Brian Unsderfer
- License
- S5099
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5099 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Aue
- Based in
- New York
- On San Francisco permits
- Sep 2005 to Dec 2018
10 permits since 2000 (engineer on 9 permits, architect on 1 permit): 8 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Howard S. Wright Constructors Lp (2), Alten Construction Inc, Caliente Construction Inc, Deb Construction Llc, Dome Construction Corp, Trinity Heritage Construction Partners L
- Architects
- Stanley Laegreid (3), Christopher Gunter, David Udkow, Karoline Derse, Steve Epple Callison
- Engineers
- Brandon Elliott, Daniel Schoenberger, Mark Huffnagle, Peter Yu, Robert Trifunovic, Sean Turner
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 12, 2018 | Completed final sign-off Jul 2019 | 3 Embarcadero Center | Dome Construction Corp | suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces.Details
suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces. | $1,100,000 |
| Aug 23, 2018 | Completed final sign-off Dec 2019 | 222 Stockton St | Trinity Heritage Construction Partners L | interior ti (e) retail, gr floor basement, new partitions, new flooring/ wall / ceiling finishes, new product display fixture, new ceiling with light fixture, new duct work from new mech unit, new electrical, new plumbing, new structural work storefront & signage under separate permit.Details
interior ti (e) retail, gr floor basement, new partitions, new flooring/ wall / ceiling finishes, new product display fixture, new ceiling with light fixture, new duct work from new mech unit, new electrical, new plumbing, new structural work storefront & signage under separate permit. | $50,000 |
| Nov 14, 2017 | Completed final sign-off May 2018 | 1 Powell St | Caliente Construction Inc | revision to pa #201605026222 - structural work to add vr cube fixture to 2nd floor . no change in use, occupancy or floor area. no exterior work. n/a maher ordinanceDetails
revision to pa #201605026222 - structural work to add vr cube fixture to 2nd floor . no change in use, occupancy or floor area. no exterior work. n/a maher ordinance | $30,000 |
| Mar 27, 2014 | Completed final sign-off Mar 2015 | 398 Kansas St | shop drawings for glass curtain wall and supporting structure approved under 201306109032; compliance with ordinance 155-13 not requiredDetails
shop drawings for glass curtain wall and supporting structure approved under 201306109032; compliance with ordinance 155-13 not required | $65,000 | |
| Oct 12, 2012 | Completed final sign-off Sep 2013 | 845 Market St | 1st floor space 181 - glass handrail in front window of retail space will be installed. ref. #2012-0710-4506.Details
1st floor space 181 - glass handrail in front window of retail space will be installed. ref. #2012-0710-4506. | $15,000 | |
| Jul 27, 2012 | Completed final sign-off May 2013 | 435 China Basin St | Howard S. Wright Constructors Lp | tenant improvement of interior ground floor space including structural floor, exterior storefront alterations & interior finishes & restroom.Details
tenant improvement of interior ground floor space including structural floor, exterior storefront alterations & interior finishes & restroom. | $449,000 |
| Apr 6, 2012 | Never finaled issued May 2012, no final | 101 Spear St | Howard S. Wright Constructors Lp | tenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, and plumbingDetails
tenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, and plumbing | $466,302 |
| Oct 12, 2010 | Completed final sign-off Apr 2014 | 451 Galvez Av | Alten Construction Inc | curtain wall engineered drawing for previously approved permit #201006174685. building is set back per drawing.Details
curtain wall engineered drawing for previously approved permit #201006174685. building is set back per drawing. | |
| Aug 31, 2010 | Completed final sign-off Dec 2010 | 2500 Mission St | Deb Construction Llc | repair of existing roof structure. revision to 201004059616Details
repair of existing roof structure. revision to 201004059616 | $50,000 |
| Sep 15, 2005 | Expired or cancelled cancelled Mar 2009 | 1500 Polk St | t.i.for training center on 3/f of an (e)3 story bldg., interior work includes non-structural partition ceilings,finishes & casework,related mechanical,plumbing & electrical work included.Details
t.i.for training center on 3/f of an (e)3 story bldg., interior work includes non-structural partition ceilings,finishes & casework,related mechanical,plumbing & electrical work included. | $300,000 |