Permit GraphShortlistSan Francisco building permits since 2000

Block 3716, lot 023

101 Spear St

City’s use
Commercial Retail
Built
1925
Stories
5
Building
297,204 sq ft
Zoning
C3O
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

152 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 16, 2026In progress
filed Nov 2026, not yet issued
101 Spear Stnon-structural, interior only, select demolition on 6 floors among approx 20,645 sf area of interior partitions, ceilings, finishes in order to expose structural for future structural retroofit under separate permit.
Details
Permit
202611160809

non-structural, interior only, select demolition on 6 floors among approx 20,645 sf area of interior partitions, ceilings, finishes in order to expose structural for future structural retroofit under separate permit.

Open the permit page

$186,717
Sep 11, 2026In progress
filed Sep 2026, not yet issued
101 Spear Stsite permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow
Details
Permit
202608317472

site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow

Open the permit page

$15,000,000
Aug 14, 2026In progress
filed Aug 2026, not yet issued
101 Spear St3 exploratory excavation pit to deterine fondation size and existing pile conditions. no structural work.
Details
Permit
202608146629

3 exploratory excavation pit to deterine fondation size and existing pile conditions. no structural work.

Open the permit page

$2,000
Jan 26, 2024In progress
issued Jan 2024
101 Spear StCity Mechanical Incinstallation of water source heat pumps, ductwork and diffusers in the atrium
Details
Permit
202401264727
Permit issued
Jan 26, 2024

installation of water source heat pumps, ductwork and diffusers in the atrium

Open the permit page

$40,000
Jan 10, 2024In progress
filed Jan 2024, not yet issued
101 Spear StSabah International Incorporatedto unlock stairwell doors via the existing fire alarm sysem, system relays shall be added to unlock stairwell doors on 1st, 2nd and 3rd flrs. note: there is no building t.i. occuring.
Details
Permit
202401103693

to unlock stairwell doors via the existing fire alarm sysem, system relays shall be added to unlock stairwell doors on 1st, 2nd and 3rd flrs. note: there is no building t.i. occuring.

Open the permit page

$10,469
Jan 10, 2024In progress
issued May 2024
101 Spear StSabah International Incorporated1/f: provide modification of existing fire alarm system to accommodate new mechanical water source heat pumps at the 1st flr atrium. no architectural changes associated to the mechanical. ref permit 202401264727
Details
Permit
202401103695
Permit issued
May 7, 2024

1/f: provide modification of existing fire alarm system to accommodate new mechanical water source heat pumps at the 1st flr atrium. no architectural changes associated to the mechanical. ref permit 202401264727

Open the permit page

$11,269
Jul 12, 2023Completed
final sign-off Jul 2024
101 Spear StSkyline Constructionste 220: voluntary addition of structural glass guardrails at (e) balconies floors lvls 2,3,4 (e) steel guardrails (c.1988) are non-compliant w/respect to cbc 1015.3 height (42"min) & cbc 1015.4 opening limitations; (n) glass railings shall comply w/these requirements. patch/repair impacted finishes
Details
Permit
202307121952
Permit issued
Aug 18, 2023
Final sign-off
Jul 10, 2024

ste 220: voluntary addition of structural glass guardrails at (e) balconies floors lvls 2,3,4 (e) steel guardrails (c.1988) are non-compliant w/respect to cbc 1015.3 height (42"min) & cbc 1015.4 opening limitations; (n) glass railings shall comply w/these requirements. patch/repair impacted finishes

Open the permit page

$465,000
Jun 8, 2023Expired or cancelled
cancelled Jan 2026
101 Spear StNovo Construction Incseismic anchorage for phone booths on the 4th and 5th floors. fire sprinkler under separate permit
Details
Permit
202306089525

seismic anchorage for phone booths on the 4th and 5th floors. fire sprinkler under separate permit

Open the permit page

$75,000
Nov 10, 2022Completed
final sign-off Aug 2023
101 Spear StSabah International Incorporatedtenant improvement, fire alarm changes to modify/add fire alarms system.
Details
Permit
202211106240
Permit issued
Nov 10, 2022
Final sign-off
Aug 28, 2023

tenant improvement, fire alarm changes to modify/add fire alarms system.

Open the permit page

$40,865
Aug 17, 2022Completed
final sign-off Jul 2023
101 Spear Stt.i. of the (e) fire sprinkler system; 50 (n) concealed heads (vertical sidewall) 07 (n) concealed heads (pendent)
Details
Permit
202208170747
Permit issued
Jul 24, 2023
Final sign-off
Jul 31, 2023

t.i. of the (e) fire sprinkler system; 50 (n) concealed heads (vertical sidewall) 07 (n) concealed heads (pendent)

Open the permit page

$5,000
Feb 28, 2022Completed
final sign-off Jun 2022
101 Spear StNovo Construction Inc4th floor fire only permit to obatain assembly permit required stamps for flex work 0457/lounge 0403/roof deck 0456. ref pa #202105140410 and 202108267170
Details
Permit
202202288811
Permit issued
Feb 28, 2022
Final sign-off
Jun 6, 2022

4th floor fire only permit to obatain assembly permit required stamps for flex work 0457/lounge 0403/roof deck 0456. ref pa #202105140410 and 202108267170

Open the permit page

Feb 25, 2022Completed
final sign-off Jun 2022
101 Spear StNovo Construction Inc5th fl: fire only permit to obtain assembly permit required stamps for game room 0502 / flex work 0536 / break room 0551 / solarium 0552.
Details
Permit
202202258748
Permit issued
Feb 28, 2022
Final sign-off
Jun 6, 2022

5th fl: fire only permit to obtain assembly permit required stamps for game room 0502 / flex work 0536 / break room 0551 / solarium 0552.

Open the permit page

Feb 16, 2022Completed
final sign-off Sep 2022
101 Spear StMarchetti Groupgr floor interior dmeo for 1 vacant retail space. demolish e suspended ceiling and carpet. patch e drywall walls and ceiling and paint. polish e concrete floor. no other work.
Details
Permit
202202168139
Permit issued
Apr 13, 2022
Final sign-off
Sep 30, 2022

gr floor interior dmeo for 1 vacant retail space. demolish e suspended ceiling and carpet. patch e drywall walls and ceiling and paint. polish e concrete floor. no other work.

Open the permit page

$10,000
Dec 16, 2021Completed
final sign-off Feb 2024
101 Spear StMarchetti Grouprevisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved.
Details
Permit
202112164578
Permit issued
Sep 7, 2022
Final sign-off
Feb 29, 2024

revisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved.

Open the permit page

$125,000
Sep 14, 2021Expired or cancelled
cancelled Jan 2026
101 Spear StMarchetti Grouprevision to existing permit # 2020-5310-6671 and 2020-0922-4736 to keep e temporary barricade walls as permanent
Details
Permit
202109148426

revision to existing permit # 2020-5310-6671 and 2020-0922-4736 to keep e temporary barricade walls as permanent

Open the permit page

$5,000
Aug 26, 2021Completed
final sign-off Mar 2022
101 Spear StNovo Construction Inc4th fl - revision to 2021-0514-0410 per field inspector to modify card readers and obtain an assembly permit for existing roof deck
Details
Permit
202108267170
Permit issued
Aug 31, 2021
Final sign-off
Mar 9, 2022

4th fl - revision to 2021-0514-0410 per field inspector to modify card readers and obtain an assembly permit for existing roof deck

Open the permit page

Aug 26, 2021Completed
final sign-off Mar 2022
101 Spear StNovo Construction Increvision to 202105180510 to modify card readers per field inspector
Details
Permit
202108267194
Permit issued
Aug 31, 2021
Final sign-off
Mar 10, 2022

revision to 202105180510 to modify card readers per field inspector

Open the permit page

Jul 26, 2021Never finaled
issued Jul 2021, no final
101 Spear StSabah International Incorporated4th & 5th flr-add:(2) dual input module,(4) output module,(5) control relay, (20 interllgent smk det. (3)photo duct smk det. (4) dooster pwr supply,(32) speaker ceiling stobes & (4) speaker/strobe. ref#202105140410/05180510/06212849/06182772
Details
Permit
202107265050
Permit issued
Jul 26, 2021

4th & 5th flr-add:(2) dual input module,(4) output module,(5) control relay, (20 interllgent smk det. (3)photo duct smk det. (4) dooster pwr supply,(32) speaker ceiling stobes & (4) speaker/strobe. ref#202105140410/05180510/06212849/06182772

Open the permit page

$68,613
Jun 30, 2021Completed
final sign-off Aug 2021
101 Spear StAyoob & Peery Plumbing Co Inc4th fl: add (9) changeout (9), relocate (3) sprinklers per t.i. pa #202105140410. 5th fl: add (9) changeout (9), relocate (13) sprinklers per t.i. pa #202105180510.
Details
Permit
202106303525
Permit issued
Jul 6, 2021
Final sign-off
Aug 25, 2021

4th fl: add (9) changeout (9), relocate (3) sprinklers per t.i. pa #202105140410. 5th fl: add (9) changeout (9), relocate (13) sprinklers per t.i. pa #202105180510.

