Bert Deviterbo
- Listed as
- architect, authorized agent-others
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Aug 2026
89 permits since 2000 (architect on 83 permits, authorized agent-others on 6 permits): 62 completed, 4 in progress, 15 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 645 Harrison St | Skyline Construction | limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation.Details
limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation. | $107,970 |
| Aug 27, 2025 | Completed final sign-off Nov 2025 | 600 California St | Novo Construction Inc | 2/f: minor ti. health dept correction to pantry. ref permit 2019-1011-4277Details
2/f: minor ti. health dept correction to pantry. ref permit 2019-1011-4277 | $109,000 |
| Dec 18, 2024 | In progress issued Jan 2025 | 181 Fremont St | Level 10 Construction Lp | 16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remainDetails
16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remain | |
| Dec 18, 2024 | In progress issued Jan 2025 | 181 Fremont St | Level 10 Construction Lp | 18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remainDetails
18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remain | |
| Sep 9, 2024 | In progress issued Sep 2024 | 181 Fremont St | Level 10 Construction Lp | 17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048.Details
17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048. | |
| Aug 20, 2024 | Completed final sign-off Oct 2024 | 181 Fremont St | Level 10 Construction Lp | revision to 202406104048, work includes the addition of new card readers and ceiling additionDetails
revision to 202406104048, work includes the addition of new card readers and ceiling addition | |
| Jul 30, 2024 | Completed final sign-off Oct 2024 | 181 Fremont St | Level 10 Construction Lp | 18th fl revision to pa # 2024-0610-4048 addition of new card readersDetails
18th fl revision to pa # 2024-0610-4048 addition of new card readers | |
| Jun 10, 2024 | Completed final sign-off Oct 2024 | 181 Fremont St | Level 10 Construction Lp | construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl.Details
construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl. | $331,360 |
| Jun 10, 2024 | Completed final sign-off Oct 2024 | 181 Fremont St | Level 10 Construction Lp | construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl.Details
construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl. | $232,309 |
| Apr 25, 2024 | Completed final sign-off Oct 2024 | 101 California St | Novo Construction Inc | 27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lightingDetails
27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting | $1,967,498 |
| Nov 14, 2023 | Completed final sign-off Feb 2025 | 1 California St | Swinerton Builders | 19th fl: revision to 202212289252. tenant build out of 19th fl. reduction of sf footage to 7000 sf. flooring, partitions, mep, ceiling,ligting.Details
19th fl: revision to 202212289252. tenant build out of 19th fl. reduction of sf footage to 7000 sf. flooring, partitions, mep, ceiling,ligting. | |
| Aug 1, 2023 | Never finaled filed Aug 2023, never issued | 360 Spear St | Hitt Contracting Inc. | revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538Details
revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538 | |
| Jul 26, 2023 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | 3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope.Details
3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope. | |
| Jun 8, 2023 | Expired or cancelled cancelled Jan 2026 | 101 Spear St | Novo Construction Inc | seismic anchorage for phone booths on the 4th and 5th floors. fire sprinkler under separate permitDetails
seismic anchorage for phone booths on the 4th and 5th floors. fire sprinkler under separate permit | $75,000 |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 221 Main St | Principal Builders Inc. | 9f, 14f, 15f - minor ti to (e) 9f, 14f, 15f pantry & support areas for sfdph & safety complianceDetails
9f, 14f, 15f - minor ti to (e) 9f, 14f, 15f pantry & support areas for sfdph & safety compliance | $120,000 |
| Jan 31, 2023 | Never finaled issued Feb 2023, no final | 525 Market St | Skyline Construction | 20/flr: change from conference room to video production room, limited demolition & new construction only to the single room.Details
20/flr: change from conference room to video production room, limited demolition & new construction only to the single room. | $90,000 |
| Dec 28, 2022 | Completed final sign-off Mar 2025 | 1 California St | Bcci Construction Company, Swinerton Builders | 19th floor office t.i. to include new partitions, ceilings, finishes & mep.Details
19th floor office t.i. to include new partitions, ceilings, finishes & mep. | $345,000 |
