Block 3719, lot 451
181 Fremont St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress issued Sep 2026 | 181 Fremont St | Artsigns | revision to permit#202607094758. evacuation maps for floors 9,10,11,12. new artwork from architect.Details
revision to permit#202607094758. evacuation maps for floors 9,10,11,12. new artwork from architect. | |
| Aug 20, 2026 | In progress issued Oct 2026 | 181 Fremont St | Sc Builders, Inc | 8/fl-interior soft demo of non-bearing walls, addition of non-bearing partitions. new mechanical, electrical and new equipment.Details
8/fl-interior soft demo of non-bearing walls, addition of non-bearing partitions. new mechanical, electrical and new equipment. | $1,000,000 |
| Aug 17, 2026 | In progress issued Aug 2026 | 181 Fremont St | Sc Builders, Inc | 9/12/fl- ref 202606113030 and 202604300372- deferred submittal for seismic anchorage for fan powered boxDetails
9/12/fl- ref 202606113030 and 202604300372- deferred submittal for seismic anchorage for fan powered box | |
| Jul 9, 2026 | In progress issued Jul 2026 | 181 Fremont St | Artsigns | evacuation maps floor 9,10,11,12Details
evacuation maps floor 9,10,11,12 | $5,757 |
| Jul 7, 2026 | In progress issued Sep 2026 | 181 Fremont St | Sc Builders, Inc | 25/fl- ti includes soft demo to create more seating, flex space and showers. (n) non strutrual partitions and doors, adjustment of millwork and addition of light fixtures and outletsDetails
25/fl- ti includes soft demo to create more seating, flex space and showers. (n) non strutrual partitions and doors, adjustment of millwork and addition of light fixtures and outlets | $750,000 |
| Jun 11, 2026 | In progress issued Jul 2026 | 181 Fremont St | Sc Builders, Inc | 9/fl- demo of select light fixtures, non strutrucal walls. adding (n) non structural partitions and doors, new equipment, overhead, mechanical and electrical, new pantry cabinets, equipment and millwork.Details
9/fl- demo of select light fixtures, non strutrucal walls. adding (n) non structural partitions and doors, new equipment, overhead, mechanical and electrical, new pantry cabinets, equipment and millwork. | $203,611 |
| May 22, 2026 | In progress issued Sep 2026 | 181 Fremont St | Sc Builders, Inc | demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31Details
demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31 | $1,300,000 |
| Apr 30, 2026 | In progress issued May 2026 | 181 Fremont St | Sc Builders, Inc | parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors,new equipments,overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishesDetails
parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors,new equipments,overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishes | $3,000,000 |
| Apr 15, 2026 | In progress issued May 2026 | 181 Fremont St | Sc Builders, Inc | level 11 - interior only - scope includes demolition of select light fixtures, non structural walls, new non structural partitons and doors, new equipment for pantry, mechanical & electrical work, new millwork and plumbing fixtures.Details
level 11 - interior only - scope includes demolition of select light fixtures, non structural walls, new non structural partitons and doors, new equipment for pantry, mechanical & electrical work, new millwork and plumbing fixtures. | $500,000 |
| Apr 1, 2026 | In progress issued May 2026 | 181 Fremont St | Sc Builders, Inc | 10th fl - interior scope includes demo of select light fixtures power poles, non-structural walls, partitions, and doors. install of new non-structural partitions, doors, new equipment, fixtures and overhead mechanical and electricalDetails
10th fl - interior scope includes demo of select light fixtures power poles, non-structural walls, partitions, and doors. install of new non-structural partitions, doors, new equipment, fixtures and overhead mechanical and electrical | $450,000 |
| Oct 16, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | Acco Engineered Systems Inc. Dba Acco En | 24&25/fl- install plumbing connection to (n) coffee and tea equipment. install of plumbing connections to (n) bevi water dispenser and refrigertorsDetails
24&25/fl- install plumbing connection to (n) coffee and tea equipment. install of plumbing connections to (n) bevi water dispenser and refrigertors | $49,000 |