Open the permit page

$18,900
Jun 21, 2021Completed
final sign-off Feb 2022
101 Spear StNovo Construction Inc4/f: mechanical & electrical work for t.i. ref bpa#202105140410
Details
Permit
202106212849
Permit issued
Jun 21, 2021
Final sign-off
Feb 28, 2022

4/f: mechanical & electrical work for t.i. ref bpa#202105140410

Open the permit page

Jun 18, 2021Completed
final sign-off Feb 2022
101 Spear StNovo Construction Inc5th fl - mech and mech-e work for ti. ref pa 2021-0518-0510
Details
Permit
202106182772
Permit issued
Jun 21, 2021
Final sign-off
Feb 28, 2022

5th fl - mech and mech-e work for ti. ref pa 2021-0518-0510

Open the permit page

May 25, 2021Expired or cancelled
withdrawn May 2023
101 Spear StCorporate Sign Systemssign a: install 2 illuminated double-faced projecting blade sign. "rincon"
Details
Permit
202105251019

sign a: install 2 illuminated double-faced projecting blade sign. "rincon"

Open the permit page

$4,000
May 25, 2021Expired or cancelled
expired Dec 2024
101 Spear StCorporate Sign Systemserect 2 electric single faced wall signs permit: "rincon" (2)total
Details
Permit
202105251017
Permit issued
May 12, 2023

erect 2 electric single faced wall signs permit: "rincon" (2)total

Open the permit page

$3,500
May 25, 2021Completed
final sign-off May 2024
101 Spear StCorporate Sign Systemsinstall 1 electric single faced wall sign: "parking"
Details
Permit
202105251014
Permit issued
Apr 14, 2023
Final sign-off
May 23, 2024

install 1 electric single faced wall sign: "parking"

Open the permit page

$2,000
May 25, 2021Expired or cancelled
cancelled Sep 2023
101 Spear StCorporate Sign Systemssign d: install 1 non-illuminated single face canopy sign. for "tenant xyz"
Details
Permit
202105251021
Permit issued
May 11, 2023

sign d: install 1 non-illuminated single face canopy sign. for "tenant xyz"

Open the permit page

$1,000
May 25, 2021Expired or cancelled
cancelled Sep 2023
101 Spear StCorporate Sign Systemssign c: install 2 illuminated double-faced projecting blade sign. for "tenant xyz rincon center"
Details
Permit
202105251018
Permit issued
May 11, 2023

sign c: install 2 illuminated double-faced projecting blade sign. for "tenant xyz rincon center"

Open the permit page

$1,000
May 25, 2021Expired or cancelled
cancelled Sep 2023
101 Spear StCorporate Sign Systemserect a non-electric single wall faced sign permit. "rincon center"
Details
Permit
202105251011
Permit issued
May 12, 2023

erect a non-electric single wall faced sign permit. "rincon center"

Open the permit page

$3,000
May 25, 2021Expired or cancelled
expired Dec 2024
101 Spear StCorporate Sign Systemserect a non-electric, wall single faced sign. "spear street"
Details
Permit
202105251013
Permit issued
May 12, 2023

erect a non-electric, wall single faced sign. "spear street"

Open the permit page

$1,000
May 25, 2021Completed
final sign-off May 2024
101 Spear StCorporate Sign Systemsinstall 1 non electric single faced wall sign: "office elevators"
Details
Permit
202105251012
Permit issued
Apr 14, 2023
Final sign-off
May 23, 2024

install 1 non electric single faced wall sign: "office elevators"

Open the permit page

$1,000
May 25, 2021Expired or cancelled
cancelled Sep 2023
101 Spear StCorporate Sign Systemserect an electric, single faced wall sign. "rincon" (4) total
Details
Permit
202105251015
Permit issued
May 12, 2023

erect an electric, single faced wall sign. "rincon" (4) total

Open the permit page

$3,000
May 20, 2021Completed
final sign-off Apr 2024
101 Spear StCorporate Sign Systemsreplace extg 1-non illuminated single-faced wall sign "one rincon center"
Details
Permit
202105200744
Permit issued
May 2, 2023
Final sign-off
Apr 9, 2024

replace extg 1-non illuminated single-faced wall sign "one rincon center"

Open the permit page

$3,000
May 20, 2021Expired or cancelled
withdrawn May 2023
101 Spear StCorporate Sign Systemssign typae a- retail blade id qty 13. fabricate and install primary id blade, internally illuminated; wall mounting. signage is within "transit center special sign district" to have dimmable transformer. in line dimmer switch, dedicated and timers by others
Details
Permit
202105200747

sign typae a- retail blade id qty 13. fabricate and install primary id blade, internally illuminated; wall mounting. signage is within "transit center special sign district" to have dimmable transformer. in line dimmer switch, dedicated and timers by others

Open the permit page

$1,600
May 18, 2021Completed
final sign-off Mar 2022
101 Spear StNovo Construction Inc5th fl: demolition of select bnon-structural partitions, acoustical ceiling finishes, etc. provide new non-structural partitions and finishes. mep under sep. permit.
Details
Permit
202105180510
Permit issued
Jun 3, 2021
Final sign-off
Mar 9, 2022

5th fl: demolition of select bnon-structural partitions, acoustical ceiling finishes, etc. provide new non-structural partitions and finishes. mep under sep. permit.

Open the permit page

$1,445,000
May 14, 2021Completed
final sign-off Mar 2022
101 Spear StNovo Construction Inc4th fl: demoliton of select non-structural partitions, acoustical ceilings, finishes, etc.. provide new non-structural partitions & finishes. electrical under separate permit.
Details
Permit
202105140410
Permit issued
Jun 2, 2021
Final sign-off
Mar 9, 2022

4th fl: demoliton of select non-structural partitions, acoustical ceilings, finishes, etc.. provide new non-structural partitions & finishes. electrical under separate permit.

Open the permit page

$1,305,000
Jan 28, 2021Completed
final sign-off Mar 2021
101 Spear StSabah International Incorporatedas-built for permit # 2020-0206-5443. relocate ceiling devices to wall mouted in open ceiling areas and provide additional devices in restrooms per inspector request. added fan coil units 1-6 and 1-7 to drawings. added additional window openers.
Details
Permit
202101283571
Permit issued
Mar 1, 2021
Final sign-off
Mar 19, 2021

as-built for permit # 2020-0206-5443. relocate ceiling devices to wall mouted in open ceiling areas and provide additional devices in restrooms per inspector request. added fan coil units 1-6 and 1-7 to drawings. added additional window openers.

Open the permit page

Oct 3, 2020Completed
final sign-off Feb 2024
101 Spear Stground fl construction of aluminum frame storefront glazing partition system & glass doors. new corridor partition wall & doors for all access to (e) restrooms. proposed office spaces to remain vacant & disabled access is preferred per ab-017
Details
Permit
202010035855
Permit issued
Dec 28, 2020
Final sign-off
Feb 29, 2024

ground fl construction of aluminum frame storefront glazing partition system & glass doors. new corridor partition wall & doors for all access to (e) restrooms. proposed office spaces to remain vacant & disabled access is preferred per ab-017

Open the permit page

$65,000
Oct 3, 2020Completed
final sign-off May 2022
101 Spear Stadministrative permit to memorialize occii motions authorizing 23,224.88 gsf of office use to be flexibly configured @ ground fl.no construction under this permit, permit establishes that a change of use occupancy is approved for future tenant improvement.
Details
Permit
202010035859
Permit issued
Dec 23, 2020
Final sign-off
May 12, 2022

administrative permit to memorialize occii motions authorizing 23,224.88 gsf of office use to be flexibly configured @ ground fl.no construction under this permit, permit establishes that a change of use occupancy is approved for future tenant improvement.

Open the permit page

Sep 22, 2020Completed
final sign-off Sep 2022
101 Spear StMarchetti Group1st fl - temporary barricades and egress path per inspector's request. ref to pa 2020 0310 6671.
Details
Permit
202009224736
Permit issued
Dec 17, 2020
Final sign-off
Sep 30, 2022

1st fl - temporary barricades and egress path per inspector's request. ref to pa 2020 0310 6671.

Open the permit page

$8,000
Jun 11, 2020Never finaled
issued Jun 2020, no final
101 Spear Ststreet space
Details
Permit
M1209967
Permit issued
Jun 29, 2020

street space

Open the permit page

Mar 10, 2020Completed
final sign-off Sep 2021
101 Spear StMarchetti Grouprenovation of existing elevator lobby space, including ceiling, lighting, and new reception desk area.
Details
Permit
202003106676
Permit issued
Jul 17, 2020
Final sign-off
Sep 10, 2021

renovation of existing elevator lobby space, including ceiling, lighting, and new reception desk area.

