Permit GraphShortlistSan Francisco building permits since 2000

Block 3719, lot 450

181 Fremont St #parcel A

City’s use
Commercial Office
Built
2018
Stories
55
Building
432,000 sq ft
Lot
15,302 sq ft
Zoning
C3OSD
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 16, 2026In progress
issued Nov 2026
181 Fremont StLevel 10 Construction Lp18th fl - installation of door hardware release of electronically locked egress doors. reference pa# 202412187109
Details
Permit
202609168204
Permit issued
Nov 2, 2026

18th fl - installation of door hardware release of electronically locked egress doors. reference pa# 202412187109

Open the permit page

$2,500
Sep 15, 2026In progress
issued Nov 2026
181 Fremont StLevel 10 Construction Lp16th and 18th fl: installation of pre manufactured phone booths
Details
Permit
202609158135
Permit issued
Nov 2, 2026

16th and 18th fl: installation of pre manufactured phone booths

Open the permit page

$30,000
Sep 15, 2026In progress
issued Nov 2026
181 Fremont StLevel 10 Construction Lplevel 16: egress path revision and installation of door hardware release of electronic door lockers. (ref bpa: 2024.1218.7109 and 2024.0730.7534)
Details
Permit
202609158149
Permit issued
Nov 2, 2026

level 16: egress path revision and installation of door hardware release of electronic door lockers. (ref bpa: 2024.1218.7109 and 2024.0730.7534)

Open the permit page

$2,500
Jul 31, 2026In progress
issued Sep 2026
181 Fremont StSc Builders, Inc30th fl - revision to pa 202604239936, removal of scope from conference room/yoga room which includes lighting & mechanical
Details
Permit
202607315875
Permit issued
Sep 24, 2026

30th fl - revision to pa 202604239936, removal of scope from conference room/yoga room which includes lighting & mechanical

Open the permit page

Jul 20, 2026Completed
final sign-off Nov 2026
181 Fremont StSc Builders, Incinstallation of architectural, non-rated stair enclosure at existing architectural convenience/communicating stair on level 36. no changes in use, occupancy load, nor egress occupant load cabacity. no change to smoke control.
Details
Permit
202607205266
Permit issued
Jul 28, 2026
Final sign-off
Nov 5, 2026

installation of architectural, non-rated stair enclosure at existing architectural convenience/communicating stair on level 36. no changes in use, occupancy load, nor egress occupant load cabacity. no change to smoke control.

Open the permit page

$50,000
Jul 1, 2026In progress
issued Jul 2026
181 Fremont StSc Builders, Incref pa# 202604018674 (10th fl) & pa# 202604159456 (11th fl.): deffered submitals: phone booths anchorage and fan powered box seismic anchorage structural details on l10 & 11
Details
Permit
202607014399
Permit issued
Jul 10, 2026

ref pa# 202604018674 (10th fl) & pa# 202604159456 (11th fl.): deffered submitals: phone booths anchorage and fan powered box seismic anchorage structural details on l10 & 11

Open the permit page

$10,000
Apr 23, 2026In progress
issued May 2026
181 Fremont StSc Builders, Inc30/f: addition of power, modifications to (e) millwork in (e) pantry. conversion of storage room into conference room.
Details
Permit
202604239936
Permit issued
May 15, 2026

30/f: addition of power, modifications to (e) millwork in (e) pantry. conversion of storage room into conference room.

Open the permit page

$250,000
Mar 24, 2026Completed
final sign-off Oct 2026
181 Fremont StSc Builders, Incto comply with disables access - per ab-056. in order to demonstrate compliance with diabled access requirments for commericial office building access at 181 fremont st.
Details
Permit
202603248154
Permit issued
Mar 24, 2026
Final sign-off
Oct 13, 2026

to comply with disables access - per ab-056. in order to demonstrate compliance with diabled access requirments for commericial office building access at 181 fremont st.

Open the permit page

Sep 22, 2025Completed
final sign-off Oct 2025
181 Fremont StRapid Fire Safety&Security Llc Dba Pafa21st floor: fire alarm t.i. adding 1 relay to existing notifier nfs2-3030 fire alarm system.
Details
Permit
202509225852
Permit issued
Sep 23, 2025
Final sign-off
Oct 28, 2025

21st floor: fire alarm t.i. adding 1 relay to existing notifier nfs2-3030 fire alarm system.

Open the permit page

$6,695
Jul 16, 2025Completed
final sign-off Sep 2025
181 Fremont StAllied Fire Protection17th/fl: modify sprinkler system - ti revisions ref#2025-0703-0191
Details
Permit
202507160925
Permit issued
Jul 16, 2025
Final sign-off
Sep 9, 2025

17th/fl: modify sprinkler system - ti revisions ref#2025-0703-0191

Open the permit page

$5,100
Jul 3, 2025Completed
final sign-off Oct 2025
181 Fremont StLevel 10 Construction Lp17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.
Details
Permit
202507030191
Permit issued
Jul 11, 2025
Final sign-off
Oct 28, 2025

17th floor: board room revisions including grid and title ceilings, light fixtures, millwork and finishes. no plumbing fixtures.

Open the permit page

$250,000
May 5, 2025In progress
issued May 2025
181 Fremont StRapid Fire Safety&Security Llc Dba Pafa19th,20th,21st fl fire alarm t.i. adding 3 smoke detectors to e) notifier nfs2-3030 fire alarm system ref pa 2025-0505-5811
Details
Permit
202505055821
Permit issued
May 5, 2025

19th,20th,21st fl fire alarm t.i. adding 3 smoke detectors to e) notifier nfs2-3030 fire alarm system ref pa 2025-0505-5811

Open the permit page

$8,350
May 5, 2025In progress
issued May 2025
181 Fremont StMetropolitan Electrical Constructionadd card readers @ loby door ad noted. floors 19,20,21
Details
Permit
202505055811
Permit issued
May 5, 2025

add card readers @ loby door ad noted. floors 19,20,21

Open the permit page

$30,000
Dec 18, 2024In progress
issued Jan 2025
181 Fremont StLevel 10 Construction Lp16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remain
Details
Permit
202412187109
Permit issued
Jan 17, 2025

16/fl- revision 202407307534- work includes relocation of exit sign and path of travel on level 16 (e) security card readers to remain

Open the permit page

Dec 18, 2024In progress
issued Jan 2025
181 Fremont StLevel 10 Construction Lp18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remain
Details
Permit
202412187111
Permit issued
Jan 21, 2025

18/fl- revision 202407307548- work includes relocation of exit sign and path of travel on level 18 (e) security card readers to remain

Open the permit page

Oct 31, 2024Completed
final sign-off Feb 2025
181 Fremont StAcco Engineered Systems Inc. Dba Acco En28/fl- install (n) ductwork on (e) fan powered box on northside
Details
Permit
202410314104
Permit issued
Oct 31, 2024
Final sign-off
Feb 6, 2025

28/fl- install (n) ductwork on (e) fan powered box on northside

Open the permit page

$38,000
Oct 15, 2024Completed
final sign-off Dec 2024
181 Fremont StRapid Fire Safety&Security Llc Dba Pafa28th fl- fire alarm ti relocate (1) existing speaker strobe on (e) notifier nfs2-3038 fire alarm system pa: 202409261659
Details
Permit
202410152901
Permit issued
Oct 15, 2024
Final sign-off
Dec 10, 2024

28th fl- fire alarm ti relocate (1) existing speaker strobe on (e) notifier nfs2-3038 fire alarm system pa: 202409261659

Open the permit page

$2,910
Sep 26, 2024Completed
final sign-off Feb 2025
181 Fremont StSc Builders, Inc28/f. construction of new meeting room including non str partition, acounstical grid ceiling panel light fixture, door and finishes. existing acounstcial grid tile and gyp board ceiling light fixtures and finishes to remain. no change in use, exit stair egress path, elevators (mep fire alarm sprinkl
Details
Permit
202409261659
Permit issued
Oct 3, 2024
Final sign-off
Feb 6, 2025

28/f. construction of new meeting room including non str partition, acounstical grid ceiling panel light fixture, door and finishes. existing acounstcial grid tile and gyp board ceiling light fixtures and finishes to remain. no change in use, exit stair egress path, elevators (mep fire alarm sprinkl

Open the permit page

$188,000
Sep 26, 2024Completed
final sign-off Feb 2025
181 Fremont StSc Builders, Inc25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed)
Details
Permit
202409261654
Permit issued
Oct 3, 2024
Final sign-off
Feb 6, 2025

25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed)

Open the permit page

$188,000
Sep 9, 2024In progress
issued Sep 2024
181 Fremont StLevel 10 Construction Lp17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048.
Details
Permit
202409090372
Permit issued
Sep 11, 2024

17/f: admin permit - obtain fire assembly permit correction to pa# 202408209070 to denote it was a revision to pa# 202406104047 and not pa#202406104048.

Open the permit page

Aug 21, 2024In progress
issued Aug 2024
181 Fremont StRapid Fire Safety&Security Llc Dba Pafafloors# 4, 7, 17, 24, 34: fire alarm ti - stairwell door locks are being reconnected to main building security system as existing tenant vacates. no new equipment; existing relay modules to be revised.
Details
Permit
202408219142
Permit issued
Aug 21, 2024

floors# 4, 7, 17, 24, 34: fire alarm ti - stairwell door locks are being reconnected to main building security system as existing tenant vacates. no new equipment; existing relay modules to be revised.

Open the permit page

$6,280
Aug 20, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lprevision to 202406104048, work includes the addition of new card readers and ceiling addition
Details
Permit
202408209070
Permit issued
Aug 29, 2024
Final sign-off
Oct 1, 2024

revision to 202406104048, work includes the addition of new card readers and ceiling addition

Open the permit page

Jul 30, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lp18th fl revision to pa # 2024-0610-4048 addition of new card readers
Details
Permit
202407307548
Permit issued
Aug 14, 2024
Final sign-off
Oct 1, 2024

18th fl revision to pa # 2024-0610-4048 addition of new card readers

Open the permit page

Jul 30, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lprevision to 202406104044, work includes the addition of new card readers.
Details
Permit
202407307534
Permit issued
Aug 14, 2024
Final sign-off
Oct 1, 2024

revision to 202406104044, work includes the addition of new card readers.

Open the permit page

Jul 9, 2024Completed
final sign-off Aug 2024
181 Fremont StRapid Fire Safety&Security Llc Dba Pafafire alarm ti adding 6 speaker strobes, 1 duct detectord, 4 relay modules to e notifier nfs2-3030 fire alarm system
Details
Permit
202407096105
Permit issued
Jul 10, 2024
Final sign-off
Aug 29, 2024

fire alarm ti adding 6 speaker strobes, 1 duct detectord, 4 relay modules to e notifier nfs2-3030 fire alarm system

Open the permit page

$15,380
Jul 3, 2024Completed
final sign-off Aug 2024
181 Fremont StAllied Fire Protectionref 202406104048- 18 flr-fire only modify fire spirinkler system. relocated (4) and add (6) sprinklers
Details
Permit
202407035743
Permit issued
Jul 3, 2024
Final sign-off
Aug 29, 2024

ref 202406104048- 18 flr-fire only modify fire spirinkler system. relocated (4) and add (6) sprinklers

Open the permit page

$4,000
Jul 3, 2024In progress
issued Jul 2024
181 Fremont StAllied Fire Protectionref pa 2024-0610-4044 modify fire sprinkler system relocate 4 & add 6 sprinklers
Details
Permit
202407035792
Permit issued
Jul 3, 2024

ref pa 2024-0610-4044 modify fire sprinkler system relocate 4 & add 6 sprinklers

Open the permit page

$5,000
Jul 3, 2024Completed
final sign-off Aug 2024
181 Fremont StAllied Fire Protection17th/f: modify fire sprinklers system, relocate 18 & add 10 sprinklers. ref to 202406104047
Details
Permit
202407035775
Permit issued
Jul 3, 2024
Final sign-off
Aug 29, 2024

17th/f: modify fire sprinklers system, relocate 18 & add 10 sprinklers. ref to 202406104047

Open the permit page

$10,534
Jun 10, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lpconstruction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl.
Details
Permit
202406104047
Permit issued
Jul 1, 2024
Final sign-off
Oct 1, 2024

construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 17th fl.