| Nov 4, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | Level 10 Construction Lp | 1st fl fan relocation and ceiling dropDetails
1st fl fan relocation and ceiling drop | $35,000 |
| Sep 3, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | Level 10 Construction Lp | 40th fl - relocation of supply fan 40-2. addition of rated fan enclosure.Details
40th fl - relocation of supply fan 40-2. addition of rated fan enclosure. | $50,000 |
| Mar 11, 2021 | Completed final sign-off Sep 2021 | 181 Fremont St | Level 10 Construction Lp | level 40: installation of three steel-framed access platforms at level 40 mechanical floor to provide inspection/maintenance access to valves and detectors.Details
level 40: installation of three steel-framed access platforms at level 40 mechanical floor to provide inspection/maintenance access to valves and detectors. | $100,000 |
| Oct 8, 2020 | Completed final sign-off Jan 2021 | 181 Fremont St | Level 10 Construction Lp | modify t-bar ceiling to incl new gypsum soffit w/ access panelDetails
modify t-bar ceiling to incl new gypsum soffit w/ access panel | $15,000 |
| Oct 8, 2020 | Completed final sign-off Apr 2021 | 181 Fremont St | Level 10 Construction Lp | remove & replace hardlid gypsum ceilings in 34 locations commercial spaceDetails
remove & replace hardlid gypsum ceilings in 34 locations commercial space | $95,000 |
| Feb 20, 2020 | Completed final sign-off Jul 2020 | 181 Fremont St | Level 10 Construction Lp | to obtain final inspection for work approved under pa 201305015894. all work is completeDetails
to obtain final inspection for work approved under pa 201305015894. all work is complete | $78,462,315 |
| Mar 18, 2019 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | level 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep systemDetails
level 6 revision to 201808298666. provide 2 hour rated wall for mech. level 4 exterior decorative fins to remain - new fire suppression system to be installed in exterior grease duct under sep system | $8,000 |
| Jul 19, 2018 | Completed final sign-off Jun 2021 | 181 Fremont St | Level 10 Construction Lp | 34th floor: revision to app#201803264637: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maherDetails
34th floor: revision to app#201803264637: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maher | |
| Jul 19, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 22nd floor: revision to app#201803264623: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maherDetails
22nd floor: revision to app#201803264623: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maher | |
| Jul 19, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 23rd floor: revision to app#201803267632: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maherDetails
23rd floor: revision to app#201803267632: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maher | |
| Jul 19, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 33rd floor: revision to app#201803264630: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maherDetails
33rd floor: revision to app#201803264630: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maher | |
| Jul 19, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 24th floor: revision to app#201803264629: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maherDetails
24th floor: revision to app#201803264629: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maher | |
| Jul 19, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 32nd floor: revision to app#201803264634: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maherDetails
32nd floor: revision to app#201803264634: add ul details for partition head. add card reader matrix, upgrade egress plan with card readers, and door tags, up date wd-2. substrates-add fire treated notes. n/a for maher | |
| May 29, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 14th floor: construction of i d f room.Details
14th floor: construction of i d f room. | $18,000 |
| May 7, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | level 9: construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes. fire alarm and sprinklers under a seperate permit. type-i hood exhaust system under separate permit.Details