| Nov 8, 2022 | Completed final sign-off Jun 2023 | 475 Sansome St | Bcci Construction Company | 5th fl - revision to pa arch & mep permit. proposed millwork planters to be omitted ref pa 2022-0719-8832 adding light fixture and wall furing, changeing wall type and realigning glass partition at rm. #504 patch and repair as noted.Details
5th fl - revision to pa arch & mep permit. proposed millwork planters to be omitted ref pa 2022-0719-8832 adding light fixture and wall furing, changeing wall type and realigning glass partition at rm. #504 patch and repair as noted. | |
| Oct 13, 2022 | Completed final sign-off Apr 2026 | 100 Pine St | Bcci Construction Company | 32nd fl - revision to change configuration of men's restroom. electrical & plumbing & drawings included. ref 2022-0420-2653Details
32nd fl - revision to change configuration of men's restroom. electrical & plumbing & drawings included. ref 2022-0420-2653 | $5,000 |
| Sep 13, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl.Details
revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl. | |
| Aug 17, 2022 | Expired or cancelled expired Apr 2026 | 510 Townsend St | Bcci Construction Company | 7th fl new non structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred.Details
7th fl new non structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred. | $350,000 |
| Aug 10, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | Hitt Contracting Inc. | 3/f: revise island layout @ catering kitchen. ref bpa#202201246538Details
3/f: revise island layout @ catering kitchen. ref bpa#202201246538 | |
| Aug 1, 2022 | Completed final sign-off Oct 2022 | 1 Sansome St | Hp Build | 34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a.Details
34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a. | |
| Jul 28, 2022 | Completed final sign-off Aug 2023 | 510 Townsend St | Bcci Construction Company | 3rd fl: new non-structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred.Details
3rd fl: new non-structural partitions, ceilings, light fixtures, millwork, and finishes. mep deferred. | $375,000 |
| Jul 28, 2022 | Completed final sign-off Sep 2023 | 510 Townsend St | Bcci Construction Company | 5th fl: office remodel, new partitions & conference rooms, mep def. new micro kitchen.Details
5th fl: office remodel, new partitions & conference rooms, mep def. new micro kitchen. | $190,000 |
| Jul 27, 2022 | Completed final sign-off Sep 2023 | 510 Townsend St | Bcci Construction Company | 4th fl - office ti new partitions & conference rooms. mep/fa/fs deferred.Details
4th fl - office ti new partitions & conference rooms. mep/fa/fs deferred. | $3,000,000 |
| Jul 19, 2022 | Completed final sign-off Jun 2023 | 475 Sansome St | Bcci Construction Company | 5/f: new non-structural partitions, doors, and associated mep. demo permit 202205254994. structural drawings included.Details
5/f: new non-structural partitions, doors, and associated mep. demo permit 202205254994. structural drawings included. | $2,700,000 |
| Jul 18, 2022 | Never finaled issued Oct 2022, no final | 510 Townsend St | Bcci Construction Company | 2/f: new non-structural partitions, acoustical grid & tile, ceiling, light fixtures, millwork and finishes. mep/fa/fs deferred.Details
2/f: new non-structural partitions, acoustical grid & tile, ceiling, light fixtures, millwork and finishes. mep/fa/fs deferred. | $400,000 |
| Jul 18, 2022 | Expired or cancelled expired Aug 2026 | 510 Townsend St | Bcci Construction Company | non structural partition acoustical grid and tile, light fixtures millwork and finishes, mep deferred.Details
non structural partition acoustical grid and tile, light fixtures millwork and finishes, mep deferred. | $1,250,000 |
| Jul 12, 2022 | Expired or cancelled expired Apr 2026 | 510 Townsend St | Bcci Construction Company | basement: new non-structural partitions, doors, card readers, and finishes. mep deferred.Details
basement: new non-structural partitions, doors, card readers, and finishes. mep deferred. | $175,000 |
| Jun 27, 2022 | Completed final sign-off Apr 2023 | 510 Townsend St | Bcci Construction Company | floor 1-6 floor demo only. ceiling will remain. ab-017 appliesDetails
floor 1-6 floor demo only. ceiling will remain. ab-017 applies | $110,000 |
| Jun 9, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | Hitt Contracting Inc. | revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room.Details
revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room. | |
| Jun 2, 2022 | Never finaled issued Jun 2022, no final | 333 Bush St | Skyline Construction | 32nd fl: administrative permit to obtain sffd assembly occupancy load stamps. no changes to egress and life safety. no work under this permit.Details
32nd fl: administrative permit to obtain sffd assembly occupancy load stamps. no changes to egress and life safety. no work under this permit. | |
