd StSkyline Constructioninterior demolition on 3rd, 9th, and 10th fls. per ab-017.
Details
Permit
202001222498
Status
complete
Filed
Jan 22, 2020
Permit issued
Jan 28, 2020
Final sign-off
Oct 13, 2021
Declared cost
$275,000
Address
303 02nd St

interior demolition on 3rd, 9th, and 10th fls. per ab-017.

Open the permit page

$275,000
Dec 30, 2019Never finaled
filed Dec 2019, never issued
150 Minna StSkyline Constructiontenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit
Details
Permit
201912300883
Status
filed
Filed
Dec 30, 2019
Declared cost
$1,500,000
Address
150 Minna St

tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit

Open the permit page

$1,500,000
Dec 23, 2019Completed
final sign-off Feb 2021
988 Market StNovo Construction Inc6th fl: tenant improvement on the 6th fl to include new finishes, millwork, lighting. mep under sep permit maher not req
Details
Permit
201912230242
Status
complete
Filed
Dec 23, 2019
Permit issued
Jan 16, 2020
Final sign-off
Feb 16, 2021
Declared cost
$224,148
Address
988 Market St

6th fl: tenant improvement on the 6th fl to include new finishes, millwork, lighting. mep under sep permit maher not req

Open the permit page

$224,148
Dec 23, 2019Completed
final sign-off Sep 2022
555 California StBcci Construction Companypartial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.
Details
Permit
201912230291
Status
complete
Filed
Dec 23, 2019
Permit issued
Mar 5, 2020
Final sign-off
Sep 8, 2022
Declared cost
$210,000
Address
555 California St

partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.

Open the permit page

$210,000
Dec 23, 2019Completed
final sign-off Oct 2020
1 California StR.M.R. Construction Company, Bcci Construction Companyunit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.
Details
Permit
201912230407
Status
complete
Filed
Dec 23, 2019
Permit issued
Jan 7, 2020
Final sign-off
Oct 1, 2020
Declared cost
$580,000
Address
1 California St

unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.

Open the permit page

$580,000
Dec 20, 2019Completed
final sign-off Jun 2020
155 05th StSc Builders, Inc6th fl: construction of non-structural screens, new drinking fountains, new lactation room sink. maher na
Details
Permit
201912200125
Status
complete
Filed
Dec 20, 2019
Permit issued
Jan 17, 2020
Final sign-off
Jun 11, 2020
Declared cost
$30,000
Address
155 05th St

6th fl: construction of non-structural screens, new drinking fountains, new lactation room sink. maher na

Open the permit page

$30,000
Dec 19, 2019Completed
final sign-off Sep 2022
555 California StBcci Construction Company30th fl - ti for office remodel. new partitions, millwork & finishes. mep deferred. maher na. vif card readers in elevator lobbies require two way communication per cfc 1010.1.9.12
Details
Permit
201912190036
Status
complete
Filed
Dec 19, 2019
Permit issued
Jan 14, 2020
Final sign-off
Sep 8, 2022
Declared cost
$980,000
Address
555 California St

30th fl - ti for office remodel. new partitions, millwork & finishes. mep deferred. maher na. vif card readers in elevator lobbies require two way communication per cfc 1010.1.9.12

Open the permit page

$980,000
Dec 4, 2019Never finaled
issued Mar 2020, no final
150 Minna StSkyline Construction6th fl - ti renovation including non-structural partitions, new ceiling and finishes
Details
Permit
201912048610
Status
issued
Filed
Dec 4, 2019
Permit issued
Mar 11, 2020
Declared cost
$1,500,000
Address
150 Minna St

6th fl - ti renovation including non-structural partitions, new ceiling and finishes

Open the permit page

$1,500,000
Nov 4, 2019Never finaled
issued Nov 2019, no final
555 Mission StBcci Construction Company34th fl - construction of new non-structural partitions, ceilings, and finishes.
Details
Permit
201911046298
Status
issued
Filed
Nov 4, 2019
Permit issued
Nov 20, 2019
Declared cost
$800,000
Address
555 Mission St

34th fl - construction of new non-structural partitions, ceilings, and finishes.

Open the permit page

$800,000
Nov 1, 2019Completed
final sign-off Aug 2020
555 Mission StBcci Construction Company34th fl - demo of mechanical systems. sprinkler permit ref 2019-0614-3450. ab-017.
Details
Permit
201911016186
Status
complete
Filed
Nov 1, 2019
Permit issued
Nov 1, 2019
Final sign-off
Aug 21, 2020
Declared cost
$4,000
Address
555 Mission St

34th fl - demo of mechanical systems. sprinkler permit ref 2019-0614-3450. ab-017.

Open the permit page

$4,000
Aug 12, 2019Completed
final sign-off May 2020
989 Market StNovo Construction Inct.i. on ground floor lobby including new finishes millwork and lighting.
Details
Permit
201908128487
Status
complete
Filed
Aug 12, 2019
Permit issued
Oct 16, 2019
Final sign-off
May 13, 2020
Declared cost
$100,000
Address
989 Market St

t.i. on ground floor lobby including new finishes millwork and lighting.

Open the permit page

$100,000
Jun 18, 2019Completed
final sign-off Dec 2019
4 Embarcadero CenterTurner Construction Co25/f: revison to app#201905201181 to revise office floor plan layout. n/a for maher
Details
Permit
201906183730
Status
complete
Filed
Jun 18, 2019
Permit issued
Jun 25, 2019
Final sign-off
Dec 4, 2019
Address
4 Embarcadero Center

25/f: revison to app#201905201181 to revise office floor plan layout. n/a for maher

Open the permit page

May 20, 2019Expired or cancelled
expired Dec 2019
4 Embarcadero CenterTurner Construction Co25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit.
Details
Permit
201905201181
Status
expired
Filed
May 20, 2019
Permit issued
Jun 6, 2019
Declared cost
$3,000,000
Address
4 Embarcadero Center

25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit.