level 9: construction of new non-structural partitions, acoustical grid and tile and gyp board ceilings, light fixtures, millwork, and finishes. fire alarm and sprinklers under a seperate permit. type-i hood exhaust system under separate permit. | $3,967,758 |
| May 4, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 13th floor: demo of extg women's restroom and reconstruction of new non-bearing partitions, ceiling, fixtures, and accessories. n/a for maherDetails
13th floor: demo of extg women's restroom and reconstruction of new non-bearing partitions, ceiling, fixtures, and accessories. n/a for maher | $115,000 |
| Apr 9, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 1st floor: t.i. revision to app#201712015327. minor changes to finishes and security desk on 1st floor.chnage commercial lobby from a3 to b occupancy. n/a for maherDetails
1st floor: t.i. revision to app#201712015327. minor changes to finishes and security desk on 1st floor.chnage commercial lobby from a3 to b occupancy. n/a for maher | |
| Apr 6, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | 25th revision to 201711073346 for ti revisions include bathroom design, food service boh mep maher naDetails
25th revision to 201711073346 for ti revisions include bathroom design, food service boh mep maher na | |
| Mar 26, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | construction of new non structural partitions, acoustical grid and tile and gyp ceilings, light fixtures, millwork and finishesDetails
construction of new non structural partitions, acoustical grid and tile and gyp ceilings, light fixtures, millwork and finishes | $1,300,000 |
| Mar 26, 2018 | Completed final sign-off May 2021 | 181 Fremont St | Level 10 Construction Lp | contruction of new non structural partitions, acoustical grid and tile gyp bd ceiling, light fixtures, millwork ,finishes maher not reqDetails
contruction of new non structural partitions, acoustical grid and tile gyp bd ceiling, light fixtures, millwork ,finishes maher not req | $1,500,000 |
| Mar 16, 2018 | Completed final sign-off Apr 2020 | 181 Fremont St | Pacific Auxiliary Fire Alarm | ref # 201711063208 improvement to existing notifier 1fs2-3030 fire alarm system high rise elevators are being modified to stop at levels 13 & 25, womens restroom on level 13 os being relocated. additions are smoke detector, 1 relay module 1 monitor module, 1 temp sensor, 1 input module, 1 sprinklerDetails
ref # 201711063208 improvement to existing notifier 1fs2-3030 fire alarm system high rise elevators are being modified to stop at levels 13 & 25, womens restroom on level 13 os being relocated. additions are smoke detector, 1 relay module 1 monitor module, 1 temp sensor, 1 input module, 1 sprinkler | $12,500 |
| Mar 16, 2018 | Completed final sign-off May 2018 | 181 Fremont St | Pacific Auxiliary Fire Alarm | ref #201711073338 full floor tenant improvement to (e) nfs2-3030, adding 4 smoke dectectors, 19 duct detectors, 6 relay modules, 6 monitoring modules,1 speaker & 27 speakers/strobes, relocating 3 sprinklers interconnecting, stairwell (interior) is being added connecting levels 26-28. n/a for maherDetails
ref #201711073338 full floor tenant improvement to (e) nfs2-3030, adding 4 smoke dectectors, 19 duct detectors, 6 relay modules, 6 monitoring modules,1 speaker & 27 speakers/strobes, relocating 3 sprinklers interconnecting, stairwell (interior) is being added connecting levels 26-28. n/a for maher | $34,500 |
| Mar 12, 2018 | Completed final sign-off Nov 2018 | 181 Fremont St | Pacific Auxiliary Fire Alarm | level 24: t.i. on extg notifier nfs23030 fire alarm system, adding 1 smoke detector, 2 relay modules, and 1 speaker strobe. ref app#201712156635 n/a for maherDetails
level 24: t.i. on extg notifier nfs23030 fire alarm system, adding 1 smoke detector, 2 relay modules, and 1 speaker strobe. ref app#201712156635 n/a for maher | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Level 10 Construction Lp (20), Sc Builders, Inc (8), Pacific Auxiliary Fire Alarm (3), Artsigns (2), Acco Engineered Systems Inc. Dba Acco En
- Architects
- Michael Zelazek (8), Douglas Zucker (3), John C Fullerton (2), Guion Childress
- Engineers
- Gregory Bucher (3), Sidhu Harjot Singh (3), Jeffrey Ouellette (2), James Bradshaw, Joseph Collins, Lars P. Mortensen, Timothy Nelson
- Designers
- Artsigns (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.