Block 3763, lot 105
645 Harrison St
- City’s use
- Industrial
- Built
- 1948
- Stories
- 3
- Rooms
- 8 bathrooms
- Building
- 148,076 sq ft
- Lot
- 37,121 sq ft
- Zoning
- SSO
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
79 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 645 Harrison St | Skyline Construction | limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation.Details
limited t.i. on level 3, removal of 8 non-structural screening partitions, patch & re-finish, replace (2) doors. equipment relocation. | $107,970 |
| Oct 10, 2025 | In progress issued Oct 2025 | 645 Harrison St | Acco Engineered Systems Inc. Dba Acco En | remove and replace vrf fan coil unit with new duct, pipe and branch controllerDetails
remove and replace vrf fan coil unit with new duct, pipe and branch controller | $50,000 |
| Jun 20, 2024 | In progress filed Jun 2024, not yet issued | 645 Harrison St | interior tenant improvement to provide new location for a future electrical panelDetails
interior tenant improvement to provide new location for a future electrical panel | $6,000 | |
| Jun 2, 2023 | Completed final sign-off Jun 2023 | 645 Harrison St | Pyro-Comm Systems, Inc. | as-builts to show 2 added duct detectors, ref pa#202304206136. mech ref #202302282747Details
as-builts to show 2 added duct detectors, ref pa#202304206136. mech ref #202302282747 | |
| Apr 27, 2023 | Completed final sign-off May 2023 | 645 Harrison St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 4 pendent sprinklers and relocate 2 uprights on the ground floor; add 3 uprights and delete 3 uprights. ref pa 2023-0228-2747Details
fire sprinklers; relocate 4 pendent sprinklers and relocate 2 uprights on the ground floor; add 3 uprights and delete 3 uprights. ref pa 2023-0228-2747 | $4,950 |
| Apr 20, 2023 | Completed final sign-off Jun 2023 | 645 Harrison St | Pyro-Comm Systems, Inc. | per tenant improvement, modify existing fire alarm system, ref 202302282747. add 7 horn strobes, 4 strobes ceiling.Details
per tenant improvement, modify existing fire alarm system, ref 202302282747. add 7 horn strobes, 4 strobes ceiling. | $1,500 |
| Feb 28, 2023 | Completed final sign-off Jul 2023 | 645 Harrison St | Bcci Construction Company | 1st fl - 5189 ti interior ti with associated mepDetails
1st fl - 5189 ti interior ti with associated mep | $1,000,000 |
| Mar 13, 2020 | Expired or cancelled cancelled Jan 2026 | 645 Harrison St | Novo Construction Inc | interior tenant improvement on the 1st fl including storage and liquid nitrogen tank. structural work includedDetails
interior tenant improvement on the 1st fl including storage and liquid nitrogen tank. structural work included | $95,000 |
| Dec 6, 2019 | Never finaled filed Dec 2019, never issued | 645 Harrison St | retain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office & pdr uses will be retained within the 4 story podium bldg. (r-1,b,m,a-2,a-3) ** maher: n/a **Details
retain the historic 4 story building & construct new 237,750 sf vertical addition above (e) bldg. existing ground floor would feature mixed-use retail space & a basement will be added the (e) office & pdr uses will be retained within the 4 story podium bldg. (r-1,b,m,a-2,a-3) ** maher: n/a ** | $100,000,000 | |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 645 Harrison St | Novo Construction Inc | to obtain final inspection for work approved under pa # 201703101213, 201712287568. all work is complete.Details
to obtain final inspection for work approved under pa # 201703101213, 201712287568. all work is complete. | |
| Jan 3, 2019 | Completed final sign-off Jan 2019 | 645 Harrison St | Pyro-Comm Systems, Inc. | as-builts to ref pa #201808066483. change led annuc and device address changes. maher naDetails
as-builts to ref pa #201808066483. change led annuc and device address changes. maher na | |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 645 Harrison St | Novo Construction Inc | revision to pa #201806071243 to add fan coil shut down sequence to sheets ac1.01, ac702, ac7.03. 4th flDetails
