John C Fullerton
- License
- 27315
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- On San Francisco permits
- Sep 2019 to Oct 2020
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Level 10 Construction Lp (2), Baxter Construction
- Engineers
- Benjamin Noggle, James Bradshaw
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2020 | Completed final sign-off Apr 2021 | 181 Fremont St | Level 10 Construction Lp | remove & replace hardlid gypsum ceilings in 34 locations commercial spaceDetails
remove & replace hardlid gypsum ceilings in 34 locations commercial space | $95,000 |
| Oct 8, 2020 | Completed final sign-off Jan 2021 | 181 Fremont St | Level 10 Construction Lp | modify t-bar ceiling to incl new gypsum soffit w/ access panelDetails
modify t-bar ceiling to incl new gypsum soffit w/ access panel | $15,000 |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 181 Fremont St | Baxter Construction | ti on level 3 & 4 - level 3 add all gender restroom, convert existing storage to laundry room, remove storage lockers; 4th fl - convert existing office to break room, hvac, plumbing, electrical under separate permitsDetails
ti on level 3 & 4 - level 3 add all gender restroom, convert existing storage to laundry room, remove storage lockers; 4th fl - convert existing office to break room, hvac, plumbing, electrical under separate permits | $150,000 |