Open the permit page

$232,309
Jun 10, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lpconstruction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl.
Details
Permit
202406104048
Permit issued
Jul 1, 2024
Final sign-off
Oct 1, 2024

construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes 18th fl.

Open the permit page

$331,360
Jun 10, 2024Completed
final sign-off Oct 2024
181 Fremont StLevel 10 Construction Lpconstruction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 16th fl.
Details
Permit
202406104044
Permit issued
Jul 1, 2024
Final sign-off
Oct 1, 2024

construction of new non-structural partitions, acoustical grid and tiles and gyp board ceilings, light fixtures, millwork, and finishes 16th fl.

Open the permit page

$224,577
Nov 20, 2023Completed
final sign-off Oct 2024
181 Fremont StSc Builders, Inc7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevator
Details
Permit
202311201134
Permit issued
Jan 25, 2024
Final sign-off
Oct 30, 2024

7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevator

Open the permit page

$175,000
Nov 1, 2021Completed
final sign-off Mar 2024
181 Fremont StPacific Auxiliary Fire Alarm55th fl: fire alarm ti: adding 1 new speakers and relocate 3 (e) speaker on (e) nfs2-3030 fire alarm system
Details
Permit
202111011564
Permit issued
Nov 1, 2021
Final sign-off
Mar 7, 2024

55th fl: fire alarm ti: adding 1 new speakers and relocate 3 (e) speaker on (e) nfs2-3030 fire alarm system

Open the permit page

$8,502
Aug 2, 2021Completed
final sign-off Dec 2022
181 Fremont StPacific Auxiliary Fire Alarmfire alarm ti: add (1) relay, (1) smoke detector, (1) monitor module, (1) dual point monitor module to (e) notifier nfs2-3030 fa system
Details
Permit
202108025583
Permit issued
Aug 2, 2021
Final sign-off
Dec 16, 2022

fire alarm ti: add (1) relay, (1) smoke detector, (1) monitor module, (1) dual point monitor module to (e) notifier nfs2-3030 fa system

Open the permit page

$6,630
May 20, 2021Completed
final sign-off Apr 2022
181 Fremont StPacific Auxiliary Fire Alarmfire alarm ti: adding (15) speakers to existing notifier nfs2-3030 fa system.
Details
Permit
202105200703
Permit issued
Jun 29, 2021
Final sign-off
Apr 18, 2022

fire alarm ti: adding (15) speakers to existing notifier nfs2-3030 fa system.

Open the permit page

$8,224
May 10, 2021Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpto obtain final inspection for work approved under permit application #'s 201804166436, 201804166442, 201804166440. all work is completed.
Details
Permit
202105100033
Permit issued
May 11, 2021
Final sign-off
May 28, 2021

to obtain final inspection for work approved under permit application #'s 201804166436, 201804166442, 201804166440. all work is completed.

Open the permit page

May 10, 2021Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpto obtain final inspection for work approved under permit# 201804166439, 201804277573, and 201804277574. all work is completed.
Details
Permit
202105100086
Permit issued
May 11, 2021
Final sign-off
May 28, 2021

to obtain final inspection for work approved under permit# 201804166439, 201804277573, and 201804277574. all work is completed.

Open the permit page

Apr 28, 2021Completed
final sign-off Jan 2022
181 Fremont Stas-built permit for errcs. replace yagi antenna on roof, and reprogram bda with new frequencies. ref. pa # 2013-0501-5894 s19
Details
Permit
202104289504
Permit issued
May 11, 2021
Final sign-off
Jan 18, 2022

as-built permit for errcs. replace yagi antenna on roof, and reprogram bda with new frequencies. ref. pa # 2013-0501-5894 s19

Open the permit page

Mar 22, 2021Completed
final sign-off Dec 2022
181 Fremont Stlevel 40: new battery rack and ac/dc charger as required by pg&e. level 58: trash chute exhaust revision. level 58: new fan and louver for extg microturbine cooling load.
Details
Permit
202103227042
Permit issued
Jul 26, 2021
Final sign-off
Dec 5, 2022

level 40: new battery rack and ac/dc charger as required by pg&e. level 58: trash chute exhaust revision. level 58: new fan and louver for extg microturbine cooling load.

Open the permit page

$46,000
Jan 14, 2021Completed
final sign-off Apr 2021
181 Fremont StParadise Door And Serviceti l-39 assembly revision. administrative permit only for sffd assembly stamps for approved permit. see pa #2020-1008-6196.
Details
Permit
202101142657
Permit issued
Mar 19, 2021
Final sign-off
Apr 29, 2021

ti l-39 assembly revision. administrative permit only for sffd assembly stamps for approved permit. see pa #2020-1008-6196.

Open the permit page

Dec 8, 2020Completed
final sign-off Nov 2021
181 Fremont StPacific Auxiliary Fire Alarmfire alarm ti: (3) speaker-strobes, (3) duct detectors, (2) monitor modules, (4) dual point monitor modules, (2) dual point monitor/relay modules & (1) relay module are being relocated and reinstalled (to provide easier access) to existing notifier nrs2-3030 fa system.
Details
Permit
202012080562
Permit issued
Feb 10, 2021
Final sign-off
Nov 29, 2021

fire alarm ti: (3) speaker-strobes, (3) duct detectors, (2) monitor modules, (4) dual point monitor modules, (2) dual point monitor/relay modules & (1) relay module are being relocated and reinstalled (to provide easier access) to existing notifier nrs2-3030 fa system.

Open the permit page

$20,400
Sep 19, 2020Completed
final sign-off Apr 2021
181 Fremont StPacific Auxiliary Fire Alarmfire alarm only - existing doas fans are being replaced from level 5 to level 38. fire alarm devices (duct smoke detector & control modules/relays are being removed and the being reinstalled on new fnns.
Details
Permit
202009194529
Permit issued
Nov 5, 2020
Final sign-off
Apr 29, 2021

fire alarm only - existing doas fans are being replaced from level 5 to level 38. fire alarm devices (duct smoke detector & control modules/relays are being removed and the being reinstalled on new fnns.

Open the permit page

$25,000
Mar 11, 2020Expired or cancelled
cancelled Jan 2026
181 Fremont StLevel 10 Construction Lpinstall new trash chute exhaust fan at roof level
Details
Permit
202003116714

install new trash chute exhaust fan at roof level

Open the permit page

$20,000
Jan 29, 2020Completed
final sign-off Feb 2021
181 Fremont StAllied Fire Protectionfire sprinklers: hoa level 3 & 4. 7 added level (3), 2 relocated on level 4. total 9 sprinklers ref pa 2019-0923-2376
Details
Permit
202001292977
Permit issued
Jan 29, 2020
Final sign-off
Feb 23, 2021

fire sprinklers: hoa level 3 & 4. 7 added level (3), 2 relocated on level 4. total 9 sprinklers ref pa 2019-0923-2376

Open the permit page

$4,400
Jan 24, 2020Completed
final sign-off Mar 2021
181 Fremont StLevel 10 Construction Lprevision to pa #201908078142 - remove existing lobby doors at level 1 & 7, replace with new ballistic reinforced doors, add ballistic reinforcement panels at level 7 lobby walls, replace millwokr at levels 1 & 7.
Details
Permit
202001242701
Permit issued
Jan 30, 2020
Final sign-off
Mar 25, 2021

revision to pa #201908078142 - remove existing lobby doors at level 1 & 7, replace with new ballistic reinforced doors, add ballistic reinforcement panels at level 7 lobby walls, replace millwokr at levels 1 & 7.

Open the permit page

$10,000
Dec 19, 2019Completed
final sign-off Oct 2020
181 Fremont StPacific Auxiliary Fire Alarmfire alarm t.i. adding (2) speakers and (4) speaker-strobes, to existing notifier nfs2-3030 fire alarm system
Details
Permit
201912190063
Permit issued
Dec 19, 2019
Final sign-off
Oct 15, 2020

fire alarm t.i. adding (2) speakers and (4) speaker-strobes, to existing notifier nfs2-3030 fire alarm system

Open the permit page

$6,516
Nov 25, 2019Never finaled
issued Nov 2019, no final
181 Fremont StPacific Auxiliary Fire Alarmfloors 5,6,13: fire alarm t.i. to delete 3 duct detectors from extg notifier nfs2-3030 fa system. ref app#201907317407. n/a for maher
Details
Permit
201911258059
Permit issued
Nov 25, 2019

floors 5,6,13: fire alarm t.i. to delete 3 duct detectors from extg notifier nfs2-3030 fa system. ref app#201907317407. n/a for maher

Open the permit page

$9,300
Oct 23, 2019Completed
final sign-off Sep 2020
181 Fremont StPacific Auxiliary Fire Alarmlevel 4: fire alarm only. t.i. to extg notifier nfs2-3030. adding 1 control relay for door holder. n/a for maher
Details
Permit
201910235286
Permit issued
Oct 23, 2019
Final sign-off
Sep 14, 2020

level 4: fire alarm only. t.i. to extg notifier nfs2-3030. adding 1 control relay for door holder. n/a for maher

Open the permit page

$6,000
Sep 23, 2019Expired or cancelled
cancelled Jan 2026
181 Fremont StAcco Engineered Systems Inc. Dba Acco Enrevision to app#201907317407 to change fsd to smoke control damper. n/a for maher
Details
Permit
201909232431

revision to app#201907317407 to change fsd to smoke control damper. n/a for maher

Open the permit page

$10,000
Sep 23, 2019Never finaled
issued Oct 2019, no final
181 Fremont StBaxter Constructionti on level 3 & 4 - level 3 add all gender restroom, convert existing storage to laundry room, remove storage lockers; 4th fl - convert existing office to break room, hvac, plumbing, electrical under separate permits
Details
Permit
201909232376
Permit issued
Oct 18, 2019

ti on level 3 & 4 - level 3 add all gender restroom, convert existing storage to laundry room, remove storage lockers; 4th fl - convert existing office to break room, hvac, plumbing, electrical under separate permits

Open the permit page

$150,000
Aug 7, 2019Completed
final sign-off Mar 2021
181 Fremont StLevel 10 Construction Lpreplace millwork at level 1 and 7. remove e lobby doors at level 1 and 7. replace with new ballistic reinformced doors. add aballistic reinforcement panels at level 7 lobby walls
Details
Permit
201908078142
Permit issued
Aug 23, 2019
Final sign-off
Mar 25, 2021

replace millwork at level 1 and 7. remove e lobby doors at level 1 and 7. replace with new ballistic reinformced doors. add aballistic reinforcement panels at level 7 lobby walls

Open the permit page

$100,000
Jul 31, 2019Never finaled
issued Aug 2019, no final
181 Fremont StAcco Engineered Systems Inc. Dba Acco Enrev to pa#'s 201805149058, 201808167576, 201811075285, 201811075286; remove fire smoke dampers on floors 4/5/6/13/14. maher n/a.
Details
Permit
201907317407
Permit issued
Aug 5, 2019

rev to pa#'s 201805149058, 201808167576, 201811075285, 201811075286; remove fire smoke dampers on floors 4/5/6/13/14. maher n/a.