| May 25, 2022 | Completed final sign-off Jul 2022 | 475 Sansome St | Bcci Construction Company | 5th fl: demo only permit to remove (e) partitions, ceiling, and mep elements per ab-017. sprinkler pa# 202205234804.Details
5th fl: demo only permit to remove (e) partitions, ceiling, and mep elements per ab-017. sprinkler pa# 202205234804. | $50,000 |
| Apr 27, 2022 | Completed final sign-off Feb 2023 | 505 Montgomery St | Principal Builders Inc. | 4th floor t.i. demo of portion of extg hi-density file cabinet storage are construction of an enclosed moot court. improvements include construction of new non-load bearing partitions, doors, electrical, mechanical air distribution ceiling, and lighting elements.Details
4th floor t.i. demo of portion of extg hi-density file cabinet storage are construction of an enclosed moot court. improvements include construction of new non-load bearing partitions, doors, electrical, mechanical air distribution ceiling, and lighting elements. | $250,000 |
| Apr 22, 2022 | Completed final sign-off Jun 2023 | 555 Mission St | Bcci Construction Company | 32nd floor tenant improvement of office space, conference rooms, break rarea and supporting space. mep included in set.Details
32nd floor tenant improvement of office space, conference rooms, break rarea and supporting space. mep included in set. | $1,900,000 |
| Apr 20, 2022 | Completed final sign-off Apr 2023 | 100 Pine St | Bcci Construction Company | 32nd flr ste 3200: arch only. office t.i new partitions, offices and conference rooms. mep/life safety deferred. ref 202204182415/202204152322.Details
32nd flr ste 3200: arch only. office t.i new partitions, offices and conference rooms. mep/life safety deferred. ref 202204182415/202204152322. | $2,505,780 |
| Apr 18, 2022 | Never finaled issued Apr 2022, no final | 100 Pine St | Bcci Construction Company | 32nd fl: demo only permit per ab-017. remove non-structural partitions and ceilings. sprinkler permit: pa# 202204152322Details
32nd fl: demo only permit per ab-017. remove non-structural partitions and ceilings. sprinkler permit: pa# 202204152322 | $100,000 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 4 Embarcadero Center | Skyline Construction | ste 3500: demolition of (e) partitions, restrooms, associated mep and finishes. demo ref pa# 202202027136. "no ceiling work"Details
ste 3500: demolition of (e) partitions, restrooms, associated mep and finishes. demo ref pa# 202202027136. "no ceiling work" | $50,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2022 | 101 Spear St | Novo Construction Inc | 4th floor fire only permit to obatain assembly permit required stamps for flex work 0457/lounge 0403/roof deck 0456. ref pa #202105140410 and 202108267170Details
4th floor fire only permit to obatain assembly permit required stamps for flex work 0457/lounge 0403/roof deck 0456. ref pa #202105140410 and 202108267170 | |
| Feb 25, 2022 | Completed final sign-off Jun 2022 | 101 Spear St | Novo Construction Inc | 5th fl: fire only permit to obtain assembly permit required stamps for game room 0502 / flex work 0536 / break room 0551 / solarium 0552.Details
5th fl: fire only permit to obtain assembly permit required stamps for game room 0502 / flex work 0536 / break room 0551 / solarium 0552. | |
| Jan 25, 2022 | Completed final sign-off May 2022 | 1 Sansome St | Principal Builders Inc. | 34/f: interior t.i. work includes non-load bearing partitionis, doors & associated finishes and mep.Details
34/f: interior t.i. work includes non-load bearing partitionis, doors & associated finishes and mep. | $800,000 |
| Jan 24, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.Details
3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales. | $5,000,000 |
| Jan 7, 2022 | Completed final sign-off Jun 2022 | 333 Bush St | Bcci Construction Company | 25/f: rev to 202110291487: architectural revisions to t.i.Details
25/f: rev to 202110291487: architectural revisions to t.i. | |
| Nov 9, 2021 | Completed final sign-off Apr 2022 | 100 California St | Skyline Construction | 5th floor: demolition of non structural partitons and finishes construction of new non structural partitions, finish touch ups where required. m/e under seperate permit.Details
5th floor: demolition of non structural partitons and finishes construction of new non structural partitions, finish touch ups where required. m/e under seperate permit. | $150,000 |
| Oct 29, 2021 | Completed final sign-off Jun 2022 | 333 Bush St | Bcci Construction Company | 25th fl demo and build bac of non structural partitons, ceilings, and finishes. mep includedDetails
25th fl demo and build bac of non structural partitons, ceilings, and finishes. mep included | $328,000 |
