Yu-Ning Chen
- License
- S5706
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5706 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- May 2021 to Jun 2022
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kaiser Foundation Health Plan Inc (2)
- Architects
- Albert Lee, Shannon Bolick
- Engineers
- Kevin Kinoshita (2), Joe Tai
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy.Details
renovation to an existing pharmacy work area to add workstation within the existing project limits through selective wall demolition. no change to egress or occupancy. | $300,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 4141 Geary Bl | Kaiser Foundation Health Plan Inc | upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remainDetails
upgrade/refresh restrooms located 1st fl, room g118 & g120. 2nd fl room 202, 206 & 207a. 3rd fl room 3026, 3035. 4th fl room 429a, 429b, 429c. replace flooring, paint, countertop, toilet fixtures. (e) hvac system to remain | $180,000 |
| May 6, 2021 | Never finaled filed May 2021, never issued | 330 Rutledge St | new second story wood framed deck (246 sqft) located at the rear of existing residence.Details
new second story wood framed deck (246 sqft) located at the rear of existing residence. | $20,000 |