Open the permit page

$10,000
Mar 19, 2019Completed
final sign-off Apr 2021
181 Fremont StPacific Auxiliary Fire Alarm5th fl - full floor ti to existing notifier nfs2-3030 ref pa 2018-0829-8664. adding 4 smoke detectors, 15 duct detectors, 8 replay modules; 9 dual monitor modules; islator module; 17 speaker strobes, relocating 2 existing speaker strobes
Details
Permit
201903195629
Permit issued
Mar 19, 2019
Final sign-off
Apr 27, 2021

5th fl - full floor ti to existing notifier nfs2-3030 ref pa 2018-0829-8664. adding 4 smoke detectors, 15 duct detectors, 8 replay modules; 9 dual monitor modules; islator module; 17 speaker strobes, relocating 2 existing speaker strobes

Open the permit page

$39,000
Mar 19, 2019Completed
final sign-off Apr 2021
181 Fremont StPacific Auxiliary Fire Alarm6th fl - full floor ti to existing notifier nfs2-3030 ref pa 2018-0829-8666. adding 3 smoke detectors, 12 duct detectors, 7 relay modules, 8 monitor modules, 5 dual monitor modules; islator module; 25 speaker strobes, 2 speaker strobe to be relocated
Details
Permit
201903195630
Permit issued
Mar 19, 2019
Final sign-off
Apr 27, 2021

6th fl - full floor ti to existing notifier nfs2-3030 ref pa 2018-0829-8666. adding 3 smoke detectors, 12 duct detectors, 7 relay modules, 8 monitor modules, 5 dual monitor modules; islator module; 25 speaker strobes, 2 speaker strobe to be relocated

Open the permit page

$33,000
Mar 11, 2019Completed
final sign-off May 2019
181 Fremont StEdison Fire Extinguisher Company Inclevel 6: ul 300 fire system installation. n/a for maher
Details
Permit
201903114845
Permit issued
Mar 11, 2019
Final sign-off
May 10, 2019

level 6: ul 300 fire system installation. n/a for maher

Open the permit page

$27,730
Mar 4, 2019Completed
final sign-off Apr 2019
181 Fremont StPacific Auxiliary Fire Alarm4th flr. fire alarm 39th fl offices, 4 smoke detectors, 12 duct detectors, 6 monitor modules, 7 relay modules, 1 isolator module, 19 spaker strobes, 1 speaker
Details
Permit
201903044332
Permit issued
Mar 5, 2019
Final sign-off
Apr 30, 2019

4th flr. fire alarm 39th fl offices, 4 smoke detectors, 12 duct detectors, 6 monitor modules, 7 relay modules, 1 isolator module, 19 spaker strobes, 1 speaker

Open the permit page

$32,000
Mar 4, 2019Completed
final sign-off Apr 2019
181 Fremont StPacific Auxiliary Fire Alarmfull floor fire alarm t.i. to extg notifier nsf2-3030. adding 2 smoke detectors, 13 duct detectors, 5 relay modules, 5 monitor modules, 2 speakers, and 18 speaker strobes. 4 speaker strobes are being relocated. ref app#201810102809.
Details
Permit
201903044321
Permit issued
Mar 4, 2019
Final sign-off
Apr 9, 2019

full floor fire alarm t.i. to extg notifier nsf2-3030. adding 2 smoke detectors, 13 duct detectors, 5 relay modules, 5 monitor modules, 2 speakers, and 18 speaker strobes. 4 speaker strobes are being relocated. ref app#201810102809.

Open the permit page

$36,000
Mar 4, 2019Never finaled
issued Mar 2019, no final
181 Fremont StLevel 10 Construction Lp6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application
Details
Permit
201903044266
Permit issued
Mar 5, 2019

6th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate application

Open the permit page

$15,000
Mar 4, 2019Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton
Details
Permit
201903044264
Permit issued
Mar 5, 2019
Final sign-off
May 18, 2021

5th floor- construction of new rater 11 have partition at (e) perimeter window. sprinkler removal under separate applicatton

Open the permit page

$15,000
Feb 22, 2019Completed
final sign-off Apr 2019
181 Fremont StPacific Auxiliary Fire Alarmbuild permit #2018-1010-2810 36th floor fire alarm ti (3) new smoke detectors, (16) duct detectors, (8) relay modules, (5) monitor modules, (1) speaker, (25) speakers/strobes.
Details
Permit
201902223638
Permit issued
Mar 4, 2019
Final sign-off
Apr 30, 2019

build permit #2018-1010-2810 36th floor fire alarm ti (3) new smoke detectors, (16) duct detectors, (8) relay modules, (5) monitor modules, (1) speaker, (25) speakers/strobes.

Open the permit page

$16,000
Feb 15, 2019Completed
final sign-off Apr 2019
181 Fremont StPacific Auxiliary Fire Alarmfire arlm 2 new smoke detectors, 13 duct detectors, 5 relay modules, 5 monitor modures 5 speakers, 16 speaker strobes
Details
Permit
201902153089
Permit issued
Feb 15, 2019
Final sign-off
Apr 30, 2019

fire arlm 2 new smoke detectors, 13 duct detectors, 5 relay modules, 5 monitor modures 5 speakers, 16 speaker strobes

Open the permit page

$6,000
Feb 15, 2019Never finaled
issued Feb 2019, no final
181 Fremont StPacific Auxiliary Fire Alarminstall remodel communicator in security office on l2
Details
Permit
201902153116
Permit issued
Feb 15, 2019

install remodel communicator in security office on l2

Open the permit page

$5,208
Jan 10, 2019Completed
final sign-off Apr 2019
181 Fremont StAllied Fire Protection38th flr - fire sprinklers 54 added, 9 relocated total 63 red 201810102812 maher na
Details
Permit
201901109997
Permit issued
Jan 10, 2019
Final sign-off
Apr 17, 2019

38th flr - fire sprinklers 54 added, 9 relocated total 63 red 201810102812 maher na

Open the permit page

$58,300
Jan 10, 2019Never finaled
issued Jan 2019, no final
181 Fremont StAllied Fire Protection6th flr - fire sprinklers 95 addes, 12 relocated total 107 red 201808298666 maher na
Details
Permit
201901109996
Permit issued
Jan 10, 2019

6th flr - fire sprinklers 95 addes, 12 relocated total 107 red 201808298666 maher na

Open the permit page

$58,300
Dec 18, 2018Completed
final sign-off Apr 2020
181 Fremont StPacific Auxiliary Fire Alarm29/f: ref building pa# 201801310021; ref fire pa# 201804166484; revision & as built fire alarm drawing addition/smoke detector
Details
Permit
201812188593
Permit issued
Dec 18, 2018
Final sign-off
Apr 2, 2020

29/f: ref building pa# 201801310021; ref fire pa# 201804166484; revision & as built fire alarm drawing addition/smoke detector

Open the permit page

$2,900
Dec 18, 2018Completed
final sign-off Apr 2020
181 Fremont StPacific Auxiliary Fire Alarmref building pa# 201803284864; ref fire pa# 201803123398; revision & as built fire alarm drawings, per sffd fire inspector adding 1 smoke detector above pre action panel
Details
Permit
201812188597
Permit issued
Dec 18, 2018
Final sign-off
Apr 2, 2020

ref building pa# 201803284864; ref fire pa# 201803123398; revision & as built fire alarm drawings, per sffd fire inspector adding 1 smoke detector above pre action panel

Open the permit page

$2,900
Dec 18, 2018Completed
final sign-off Apr 2020
181 Fremont StPacific Auxiliary Fire Alarmref building pa# 201801310021; ref fire pa# 201804166483; revision & as builts fire alarm drawings, added 2 smoke detector (unisex restroom & corridor)
Details
Permit
201812188598
Permit issued
Dec 18, 2018
Final sign-off
Apr 16, 2020

ref building pa# 201801310021; ref fire pa# 201804166483; revision & as builts fire alarm drawings, added 2 smoke detector (unisex restroom & corridor)

Open the permit page

$2,900
Dec 18, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protectionfire sprinkler 111 added, 14 relocated, 125 total 201808298664 facebook ti lvl 5
Details
Permit
201812188575
Permit issued
Jan 10, 2019
Final sign-off
May 1, 2019

fire sprinkler 111 added, 14 relocated, 125 total 201808298664 facebook ti lvl 5

Open the permit page

$68,000
Dec 11, 2018Completed
final sign-off Dec 2018
181 Fremont StAllied Fire Protectionlevel 7 fire sprinklers: (3) added adendum #1 (original fire sprinkler pa# 201811085354)
Details
Permit
201812117951
Permit issued
Dec 11, 2018
Final sign-off
Dec 19, 2018

level 7 fire sprinklers: (3) added adendum #1 (original fire sprinkler pa# 201811085354)

Open the permit page

$1,500
Dec 11, 2018Completed
final sign-off Jan 2019
181 Fremont StPacific Auxiliary Fire Alarm14th fl: fire alarm full floor ti to (e) nfs2-3030. adding 2 smoke detectors, 12 duct detectors, 6 relay modules, 6 monitor modules, 1 isolator module, 2 speakers, & 24 speaker strobes, 1 (e) speaker to be relocated. ref oa #201808167576.
Details
Permit
201812117990
Permit issued
Dec 11, 2018
Final sign-off
Jan 9, 2019

14th fl: fire alarm full floor ti to (e) nfs2-3030. adding 2 smoke detectors, 12 duct detectors, 6 relay modules, 6 monitor modules, 1 isolator module, 2 speakers, & 24 speaker strobes, 1 (e) speaker to be relocated. ref oa #201808167576.

Open the permit page

$40,000
Dec 4, 2018Never finaled
issued Dec 2018, no final
181 Fremont StAllied Fire Protectionlevel 18: ref pa# 201809170503; fire sprinklers (31) added, (5) relocated, total (36) sprinklers
Details
Permit
201812047368
Permit issued
Dec 13, 2018

level 18: ref pa# 201809170503; fire sprinklers (31) added, (5) relocated, total (36) sprinklers

Open the permit page

$18,500
Dec 4, 2018Completed
final sign-off Jan 2019
181 Fremont StAllied Fire Protectionlevel 15: ref pa# 201808167574; fire sprinklers: (26) added, (2) relocated, total (28) sprinklers
Details
Permit
201812047363
Permit issued
Dec 13, 2018
Final sign-off
Jan 9, 2019

level 15: ref pa# 201808167574; fire sprinklers: (26) added, (2) relocated, total (28) sprinklers

Open the permit page

$14,400
Dec 3, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lphealth only routing. bldg review uner #2018.0816.7576
Details
Permit
201812037254
Permit issued
Jan 4, 2019
Final sign-off
May 24, 2021

health only routing. bldg review uner #2018.0816.7576

Open the permit page

Nov 30, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp
Details
Permit
201811307170
Permit issued
Dec 18, 2018
Final sign-off
May 18, 2021

7/f: rev to pa# 201808107073; to revise occupant load in 7th fl. cafe area per sffd field inspection. reduce occupancy from 66pp to 48pp

Open the permit page

Nov 29, 2018Completed
final sign-off Feb 2019
181 Fremont StPacific Auxiliary Fire Alarmlevel 20: fire alarm full fl ti to e nfs2 3030 add 3 smoke dete, 19 duct detectors, 11 control relay modules, 1 isolator module, 4 speakers, 31 speaker strobes. 3 speaker strobes are being relocated
Details
Permit
201811297029
Permit issued
Nov 30, 2018
Final sign-off
Feb 5, 2019

level 20: fire alarm full fl ti to e nfs2 3030 add 3 smoke dete, 19 duct detectors, 11 control relay modules, 1 isolator module, 4 speakers, 31 speaker strobes. 3 speaker strobes are being relocated

Open the permit page

$38,200
Nov 29, 2018Completed
final sign-off Feb 2019
181 Fremont StPacific Auxiliary Fire Alarmfull floor ti to e nfs2 3030 adding 2 smoke detectors, 16 duct detecotrs, 6 control relay modules, 6 monitor modules, 1 isolator module, 5 speakers, 18 speaker strobes, 3 speaker strobe
Details
Permit
201811297025
Permit issued
Dec 4, 2018
Final sign-off
Feb 27, 2019

full floor ti to e nfs2 3030 adding 2 smoke detectors, 16 duct detecotrs, 6 control relay modules, 6 monitor modules, 1 isolator module, 5 speakers, 18 speaker strobes, 3 speaker strobe

Open the permit page

$36,400
Nov 29, 2018Completed
final sign-off May 2021
181 Fremont StPacific Auxiliary Fire Alarm17 fl: full fl f/a ti to (e) nfs2-3030. add: 3 smoke detectors, 19 duct detectors, 11 control relays, 6 monitor modules, 1 isolater module, 7 speakers, 33 speaker strobes, 2 speaker strobe being relocated. ref pa #201809170501.
Details
Permit
201811297066
Permit issued
Dec 6, 2018
Final sign-off
May 12, 2021

17 fl: full fl f/a ti to (e) nfs2-3030. add: 3 smoke detectors, 19 duct detectors, 11 control relays, 6 monitor modules, 1 isolater module, 7 speakers, 33 speaker strobes, 2 speaker strobe being relocated. ref pa #201809170501.