Open the permit page

$350,000
Mar 10, 2020Completed
final sign-off Aug 2021
101 Spear StMarchetti Grouprevision to pa #2019-0806-7976: omission of scope including raised platform area at spear st. entry including associated finish work, and elevator lift.
Details
Permit
202003106671
Permit issued
Jul 17, 2020
Final sign-off
Aug 30, 2021

revision to pa #2019-0806-7976: omission of scope including raised platform area at spear st. entry including associated finish work, and elevator lift.

Open the permit page

Mar 3, 2020Never finaled
issued Mar 2020, no final
101 Spear Ststreet space
Details
Permit
M1201247
Permit issued
Mar 3, 2020

street space

Open the permit page

Feb 28, 2020Never finaled
issued Mar 2020, no final
101 Spear StMarchetti Grouprevision to pa #201911278338 for local equivalency of existing verical grase ducts.
Details
Permit
202002285764
Permit issued
Mar 12, 2020

revision to pa #201911278338 for local equivalency of existing verical grase ducts.

Open the permit page

Feb 26, 2020Completed
final sign-off Mar 2021
101 Spear StSabah International Incorporatedref pa# 201908279939; modify (e) fire alarm system, relocate (e) annunciator add(6) input/output modules, (12) dual input modules, (1) synch output module,(6) high power control relays, (2) smoke detectors, (8) duct smoke detectors, (4) interior relays, (2) booster power supplies, 38 speaker strobes
Details
Permit
202002265443
Permit issued
Feb 26, 2020
Final sign-off
Mar 15, 2021

ref pa# 201908279939; modify (e) fire alarm system, relocate (e) annunciator add(6) input/output modules, (12) dual input modules, (1) synch output module,(6) high power control relays, (2) smoke detectors, (8) duct smoke detectors, (4) interior relays, (2) booster power supplies, 38 speaker strobes

Open the permit page

$88,758
Jan 30, 2020Completed
final sign-off Oct 2022
101 Spear StMarchetti Grouprevision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit.
Details
Permit
202001303189
Permit issued
Feb 19, 2020
Final sign-off
Oct 5, 2022

revision to pa #2019-0806-7976: temporary fire assembly occupancy calculations for atrium spaces previously approved to be used as exhibit as part of sffd assembly/operational permit.

Open the permit page

Jan 7, 2020Completed
final sign-off Aug 2021
101 Spear Stfire sprinkler permit for 1st fl: install 137 upright sprinklers and 71 pendents for the atrium remodel. ref ti #201908067976.
Details
Permit
202001071318
Permit issued
Jan 7, 2020
Final sign-off
Aug 25, 2021

fire sprinkler permit for 1st fl: install 137 upright sprinklers and 71 pendents for the atrium remodel. ref ti #201908067976.

Open the permit page

$92,000
Dec 6, 2019Never finaled
issued Dec 2019, no final
101 Spear Ststreet space
Details
Permit
M1173187
Permit issued
Dec 6, 2019

street space

Open the permit page

Dec 3, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Increvision 2019-0610-2983 and 2019-0524-1693 to change furniture layout in employee break area on level 1 & 2
Details
Permit
201912038539
Permit issued
Dec 6, 2019
Final sign-off
May 18, 2020

revision 2019-0610-2983 and 2019-0524-1693 to change furniture layout in employee break area on level 1 & 2

Open the permit page

Nov 27, 2019Completed
final sign-off Sep 2021
101 Spear StMarchetti Groupref# 201908279939 & 201908067976: deferred mep including grease exhaust fans&ducts, general exhaust & type 2 exhaust ducts. motorized operable windows for smoke control, restroom exhasut and rebalance existing restroom exhaust floor 2-5.
Details
Permit
201911278338
Permit issued
Jan 31, 2020
Final sign-off
Sep 10, 2021

ref# 201908279939 & 201908067976: deferred mep including grease exhaust fans&ducts, general exhaust & type 2 exhaust ducts. motorized operable windows for smoke control, restroom exhasut and rebalance existing restroom exhaust floor 2-5.

Open the permit page

Nov 15, 2019Completed
final sign-off Mar 2021
101 Spear StMarchetti Groupproject scope includes the installation of atrium doors assembly structural frame support framing on ground level slab. reference pa# 2019-0828-0119
Details
Permit
201911157436
Permit issued
Nov 18, 2019
Final sign-off
Mar 4, 2021

project scope includes the installation of atrium doors assembly structural frame support framing on ground level slab. reference pa# 2019-0828-0119

Open the permit page

$25,000
Nov 6, 2019Completed
final sign-off Mar 2020
101 Spear StMartinelli Environmental Graphevacuation signs on floors 1,2, & 3.
Details
Permit
201911066623
Permit issued
Nov 6, 2019
Final sign-off
Mar 26, 2020

evacuation signs on floors 1,2, & 3.

Open the permit page

$3,500
Nov 5, 2019Completed
final sign-off Mar 2020
101 Spear StSabah International Incorporatedmodification of f.a. system. reusing (e) heat pumps and fire device. add (9) new heat pumps with duct det and shut downs. adding (1) new fsd and replacing (151) speaker strobes. ref app#201906254311
Details
Permit
201911056504
Permit issued
Nov 13, 2019
Final sign-off
Mar 26, 2020

modification of f.a. system. reusing (e) heat pumps and fire device. add (9) new heat pumps with duct det and shut downs. adding (1) new fsd and replacing (151) speaker strobes. ref app#201906254311

Open the permit page

$48,000
Nov 4, 2019Never finaled
issued Nov 2019, no final
101 Spear StMarchetti Groupproject scope includes the construction of raised platforms withtin the atrium of rincon center located at 121 spear street. referece pa 2019-0806-7976
Details
Permit
201911046383
Permit issued
Nov 8, 2019

project scope includes the construction of raised platforms withtin the atrium of rincon center located at 121 spear street. referece pa 2019-0806-7976

Open the permit page

Oct 28, 2019Completed
final sign-off Mar 2021
101 Spear StMarchetti Groupreference app#201908280119. structural work only. install new stair at egress corridor.
Details
Permit
201910285684
Permit issued
Oct 29, 2019
Final sign-off
Mar 1, 2021

reference app#201908280119. structural work only. install new stair at egress corridor.

Open the permit page

$18,000
Oct 28, 2019Completed
final sign-off Mar 2020
101 Spear StSabah International Incorporatedbasement: voluntary fire alarm changes to accomodate tei project @ basement fl. add 1 single input monitor module & 1 dual input monitor module for fire kpump test loop tampers. maher n/a.
Details
Permit
201910285695
Permit issued
Oct 28, 2019
Final sign-off
Mar 26, 2020

basement: voluntary fire alarm changes to accomodate tei project @ basement fl. add 1 single input monitor module & 1 dual input monitor module for fire kpump test loop tampers. maher n/a.

Open the permit page

$13,868
Oct 2, 2019Never finaled
issued Oct 2019, no final
101 Spear Ststreet space
Details
Permit
M1147167
Permit issued
Oct 2, 2019

street space

Open the permit page

Oct 2, 2019Never finaled
issued Oct 2019, no final
101 Spear Ststreet space
Details
Permit
M1147187
Permit issued
Oct 2, 2019

street space

Open the permit page

Sep 17, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Increvision to 201905241699 2nd flr & 201906254311 3rd flr. add roll down door at elevator lobby. roll down door approved on application listed above, this is for the strucutral approval with calcs
Details
Permit
201909171857
Permit issued
Oct 18, 2019
Final sign-off
May 18, 2020

revision to 201905241699 2nd flr & 201906254311 3rd flr. add roll down door at elevator lobby. roll down door approved on application listed above, this is for the strucutral approval with calcs

Open the permit page

$5,000
Aug 28, 2019Completed
final sign-off Sep 2021
101 Spear StMarchetti Grouprevision to app#201809129816. remove portion of extg interior fl slab at extg service entry. remove portion of extg rated transfer corridor & extg egress stair. remove extg walls,doors, ceilings, & lighting at new proposed public entry lobby. install new slabs, rated partitions & openings, stairs,
Details
Permit
201908280119
Permit issued
Sep 4, 2019
Final sign-off
Sep 10, 2021

revision to app#201809129816. remove portion of extg interior fl slab at extg service entry. remove portion of extg rated transfer corridor & extg egress stair. remove extg walls,doors, ceilings, & lighting at new proposed public entry lobby. install new slabs, rated partitions & openings, stairs,

Open the permit page

$645,620
Aug 27, 2019Never finaled
issued Sep 2019, no final
101 Spear StNovo Construction Inc3rd flr ti deferred mep. ref pa 201906254311
Details
Permit
201908279941
Permit issued
Sep 19, 2019