| Sep 15, 2021 | Completed final sign-off Aug 2022 | 555 California St | Bcci Construction Company | fire only administrative permit to revise assembly space occupancy calculations to obtain assembly stamp. ref pa 2021-0510-0074Details
fire only administrative permit to revise assembly space occupancy calculations to obtain assembly stamp. ref pa 2021-0510-0074 | |
| Aug 26, 2021 | Completed final sign-off Mar 2022 | 101 Spear St | Novo Construction Inc | 4th fl - revision to 2021-0514-0410 per field inspector to modify card readers and obtain an assembly permit for existing roof deckDetails
4th fl - revision to 2021-0514-0410 per field inspector to modify card readers and obtain an assembly permit for existing roof deck | |
| Aug 23, 2021 | Never finaled issued Sep 2021, no final | 615 Battery St | Skyline Construction | revision to 2021 0621 2851 to provide revised reflected ceiling plan to remove comdor froom scope & revise previously approved light fixtureDetails
revision to 2021 0621 2851 to provide revised reflected ceiling plan to remove comdor froom scope & revise previously approved light fixture | |
| Aug 17, 2021 | Never finaled issued Aug 2021, no final | 333 Bush St | Skyline Construction | administrative permit to establish occupant loads in response to sffd nov 2107-0093.Details
administrative permit to establish occupant loads in response to sffd nov 2107-0093. | |
| Jul 22, 2021 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 29th floor: replacement of food service equipment in existing pantry area. electrical drawing included.Details
29th floor: replacement of food service equipment in existing pantry area. electrical drawing included. | $50,000 |
| Jul 7, 2021 | Completed final sign-off Oct 2022 | 303 02nd St | Skyline Construction | 3rd fl: renovation of (e) elevator lobby & multi-stall restrooms proposed tenant improvement entils construction of new paint, tile, and wall, covering finishes. including mep.Details
3rd fl: renovation of (e) elevator lobby & multi-stall restrooms proposed tenant improvement entils construction of new paint, tile, and wall, covering finishes. including mep. | $350,000 |
| Jun 30, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | M C S Construction Services | rev to pa 202103035769 full floor ti updates to new interior non lod bearing partitions, mechanical, plumbing, electrical and finishes.Details
rev to pa 202103035769 full floor ti updates to new interior non lod bearing partitions, mechanical, plumbing, electrical and finishes. | |
| Jun 28, 2021 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 29th floor: demo and build back of non-structural partitions. new walls and finishes. new ceilings. mep included.Details
29th floor: demo and build back of non-structural partitions. new walls and finishes. new ceilings. mep included. | $100,000 |
| Mar 24, 2021 | Completed final sign-off Oct 2021 | 303 02nd St | Skyline Construction | revision to pa# 202007019450. to revise the step and ramp at exterior pation on the 9th floor.Details
revision to pa# 202007019450. to revise the step and ramp at exterior pation on the 9th floor. | $20,000 |
| Mar 10, 2021 | Never finaled issued Apr 2021, no final | 555 Mission St | Bcci Construction Company | flrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included.Details
flrs 8,9: new convenience stair connecting floors 8 and 9. ti work under separate permit. structural drawings and calculation included. | $700,000 |
| Mar 9, 2021 | Never finaled issued Nov 2021, no final | 555 Mission St | Bcci Construction Company | 9/f: construction of new partitions, ceiling, light fixtures, millwork and finishes throughout.Details
9/f: construction of new partitions, ceiling, light fixtures, millwork and finishes throughout. | $2,000,000 |
| Mar 3, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | M C S Construction Services | suite 1200 on 12/f: interior ti includes selective non structural demo, new interior non load bearing partitions, mep and finishes.Details
suite 1200 on 12/f: interior ti includes selective non structural demo, new interior non load bearing partitions, mep and finishes. | $1,600,000 |
| Feb 16, 2021 | Completed final sign-off Apr 2022 | 650 California St | Bcci Construction Company | 31st floor: new non-structural partitions, ceilings and finishes. mep included. life safety deferred.Details
31st floor: new non-structural partitions, ceilings and finishes. mep included. life safety deferred. | $1,100,000 |
| Jan 21, 2021 | Completed final sign-off Nov 2021 | 101 California St | Skyline Construction | 36/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communication. celing systems with new lighting, floor, paint and finishes. maher n/a.Details