Open the permit page

$40,000
Nov 29, 2018Completed
final sign-off Feb 2019
181 Fremont StPacific Auxiliary Fire Alarmlevel 21: fire alarm full fl ti to e nfs2-3030, adding 2 smoke det, 17 duct detectors, 6 control relay modules, 6 monitor modules, 1 isolator modules, 5 speaker, 18 speaker strobes, 2 speaker strobes being relocated ref 201810011839
Details
Permit
201811297028
Permit issued
Nov 30, 2018
Final sign-off
Feb 27, 2019

level 21: fire alarm full fl ti to e nfs2-3030, adding 2 smoke det, 17 duct detectors, 6 control relay modules, 6 monitor modules, 1 isolator modules, 5 speaker, 18 speaker strobes, 2 speaker strobes being relocated ref 201810011839

Open the permit page

$36,400
Nov 29, 2018Completed
final sign-off Feb 2019
181 Fremont StPacific Auxiliary Fire Alarmfire alarm full fl ti to e nfs2-3030, adding 2 smoke det, 16 duct detectors, 6 control relay modules, 6 monitor modules, 1 isolator modules, 5 speaker, 18 speaker strobes, 3 speaker strobes, being relocated
Details
Permit
201811297027
Permit issued
Dec 4, 2018
Final sign-off
Feb 27, 2019

fire alarm full fl ti to e nfs2-3030, adding 2 smoke det, 16 duct detectors, 6 control relay modules, 6 monitor modules, 1 isolator modules, 5 speaker, 18 speaker strobes, 3 speaker strobes, being relocated

Open the permit page

$36,400
Nov 29, 2018Completed
final sign-off May 2021
181 Fremont StPacific Auxiliary Fire Alarm16 fl: full fl f/a ti to (e) nfs2-3030. add: 2 smoke detectors, 16 duct detectors, 6 control relay modules, 6 monitor modules, 5 speakers, 21 speaker strobes, 3 speaker strobe being relocated. ref pa #201809170487.
Details
Permit
201811297069
Permit issued
Dec 6, 2018
Final sign-off
May 12, 2021

16 fl: full fl f/a ti to (e) nfs2-3030. add: 2 smoke detectors, 16 duct detectors, 6 control relay modules, 6 monitor modules, 5 speakers, 21 speaker strobes, 3 speaker strobe being relocated. ref pa #201809170487.

Open the permit page

$38,000
Nov 27, 2018Completed
final sign-off Mar 2019
181 Fremont StAllied Fire Protectionfl0or 16 -fire sprinkler 43 added, 6 relocated, 49 total 201809170487
Details
Permit
201811276724
Permit issued
Dec 18, 2018
Final sign-off
Mar 11, 2019

fl0or 16 -fire sprinkler 43 added, 6 relocated, 49 total 201809170487

Open the permit page

$26,800
Nov 27, 2018Completed
final sign-off Feb 2019
181 Fremont StAllied Fire Protectionon 19th floor - revise sprinkler system - fire sprinkler 31 added, 5 relocated, total 36 ref 201810011844. n/a for maher.
Details
Permit
201811276721
Permit issued
Nov 27, 2018
Final sign-off
Feb 11, 2019

on 19th floor - revise sprinkler system - fire sprinkler 31 added, 5 relocated, total 36 ref 201810011844. n/a for maher.

Open the permit page

$19,600
Nov 27, 2018Completed
final sign-off Feb 2019
181 Fremont StAllied Fire Protectionon 20th floor revise sprinkler system -fire sprinkler 48 added, 2 relocated total 50 ref 201810022002. n/a for maher.
Details
Permit
201811276719
Permit issued
Nov 27, 2018
Final sign-off
Feb 11, 2019

on 20th floor revise sprinkler system -fire sprinkler 48 added, 2 relocated total 50 ref 201810022002. n/a for maher.

Open the permit page

$27,200
Nov 27, 2018Completed
final sign-off Dec 2018
181 Fremont StAllied Fire Protectionon 14th floor - fire sprinkler system revision -fire sprinklers 96 added, 4 relocated, 100 total ref 201808167576. n/a for maher.
Details
Permit
201811276723
Permit issued
Nov 27, 2018
Final sign-off
Dec 31, 2018

on 14th floor - fire sprinkler system revision -fire sprinklers 96 added, 4 relocated, 100 total ref 201808167576. n/a for maher.

Open the permit page

$54,400
Nov 20, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 4 to 6 new grease exhaust system. revision to level 4, 201712065692. grease interceptor room to accept duct from level 6 new grease duct exhaust screens on level 4. new air intake louvers on level 6. grease duct shaft under 201808298664, 201808298666, mech under 201811075285, 201811075286
Details
Permit
201811206443
Permit issued
Jan 24, 2019
Final sign-off
May 24, 2021

level 4 to 6 new grease exhaust system. revision to level 4, 201712065692. grease interceptor room to accept duct from level 6 new grease duct exhaust screens on level 4. new air intake louvers on level 6. grease duct shaft under 201808298664, 201808298666, mech under 201811075285, 201811075286

Open the permit page

$20,000
Nov 16, 2018Completed
final sign-off Jan 2019
181 Fremont StPacific Auxiliary Fire Alarm13th fl - full floor ti to existing notifier nfs2-3030, adding 4 smoke detectors, 12 duct detectors, 8 relay modules, 11 monitor modules, 8 dual monitor/relay modules, 2 speakers, 27 speaker strobes, 1 speaker strobe is being relocated; ref pa#201805149058
Details
Permit
201811166123
Permit issued
Nov 16, 2018
Final sign-off
Jan 17, 2019

13th fl - full floor ti to existing notifier nfs2-3030, adding 4 smoke detectors, 12 duct detectors, 8 relay modules, 11 monitor modules, 8 dual monitor/relay modules, 2 speakers, 27 speaker strobes, 1 speaker strobe is being relocated; ref pa#201805149058

Open the permit page

$42,000
Nov 15, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protection36th floor: fire sprinklers: 65 added. ref #201810102810. n/a for maher
Details
Permit
201811155969
Permit issued
Dec 18, 2018
Final sign-off
May 1, 2019

36th floor: fire sprinklers: 65 added. ref #201810102810. n/a for maher

Open the permit page

$35,400
Nov 15, 2018Completed
final sign-off Apr 2019
181 Fremont StAllied Fire Protection37th floor: fire sprinklers: 41 added. 7 relocated. total 48. ref app#201810102811. n/a for maher
Details
Permit
201811155967
Permit issued
Jan 10, 2019
Final sign-off
Apr 3, 2019

37th floor: fire sprinklers: 41 added. 7 relocated. total 48. ref app#201810102811. n/a for maher

Open the permit page

$14,600
Nov 15, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protection35th floor: fire sprinklers: 23 added. 10 relocated. total 33. ref app#201810102809. n/a for maher
Details
Permit
201811155970
Permit issued
Dec 18, 2018
Final sign-off
May 1, 2019

35th floor: fire sprinklers: 23 added. 10 relocated. total 33. ref app#201810102809. n/a for maher

Open the permit page

$18,000
Nov 15, 2018Completed
final sign-off Dec 2018
181 Fremont StAllied Fire Protection57th floor: fire sprinklers: 1 added. 10 relocated. total 11. ref app#201305015894. n/a for maher
Details
Permit
201811155971
Permit issued
Nov 20, 2018
Final sign-off
Dec 4, 2018

57th floor: fire sprinklers: 1 added. 10 relocated. total 11. ref app#201305015894. n/a for maher

Open the permit page

$5,500
Nov 14, 2018Completed
final sign-off Jan 2019
181 Fremont StEdison Fire Extinguisher Company Incul300 fire sprinl hood & ducts ref 201808167576 maher na
Details
Permit
201811145779
Permit issued
Nov 14, 2018
Final sign-off
Jan 4, 2019

ul300 fire sprinl hood & ducts ref 201808167576 maher na

Open the permit page

$14,000
Nov 14, 2018Completed
final sign-off Jan 2019
181 Fremont StEdison Fire Extinguisher Company Incul300 fire sprinl hood & ducts ref 201805149058 maher na
Details
Permit
201811145775
Permit issued
Nov 14, 2018
Final sign-off
Jan 31, 2019

ul300 fire sprinl hood & ducts ref 201805149058 maher na

Open the permit page

$33,000
Nov 8, 2018Completed
final sign-off Nov 2018
181 Fremont StAllied Fire Protection7th fl - fire sprinklers (20) added, (1) relocated, total 21 sprinklers. ref pa 2018-0810-7073
Details
Permit
201811085354
Permit issued
Nov 13, 2018
Final sign-off
Nov 15, 2018

7th fl - fire sprinklers (20) added, (1) relocated, total 21 sprinklers. ref pa 2018-0810-7073

Open the permit page

$10,500
Nov 7, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th floor - mep only arch approved under pa# 201808298664 - installation of dining area & servery for employee use. ** maher: n/a **
Details
Permit
201811075285
Permit issued
Feb 6, 2019
Final sign-off
May 18, 2021

5th floor - mep only arch approved under pa# 201808298664 - installation of dining area & servery for employee use. ** maher: n/a **

Open the permit page

$10,000
Nov 7, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp6th floor - mep only arch approved under pa# 201808298666 - installation of dining area grease duct term on 4th floor fire alarm & sprinklers under seperate permit. ** maher: n/a **
Details
Permit
201811075286
Permit issued
Feb 6, 2019
Final sign-off
May 18, 2021

6th floor - mep only arch approved under pa# 201808298666 - installation of dining area grease duct term on 4th floor fire alarm & sprinklers under seperate permit. ** maher: n/a **

Open the permit page

$10,000
Nov 6, 2018Completed
final sign-off Jan 2019
181 Fremont StAllied Fire Protectionfire sprinklers 74 new 16 relocated 90 total ref 201809170501 maher na
Details
Permit
201811065104
Permit issued
Nov 6, 2018
Final sign-off
Jan 9, 2019

fire sprinklers 74 new 16 relocated 90 total ref 201809170501 maher na

Open the permit page

$46,400
Nov 6, 2018Completed
final sign-off Feb 2019
181 Fremont StAllied Fire Protection21st fl - facebook ti lve. 21 fire sprinklers 34 added. ref pa 2018-1001-1839
Details
Permit
201811065106
Permit issued
Nov 6, 2018
Final sign-off
Feb 12, 2019

21st fl - facebook ti lve. 21 fire sprinklers 34 added. ref pa 2018-1001-1839

Open the permit page

$18,300
Oct 31, 2018Completed
final sign-off Dec 2018
181 Fremont StAllied Fire Protection13/f: new f/s system - add 78, relocate 32 for a total of 110 f/s heads. ref t.i. pa201805149058. maher n/a.
Details
Permit
201810314640
Permit issued
Oct 31, 2018
Final sign-off
Dec 19, 2018

13/f: new f/s system - add 78, relocate 32 for a total of 110 f/s heads. ref t.i. pa201805149058. maher n/a.