3rd flr ti deferred mep. ref pa 201906254311

Open the permit page

$1,300,000
Aug 27, 2019Expired or cancelled
cancelled Sep 2021
101 Spear StMarchetti Groupground flr interior tenant improvements for 9 food service commercial kitchens and support spaces incl common food storage area, common employee lockers & changing rms, janitorial closets & common refuse rm. (n) partitions, finishes and kitchen equipment. mep under separate permits
Details
Permit
201908279939
Permit issued
Oct 21, 2019

ground flr interior tenant improvements for 9 food service commercial kitchens and support spaces incl common food storage area, common employee lockers & changing rms, janitorial closets & common refuse rm. (n) partitions, finishes and kitchen equipment. mep under separate permits

Open the permit page

$975,000
Aug 26, 2019Completed
final sign-off Oct 2019
101 Spear Stfire sprinklers install 90 new upright sprinklers for atrium demo ref 201803274706
Details
Permit
201908269823
Permit issued
Aug 26, 2019
Final sign-off
Oct 18, 2019

fire sprinklers install 90 new upright sprinklers for atrium demo ref 201803274706

Open the permit page

$18,000
Aug 22, 2019Never finaled
issued Oct 2019, no final
101 Spear StSabah International Incorporatedfire alarm modify existing system. add 1 dual signature driver controller, 2 20 control relay, 1 input/0utput module , 2 optical smk detector, 17 photosmk det, 6 booster power supply 158 speaker strobes, 70 v and 5 speaker strobes and 5 speaker strobes wp. ref pa#2019-0524-1699.**maher n/a**
Details
Permit
201908229519
Permit issued
Oct 16, 2019

fire alarm modify existing system. add 1 dual signature driver controller, 2 20 control relay, 1 input/0utput module , 2 optical smk detector, 17 photosmk det, 6 booster power supply 158 speaker strobes, 70 v and 5 speaker strobes and 5 speaker strobes wp. ref pa#2019-0524-1699.**maher n/a**

Open the permit page

$101,509
Aug 8, 2019Completed
final sign-off Mar 2021
101 Spear StMarchetti Grouprevision to 201809129816. as construction will be going on for months, the fire inspector has requested a temporary egress path to be constructed.
Details
Permit
201908088300
Permit issued
Aug 14, 2019
Final sign-off
Mar 1, 2021

revision to 201809129816. as construction will be going on for months, the fire inspector has requested a temporary egress path to be constructed.

Open the permit page

$3,812,400
Aug 6, 2019Completed
final sign-off Oct 2019
101 Spear StAyoob & Peery Plumbing Co Inc2nd flr, fire sprinklers. tenant improvement - add 136, relocate 107 sprinklers. ref 201905241699
Details
Permit
201908068014
Permit issued
Aug 16, 2019
Final sign-off
Oct 22, 2019

2nd flr, fire sprinklers. tenant improvement - add 136, relocate 107 sprinklers. ref 201905241699

Open the permit page

$95,475
Aug 6, 2019Completed
final sign-off Sep 2021
101 Spear StMarchetti Grouprevision to pa 2018-0327-4706 to include (n) raised platforms, (n) all gender neutral restrooms, removal of non-historic windows, & install (n) actuating windows.
Details
Permit
201908067976
Permit issued
Nov 4, 2019
Final sign-off
Sep 10, 2021

revision to pa 2018-0327-4706 to include (n) raised platforms, (n) all gender neutral restrooms, removal of non-historic windows, & install (n) actuating windows.

Open the permit page

$200,000
Aug 6, 2019Completed
final sign-off Sep 2019
101 Spear StAyoob & Peery Plumbing Co Inc1st flr, fire sprinklers. tenant improvement - add 34, relocate 27 sprinklers. ref 201906102983
Details
Permit
201908068010
Permit issued
Aug 16, 2019
Final sign-off
Sep 20, 2019

1st flr, fire sprinklers. tenant improvement - add 34, relocate 27 sprinklers. ref 201906102983

Open the permit page

$23,925
Aug 6, 2019Completed
final sign-off Feb 2020
101 Spear StAyoob & Peery Plumbing Co Inc3rd flr, fire sprinklers. tenant improvement - add 52, relocate 30 sprinklers. ref 201906254311
Details
Permit
201908068015
Permit issued
Aug 16, 2019
Final sign-off
Feb 7, 2020

3rd flr, fire sprinklers. tenant improvement - add 52, relocate 30 sprinklers. ref 201906254311

Open the permit page

$34,050
Aug 1, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Incdeferred mep for first floor ti ref 201906102983
Details
Permit
201908017630
Permit issued
Aug 2, 2019
Final sign-off
May 18, 2020

deferred mep for first floor ti ref 201906102983

Open the permit page

Jul 15, 2019Completed
final sign-off Jun 2020
101 Spear StNovo Construction Inc2nd floor:mep: relocate extg heat pumps, 17 new heat pumps, install 2 new exhaust fans, install 1 new f.s.p. install low pressure duct work. install condenser water per plans. n/a for maher
Details
Permit
201907155860
Permit issued
Jul 23, 2019
Final sign-off
Jun 1, 2020

2nd floor:mep: relocate extg heat pumps, 17 new heat pumps, install 2 new exhaust fans, install 1 new f.s.p. install low pressure duct work. install condenser water per plans. n/a for maher

Open the permit page

$100,000
Jun 25, 2019Never finaled
issued Jun 2019, no final
101 Spear Ststreet space
Details
Permit
M1100227
Permit issued
Jun 25, 2019

street space

Open the permit page

Jun 25, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Inc3rd flr. interior tenant improvement of approx 63,000 sq ft, located on level 3. improvements incl open offices, pantry, employee break room and conference rooms
Details
Permit
201906254311
Permit issued
Jul 18, 2019
Final sign-off
May 18, 2020

3rd flr. interior tenant improvement of approx 63,000 sq ft, located on level 3. improvements incl open offices, pantry, employee break room and conference rooms

Open the permit page

$1,500,000
Jun 10, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Inc1st fl - interior ti of approximately 12,000 sq ft on level 1. improvements include reception, pantry, game area, fitness room, employee break rooms, unisex and shower
Details
Permit
201906102983
Permit issued
Jul 26, 2019
Final sign-off
May 18, 2020

1st fl - interior ti of approximately 12,000 sq ft on level 1. improvements include reception, pantry, game area, fitness room, employee break rooms, unisex and shower

Open the permit page

$1,550,000
May 24, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Incinterior t.i. of approx. 65,228 sf on level 2 & mezz improvements include open office, pantry employee, break rooms, conference rooms, unisex restrooms
Details
Permit
201905241699
Permit issued
Jun 26, 2019
Final sign-off
May 18, 2020

interior t.i. of approx. 65,228 sf on level 2 & mezz improvements include open office, pantry employee, break rooms, conference rooms, unisex restrooms

Open the permit page

$5,900,000
May 24, 2019Completed
final sign-off Jun 2020
101 Spear StNovo Construction Incinteror soft demo of approx .23,150 sf located on level 3
Details
Permit
201905241693
Permit issued
May 30, 2019
Final sign-off
Jun 1, 2020

interor soft demo of approx .23,150 sf located on level 3

Open the permit page

$120,000
Apr 8, 2019Completed
final sign-off May 2020
101 Spear StNovo Construction Incdemo of non structural partitions and finishes on 1st & 2nd floors ab 0.17
Details
Permit
201904087325
Permit issued
May 1, 2019
Final sign-off
May 18, 2020

demo of non structural partitions and finishes on 1st & 2nd floors ab 0.17

Open the permit page

$10,000
Mar 12, 2019Never finaled
issued May 2019, no final
101 Spear StRichlen Constructionrelocation of existing door at salesforce/twilio tenant suite on the 1st floor/ accessible upgrades per form c allowance
Details
Permit
201903124979
Permit issued
May 1, 2019

relocation of existing door at salesforce/twilio tenant suite on the 1st floor/ accessible upgrades per form c allowance

Open the permit page

$10,000
Sep 12, 2018Completed
final sign-off Sep 2021
101 Spear StMarchetti Groupremove portions of (e) interior & exterior slab at (e) service entry, portions of (e) rated transfer corridor & egress stair & associated walls, door, ceiling & lighting. install new floor slab & exterior landing & door, rated partitions, openings & stairs. accessible lift, ceiling & lighting
Details
Permit
201809129816
Permit issued
Mar 11, 2019
Final sign-off
Sep 10, 2021

remove portions of (e) interior & exterior slab at (e) service entry, portions of (e) rated transfer corridor & egress stair & associated walls, door, ceiling & lighting. install new floor slab & exterior landing & door, rated partitions, openings & stairs. accessible lift, ceiling & lighting