36/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communication. celing systems with new lighting, floor, paint and finishes. maher n/a. | $6,000,000 |
| Jan 21, 2021 | Completed final sign-off Nov 2021 | 101 California St | Skyline Construction | 32/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communicatioin celing systems with new lighting, floor, paint and finishes.Details
32/f: renovation of (e) office space t.i. construction of non-load bearing partitions, mep & communicatioin celing systems with new lighting, floor, paint and finishes. | $3,000,000 |
| Dec 24, 2020 | Completed final sign-off Dec 2021 | 555 Mission St | Bcci Construction Company | 8th fl- construction of non-structural partitions. new acoustical tile and grid and gyp bpard ceilings. new lighting fixtures, millwork and finishes throughout. mep included.Details
8th fl- construction of non-structural partitions. new acoustical tile and grid and gyp bpard ceilings. new lighting fixtures, millwork and finishes throughout. mep included. | $2,000,000 |
| Dec 1, 2020 | Never finaled issued Mar 2021, no final | 303 02nd St | Skyline Construction | rev to pa# 202007019450; to add additional work at patio 965 to add guard railsDetails
rev to pa# 202007019450; to add additional work at patio 965 to add guard rails | $15,000 |
| Nov 13, 2020 | Completed final sign-off Sep 2021 | 345 Spear St | Bcci Construction Company | 1st fl- new wall and door inside existing lobby. ref pa# 201912230295Details
1st fl- new wall and door inside existing lobby. ref pa# 201912230295 | $45,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | Bcci Construction Company | 11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred.Details
11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred. | $850,000 |
| Aug 26, 2020 | Never finaled issued Sep 2020, no final | 4 Embarcadero Center | Source Planning And Construction Inc | suite 2100. office partition ( glass w/ door )Details
suite 2100. office partition ( glass w/ door ) | $40,000 |
| Feb 24, 2020 | Expired or cancelled cancelled Jan 2026 | 555 California St | Bcci Construction Company | 30th fl - revision to pa 2019-1219-0036 to include the expaned scope of work for coffee station @ break area & minor finish changes for the rest of the floorDetails
30th fl - revision to pa 2019-1219-0036 to include the expaned scope of work for coffee station @ break area & minor finish changes for the rest of the floor | |
| Jan 22, 2020 | Completed final sign-off Oct 2021 | 303 02nd St | Skyline Construction | interior demolition on 3rd, 9th, and 10th fls. per ab-017.Details
interior demolition on 3rd, 9th, and 10th fls. per ab-017. | $275,000 |
| Dec 30, 2019 | Never finaled filed Dec 2019, never issued | 150 Minna St | Skyline Construction | tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permitDetails
tenant improvement on the 1st fl. to include non-load bearing partitions, new accoustical ceilings and finishes, mep uner sep permit | $1,500,000 |
| Dec 23, 2019 | Completed final sign-off Feb 2021 | 988 Market St | Novo Construction Inc | 6th fl: tenant improvement on the 6th fl to include new finishes, millwork, lighting. mep under sep permit maher not reqDetails
6th fl: tenant improvement on the 6th fl to include new finishes, millwork, lighting. mep under sep permit maher not req | $224,148 |
| Dec 23, 2019 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.Details
partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted. | $210,000 |
| Dec 23, 2019 | Completed final sign-off Oct 2020 | 1 California St | R.M.R. Construction Company, Bcci Construction Company | unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work.Details
unit #3100: selectively demolish and construct the interior ti for single tenant. no change in existing building core or core stairs. minimal new non-load beraing partitions and finishes. modification to existing mech, electrical, and minor plumbing work. | $580,000 |
| Dec 20, 2019 | Completed final sign-off Jun 2020 | 155 05th St | Sc Builders, Inc | 6th fl: construction of non-structural screens, new drinking fountains, new lactation room sink. maher naDetails
6th fl: construction of non-structural screens, new drinking fountains, new lactation room sink. maher na | $30,000 |
| Dec 19, 2019 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 30th fl - ti for office remodel. new partitions, millwork & finishes. mep deferred. maher na. vif card readers in elevator lobbies require two way communication per cfc 1010.1.9.12Details
30th fl - ti for office remodel. new partitions, millwork & finishes. mep deferred. maher na. vif card readers in elevator lobbies require two way communication per cfc 1010.1.9.12 | $980,000 |
| Dec 4, 2019 | Never finaled issued Mar 2020, no final | 150 Minna St | Skyline Construction | 6th fl - ti renovation including non-structural partitions, new ceiling and finishesDetails