Open the permit page

$59,000
Oct 30, 2018Completed
final sign-off Jan 2019
181 Fremont StPacific Auxiliary Fire Alarm14th fl: fire alarm ti to an existing nfs2-3030. adding 1 smoke detector, 5 relay modules, 1 speaker strobe. ref pa #201805290380.
Details
Permit
201810304553
Permit issued
Nov 1, 2018
Final sign-off
Jan 4, 2019

14th fl: fire alarm ti to an existing nfs2-3030. adding 1 smoke detector, 5 relay modules, 1 speaker strobe. ref pa #201805290380.

Open the permit page

$4,500
Oct 30, 2018Completed
final sign-off Jan 2019
181 Fremont StPacific Auxiliary Fire Alarm15th fl: fire alarm ti to existing notifier nfs2-3030. adding 2 smoke detectors, 14 duct detectors, 19 control relays, 5 monitor modules, 1 isolator modules, 2 speakers, and 13 speaker strobes, 3 speaker strobes are being relocated. ref pa #
Details
Permit
201810304552
Permit issued
Nov 1, 2018
Final sign-off
Jan 4, 2019

15th fl: fire alarm ti to existing notifier nfs2-3030. adding 2 smoke detectors, 14 duct detectors, 19 control relays, 5 monitor modules, 1 isolator modules, 2 speakers, and 13 speaker strobes, 3 speaker strobes are being relocated. ref pa #

Open the permit page

$46,000
Oct 30, 2018Completed
final sign-off May 2021
181 Fremont StPacific Auxiliary Fire Alarm7th fl: fire alarm ti on existing notifier nfs2-3030. adding 4 duct smoke detectors, 2 monitor modules (1 dual and 1 single input), 5 control relay, 1 solator module, and 6 speaker strobes. ref pa #201808107073
Details
Permit
201810304554
Permit issued
Nov 7, 2018
Final sign-off
May 12, 2021

7th fl: fire alarm ti on existing notifier nfs2-3030. adding 4 duct smoke detectors, 2 monitor modules (1 dual and 1 single input), 5 control relay, 1 solator module, and 6 speaker strobes. ref pa #201808107073

Open the permit page

$74,000
Oct 29, 2018Completed
final sign-off Nov 2019
181 Fremont Stremoval/demo of doors, door frames, and door hardware of residential convenience door from residential unit into fsae lobby on level 57 (door 5701) & patch (e) w/new wall to maintain fire rating. remove trench drain at door 5701, fill trench and cap line maher na
Details
Permit
201810294434
Permit issued
Nov 15, 2018
Final sign-off
Nov 4, 2019

removal/demo of doors, door frames, and door hardware of residential convenience door from residential unit into fsae lobby on level 57 (door 5701) & patch (e) w/new wall to maintain fire rating. remove trench drain at door 5701, fill trench and cap line maher na

Open the permit page

$10,000
Oct 29, 2018Completed
final sign-off Nov 2019
181 Fremont Stremoval/demo of doors, door frames, and door hardware of residential convenience door from residential unit into fsae lobby on level 55 & 56 (door 5501 & 5601) & patch (e) w/new wall to maintain fire rating. remove trench drain, fill trench and cap line maher na
Details
Permit
201810294437
Permit issued
Nov 2, 2018
Final sign-off
Nov 4, 2019

removal/demo of doors, door frames, and door hardware of residential convenience door from residential unit into fsae lobby on level 55 & 56 (door 5501 & 5601) & patch (e) w/new wall to maintain fire rating. remove trench drain, fill trench and cap line maher na

Open the permit page

$15,000
Oct 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp38th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit
Details
Permit
201810102812
Permit issued
Nov 8, 2018
Final sign-off
May 14, 2021

38th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit

Open the permit page

$1,300,000
Oct 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp36th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit
Details
Permit
201810102810
Permit issued
Nov 8, 2018
Final sign-off
May 14, 2021

36th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit

Open the permit page

$1,300,000
Oct 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp37th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit
Details
Permit
201810102811
Permit issued
Nov 8, 2018
Final sign-off
May 14, 2021

37th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit

Open the permit page

$1,300,000
Oct 10, 2018Completed
final sign-off Jun 2021
181 Fremont StLevel 10 Construction Lp35th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit
Details
Permit
201810102809
Permit issued
Nov 8, 2018
Final sign-off
Jun 1, 2021

35th flr - open office ti - non bearing partitions, millwork & finishes. mep included. fire/life safety under sep permit

Open the permit page

$1,300,000
Oct 2, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp20th fl: construction of new non structural partitions, acoustical grid and tile & 649, board ceilings, millwork, finishes, mech, elec, and plumbing. conv. stairs, fire alarm, sprinklers, under seperate permit
Details
Permit
201810022002
Permit issued
Oct 30, 2018
Final sign-off
May 26, 2021

20th fl: construction of new non structural partitions, acoustical grid and tile & 649, board ceilings, millwork, finishes, mech, elec, and plumbing. conv. stairs, fire alarm, sprinklers, under seperate permit

Open the permit page

$1,365,000
Oct 1, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na
Details
Permit
201810011844
Permit issued
Oct 30, 2018
Final sign-off
May 24, 2021

19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na

Open the permit page

$1,365,000
Oct 1, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na
Details
Permit
201810011839
Permit issued
Oct 25, 2018
Final sign-off
May 26, 2021

21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na

Open the permit page

$1,365,000
Sep 21, 2018Completed
final sign-off Nov 2018
181 Fremont StPacific Auxiliary Fire Alarm7th fl: fire alarm ti to (r) notifies nfs2-30303 adding 2 duct smk det w/internal control relay ref 201806141936
Details
Permit
201809211098
Permit issued
Sep 24, 2018
Final sign-off
Nov 19, 2018

7th fl: fire alarm ti to (r) notifies nfs2-30303 adding 2 duct smk det w/internal control relay ref 201806141936

Open the permit page

$6,253
Sep 19, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpretail tenant street level non structural partitions, light fixtures, millwork finishes
Details
Permit
201809190836
Permit issued
Nov 8, 2018
Final sign-off
May 14, 2021

retail tenant street level non structural partitions, light fixtures, millwork finishes

Open the permit page

$16,000
Sep 19, 2018Expired or cancelled
cancelled Jan 2026
181 Fremont Stretail tenant street level non structural partitions light fixtures, millwork finishes
Details
Permit
201809190835

retail tenant street level non structural partitions light fixtures, millwork finishes

Open the permit page

$16,000
Sep 18, 2018Completed
final sign-off Jun 2021
181 Fremont StLevel 10 Construction Lplevel 38: new fan room with new tenant fan and seismic isolation. new exhaust fan for commercial tennants. n/a for maher
Details
Permit
201809180686
Permit issued
Nov 26, 2018
Final sign-off
Jun 1, 2021

level 38: new fan room with new tenant fan and seismic isolation. new exhaust fan for commercial tennants. n/a for maher

Open the permit page

$220,000
Sep 18, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpnew distribution switchboard entrance. new 480 bosduct, new bosduct from utility vault on b2 to floor 5 distribution panel. enlarge electrical room on b2. rate electrical room on 5th to 2 hours - new fsd. ** maher: n/a **
Details
Permit
201809180683
Permit issued
Dec 10, 2018
Final sign-off
May 18, 2021

new distribution switchboard entrance. new 480 bosduct, new bosduct from utility vault on b2 to floor 5 distribution panel. enlarge electrical room on b2. rate electrical room on 5th to 2 hours - new fsd. ** maher: n/a **

Open the permit page

$220,000
Sep 17, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp18th fl tenant improvement, non bearing partition new ceiling, finishes, pantry
Details
Permit
201809170503
Permit issued
Oct 24, 2018
Final sign-off
May 24, 2021

18th fl tenant improvement, non bearing partition new ceiling, finishes, pantry

Open the permit page

$1,365,000
Sep 17, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp17th fl tenant improvement, non bearing partition new ceiling, finishes, pantry
Details
Permit
201809170501
Permit issued
Oct 25, 2018
Final sign-off
May 24, 2021

17th fl tenant improvement, non bearing partition new ceiling, finishes, pantry

Open the permit page

$1,365,000
Sep 17, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permit
Details
Permit
201809170487
Permit issued
Oct 24, 2018
Final sign-off
May 24, 2021

16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permit

Open the permit page

$1,365,000
Aug 29, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp6th flr - arch ti - non structural walls, office millwork, finishes, kitchen and servery. mep under separate permit
Details
Permit
201808298666
Permit issued
Nov 5, 2018
Final sign-off
May 14, 2021

6th flr - arch ti - non structural walls, office millwork, finishes, kitchen and servery. mep under separate permit

Open the permit page

$1,593,930
Aug 29, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th flr - arch ti - non bearing walls, office millwork, finishes, kitchen and servery. mep under separate permit
Details
Permit
201808298664
Permit issued
Nov 5, 2018
Final sign-off
May 14, 2021

5th flr - arch ti - non bearing walls, office millwork, finishes, kitchen and servery. mep under separate permit

Open the permit page

$1,575,000
Aug 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp14th - ti with no bearing partitions. kitchen with back of house support areas. offices & conference rooms
Details
Permit
201808167576
Permit issued
Nov 13, 2018
Final sign-off
May 14, 2021

14th - ti with no bearing partitions. kitchen with back of house support areas. offices & conference rooms

Open the permit page

$1,300,000
Aug 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp15th - ti with no bearing partitions for open office
Details
Permit
201808167574
Permit issued
Sep 19, 2018
Final sign-off
May 24, 2021

15th - ti with no bearing partitions for open office

Open the permit page

$1,300,000
Aug 14, 2018Completed
final sign-off Oct 2018
181 Fremont StAllied Fire Protection8th floor - fire sprinklers 58 added, 11 relocated = 69 sprinklers total. ref pa 2018-0507-8360. maher n/a.
Details
Permit
201808147235
Permit issued
Aug 14, 2018
Final sign-off
Oct 30, 2018

8th floor - fire sprinklers 58 added, 11 relocated = 69 sprinklers total. ref pa 2018-0507-8360. maher n/a.

Open the permit page

$37,600
Aug 10, 2018Completed
final sign-off Nov 2018
181 Fremont StPacific Auxiliary Fire Alarm10th floor: fire alarm t.i. to an extg notifier nfs2-3030 adding 3 smoke detectors, 16 duct smoke detectors, 7 relay modules, 7 monitor modules, 1 isolator modules, 5 speakers and 19 speaker strobes, 4 extg speaker strobe are being relocated. floor 10 is part of a internal
Details
Permit
201808107087
Permit issued
Aug 27, 2018
Final sign-off
Nov 7, 2018

10th floor: fire alarm t.i. to an extg notifier nfs2-3030 adding 3 smoke detectors, 16 duct smoke detectors, 7 relay modules, 7 monitor modules, 1 isolator modules, 5 speakers and 19 speaker strobes, 4 extg speaker strobe are being relocated. floor 10 is part of a internal

Open the permit page

$33,000
Aug 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp7th fl l- construction of cafe - no open flame. electric only. 64 occupant load. retail coffee sales
Details
Permit
201808107073
Permit issued
Oct 17, 2018
Final sign-off
May 14, 2021

7th fl l- construction of cafe - no open flame. electric only. 64 occupant load. retail coffee sales

Open the permit page

$75,000
Aug 10, 2018Completed
final sign-off Nov 2018
181 Fremont StPacific Auxiliary Fire Alarmref pa# 201805088579; fire alarm t.i. to (e) notifier nfs2-3030, adding (4) smoke detctors, (10) relay modules, (7) monitor modules, (1) isolator module, (9) sprinklers and (33) speaker/strobes, (4) existing speaker strobes are being relocated. 11th fl. is part of a internal stairwell connecting
Details
Permit
201808107085
Permit issued
Aug 22, 2018
Final sign-off
Nov 7, 2018

ref pa# 201805088579; fire alarm t.i. to (e) notifier nfs2-3030, adding (4) smoke detctors, (10) relay modules, (7) monitor modules, (1) isolator module, (9) sprinklers and (33) speaker/strobes, (4) existing speaker strobes are being relocated. 11th fl. is part of a internal stairwell connecting