Open the permit page

$645,620
Jun 7, 2018Expired or cancelled
withdrawn Sep 2018
101 Spear Stremove portion of existing interior fl slab 2 existing service entry, portion of existing rated transfer corridor & egress stair, existing walls, doors ceilings, lighting, entry,elevator lobby. install new slabs, stairs, ceilings, lighting, rated construction @ new public lobby and elevator lobby
Details
Permit
201806071251

remove portion of existing interior fl slab 2 existing service entry, portion of existing rated transfer corridor & egress stair, existing walls, doors ceilings, lighting, entry,elevator lobby. install new slabs, stairs, ceilings, lighting, rated construction @ new public lobby and elevator lobby

Open the permit page

$645,620
Apr 4, 2018Expired or cancelled
cancelled Jul 2024
101 Spear Strehabilitation of 5 windows opening & 1 entrance @ the steuart street facade of the landmark post oppice bldg, including the removal of non-historic louvers. the installation of new glazing in (e) frams, updated louvers in one window, new entrance doors & surround. ** maher: n/a **
Details
Permit
201804045529

rehabilitation of 5 windows opening & 1 entrance @ the steuart street facade of the landmark post oppice bldg, including the removal of non-historic louvers. the installation of new glazing in (e) frams, updated louvers in one window, new entrance doors & surround. ** maher: n/a **

Open the permit page

$1,500,000
Mar 27, 2018Never finaled
issued Mar 2019, no final
101 Spear StMarchetti Grouprenovation of extg atrium space at rincon tower one: remove some extg int. food service tenant spaces, including most storefronts, flooring, ceilings, lighting in non-historic lobby & atrium spaces. install new retail storefronts and retail signage, new flooring, ceiling & lighting.
Details
Permit
201803274706
Permit issued
Mar 11, 2019

renovation of extg atrium space at rincon tower one: remove some extg int. food service tenant spaces, including most storefronts, flooring, ceilings, lighting in non-historic lobby & atrium spaces. install new retail storefronts and retail signage, new flooring, ceiling & lighting.

Open the permit page

$2,500,000
Apr 10, 2017Completed
final sign-off May 2017
101 Spear StRed Hawk Fire & Security Ca Llcfire alarm ti on 4th fl salesforce. add 42 speaker strobes, 333 smoke det for atrium perimeter, 20 duct detectors, with relays for hp unints. 2 pendent smoke , 1 duct detector for fsds and 1 new loop controller cord ref 201612094519
Details
Permit
201704103602
Permit issued
Apr 10, 2017
Final sign-off
May 26, 2017

fire alarm ti on 4th fl salesforce. add 42 speaker strobes, 333 smoke det for atrium perimeter, 20 duct detectors, with relays for hp unints. 2 pendent smoke , 1 duct detector for fsds and 1 new loop controller cord ref 201612094519

Open the permit page

$55,560
Mar 7, 2017Never finaled
issued Mar 2017, no final
101 Spear StGolden Gate Fire Protection Inc4th floor fire sprinkler - relocate 119 pendent sprinkler heads, relocate 114 upright sprinklers. upgrade end of line bracing & earthquake bracing. ref pa #201612094619. n/a maher ordinance
Details
Permit
201703070836
Permit issued
Mar 20, 2017

4th floor fire sprinkler - relocate 119 pendent sprinkler heads, relocate 114 upright sprinklers. upgrade end of line bracing & earthquake bracing. ref pa #201612094619. n/a maher ordinance

Open the permit page

$98,175
Dec 9, 2016Completed
final sign-off Nov 2017
101 Spear StHathaway Dinwiddie Co.partial floor interior tenant improvement for single tenant on 4th flr including mep demo work filed under 201612024025. n/a maher ord. 155-13
Details
Permit
201612094619
Permit issued
Jan 5, 2017
Final sign-off
Nov 16, 2017

partial floor interior tenant improvement for single tenant on 4th flr including mep demo work filed under 201612024025. n/a maher ord. 155-13

Open the permit page

$2,000,000
Dec 6, 2016Completed
final sign-off Mar 2017
101 Spear StGolden Gate Fire Protection Incfire sprinklers; relocate 28 upright sprinklers on the 4th floor. maher na
Details
Permit
201612064254
Permit issued
Dec 6, 2016
Final sign-off
Mar 22, 2017

fire sprinklers; relocate 28 upright sprinklers on the 4th floor. maher na

Open the permit page

$5,600
Dec 2, 2016Completed
final sign-off Nov 2017
101 Spear StHathaway Dinwiddie Co.4th flr: interior non-structural demo work only. partial existing high rise building fully sprinklered, t.i. scope of work filed under separate permit.all demo work to comply with ab-017; maher n/a
Details
Permit
201612024025
Permit issued
Dec 6, 2016
Final sign-off
Nov 16, 2017

4th flr: interior non-structural demo work only. partial existing high rise building fully sprinklered, t.i. scope of work filed under separate permit.all demo work to comply with ab-017; maher n/a

Open the permit page

$24,347
Jun 6, 2016Completed
final sign-off Aug 2016
101 Spear StHathaway Dinwiddie Co.revision to pa 2014-0626-9637 for infield design modifications including open seating layout, electrical lighting and plumbing
Details
Permit
201606069210
Permit issued
Jun 17, 2016
Final sign-off
Aug 29, 2016

revision to pa 2014-0626-9637 for infield design modifications including open seating layout, electrical lighting and plumbing

Open the permit page

Jun 3, 2016Completed
final sign-off Aug 2016
101 Spear StRed Hawk Fire & Security Ca Llc2nd floor fire alarm for t.i. - add (101) new speaker/strobes, (16) strobes, (1) speaker, (40) smoke detectors, (64) duct detectors, (69) control relays, (3) booster supplies. ref #20140626963. n/a maher ordinance
Details
Permit
201606039126
Permit issued
Jun 6, 2016
Final sign-off
Aug 23, 2016

2nd floor fire alarm for t.i. - add (101) new speaker/strobes, (16) strobes, (1) speaker, (40) smoke detectors, (64) duct detectors, (69) control relays, (3) booster supplies. ref #20140626963. n/a maher ordinance

Open the permit page

$40,000
Apr 22, 2016Completed
final sign-off Apr 2016
101 Spear StK Bali Constructionrevision to app#201603020962. project under construction. remove ansul from drawings and provide fire protection per ab-005. n/a maher
Details
Permit
201604225536
Permit issued
Apr 26, 2016
Final sign-off
Apr 27, 2016

revision to app#201603020962. project under construction. remove ansul from drawings and provide fire protection per ab-005. n/a maher

Open the permit page

Apr 19, 2016Never finaled
issued Apr 2016, no final
101 Spear StHathaway Dinwiddie Co.2nd fl: revision to ref pa 2014-0626-9637: revised work includes new pantry, millwork layout, elevator lobby, new horizontal exit location & mep design. fire alarm & sprinkler deferred. compliance with maher ordinance no 155-13 not required.
Details
Permit
201604195174
Permit issued
Apr 29, 2016

2nd fl: revision to ref pa 2014-0626-9637: revised work includes new pantry, millwork layout, elevator lobby, new horizontal exit location & mep design. fire alarm & sprinkler deferred. compliance with maher ordinance no 155-13 not required.

Open the permit page

$90,000
Mar 21, 2016Completed
final sign-off Jun 2016
101 Spear StGolden Gate Fire Protection Inc2nd floor fire sprinklers - relocate 155 pendent sprinklers, relocate 183 upright sprinklers heads, upgrade end of line & earthquake bracing. ref t.i. #201511122392.
Details
Permit
201603212533
Permit issued
Apr 1, 2016
Final sign-off
Jun 14, 2016

2nd floor fire sprinklers - relocate 155 pendent sprinklers, relocate 183 upright sprinklers heads, upgrade end of line & earthquake bracing. ref t.i. #201511122392.

Open the permit page

$174,070
Mar 16, 2016Never finaled
issued Mar 2016, no final
101 Spear Ststreet space
Details
Permit
M673047
Permit issued
Mar 18, 2016

street space

Open the permit page

Mar 2, 2016Completed
final sign-off Apr 2016
101 Spear StK Bali Constructionminor non-structural remodel to existing restaurant to include changes to customer serving area. changes to prep room adjacent to serving area. maher na
Details
Permit
201603020962
Permit issued
Mar 17, 2016
Final sign-off
Apr 27, 2016

minor non-structural remodel to existing restaurant to include changes to customer serving area. changes to prep room adjacent to serving area. maher na

Open the permit page

$35,250
Mar 2, 2016Never finaled
issued Dec 2016, no final
101 Spear Ststreet space
Details
Permit
M668507
Permit issued
Dec 14, 2016

street space

Open the permit page

Feb 5, 2016Completed
final sign-off May 2016
101 Spear Stsuite 400: demolition of (e) non-structural partitions, millwork and ceiling. removal of (e) mep distribution. re-suport lights throughout. maher na
Details
Permit
201602058920
Permit issued
Feb 9, 2016
Final sign-off
May 2, 2016

suite 400: demolition of (e) non-structural partitions, millwork and ceiling. removal of (e) mep distribution. re-suport lights throughout. maher na

Open the permit page

$96,000
Nov 12, 2015Never finaled
issued Mar 2016, no final
101 Spear StHathaway Dinwiddie Co.revision to pa#201406269637 for 2/f, partial office level t.i., revision include mezzanine, turnstiles & corresponding mechanical. n/a ordinance #155-13
Details
Permit
201511122392
Permit issued
Mar 24, 2016

revision to pa#201406269637 for 2/f, partial office level t.i., revision include mezzanine, turnstiles & corresponding mechanical. n/a ordinance #155-13

Open the permit page

Aug 19, 2015Completed
final sign-off Aug 2016
101 Spear StHathaway Dinwiddie Co.interior non-structural soft demolition at 2nd floor: demo per ab-017. t.i. under appl, # 2014.06.26.9637 (under review). maher n/a.
Details
Permit
201508194738
Permit issued
Aug 21, 2015
Final sign-off
Aug 29, 2016

interior non-structural soft demolition at 2nd floor: demo per ab-017. t.i. under appl, # 2014.06.26.9637 (under review). maher n/a.