6th fl - ti renovation including non-structural partitions, new ceiling and finishes | $1,500,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 555 Mission St | Bcci Construction Company | 34th fl - construction of new non-structural partitions, ceilings, and finishes.Details
34th fl - construction of new non-structural partitions, ceilings, and finishes. | $800,000 |
| Nov 1, 2019 | Completed final sign-off Aug 2020 | 555 Mission St | Bcci Construction Company | 34th fl - demo of mechanical systems. sprinkler permit ref 2019-0614-3450. ab-017.Details
34th fl - demo of mechanical systems. sprinkler permit ref 2019-0614-3450. ab-017. | $4,000 |
| Aug 12, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | t.i. on ground floor lobby including new finishes millwork and lighting.Details
t.i. on ground floor lobby including new finishes millwork and lighting. | $100,000 |
| Jun 18, 2019 | Completed final sign-off Dec 2019 | 4 Embarcadero Center | Turner Construction Co | 25/f: revison to app#201905201181 to revise office floor plan layout. n/a for maherDetails
25/f: revison to app#201905201181 to revise office floor plan layout. n/a for maher | |
| May 20, 2019 | Expired or cancelled expired Dec 2019 | 4 Embarcadero Center | Turner Construction Co | 25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit.Details
25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit. | $3,000,000 |
| Mar 27, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | t.i. improvement on the 6th fl. new non structureal partitions finishes, acoustical ceilings, mep & fire life safety under sep permitDetails
t.i. improvement on the 6th fl. new non structureal partitions finishes, acoustical ceilings, mep & fire life safety under sep permit | $996,088 |
| Jan 4, 2008 | Completed final sign-off Feb 2009 | 580 California St | Bcci Construction Company | 22nd floor #2200 - new non-strucatural partitions, new acoustical ceiling grid & tile, new electrical outlets & lighting & new finishes. rework (e) hvac to new layout, fire/life safety & sprinklers under separate permit.Details
22nd floor #2200 - new non-strucatural partitions, new acoustical ceiling grid & tile, new electrical outlets & lighting & new finishes. rework (e) hvac to new layout, fire/life safety & sprinklers under separate permit. | $600,000 |
| Nov 13, 2007 | Completed final sign-off Feb 2008 | 222 Kearny St | Ward Alan Emery Construction Inc. | suite #300- office tenant improvement on third fl. new non-sturcural partitions. mep, life safety and sprinklers under separate 3Details
suite #300- office tenant improvement on third fl. new non-sturcural partitions. mep, life safety and sprinklers under separate 3 | $75,000 |
| Aug 23, 2007 | Completed final sign-off Nov 2007 | 720 California St | Principal Builders Inc. | 4/f- construction of non-structural wall, electrical and new doors & glazing. (t.i. partial floor)Details
4/f- construction of non-structural wall, electrical and new doors & glazing. (t.i. partial floor) | $30,000 |
| May 7, 2007 | Completed final sign-off Jul 2007 | 201 Spear St | oti-1, ground floor, el, ls, spDetails
oti-1, ground floor, el, ls, sp | $40,000 | |
| Feb 8, 2007 | Completed final sign-off May 2009 | 74 New Montgomery St | Cannon Constructors North Inc | provide non structural walls, raised flooring and ramps, new fully occupant restrooms and new finishes throughout. mep under seperate permit.Details
provide non structural walls, raised flooring and ramps, new fully occupant restrooms and new finishes throughout. mep under seperate permit. | $100,000 |
| Aug 14, 2006 | Expired or cancelled expired Aug 2008 | 135 Main St | restroom renovation, barrier removal, 3/f restroom. revision to appl#200607267632 scope of work: new lighting/electrical/plumbingDetails
restroom renovation, barrier removal, 3/f restroom. revision to appl#200607267632 scope of work: new lighting/electrical/plumbing | $60,000 | |
| Jul 26, 2006 | Expired or cancelled expired Aug 2008 | 135 Main St | demolition of non-load bearing partitions and toilet/plumbing fixtures. providing new fixtures to full compliance. fire alarm strobe seperate permit.Details
demolition of non-load bearing partitions and toilet/plumbing fixtures. providing new fixtures to full compliance. fire alarm strobe seperate permit. | $60,000 | |
| Jun 22, 2006 | Completed final sign-off Sep 2006 | 525 Market St | reconfigure men's restroom to be fully accessible. demolition, constructural, electrical, plumbing, design-build. barrier removal work only under this permit @ 28th floorDetails
reconfigure men's restroom to be fully accessible. demolition, constructural, electrical, plumbing, design-build. barrier removal work only under this permit @ 28th floor | $56,000 |