Open the permit page

$33,000
Aug 10, 2018Completed
final sign-off Nov 2018
181 Fremont StPacific Auxiliary Fire Alarm12th fl ref pa# 201805108812; fire alarm full fl t.i. to existing notifier nfs2-3030, adding (3) smoke detectors, (16) duct smoke detector, (7) relay modules, (7) monitor modules, (5) spearkers, and (19) speaker strobes, (4) speaker strobes devicies are being relocated
Details
Permit
201808107088
Permit issued
Aug 13, 2018
Final sign-off
Nov 7, 2018

12th fl ref pa# 201805108812; fire alarm full fl t.i. to existing notifier nfs2-3030, adding (3) smoke detectors, (16) duct smoke detector, (7) relay modules, (7) monitor modules, (5) spearkers, and (19) speaker strobes, (4) speaker strobes devicies are being relocated

Open the permit page

$33,000
Aug 10, 2018Completed
final sign-off May 2021
181 Fremont StPacific Auxiliary Fire Alarm9th floor: fire alarm t.i. to an extg notifier nfs2-3030 adding 3 smoke detectors, 18 duct detectors, 7 relay modules, 7 monitor modules, 1 isolator modules, 7 seakers and 24 speaker strobes, 4 extg speaker strobe are being relocated. 9th floor is partof internal stairway conecting fl 9-11
Details
Permit
201808107086
Permit issued
Aug 22, 2018
Final sign-off
May 12, 2021

9th floor: fire alarm t.i. to an extg notifier nfs2-3030 adding 3 smoke detectors, 18 duct detectors, 7 relay modules, 7 monitor modules, 1 isolator modules, 7 seakers and 24 speaker strobes, 4 extg speaker strobe are being relocated. 9th floor is partof internal stairway conecting fl 9-11

Open the permit page

$33,000
Aug 10, 2018Completed
final sign-off May 2021
181 Fremont StPacific Auxiliary Fire Alarm8th floor: fire alarm t.i. to an extg notifier nfs2-3030 adding 6 smoke detectors, 15 duct smoke detectors, 16 relay modules, 10 monitor modules, 2 seakers and 22 speaker strobes, 4 extg speaker strobe are being relocated. ref app#201805078360
Details
Permit
201808107084
Permit issued
Aug 22, 2018
Final sign-off
May 12, 2021

8th floor: fire alarm t.i. to an extg notifier nfs2-3030 adding 6 smoke detectors, 15 duct smoke detectors, 16 relay modules, 10 monitor modules, 2 seakers and 22 speaker strobes, 4 extg speaker strobe are being relocated. ref app#201805078360

Open the permit page

$33,000
Jul 26, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to 201805149058. add external louvers on level 13. maher na
Details
Permit
201807265609
Permit issued
Jul 26, 2018
Final sign-off
May 24, 2021

revision to 201805149058. add external louvers on level 13. maher na

Open the permit page

Jul 25, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to pa 2018-0510-8812- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.
Details
Permit
201807255556
Permit issued
Jul 31, 2018
Final sign-off
May 19, 2021

revision to pa 2018-0510-8812- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.

Open the permit page

Jul 25, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to pa 2018-0508-8579- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.
Details
Permit
201807255555
Permit issued
Jul 31, 2018
Final sign-off
May 19, 2021

revision to pa 2018-0508-8579- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.

Open the permit page

Jul 25, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to pa 2018-0508-8574- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.
Details
Permit
201807255554
Permit issued
Jul 31, 2018
Final sign-off
May 19, 2021

revision to pa 2018-0508-8574- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.

Open the permit page

Jul 25, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to pa 2018-0507-8356- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.
Details
Permit
201807255551
Permit issued
Jul 31, 2018
Final sign-off
May 19, 2021

revision to pa 2018-0507-8356- add ul detail for partition head. add carreaders matrix- upgrade egress plans with cardreaders and door tags- upgrade wd-2 stubstrates add fire treated notes. no work.

Open the permit page

Jul 19, 2018Completed
final sign-off Aug 2018
181 Fremont StAllied Fire Protection10th fl, facebook ti - 39 added, 7 relcoated ref pa 2018-0508-8574
Details
Permit
201807194913
Permit issued
Jul 24, 2018
Final sign-off
Aug 22, 2018

10th fl, facebook ti - 39 added, 7 relcoated ref pa 2018-0508-8574

Open the permit page

$23,700
Jul 19, 2018Completed
final sign-off Aug 2018
181 Fremont StAllied Fire Protection12th fl fire sprinklers - facebook - 49 added, 8 relocated. ref pa 2018-0510-8812
Details
Permit
201807194910
Permit issued
Aug 7, 2018
Final sign-off
Aug 22, 2018

12th fl fire sprinklers - facebook - 49 added, 8 relocated. ref pa 2018-0510-8812

Open the permit page

$29,300
Jul 19, 2018Completed
final sign-off Aug 2018
181 Fremont StAllied Fire Protection9th fl - facebook fire sprinklers 59 added, 7 relocated ref pa 2018-0507-8356
Details
Permit
201807194907
Permit issued
Jul 24, 2018
Final sign-off
Aug 22, 2018

9th fl - facebook fire sprinklers 59 added, 7 relocated ref pa 2018-0507-8356

Open the permit page

$33,900
Jul 19, 2018Completed
final sign-off Aug 2018
181 Fremont StAllied Fire Protection11th fl - facebook ti - 74 added, 11 relocated ref pa 2018-0508-8579
Details
Permit
201807194911
Permit issued
Jul 24, 2018
Final sign-off
Aug 22, 2018

11th fl - facebook ti - 74 added, 11 relocated ref pa 2018-0508-8579

Open the permit page

$43,800
Jul 18, 2018Completed
final sign-off May 2021
181 Fremont StPacific Auxiliary Fire Alarm13/f: ref arch/mep 201805048265 & f/a 201803163922 based on bldg t.i.: change the arch background location of the women restroom, smoke detector and speaker. strobe location moed to new locations. maher n/a.
Details
Permit
201807184804
Permit issued
Jul 18, 2018
Final sign-off
May 5, 2021

13/f: ref arch/mep 201805048265 & f/a 201803163922 based on bldg t.i.: change the arch background location of the women restroom, smoke detector and speaker. strobe location moed to new locations. maher n/a.

Open the permit page

Jun 18, 2018Completed
final sign-off Aug 2019
181 Fremont StLevel 10 Construction Lpstormwater control systems reference pa #013-0501-5894.
Details
Permit
201806182167
Permit issued
Jun 26, 2018
Final sign-off
Aug 14, 2019

stormwater control systems reference pa #013-0501-5894.

Open the permit page

Jun 14, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp7th fl- installation of light standards in lobby are, add rack room, and storage room.
Details
Permit
201806141926
Permit issued
Jun 25, 2018
Final sign-off
May 18, 2021

7th fl- installation of light standards in lobby are, add rack room, and storage room.

Open the permit page

$9,000
May 31, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protection33rd floor - fire sprinklers: 52 added, 6 relocated ref 201803264630
Details
Permit
201805310585
Permit issued
Jun 26, 2018
Final sign-off
May 1, 2019

33rd floor - fire sprinklers: 52 added, 6 relocated ref 201803264630

Open the permit page

$30,200
May 31, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protection32nd floor - fire sprinklers: 32 added, 3 relocated ref 201803264634
Details
Permit
201805310584
Permit issued
Jun 26, 2018
Final sign-off
May 1, 2019

32nd floor - fire sprinklers: 32 added, 3 relocated ref 201803264634

Open the permit page

$18,200
May 30, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protectionfire sprinklers 21 added, 0 relocated. total 21 sprinklers. ref pa 2018-0326-4637
Details
Permit
201805300416
Permit issued
May 30, 2018
Final sign-off
May 1, 2019

fire sprinklers 21 added, 0 relocated. total 21 sprinklers. ref pa 2018-0326-4637

Open the permit page

$10,800
May 23, 2018Never finaled
issued May 2018, no final
181 Fremont StAllied Fire Protectionref# 201803264629; fire sprinklers (21) added, (8) relocated, (29) sprinklers total. n/a maher
Details
Permit
201805239885
Permit issued
May 23, 2018

ref# 201803264629; fire sprinklers (21) added, (8) relocated, (29) sprinklers total. n/a maher

Open the permit page

$14,900
May 23, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protection22/f: ref: 201803264623 fire sprinklers: (33) added sprinklers, (5) relocated, (38) total sprinklers. n/a maher
Details
Permit
201805239875
Permit issued
May 23, 2018
Final sign-off
May 1, 2019

22/f: ref: 201803264623 fire sprinklers: (33) added sprinklers, (5) relocated, (38) total sprinklers. n/a maher

Open the permit page

$19,600
May 23, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpconvenience stairs connecting levels 19 - 21 n/a for maher
Details
Permit
201805239907
Permit issued
Jun 4, 2018
Final sign-off
May 26, 2021

convenience stairs connecting levels 19 - 21 n/a for maher

Open the permit page

$250,000
May 23, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpconvenience stairs connecting levels 16 - 18. n/a for maher
Details
Permit
201805239904
Permit issued
Jun 4, 2018
Final sign-off
May 26, 2021

convenience stairs connecting levels 16 - 18. n/a for maher

Open the permit page

$250,000
May 23, 2018Completed
final sign-off May 2019
181 Fremont StAllied Fire Protectionref# 201803264632 fire sprinklers (45) added sprinklers, (6) relocated, (51) total, n/a maher
Details
Permit
201805239882
Permit issued
May 23, 2018
Final sign-off
May 1, 2019

ref# 201803264632 fire sprinklers (45) added sprinklers, (6) relocated, (51) total, n/a maher

Open the permit page

$26,200
May 21, 2018Completed
final sign-off May 2021
181 Fremont StGolden State Fire Safety/Dba:Gs Fire Sansul install as built submittal pa# 201805108799; smoke control report added to drawings.
Details
Permit
201805219643
Permit issued
May 21, 2018
Final sign-off
May 24, 2021

ansul install as built submittal pa# 201805108799; smoke control report added to drawings.