revision to pa #201806071243 to add fan coil shut down sequence to sheets ac1.01, ac702, ac7.03. 4th fl | |
| Aug 6, 2018 | Completed final sign-off Jan 2019 | 645 Harrison St | Pyro-Comm Systems, Inc. | fire alarm t.i. 4th fl. addition of new fire alarm devices. referance to pa #201806071243. voluntary upgrade of (e) fire alarm sytem to voice. replace all (e) audible dvices in bldg with new audible speakers per approved pre-app minutes dated 11/29/17Details
fire alarm t.i. 4th fl. addition of new fire alarm devices. referance to pa #201806071243. voluntary upgrade of (e) fire alarm sytem to voice. replace all (e) audible dvices in bldg with new audible speakers per approved pre-app minutes dated 11/29/17 | $85,000 |
| Jul 26, 2018 | Never finaled issued Jul 2018, no final | 645 Harrison St | Ayoob & Peery Plumbing Co Inc | 1st fl: install a new fdc to connect to new fhv on 4th fl. 4th fl: add 318, relocate 52, and plug 13 sprinklers in order to conform with the new wall/ceiling layout. #18-614. ref #201711204458.Details
1st fl: install a new fdc to connect to new fhv on 4th fl. 4th fl: add 318, relocate 52, and plug 13 sprinklers in order to conform with the new wall/ceiling layout. #18-614. ref #201711204458. | $178,650 |
| Jun 7, 2018 | Never finaled issued Jul 2018, no final | 645 Harrison St | Novo Construction Inc | rev to pa# 201711204458 for interior t.i. on 4th fl. of (e) building for open office, cafe, suppport spaces, conference rooms & storageDetails
rev to pa# 201711204458 for interior t.i. on 4th fl. of (e) building for open office, cafe, suppport spaces, conference rooms & storage | $10,000 |
| Jun 4, 2018 | Completed final sign-off Aug 2018 | 645 Harrison St | Novo Construction Inc | revision to app#201712116095 to remove tank and pad from scope of work.Details
revision to app#201712116095 to remove tank and pad from scope of work. | |
| May 21, 2018 | Never finaled issued Jun 2018, no final | 645 Harrison St | provide new 1-hr fire proofing at (e) metal deck & structural members ref 201711204458 maher naDetails
provide new 1-hr fire proofing at (e) metal deck & structural members ref 201711204458 maher na | $10,000 | |
| May 21, 2018 | Completed final sign-off May 2019 | 645 Harrison St | Plant Construction Co, Lp | revision to 201711154091 remove proposed lighting at ground level room 121 and remove (1) incorrect exit signDetails
revision to 201711154091 remove proposed lighting at ground level room 121 and remove (1) incorrect exit sign | |
| Mar 8, 2018 | Completed final sign-off May 2018 | 645 Harrison St | Pyro-Comm Systems, Inc. | piro comm will provide 7 new audible/visual devices, 5 duct detectors, 6 relay modules and 6 multi voltage relays. maher n/aDetails
piro comm will provide 7 new audible/visual devices, 5 duct detectors, 6 relay modules and 6 multi voltage relays. maher n/a | $5,000 |
| Feb 20, 2018 | Completed final sign-off Mar 2018 | 645 Harrison St | R L H Fire Protection Inc | fire sprinkler ti - 7 relocated pendent; 4 added pendent; 1 deleted pendent; 7 relocated upright; 2 replaced pendent with upright; 2 deleted upright. ref pa 2017-1115-4091Details
fire sprinkler ti - 7 relocated pendent; 4 added pendent; 1 deleted pendent; 7 relocated upright; 2 replaced pendent with upright; 2 deleted upright. ref pa 2017-1115-4091 | $5,200 |
| Feb 16, 2018 | Completed final sign-off Apr 2019 | 645 Harrison St | Plant Construction Co, Lp | revision to app#201711154091. mechanical revision only. add duct detectors at fcus. n/a for maher.Details
revision to app#201711154091. mechanical revision only. add duct detectors at fcus. n/a for maher. | |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 645 Harrison St | street space w/mtaDetails
street space w/mta | ||
| Feb 8, 2018 | Completed final sign-off Aug 2018 | 645 Harrison St | Novo Construction Inc | 1st fl: revision to pa #201712116095 to add structural details for wall strengthening at mechanical openings. maher naDetails
