Permit GraphShortlistSan Francisco building permits since 2000

Joe Tai

License
M33266
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M33266 at the Board for Professional Engineers
Listed as
engineer
Firm
Stantec
Based in
San Francisco
On San Francisco permits
Dec 2018 to Feb 2022

2 permits since 2000 (engineer on 2 permits): 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Kaiser Foundation Health Plan Inc, Xl Construction, Corporation
Architects
Albert Lee, Marilyn Ching
Engineers
Kevin Kinoshita, Yu-Ning Chen

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 16, 2022Completed
final sign-off Jan 2023
4141 Geary BlKaiser Foundation Health Plan Incupgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remain
Details
Permit
202202168089
Permit issued
Apr 14, 2022
Final sign-off
Jan 20, 2023

upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remain

Open the permit page

$180,000
Dec 5, 2018Completed
final sign-off Nov 2020
1700 California StXl Construction, Corporation(4th & 2nd flrs, g5 & g2) ti of (e) office space. (n) outpatient ivf and reproductive med office clinic. (n) fuel port installation & (n) mechanical unit. (non-oshpd3 review) (fire alarm & sprinklers under separate permit) structural included. ((n) generator under separate permit)
Details
Permit
201812057469
Permit issued
Aug 13, 2019
Final sign-off
Nov 23, 2020

(4th & 2nd flrs, g5 & g2) ti of (e) office space. (n) outpatient ivf and reproductive med office clinic. (n) fuel port installation & (n) mechanical unit. (non-oshpd3 review) (fire alarm & sprinklers under separate permit) structural included. ((n) generator under separate permit)

Open the permit page

$2,400,000