Open the permit page

$35,000
May 16, 2018Completed
final sign-off Aug 2018
181 Fremont StPacific Auxiliary Fire Alarmfl24 repa 2018-0326-4632 - full floor ti, 2 smoke detectors, 16 duct detectors, 2 relay modules, 6 monitor modules, 1 isolater modules, 4 speakers and 19 speaker strobes are being added to (e) notifier nfs2-3030. 4 speaker strobes are being relocated, level 24 is part of internal stairway connecting
Details
Permit
201805169289
Permit issued
Jun 20, 2018
Final sign-off
Aug 27, 2018

fl24 repa 2018-0326-4632 - full floor ti, 2 smoke detectors, 16 duct detectors, 2 relay modules, 6 monitor modules, 1 isolater modules, 4 speakers and 19 speaker strobes are being added to (e) notifier nfs2-3030. 4 speaker strobes are being relocated, level 24 is part of internal stairway connecting

Open the permit page

$34,500
May 16, 2018Completed
final sign-off Aug 2018
181 Fremont StPacific Auxiliary Fire Alarmlevel 22. full floor tenant improvement. 2 smoke detectors, 16 duct detectors, 6 relay modules, 6 monitor modules, 1 isolation module, 4 speaker & 19 speaker strobes are being added to (e) notifier nfs2-3030. 4 speaker strobes are being relocated. level 22 is part of internal stairway
Details
Permit
201805169274
Permit issued
Jun 26, 2018
Final sign-off
Aug 27, 2018

level 22. full floor tenant improvement. 2 smoke detectors, 16 duct detectors, 6 relay modules, 6 monitor modules, 1 isolation module, 4 speaker & 19 speaker strobes are being added to (e) notifier nfs2-3030. 4 speaker strobes are being relocated. level 22 is part of internal stairway

Open the permit page

$34,500
May 16, 2018Completed
final sign-off Aug 2018
181 Fremont StPacific Auxiliary Fire Alarmfl 23 ref pa 2018-0326-4632 - full floor ti, 2 smoke detectors, 18 duct detectors, 7 relay modules, 6 monitor modules, 1 isolat0r modules, 1 speaker, 29 speaker strobes are being added to (e) notifier nfs2-3030. 3 speaker strobes are being relocated, level 23 is part of internal stairway connecting
Details
Permit
201805169287
Permit issued
Jun 20, 2018
Final sign-off
Aug 27, 2018

fl 23 ref pa 2018-0326-4632 - full floor ti, 2 smoke detectors, 18 duct detectors, 7 relay modules, 6 monitor modules, 1 isolat0r modules, 1 speaker, 29 speaker strobes are being added to (e) notifier nfs2-3030. 3 speaker strobes are being relocated, level 23 is part of internal stairway connecting

Open the permit page

$34,500
May 16, 2018Completed
final sign-off Sep 2018
181 Fremont StPacific Auxiliary Fire Alarmlevel 33. full floor tenant improvement. 3 smoke detector, 19 duct detectors, 9 relay modules, 6 monitor modules, 1 isolator module, 2 sprinklers & 28 speaker strobes are being added to nfs2-3030. 4 speaker strobes are being relocated. level 33 is part of internal stairway connecting levels 32-34.
Details
Permit
201805169276
Permit issued
Jun 26, 2018
Final sign-off
Sep 18, 2018

level 33. full floor tenant improvement. 3 smoke detector, 19 duct detectors, 9 relay modules, 6 monitor modules, 1 isolator module, 2 sprinklers & 28 speaker strobes are being added to nfs2-3030. 4 speaker strobes are being relocated. level 33 is part of internal stairway connecting levels 32-34.

Open the permit page

$33,500
May 16, 2018Completed
final sign-off Sep 2018
181 Fremont StPacific Auxiliary Fire Alarmfl34 ref:pa 2018-0326-4637 full floor ti, 2 smoke detectors, 15 duct detectors, 6 relay modules, 6 monitor modules, 1 isolator modules, 4 speakers and 16 speaker strobes are being added to (e) notifier nfs2-3030. 4 speaker strobes are being relocated. level 34 is part of internal stairway connecting
Details
Permit
201805169295
Permit issued
Jun 20, 2018
Final sign-off
Sep 18, 2018

fl34 ref:pa 2018-0326-4637 full floor ti, 2 smoke detectors, 15 duct detectors, 6 relay modules, 6 monitor modules, 1 isolator modules, 4 speakers and 16 speaker strobes are being added to (e) notifier nfs2-3030. 4 speaker strobes are being relocated. level 34 is part of internal stairway connecting

Open the permit page

$33,000
May 16, 2018Completed
final sign-off Sep 2018
181 Fremont StPacific Auxiliary Fire Alarmref pa 2018-0326-4634 - full floor ti, 2 smoke detectors, 15 duct detectors, 6 relay modules, 6 monitor modules, 1 isolator modules, 4 speakers and 17 speaker strobes are being added to (e) notifier nfs2-3030. 3 speaker strobes are being relocated. level 32 is part of internal stairway connecting
Details
Permit
201805169290
Permit issued
Jun 20, 2018
Final sign-off
Sep 18, 2018

ref pa 2018-0326-4634 - full floor ti, 2 smoke detectors, 15 duct detectors, 6 relay modules, 6 monitor modules, 1 isolator modules, 4 speakers and 17 speaker strobes are being added to (e) notifier nfs2-3030. 3 speaker strobes are being relocated. level 32 is part of internal stairway connecting

Open the permit page

$34,500
May 14, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp13th fl ti constuction of new non structural partitions, acoustical grid and tile and gyp bd ceiling. construction of kitchen and servery. structural reinforcement to cooridinate with mep service maher not req
Details
Permit
201805149058
Permit issued
Oct 22, 2018
Final sign-off
May 14, 2021

13th fl ti constuction of new non structural partitions, acoustical grid and tile and gyp bd ceiling. construction of kitchen and servery. structural reinforcement to cooridinate with mep service maher not req

Open the permit page

$2,800,000
May 10, 2018Completed
final sign-off May 2021
181 Fremont Stlevel 12 construction of new non structural paritions, acoustical grid and tile, and gyb bd ceilig light fix, millwork, finishes. fire alarm fire spr, stairs under sep permit. maher n/a.
Details
Permit
201805108812
Permit issued
Jun 26, 2018
Final sign-off
May 19, 2021

level 12 construction of new non structural paritions, acoustical grid and tile, and gyb bd ceilig light fix, millwork, finishes. fire alarm fire spr, stairs under sep permit. maher n/a.

Open the permit page

$1,400,000
May 10, 2018Completed
final sign-off May 2019
181 Fremont StGolden State Fire Safety/Dba:Gs Fire Sinstall 2 ea ansul kitchen fire system total of 9 tanks. n/a for maher.
Details
Permit
201805108799
Permit issued
May 14, 2018
Final sign-off
May 15, 2019

install 2 ea ansul kitchen fire system total of 9 tanks. n/a for maher.

Open the permit page

$6,000
May 8, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp10th fl - construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork and finish. fire alarm and sprinkler under a separate permit. maher n/a.
Details
Permit
201805088574
Permit issued
Jun 25, 2018
Final sign-off
May 19, 2021

10th fl - construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork and finish. fire alarm and sprinkler under a separate permit. maher n/a.

Open the permit page

$3,863,014
May 8, 2018Completed
final sign-off May 2021
181 Fremont St11th fl - construction of new non-structural partitions, accoustical grid and tile and gyp board ceilings, light fixtures, millwork and finishes. fire alarm and sprinkler under a separate permit
Details
Permit
201805088579
Permit issued
Jun 28, 2018
Final sign-off
May 19, 2021

11th fl - construction of new non-structural partitions, accoustical grid and tile and gyp board ceilings, light fixtures, millwork and finishes. fire alarm and sprinkler under a separate permit

Open the permit page

$5,078,680
May 7, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp8/f: construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes. fire alarm and sprinklers under a seperate permit.
Details
Permit
201805078360
Permit issued
Jul 25, 2018
Final sign-off
May 18, 2021

8/f: construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes. fire alarm and sprinklers under a seperate permit.

Open the permit page

$2,500,000
May 7, 2018Completed
final sign-off Jun 2021
181 Fremont StLevel 10 Construction Lpinstallation of 4 levels of convenience stairs floor 35 thru 38. two hour enclosure at level 35
Details
Permit
201805078377
Permit issued
Jun 25, 2018
Final sign-off
Jun 1, 2021

installation of 4 levels of convenience stairs floor 35 thru 38. two hour enclosure at level 35

Open the permit page

$3,788,000
Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 25 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref maher na
Details
Permit
201804277574
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 25 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref maher na

Open the permit page

Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 28 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201804095827 maher na
Details
Permit
201804277577
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 28 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201804095827 maher na

Open the permit page

Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 7 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201812015329 maher na
Details
Permit
201804277573
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 7 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201812015329 maher na

Open the permit page

Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 27 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201804106004 maher na
Details
Permit
201804277576
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 27 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201804106004 maher na

Open the permit page

Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 1 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201812015327 maher na
Details
Permit
201804277570
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 1 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201812015327 maher na

Open the permit page

Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 26 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201804075825 maher na
Details
Permit
201804277575
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 26 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 201804075825 maher na

Open the permit page

Apr 27, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lplevel 4 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 20804105993 maher na
Details
Permit
201804277572
Permit issued
May 1, 2018
Final sign-off
May 14, 2021

level 4 - egress sheet updated to include card readers and door tags. new sheet added to show card reader matrix ref 20804105993 maher na

Open the permit page

Apr 25, 2018Completed
final sign-off Apr 2019
181 Fremont StAllied Fire Protection25th floor - add 45 ssp pendent fire sprinklers, add 7 ws sprinklers, add 18 ssu upright sprinklers, relocaate 9 sso sprinkers maher na
Details
Permit
201804257306
Permit issued
Apr 25, 2018
Final sign-off
Apr 30, 2019

25th floor - add 45 ssp pendent fire sprinklers, add 7 ws sprinklers, add 18 ssu upright sprinklers, relocaate 9 sso sprinkers maher na

Open the permit page

$45,000
Apr 25, 2018Completed
final sign-off May 2018
181 Fremont StAllied Fire Protection26th fl: add 39 fire sprinklers; relocate 2 fire sprinklers.
Details
Permit
201804257326
Permit issued
Apr 27, 2018
Final sign-off
May 9, 2018

26th fl: add 39 fire sprinklers; relocate 2 fire sprinklers.

Open the permit page

$18,100
Apr 19, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpinstallation of convincence stairs from level 13 to level 15
Details
Permit
201804196821
Permit issued
May 25, 2018
Final sign-off
May 26, 2021

installation of convincence stairs from level 13 to level 15

Open the permit page

$475,000
Apr 18, 2018Expired or cancelled
cancelled Aug 2023
181 Fremont StAllied Fire Protection25 - fire sprinker 89 added, 6 relocated ref 201711073346 maher na
Details
Permit
201804186641

25 - fire sprinker 89 added, 6 relocated ref 201711073346 maher na

Open the permit page

$48,950
Apr 18, 2018Expired or cancelled
cancelled Aug 2023
181 Fremont StAllied Fire Protection26 - fire sprinker 39 added, 2 relocated ref 201711073351 maher na
Details
Permit
201804186642

26 - fire sprinker 39 added, 2 relocated ref 201711073351 maher na

Open the permit page

$21,000
Apr 18, 2018Completed
final sign-off May 2018
181 Fremont StAllied Fire Protection31 - fire sprinker 24 added, 5 relocated ref 201801310022 maher na
Details
Permit
201804186643
Permit issued
Apr 27, 2018
Final sign-off
May 9, 2018

31 - fire sprinker 24 added, 5 relocated ref 201801310022 maher na

Open the permit page

$15,000
Apr 16, 2018Completed
final sign-off May 2018
181 Fremont StPacific Auxiliary Fire Alarm31st fl - arch & mep permit 2018-0131-0022 this is a full ti to a notifire nfs2-3030. 3 smoke detectors, 15 duct smoke detectors, 8 relay modules, 7 monitor modules, 5 speaker and 18 speaker strobes are being added. 3 speaker strobe are being relocated. an internal stairwell is being installed
Details
Permit
201804166488
Permit issued
May 2, 2018
Final sign-off
May 25, 2018

31st fl - arch & mep permit 2018-0131-0022 this is a full ti to a notifire nfs2-3030. 3 smoke detectors, 15 duct smoke detectors, 8 relay modules, 7 monitor modules, 5 speaker and 18 speaker strobes are being added. 3 speaker strobe are being relocated. an internal stairwell is being installed

Open the permit page

$34,000
Apr 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lpti revision to pa 2017-1201-5329 updated smoke control enlarged pre app meeting minutes, updated green bldg checklist, move drinking fountains, revised minor changes in room layout, add 2 hour rated enclosure in stair vestibule, approve assembly occupancy load
Details
Permit
201804166439
Permit issued
Apr 30, 2018
Final sign-off
May 14, 2021

ti revision to pa 2017-1201-5329 updated smoke control enlarged pre app meeting minutes, updated green bldg checklist, move drinking fountains, revised minor changes in room layout, add 2 hour rated enclosure in stair vestibule, approve assembly occupancy load

Open the permit page

$10,000
Apr 16, 2018Completed
final sign-off May 2018
181 Fremont StPacific Auxiliary Fire Alarm25th fl arch & mep ref pa 201711073346 full floor ti to notifire nfs2-3030. 5 smoke detector, 9 duct smoke detectors, 13 relay modules, 6 monitor modules, 3 speakers and 27 speaker strobe are being added. 2 sprinkler strobe are being added
Details
Permit
201804166485
Permit issued
May 1, 2018
Final sign-off
May 25, 2018