1st fl: revision to pa #201712116095 to add structural details for wall strengthening at mechanical openings. maher na | |
| Feb 8, 2018 | Completed final sign-off Aug 2019 | 645 Harrison St | Pyro-Comm Systems, Inc. | fa ti pyro comm will be adding 5 smk det, 14 duct det, 15 relay modeule, 1 ceiling strobe, 16 ceiling mount horns & relocate 7 ceiling horm strobes maher naDetails
fa ti pyro comm will be adding 5 smk det, 14 duct det, 15 relay modeule, 1 ceiling strobe, 16 ceiling mount horns & relocate 7 ceiling horm strobes maher na | $25,000 |
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 645 Harrison St | Ayoob & Peery Plumbing Co Inc | 1st floor: add, removed, relocate, & change out fire sprinklers per t.i. at 1st floor. 18 add, 32 relocate, 16 plugged, 274 change out. ref 2017-12-11-6095. n/a for maher.Details
1st floor: add, removed, relocate, & change out fire sprinklers per t.i. at 1st floor. 18 add, 32 relocate, 16 plugged, 274 change out. ref 2017-12-11-6095. n/a for maher. | $75,000 |
| Dec 28, 2017 | Never finaled issued Dec 2017, no final | 645 Harrison St | Novo Construction Inc | 4th flr - demo of walls, ceiling and abandoned mep of (e) bld. maher na ref 201711204458Details
4th flr - demo of walls, ceiling and abandoned mep of (e) bld. maher na ref 201711204458 | $10,000 |
| Dec 11, 2017 | Completed final sign-off Oct 2018 | 645 Harrison St | Novo Construction Inc | 1st fl - ti, new open office, pantry, support spacesDetails
1st fl - ti, new open office, pantry, support spaces | $2,000,000 |
| Nov 20, 2017 | Never finaled issued Mar 2018, no final | 645 Harrison St | Novo Construction Inc | 4th flr: office ti of (e) vacant floor level referrence pa# 201703101213 for office allocation new employee cafeteria space. bike parking, showers & lockers under sep permit. maher naDetails
4th flr: office ti of (e) vacant floor level referrence pa# 201703101213 for office allocation new employee cafeteria space. bike parking, showers & lockers under sep permit. maher na | $5,000,000 |
| Nov 15, 2017 | Completed final sign-off May 2019 | 645 Harrison St | Plant Construction Co, Lp | core and shell improvements and toilet room upgrades 1st fl maher not reqDetails
core and shell improvements and toilet room upgrades 1st fl maher not req | $250,000 |
| Aug 9, 2017 | Never finaled issued Aug 2017, no final | 645 Harrison St | interior demolition of interior, non rated, non bearing partitoin walls on gr lvl per submitted plans on gr flevel only. no exterior demo proposedDetails
interior demolition of interior, non rated, non bearing partitoin walls on gr lvl per submitted plans on gr flevel only. no exterior demo proposed | $167,982 | |
| Jul 27, 2017 | Completed final sign-off Aug 2017 | 645 Harrison St | Pyro-Comm Systems, Inc. | 2/f- revision to pa 2017-0511-6329, addition of 5 duct detectors and 6 relay modules, connect to (e) fa system. n/a ordinance #155-13Details
2/f- revision to pa 2017-0511-6329, addition of 5 duct detectors and 6 relay modules, connect to (e) fa system. n/a ordinance #155-13 | $5,000 |
| Jun 5, 2017 | Completed final sign-off Sep 2017 | 645 Harrison St | Pyro-Comm Systems, Inc. | fa ti to 3rd floor add 1 duct detector; 1 relay module, relocate 2 existing nac appliances. connect to (e) fire alarm system. -pa 2017-0412-3765. maher naDetails
fa ti to 3rd floor add 1 duct detector; 1 relay module, relocate 2 existing nac appliances. connect to (e) fire alarm system. -pa 2017-0412-3765. maher na | $1,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 645 Harrison St | Peacock Construction | 2nd & 3rd floors - t-24 mechanical for work under pa #201704123765, #201703091105. n/a maher ordinance.Details
2nd & 3rd floors - t-24 mechanical for work under pa #201704123765, #201703091105. n/a maher ordinance. | $170,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 645 Harrison St | Peacock Construction | t 24 electrical for work under 201704123765. maher not reqDetails