Open the permit page

$15,000
Aug 14, 2015Never finaled
issued Aug 2015, no final
101 Spear Ststreet space
Details
Permit
M614627
Permit issued
Aug 14, 2015

street space

Open the permit page

Jun 19, 2015Never finaled
issued Jun 2015, no final
101 Spear StK Bali Construction1st floor suite a2: hair salon t.i. including electrical for new configuration of interior finishes, remove utility sink, new lighting and fixtures. maher n/a.
Details
Permit
201506199482
Permit issued
Jun 26, 2015

1st floor suite a2: hair salon t.i. including electrical for new configuration of interior finishes, remove utility sink, new lighting and fixtures. maher n/a.

Open the permit page

$50,000
Jan 12, 2015Completed
final sign-off Mar 2015
101 Spear StRed Hawk Fire & Security Ca Llc5th flr: fire alarm ref. appn. 201405166024 including: 72 speaker/strobes, 11 strobes, 4 smoke detectors, 50 duct detectors, 13 monitor modules, 45 relays; maher n/a
Details
Permit
201501125415
Permit issued
Jan 12, 2015
Final sign-off
Mar 5, 2015

5th flr: fire alarm ref. appn. 201405166024 including: 72 speaker/strobes, 11 strobes, 4 smoke detectors, 50 duct detectors, 13 monitor modules, 45 relays; maher n/a

Open the permit page

$23,000
Jan 8, 2015Expired or cancelled
cancelled Jan 2026
101 Spear Stste a-10: plumbing sink install, electrical re-position of sockets, window install; maher n/a
Details
Permit
201501085226

ste a-10: plumbing sink install, electrical re-position of sockets, window install; maher n/a

Open the permit page

Nov 18, 2014Completed
final sign-off Mar 2015
101 Spear StHathaway Dinwiddie Co.4th flr: revision to elevator lobby doors on 4th flr, ref. pa 201406300127 and pa 201311131835; maher n/a
Details
Permit
201411181801
Permit issued
Nov 19, 2014
Final sign-off
Mar 5, 2015

4th flr: revision to elevator lobby doors on 4th flr, ref. pa 201406300127 and pa 201311131835; maher n/a

Open the permit page

$4,000
Nov 18, 2014Completed
final sign-off Mar 2015
101 Spear StHathaway Dinwiddie Co.5th flr: revision to elevator lobby doors on 5th flr, reference 201405166024; maher n/a
Details
Permit
201411181804
Permit issued
Nov 19, 2014
Final sign-off
Mar 5, 2015

5th flr: revision to elevator lobby doors on 5th flr, reference 201405166024; maher n/a

Open the permit page

$8,000
Nov 12, 2014Completed
final sign-off Dec 2014
101 Spear StRed Hawk Fire & Security Ca Llc4th floor: as built of fire alarm t.i. revision appl. 2014.1029.0154. maher n/a.
Details
Permit
201411121198
Permit issued
Nov 17, 2014
Final sign-off
Dec 15, 2014

4th floor: as built of fire alarm t.i. revision appl. 2014.1029.0154. maher n/a.

Open the permit page

Nov 10, 2014Never finaled
issued Nov 2014, no final
101 Spear Ststreet space permit
Details
Permit
M535707
Permit issued
Nov 10, 2014

street space permit

Open the permit page

Nov 7, 2014Never finaled
issued Nov 2014, no final
101 Spear StGolden Gate Fire Protection Increlocate 202 pendent sprinkler heads, relocate 113 upright sprinklers heads, upgrade end of line bracing and earthquake bracing. t.i. pa#201405166024. n/a ordinance #155-13
Details
Permit
201411070988
Permit issued
Nov 14, 2014

relocate 202 pendent sprinkler heads, relocate 113 upright sprinklers heads, upgrade end of line bracing and earthquake bracing. t.i. pa#201405166024. n/a ordinance #155-13

Open the permit page

$162,225
Oct 29, 2014Completed
final sign-off Dec 2014
101 Spear StRed Hawk Fire & Security Ca Llcfire alarm ti on 4th fl 1 power supply, 1 pull station, 2 strobes, 1 smoke detector, 44 speaker strobes, 20 duct detectors, 18 relays
Details
Permit
201410290154
Permit issued
Oct 29, 2014
Final sign-off
Dec 4, 2014

fire alarm ti on 4th fl 1 power supply, 1 pull station, 2 strobes, 1 smoke detector, 44 speaker strobes, 20 duct detectors, 18 relays

Open the permit page

$10,000
Oct 23, 2014Never finaled
issued Oct 2014, no final
101 Spear Ststreet space
Details
Permit
M530287
Permit issued
Oct 23, 2014

street space

Open the permit page

Oct 9, 2014Completed
final sign-off Mar 2015
101 Spear StHathaway Dinwiddie Co.1st flr: training room, revise exiting and add door, as indicated in plans for office t.i. on 1st flr; maher n/a
Details
Permit
201410098560
Permit issued
Oct 15, 2014
Final sign-off
Mar 6, 2015

1st flr: training room, revise exiting and add door, as indicated in plans for office t.i. on 1st flr; maher n/a

Open the permit page

$1,000
Aug 21, 2014Never finaled
issued Aug 2014, no final
101 Spear StGolden Gate Fire Protection Inc4th floor fire sprinkler - relocate 82 pendent sprinkler heads, relcoate 52 upright sprinkler heads, upgrade end of line bracing & earthquake bracing. ref ti #2013.1113.1835.
Details
Permit
201408214379
Permit issued
Aug 21, 2014

4th floor fire sprinkler - relocate 82 pendent sprinkler heads, relcoate 52 upright sprinkler heads, upgrade end of line bracing & earthquake bracing. ref ti #2013.1113.1835.

Open the permit page

$69,010
Aug 14, 2014Expired or cancelled
withdrawn Sep 2014
101 Spear St1st flr t.i. (ref.201310240182); existing office space, mep included, fire alarm & sprinkler under separate permit for fire review only.building & mep approved under 201310240182; maher n/a
Details
Permit
201408143867

1st flr t.i. (ref.201310240182); existing office space, mep included, fire alarm & sprinkler under separate permit for fire review only.building & mep approved under 201310240182; maher n/a

Open the permit page

$1,530,000
Jul 14, 2014Completed
final sign-off Feb 2015
101 Spear StHathaway Dinwiddie Co.to erect non-electrical directional sign in courtyard entry. n/a for the maher ordinance #155-13
Details
Permit
201407141218
Permit issued
Nov 14, 2014
Final sign-off
Feb 9, 2015

to erect non-electrical directional sign in courtyard entry. n/a for the maher ordinance #155-13

Open the permit page

$800
Jul 14, 2014Completed
final sign-off Feb 2015
101 Spear StHathaway Dinwiddie Co.to erect electrical sign above main entrance door way. n/a for the maher ordinance #155-13
Details
Permit
201407141220
Permit issued
Nov 14, 2014
Final sign-off
Feb 9, 2015

to erect electrical sign above main entrance door way. n/a for the maher ordinance #155-13

Open the permit page

$20,000
Jul 14, 2014Completed
final sign-off Feb 2015
101 Spear StHathaway Dinwiddie Co.to erect non-electrical and non illuminated panel signage on extg projected blade sign on spear street and steurt street . n/a for the maher ordinance #155-13
Details
Permit
201407141221
Permit issued
Nov 14, 2014
Final sign-off
Feb 9, 2015

to erect non-electrical and non illuminated panel signage on extg projected blade sign on spear street and steurt street . n/a for the maher ordinance #155-13

Open the permit page

$5,000
Jul 14, 2014Completed
final sign-off Feb 2015
101 Spear StHathaway Dinwiddie Co.to erect non-electrical sign on bldg wall in courtyard. n/a for the maher ordinance #155-13
Details
Permit
201407141219
Permit issued
Nov 14, 2014
Final sign-off
Feb 9, 2015

to erect non-electrical sign on bldg wall in courtyard. n/a for the maher ordinance #155-13

Open the permit page

$3,000
Jun 30, 2014Completed
final sign-off Mar 2015
101 Spear StHathaway Dinwiddie Co.partail interior t.i. on 4th floor. fully sprinklered building. mep under separate permit. maher n/a. revision appl 201311131835.
Details
Permit
201406300127
Permit issued
Sep 24, 2014
Final sign-off
Mar 6, 2015

partail interior t.i. on 4th floor. fully sprinklered building. mep under separate permit. maher n/a. revision appl 201311131835.