25th fl arch & mep ref pa 201711073346 full floor ti to notifire nfs2-3030. 5 smoke detector, 9 duct smoke detectors, 13 relay modules, 6 monitor modules, 3 speakers and 27 speaker strobe are being added. 2 sprinkler strobe are being added

Open the permit page

$34,000
Apr 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp29th flr - revision to 201801310020 card readers added, added details, mens urinal to remain as is maher na
Details
Permit
201804166440
Permit issued
Apr 19, 2018
Final sign-off
May 28, 2021

29th flr - revision to 201801310020 card readers added, added details, mens urinal to remain as is maher na

Open the permit page

$1,000
Apr 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to pa 2018-0131-0021 updated smoke control system note, revision to finishes, men's urinal per base bldg, add card readers, revised lighting at elevator lobby, revised details
Details
Permit
201804166442
Permit issued
Apr 18, 2018
Final sign-off
May 28, 2021

revision to pa 2018-0131-0021 updated smoke control system note, revision to finishes, men's urinal per base bldg, add card readers, revised lighting at elevator lobby, revised details

Open the permit page

$1,000
Apr 16, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp31st flr - revision to 201801310022 updated smoke control system. revision to finishes, mens core restroom to remain as urinal per base bld. added card readers added details maher na
Details
Permit
201804166436
Permit issued
Apr 19, 2018
Final sign-off
May 28, 2021

31st flr - revision to 201801310022 updated smoke control system. revision to finishes, mens core restroom to remain as urinal per base bld. added card readers added details maher na

Open the permit page

$1,000
Apr 16, 2018Completed
final sign-off May 2019
181 Fremont StPacific Auxiliary Fire Alarm29 - arch & mep ref pa 2018-0131-0020 - full fl ti to notifire nfs2-30300 3 smoke detectors, 15 duct detector, 6 relay modules, 6 monitor modules, 1 isolator module, 4 speaker & 21 speaker strobes are being added, 3 speaker/strobe are being relocated. internal stairwell is being installed connecting
Details
Permit
201804166484
Permit issued
May 2, 2018
Final sign-off
May 10, 2019

29 - arch & mep ref pa 2018-0131-0020 - full fl ti to notifire nfs2-30300 3 smoke detectors, 15 duct detector, 6 relay modules, 6 monitor modules, 1 isolator module, 4 speaker & 21 speaker strobes are being added, 3 speaker/strobe are being relocated. internal stairwell is being installed connecting

Open the permit page

$34,000
Apr 16, 2018Completed
final sign-off May 2019
181 Fremont StPacific Auxiliary Fire Alarm30th fl. ref pa 2018-0131-0021 full floor ti to notifier nps2-3030. 3 smoke detector, 16 duct smoke detectors, 8 relay modules, 6 monitor modules, 3 speakers, and 27 speaker strobe are being added. 3 speaker strobes are being relocated. internal stairwell will be installed connecting levels 29-31.
Details
Permit
201804166483
Permit issued
May 2, 2018
Final sign-off
May 16, 2019

30th fl. ref pa 2018-0131-0021 full floor ti to notifier nps2-3030. 3 smoke detector, 16 duct smoke detectors, 8 relay modules, 6 monitor modules, 3 speakers, and 27 speaker strobe are being added. 3 speaker strobes are being relocated. internal stairwell will be installed connecting levels 29-31.

Open the permit page

$35,000
Apr 13, 2018Completed
final sign-off Apr 2018
181 Fremont StLevel 10 Construction Lpadministrative permit only to correct dwelling unit count; this permit is to correct/updte dwelling unit count from 74 to 67 as recognized in boxes 9 and 9a of this application; no work will be peformed under this permit; reference approved permits 201404163418s - altered site permit page a.007 to o
Details
Permit
201804136372
Permit issued
Apr 16, 2018
Final sign-off
Apr 23, 2018

administrative permit only to correct dwelling unit count; this permit is to correct/updte dwelling unit count from 74 to 67 as recognized in boxes 9 and 9a of this application; no work will be peformed under this permit; reference approved permits 201404163418s - altered site permit page a.007 to o

Open the permit page

Apr 12, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp5th flr - revisiont o 201712156629 update smoke control system note & green bld checklist for leep project. revise layout of mdf pic action closet. add transformer closet add exhaust shaft. pic action sprinkler system on sep permit
Details
Permit
201804126210
Permit issued
May 4, 2018
Final sign-off
May 18, 2021

5th flr - revisiont o 201712156629 update smoke control system note & green bld checklist for leep project. revise layout of mdf pic action closet. add transformer closet add exhaust shaft. pic action sprinkler system on sep permit

Open the permit page

Apr 12, 2018Never finaled
issued Apr 2018, no final
181 Fremont StAllied Fire Protection1st flr - 1 added fire sprinklers ref 201712015327 maher na
Details
Permit
201804126132
Permit issued
Apr 12, 2018

1st flr - 1 added fire sprinklers ref 201712015327 maher na

Open the permit page

$1,000
Apr 12, 2018Completed
final sign-off Feb 2019
181 Fremont StLevel 10 Construction Lp4th flr - revision to power layout & circuiting for bld maintenance - residential management & bld engineering shop maher na
Details
Permit
201804126213
Permit issued
May 2, 2018
Final sign-off
Feb 1, 2019

4th flr - revision to power layout & circuiting for bld maintenance - residential management & bld engineering shop maher na

Open the permit page

$6,000
Apr 12, 2018Completed
final sign-off Nov 2018
181 Fremont StLevel 10 Construction Lp39th flr - installation of fire pits revision to 201305015894 s8 residential addenda. maher na
Details
Permit
201804126214
Permit issued
Jul 27, 2018
Final sign-off
Nov 14, 2018

39th flr - installation of fire pits revision to 201305015894 s8 residential addenda. maher na

Open the permit page

$10,000
Apr 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision ro 201712065692. updated smoke control report, enlarged text of pre app minutes, green building form, updated revisions to finish descriptions, revisions to security control and av rooms maher na
Details
Permit
201804105993
Permit issued
Apr 12, 2018
Final sign-off
May 18, 2021

revision ro 201712065692. updated smoke control report, enlarged text of pre app minutes, green building form, updated revisions to finish descriptions, revisions to security control and av rooms maher na

Open the permit page

Apr 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp23rd floor revision to pa 2017-1215-6634(33rd floor) updated smoke control system notes & green building checklist for leed projects. add card reader locations and transformer closet. mep to coordinate with architectural changes; n/a maher
Details
Permit
201804106002
Permit issued
May 4, 2018
Final sign-off
May 26, 2021

23rd floor revision to pa 2017-1215-6634(33rd floor) updated smoke control system notes & green building checklist for leed projects. add card reader locations and transformer closet. mep to coordinate with architectural changes; n/a maher

Open the permit page

$1,000
Apr 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lp24th floor: revision to pa 2017-1215-6635 update smoke control system notes & green building checklist for leed projects. revise location of idf room. mep to coordinate with architectural changes; n/a maher
Details
Permit
201804106003
Permit issued
May 4, 2018
Final sign-off
May 27, 2021

24th floor: revision to pa 2017-1215-6635 update smoke control system notes & green building checklist for leed projects. revise location of idf room. mep to coordinate with architectural changes; n/a maher

Open the permit page

$1,000
Apr 10, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to pa 2017-1107-3338 27th fl - update smoke control system not & green building checklist for leed projects. revision to finish descriptions. men's stall at core restroom to remain. add card reader locations. additional details for finishes. mep to coordinate with architectural changes
Details
Permit
201804106004
Permit issued
Apr 12, 2018
Final sign-off
May 27, 2021

revision to pa 2017-1107-3338 27th fl - update smoke control system not & green building checklist for leed projects. revision to finish descriptions. men's stall at core restroom to remain. add card reader locations. additional details for finishes. mep to coordinate with architectural changes

Open the permit page

$1,000
Apr 9, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to t.i permit 201711073382 - updated smoke control report, updated green building checklist, revision to finish descriptions, bse building mens urinal to remain
Details
Permit
201804095827
Permit issued
Apr 10, 2018
Final sign-off
May 27, 2021

revision to t.i permit 201711073382 - updated smoke control report, updated green building checklist, revision to finish descriptions, bse building mens urinal to remain

Open the permit page

Apr 9, 2018Completed
final sign-off May 2018
181 Fremont StAllied Fire Protection4th floor: 5 added fire sprinklers. ref app#201712065692. n/a for maher
Details
Permit
201804095777
Permit issued
Apr 9, 2018
Final sign-off
May 3, 2018

4th floor: 5 added fire sprinklers. ref app#201712065692. n/a for maher

Open the permit page

$2,600
Apr 9, 2018Completed
final sign-off May 2021
181 Fremont StLevel 10 Construction Lprevision to t.i permit 201711073351 - updated smoke control report, updated green building checklist, revision to finish descriptions, bse building mens urinal to remain
Details
Permit
201804095825
Permit issued
Apr 10, 2018
Final sign-off
May 27, 2021

revision to t.i permit 201711073351 - updated smoke control report, updated green building checklist, revision to finish descriptions, bse building mens urinal to remain

Open the permit page

Apr 4, 2018Completed
final sign-off Jan 2019
181 Fremont StAllied Fire Protectionadd 36 fire sprinklers at new ceiling and new construction at floor 29 ref pa 2018-0131-0020
Details
Permit
201804045442
Permit issued
Apr 12, 2018
Final sign-off
Jan 17, 2019

add 36 fire sprinklers at new ceiling and new construction at floor 29 ref pa 2018-0131-0020

Open the permit page

$18,300
Apr 4, 2018Completed
final sign-off Apr 2018
181 Fremont StAllied Fire Protectionrelocate 6 fire sprinklers and add 58 sprinklers at 30th floor to accomodate new tenant work. ref pa 2018-0131-0021
Details
Permit
201804045443
Permit issued
Apr 4, 2018
Final sign-off
Apr 24, 2018

relocate 6 fire sprinklers and add 58 sprinklers at 30th floor to accomodate new tenant work. ref pa 2018-0131-0021

Open the permit page

$30,800
Mar 30, 2018Never finaled
issued Mar 2018, no final
181 Fremont Ststreet space
Details
Permit
M907447
Permit issued
Mar 30, 2018

street space

Open the permit page

Mar 28, 2018Completed
final sign-off Jan 2019
181 Fremont StAllied Fire Protectionfire sprinklers for 7/f: add 14 ceiling fire sprinklers, 7 upright sprinklers. ref pa #201712015329. maher na
Details
Permit
201803284776
Permit issued
Mar 28, 2018
Final sign-off
Jan 17, 2019

fire sprinklers for 7/f: add 14 ceiling fire sprinklers, 7 upright sprinklers. ref pa #201712015329. maher na

Open the permit page

$12,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Level 10 Construction Lp (78), Pacific Auxiliary Fire Alarm (46), Allied Fire Protection (44), Sc Builders, Inc (8), Rapid Fire Safety&Security Llc Dba Pafa (5), Acco Engineered Systems Inc. Dba Acco En (3), Edison Fire Extinguisher Company Inc (3), Golden State Fire Safety/Dba:Gs Fire S (2), Baxter Construction, Metropolitan Electrical Construction, Paradise Door And Service
Architects
Gensler Gensler (29), Bert Deviterbo (7), Michael Zelazek (5), Daniel Pamperin (4), Jeffrey Heller (3), Julian White (2), John Fullerton, Kathryn Carroll
Engineers
Julian White (7), Andrew Ostrowski (2), Jeffrey Sacks (2), Jillian Paige Mcleod (2), Benjamin Noggle, James Bradshaw, Joseph T Collins, Timothy H Lindfelt, Xuong Quach
Authorized agents
John Toby (2)
Designers
Allied Fire Protection, Douglas Zucker

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.