Open the permit page

$3,000,000
Mar 27, 2019Completed
final sign-off May 2020
989 Market StNovo Construction Inct.i. improvement on the 6th fl. new non structureal partitions finishes, acoustical ceilings, mep & fire life safety under sep permit
Details
Permit
201903276326
Status
complete
Filed
Mar 27, 2019
Permit issued
Apr 1, 2019
Final sign-off
May 13, 2020
Declared cost
$996,088
Address
989 Market St

t.i. improvement on the 6th fl. new non structureal partitions finishes, acoustical ceilings, mep & fire life safety under sep permit

Open the permit page

$996,088
Jan 4, 2008Completed
final sign-off Feb 2009
580 California StBcci Construction Company22nd floor #2200 - new non-strucatural partitions, new acoustical ceiling grid & tile, new electrical outlets & lighting & new finishes. rework (e) hvac to new layout, fire/life safety & sprinklers under separate permit.
Details
Permit
200801041824
Status
complete
Filed
Jan 4, 2008
Permit issued
Jan 4, 2008
Final sign-off
Feb 19, 2009
Declared cost
$600,000
Address
580 California St

22nd floor #2200 - new non-strucatural partitions, new acoustical ceiling grid & tile, new electrical outlets & lighting & new finishes. rework (e) hvac to new layout, fire/life safety & sprinklers under separate permit.

Open the permit page

$600,000
Nov 13, 2007Completed
final sign-off Feb 2008
222 Kearny StWard Alan Emery Construction Inc.suite #300- office tenant improvement on third fl. new non-sturcural partitions. mep, life safety and sprinklers under separate 3
Details
Permit
200711137867
Status
complete
Filed
Nov 13, 2007
Permit issued
Nov 13, 2007
Final sign-off
Feb 21, 2008
Declared cost
$75,000
Address
222 Kearny St

suite #300- office tenant improvement on third fl. new non-sturcural partitions. mep, life safety and sprinklers under separate 3

Open the permit page

$75,000
Aug 23, 2007Completed
final sign-off Nov 2007
720 California StPrincipal Builders Inc.4/f- construction of non-structural wall, electrical and new doors & glazing. (t.i. partial floor)
Details
Permit
200708230725
Status
complete
Filed
Aug 23, 2007
Permit issued
Aug 24, 2007
Final sign-off
Nov 28, 2007
Declared cost
$30,000
Address
720 California St

4/f- construction of non-structural wall, electrical and new doors & glazing. (t.i. partial floor)

Open the permit page

$30,000
May 7, 2007Completed
final sign-off Jul 2007
201 Spear Stoti-1, ground floor, el, ls, sp
Details
Permit
200705070573
Status
complete
Filed
May 7, 2007
Permit issued
May 7, 2007
Final sign-off
Jul 3, 2007
Declared cost
$40,000
Address
201 Spear St

oti-1, ground floor, el, ls, sp

Open the permit page

$40,000
Feb 8, 2007Completed
final sign-off May 2009
74 New Montgomery StCannon Constructors North Incprovide non structural walls, raised flooring and ramps, new fully occupant restrooms and new finishes throughout. mep under seperate permit.
Details
Permit
200702083759
Status
complete
Filed
Feb 8, 2007
Permit issued
Feb 8, 2007
Final sign-off
May 22, 2009
Declared cost
$100,000
Address
74 New Montgomery St

provide non structural walls, raised flooring and ramps, new fully occupant restrooms and new finishes throughout. mep under seperate permit.

Open the permit page

$100,000
Aug 14, 2006Expired or cancelled
expired Aug 2008
135 Main Strestroom renovation, barrier removal, 3/f restroom. revision to appl#200607267632 scope of work: new lighting/electrical/plumbing
Details
Permit
200608149363
Status
expired
Filed
Aug 14, 2006
Permit issued
Aug 14, 2006
Declared cost
$60,000
Address
135 Main St

restroom renovation, barrier removal, 3/f restroom. revision to appl#200607267632 scope of work: new lighting/electrical/plumbing

Open the permit page

$60,000
Jul 26, 2006Expired or cancelled
expired Aug 2008
135 Main Stdemolition of non-load bearing partitions and toilet/plumbing fixtures. providing new fixtures to full compliance. fire alarm strobe seperate permit.
Details
Permit
200607267632
Status
expired
Filed
Jul 26, 2006
Permit issued
Aug 14, 2006
Declared cost
$60,000
Address
135 Main St

demolition of non-load bearing partitions and toilet/plumbing fixtures. providing new fixtures to full compliance. fire alarm strobe seperate permit.

Open the permit page

$60,000
Jun 22, 2006Completed
final sign-off Sep 2006
525 Market Streconfigure men's restroom to be fully accessible. demolition, constructural, electrical, plumbing, design-build. barrier removal work only under this permit @ 28th floor
Details
Permit
200606224813
Status
complete
Filed
Jun 22, 2006
Permit issued
Jun 22, 2006
Final sign-off
Sep 25, 2006
Declared cost
$56,000
Address
525 Market St

reconfigure men's restroom to be fully accessible. demolition, constructural, electrical, plumbing, design-build. barrier removal work only under this permit @ 28th floor

Open the permit page

$56,000