Open the permit page

$20,000
Jun 26, 2014Completed
final sign-off Aug 2016
101 Spear StHathaway Dinwiddie Co.2nd floor tenant improvement on existing office space (partial floor t.i.), new mep work. n/a maher ordinance
Details
Permit
201406269637
Permit issued
Sep 23, 2015
Final sign-off
Aug 29, 2016

2nd floor tenant improvement on existing office space (partial floor t.i.), new mep work. n/a maher ordinance

Open the permit page

$1,528,688
Jun 18, 2014Completed
final sign-off Oct 2014
101 Spear StWestower Communicationsremove antenas, coax and conduit, and radio equipment. (nextel) n/a for the maher ordinance #155-13
Details
Permit
201406188781
Permit issued
Jun 24, 2014
Final sign-off
Oct 17, 2014

remove antenas, coax and conduit, and radio equipment. (nextel) n/a for the maher ordinance #155-13

Open the permit page

$10,000
May 16, 2014Completed
final sign-off Apr 2015
101 Spear Sttenanat improvement on the 5th floor, existing office space, new mechanical, electrical, & plumbing work n//a maher
Details
Permit
201405166024
Permit issued
Sep 24, 2014
Final sign-off
Apr 9, 2015

tenanat improvement on the 5th floor, existing office space, new mechanical, electrical, & plumbing work n//a maher

Open the permit page

$1,528,688
Apr 30, 2014Completed
final sign-off Oct 2014
101 Spear StHathaway Dinwiddie Co.revision to 201310240182. 1st fl partial tenant improvement. reconfigure 1st fl to include new food service area; compliance with ord 155-13 not required
Details
Permit
201404304630
Permit issued
Jun 2, 2014
Final sign-off
Oct 1, 2014

revision to 201310240182. 1st fl partial tenant improvement. reconfigure 1st fl to include new food service area; compliance with ord 155-13 not required

Open the permit page

$500,000
Apr 29, 2014Never finaled
issued Apr 2014, no final
101 Spear Ststreet space
Details
Permit
M483747
Permit issued
Apr 29, 2014

street space

Open the permit page

Apr 28, 2014Never finaled
issued Apr 2014, no final
101 Spear StMartinelli Environmental Graph3rd floor - installation of six evacuation maps. compliance with ordinance # 155-13 n/a
Details
Permit
201404284290
Permit issued
Apr 28, 2014

3rd floor - installation of six evacuation maps. compliance with ordinance # 155-13 n/a

Open the permit page

$600
Apr 2, 2014Completed
final sign-off Jul 2014
101 Spear StGolden Gate Fire Protection Inc1st floor - relocate 86 pendent sprinklers, relcoate 56 upright sprinklers, upgrade end of line bracing & earthquake bracing. ref #2013.1024.0182. compliance with ordinance #155-13 not required
Details
Permit
201404022234
Permit issued
Apr 2, 2014
Final sign-off
Jul 24, 2014

1st floor - relocate 86 pendent sprinklers, relcoate 56 upright sprinklers, upgrade end of line bracing & earthquake bracing. ref #2013.1024.0182. compliance with ordinance #155-13 not required

Open the permit page

$73,130
Mar 5, 2014Completed
final sign-off May 2014
101 Spear StGolden Gate Fire Protection Increlocate 232 pendent sprinkler heads on the 3rd fl. relocate 267 upright sprinkler heads. upgrade end of line and earthquake bracing. add new preaction cabinet. mahar ordiance not required.
Details
Permit
201403059893
Permit issued
Mar 5, 2014
Final sign-off
May 22, 2014

relocate 232 pendent sprinkler heads on the 3rd fl. relocate 267 upright sprinkler heads. upgrade end of line and earthquake bracing. add new preaction cabinet. mahar ordiance not required.

Open the permit page

$256,985
Feb 18, 2014Completed
final sign-off Aug 2014
101 Spear StRed Hawk Fire & Security Ca Llcfire alarm ti 1st and 3rd fl: 5 booster panels, 3 control modules, 2 manual pulls, 151 speaker strobes, 3 strobes, 8 speakers, 62 smoke detectors, 65 duct detectors, 274 relays. compliance with ordinance no. 155-13 not required.
Details
Permit
201402188636
Permit issued
Apr 3, 2014
Final sign-off
Aug 21, 2014

fire alarm ti 1st and 3rd fl: 5 booster panels, 3 control modules, 2 manual pulls, 151 speaker strobes, 3 strobes, 8 speakers, 62 smoke detectors, 65 duct detectors, 274 relays. compliance with ordinance no. 155-13 not required.

Open the permit page

$30,000
Feb 14, 2014Completed
final sign-off Jun 2014
101 Spear StIntelligent Technologies & Services Inc3rd floor: mdf pre-action detection and notification. 6 smoke and 1 bell. ref app#201310240183. n/a for the maher ordinance #155-13
Details
Permit
201402148521
Permit issued
Feb 14, 2014
Final sign-off
Jun 10, 2014

3rd floor: mdf pre-action detection and notification. 6 smoke and 1 bell. ref app#201310240183. n/a for the maher ordinance #155-13

Open the permit page

$3,200
Nov 6, 2012Completed
final sign-off Apr 2013
101 Spear Stscope of work. unit a7. change of use only from flower shop to fast food restaurant/retail. changes sink basin. no change to plumbing. no construction.
Details
Permit
201211063599
Permit issued
Nov 19, 2012
Final sign-off
Apr 17, 2013

scope of work. unit a7. change of use only from flower shop to fast food restaurant/retail. changes sink basin. no change to plumbing. no construction.

Open the permit page

$200
Jul 9, 2012Expired or cancelled
cancelled Jan 2026
101 Spear Strevision to bpa#2012-0406-7789 to add demising walls to tenant improvement. 1 one hour rated & 1 two hr rated wall at elevator shaft and stair.
Details
Permit
201207094396

revision to bpa#2012-0406-7789 to add demising walls to tenant improvement. 1 one hour rated & 1 two hr rated wall at elevator shaft and stair.

Open the permit page

$5,000
Jun 29, 2012Expired or cancelled
cancelled Jun 2014
101 Spear StSigntech Electrical Advertising Inc.install (4) electric, wall, single-faced, direct, new soffit band sign for "chase"
Details
Permit
201206293797

install (4) electric, wall, single-faced, direct, new soffit band sign for "chase"

Open the permit page

$8,000
Jun 29, 2012Expired or cancelled
cancelled Jun 2014
101 Spear StSigntech Electrical Advertising Inc.install (2) electric, single-faced, window, direct, new sign on building interior for "chase".
Details
Permit
201206293795

install (2) electric, single-faced, window, direct, new sign on building interior for "chase".

Open the permit page

$3,000
Jun 29, 2012Expired or cancelled
cancelled Jun 2014
101 Spear StSigntech Electrical Advertising Inc.install (1) non-electric, projecting, double-faced, non-illuminated, new sign for "chase"
Details
Permit
201206293786

install (1) non-electric, projecting, double-faced, non-illuminated, new sign for "chase"

Open the permit page

$500
Jun 29, 2012Expired or cancelled
cancelled Jun 2014
101 Spear StSigntech Electrical Advertising Inc.install electric, wall, single-faced, direct, illuminated atm sign for "chase"
Details
Permit
201206293791

install electric, wall, single-faced, direct, illuminated atm sign for "chase"

Open the permit page

$2,000
Apr 6, 2012Never finaled
issued May 2012, no final
101 Spear StHoward S. Wright Constructors Lptenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, and plumbing
Details
Permit
201204067789
Permit issued
May 29, 2012

tenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, and plumbing

Open the permit page

$466,302
Apr 6, 2012Expired or cancelled
cancelled Jan 2026
101 Spear Sttenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, plumbing work
Details
Permit
201204067787

tenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, plumbing work

Open the permit page

$466,302
Mar 27, 2012Completed
final sign-off Apr 2012
101 Spear StAura Fire Safety Incground floor-upgrade fire system for hood & duct in the kitchen area to meet ul-300 standards
Details
Permit
201203276945
Permit issued
Mar 27, 2012
Final sign-off
Apr 9, 2012

ground floor-upgrade fire system for hood & duct in the kitchen area to meet ul-300 standards

