Kevin Kinoshita
- Listed as
- engineer
- On San Francisco permits
- Feb 2022 to Jun 2023
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 450 06th Av | Kaiser Foundation Health Plan Inc | install (2) wall mounted procedure light & laser machines, new backing for new cabinets w/sinksDetails
install (2) wall mounted procedure light & laser machines, new backing for new cabinets w/sinks | $50,000 |
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy.Details
renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy. | $300,000 |
| Jun 9, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | Hitt Contracting Inc. | revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room.Details
revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room. | |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 4141 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remainDetails
upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remain | $180,000 |