Open the permit page

$1,500
Jan 13, 2012Completed
final sign-off Feb 2012
101 Spear StSkyline Construction4th floor-revision to pa# 2011-0614-8065 to add 2 fire smoke dampers. refer to pa# 2011-0310-1803
Details
Permit
201201132221
Permit issued
Jan 17, 2012
Final sign-off
Feb 8, 2012

4th floor-revision to pa# 2011-0614-8065 to add 2 fire smoke dampers. refer to pa# 2011-0310-1803

Open the permit page

$450
Jul 21, 2011Completed
final sign-off Feb 2012
101 Spear StSkyline Constructionrevision to 201103101803: change server room to telephone closet. elec, lighting
Details
Permit
201107210767
Permit issued
Dec 14, 2011
Final sign-off
Feb 8, 2012

revision to 201103101803: change server room to telephone closet. elec, lighting

Open the permit page

$125,000
Jun 17, 2011Completed
final sign-off Feb 2012
101 Spear StRed Hawk Fire & Security Ca Llc4th floor fire alarm t.i. - intrax: (1) input/output modules for fsd & new fan; (1) control relay for fan overide; (1) duct detector for fan, (2) ceiling strobes, (49) ceiling speaker strobes. ref arch pa #201103101803.
Details
Permit
201106178327
Permit issued
Jun 17, 2011
Final sign-off
Feb 8, 2012

4th floor fire alarm t.i. - intrax: (1) input/output modules for fsd & new fan; (1) control relay for fan overide; (1) duct detector for fan, (2) ceiling strobes, (49) ceiling speaker strobes. ref arch pa #201103101803.

Open the permit page

$10,827
Jun 14, 2011Completed
final sign-off Feb 2012
101 Spear StSkyline Construction4th fl - mechanical work for tenant improvment on the 4th floor including lowver. landmark 107 rincon annex post office
Details
Permit
201106148065
Permit issued
Jan 5, 2012
Final sign-off
Feb 8, 2012

4th fl - mechanical work for tenant improvment on the 4th floor including lowver. landmark 107 rincon annex post office

Open the permit page

$120,000
May 12, 2010Never finaled
issued May 2010, no final
101 Spear StAura Safety & Associatesunit #a-15-install fire suppression for hood & duct with ul-300 standards
Details
Permit
201005122310
Permit issued
May 13, 2010

unit #a-15-install fire suppression for hood & duct with ul-300 standards

Open the permit page

$4,500
May 12, 2010Expired or cancelled
cancelled Jan 2026
101 Spear StAura Safety & Associatesinstall fire suppression for hood & duct with ul-300 standards
Details
Permit
201005122313

install fire suppression for hood & duct with ul-300 standards

Open the permit page

Apr 30, 2010Completed
final sign-off Apr 2011
101 Spear StAura Safety & Associatesinstall fire suppression system in a restaurant. upgrade to ul 300
Details
Permit
201004301474
Permit issued
Apr 30, 2010
Final sign-off
Apr 20, 2011

install fire suppression system in a restaurant. upgrade to ul 300

Open the permit page

$3,500
Sep 11, 2009Never finaled
issued Sep 2009, no final
101 Spear StAaa Restaurant Fire Control/Dba Aaa Fireground floor-furnish & install 1 ansul r-102 fire suppression system in the main kitchen area on the ground floor.
Details
Permit
200909116585
Permit issued
Sep 11, 2009

ground floor-furnish & install 1 ansul r-102 fire suppression system in the main kitchen area on the ground floor.

Open the permit page

$2,000
Apr 14, 2009Never finaled
issued Apr 2009, no final
101 Spear StExxell Corp. Dba Exxell Fire Systemsul300 upgrade of fire suppression system.
Details
Permit
200904146289
Permit issued
Apr 17, 2009

ul300 upgrade of fire suppression system.

Open the permit page

$4,000
Mar 31, 2009Never finaled
issued Mar 2009, no final
101 Spear StTerra Nova Industriesremove some non-bearing wall & ceiling, grid and tile carpet remove and safty off, electrical in walls removed, work on first floor only. exception ada requirments per ab-017. life safety under separate permits.
Details
Permit
200903315207
Permit issued
Mar 31, 2009

remove some non-bearing wall & ceiling, grid and tile carpet remove and safty off, electrical in walls removed, work on first floor only. exception ada requirments per ab-017. life safety under separate permits.

Open the permit page

$5,000
Jun 16, 2008Completed
final sign-off Sep 2008
101 Spear StAyoob & Peery Plumbing Co Increlocate sprinkler heads per t.i. improvements. total of 33 heads.
Details
Permit
200806164546
Permit issued
Jun 16, 2008
Final sign-off
Sep 8, 2008

relocate sprinkler heads per t.i. improvements. total of 33 heads.

Open the permit page

$4,845
Apr 4, 2008Never finaled
issued Apr 2008, no final
101 Spear StRcm Fire Protection Inc.relocate 165 sprinkler heads for tenant improvement.(e) protection @ above ceiling to remain , areas where exposed to deck above.
Details
Permit
200804048911
Permit issued
Apr 4, 2008

relocate 165 sprinkler heads for tenant improvement.(e) protection @ above ceiling to remain , areas where exposed to deck above.

Open the permit page

$24,000
Jun 19, 2007Never finaled
issued Jun 2007, no final
101 Spear St2nd floor - t. i. upgrade of fire sprinkler system. relocate 2 sprinkler heads and added 1 sprinkler head.
Details
Permit
200706194369
Permit issued
Jun 19, 2007

2nd floor - t. i. upgrade of fire sprinkler system. relocate 2 sprinkler heads and added 1 sprinkler head.

Open the permit page

$4,392
Feb 12, 2004Completed
final sign-off Jul 2004
101 Spear Stbuilding a wood rack in storage space s-2 for storage of table tops-reference pa 9906205
Details
Permit
200402126258
Permit issued
Feb 12, 2004
Final sign-off
Jul 6, 2004

building a wood rack in storage space s-2 for storage of table tops-reference pa 9906205

Open the permit page

$1,000
Jan 22, 2004Expired or cancelled
expired Jan 2005
101 Spear Stinstall 1 18" omni antenna & relocate 1 (e) antenna to top of rail
Details
Permit
200401224632
Permit issued
Jun 7, 2004

install 1 18" omni antenna & relocate 1 (e) antenna to top of rail

Open the permit page

$15,000
Oct 14, 2003Completed
final sign-off Dec 2003
101 Spear StRudolph Commercial Interiors Inc, Rcioti-2,2nd floor-el, me, sp
Details
Permit
200310147328
Permit issued
Nov 4, 2003
Final sign-off
Dec 10, 2003

oti-2,2nd floor-el, me, sp

Open the permit page

$69,000
Aug 22, 2003Completed
final sign-off Dec 2003
101 Spear StRudolph Commercial Interiors Inc, Rcioti-1 el,me,ls,sp
Details
Permit
200308222790
Permit issued
Sep 11, 2003
Final sign-off
Dec 10, 2003

oti-1 el,me,ls,sp

Open the permit page

$115,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Novo Construction Inc (19), Marchetti Group (18), Hathaway Dinwiddie Co. (16), Corporate Sign Systems (11), Sabah International Incorporated (9), Golden Gate Fire Protection Inc (7), Red Hawk Fire & Security Ca Llc (7), Ayoob & Peery Plumbing Co Inc (5), Signtech Electrical Advertising Inc. (4), Skyline Construction (4), Aura Safety & Associates (3), K Bali Construction (3), Martinelli Environmental Graph (2), Rudolph Commercial Interiors Inc, Rci (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Aura Fire Safety Inc, City Mechanical Inc, Exxell Corp. Dba Exxell Fire Systems, Howard S. Wright Constructors Lp, Intelligent Technologies & Services Inc, Rcm Fire Protection Inc., Richlen Construction, Terra Nova Industries, Westower Communications
Architects
Douglas Zucker (9), Brian Milford (5), Melissa Hanley (5), Bert Deviterbo (4), Eric Ibsen (4), Teresa Emery (3), Ahmad Mohazab (2), Alma Jauregui (2), Marcus A. Hopper (2), Andrew Wolfram, George Soskin, Greg Sheppard, Jack Munson, John A. Hunter, Nathaniel Haynes, Stanley Laegreid, Teresa K. Emery
Engineers
Cerenico Madrona (4), Meng Hsiu Chen (4), Edward Rivera (2), Rudolfo P Bustos Iii (2), Adam T. Hugo-Holman, Antonio Jacksalem, Beian Unsderfer, Edward Rivera, Michael Gemmill, Rlh Fire Design Rlh Fire Design, Robert Pekelnicky, Stephen Shafeer
Designers
Douglas Zucker

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.