t 24 electrical for work under 201704123765. maher not req | $183,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 645 Harrison St | Pyro-Comm Systems, Inc. | 2nd flr: fa ti - add 10 nac appliances. connect to (e) fa system pa 201703091104 & 201704123765 maher naDetails
2nd flr: fa ti - add 10 nac appliances. connect to (e) fa system pa 201703091104 & 201704123765 maher na | $5,000 |
| May 11, 2017 | Never finaled issued May 2017, no final | 645 Harrison St | Golden Gate Fire Protection Inc | fire sprinkler only - relovate 4 sprinkler pendent, relocate 2 uprights. add 10 sprinkler uprights. ref 2017-0309-1104Details
fire sprinkler only - relovate 4 sprinkler pendent, relocate 2 uprights. add 10 sprinkler uprights. ref 2017-0309-1104 | $4,000 |
| Apr 21, 2017 | Completed final sign-off Sep 2017 | 645 Harrison St | Peacock Construction | ~encrypt&3/f -non-structural partitions, doors, glazing, lights, finishes & power. no change in area, occupancy or use; maher ord 155-13 naDetails
~encrypt&3/f -non-structural partitions, doors, glazing, lights, finishes & power. no change in area, occupancy or use; maher ord 155-13 na | $218,400 |
| Apr 12, 2017 | Completed final sign-off Sep 2017 | 645 Harrison St | Peacock Construction | (n) non-structural partitions, lighting, electrical, finishes. no change in occupancy, use or area; n/a maherDetails
(n) non-structural partitions, lighting, electrical, finishes. no change in occupancy, use or area; n/a maher | $630,630 |
| Mar 10, 2017 | Never finaled issued Apr 2017, no final | 645 Harrison St | no work under this building permit. hv-645 harrison street, inc. proposes to apply for building permit for office development allocation under planning code section(s) 321, 322 & 818.48 that will authorize up to 98,964 gross square feet of office use.Details
no work under this building permit. hv-645 harrison street, inc. proposes to apply for building permit for office development allocation under planning code section(s) 321, 322 & 818.48 that will authorize up to 98,964 gross square feet of office use. | ||
| Mar 9, 2017 | Completed final sign-off Sep 2017 | 645 Harrison St | Peacock Construction | 2nd flr: select demo of non structural partitions demo only ab-017 maher naDetails
2nd flr: select demo of non structural partitions demo only ab-017 maher na | $7,500 |
| Mar 9, 2017 | Completed final sign-off Sep 2017 | 645 Harrison St | Peacock Construction | 3rd flr: select demo of non structural partitions demo only ab-017 maher naDetails
3rd flr: select demo of non structural partitions demo only ab-017 maher na | $5,500 |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 645 Harrison St | Ayoob & Peery Plumbing Co Inc | fire sprinkler as built 1st flDetails
fire sprinkler as built 1st fl | |
| Aug 8, 2013 | Expired or cancelled cancelled Jan 2026 | 645 Harrison St | elevator repairs/upgrades to (e)Details
elevator repairs/upgrades to (e) | $300,000 | |
| Jul 30, 2013 | Never finaled issued Jul 2013, no final | 645 Harrison St | street space permitDetails
street space permit | ||
| Mar 26, 2013 | Completed final sign-off Jun 2013 | 645 Harrison St | Eagle Bay Enterprises, Inc (Dba Garnett | 3rd floor-install 4 evac signsDetails
3rd floor-install 4 evac signs | $1,000 |
| Feb 26, 2013 | Completed final sign-off Jun 2013 | 645 Harrison St | Mc Carthy Building Companies Inc | revision to app#201208228000 to reclassification of office 330 to "classroom office" on the 3rd floor, 645 harrision st.Details
revision to app#201208228000 to reclassification of office 330 to "classroom office" on the 3rd floor, 645 harrision st. | |
| Jan 31, 2013 | Never finaled issued Jan 2013, no final | 645 Harrison St | Ayoob & Peery Plumbing Co Inc | 1st & 3rd floors-add, relocate & removed fire sprinkler heads per ti-3rd fl-28 added, 54 relocated, 15 removed. 1st fl-5 added & 21 relocated. ti pa's# 2012-0822-8000 & 2012-1022-2550Details
1st & 3rd floors-add, relocate & removed fire sprinkler heads per ti-3rd fl-28 added, 54 relocated, 15 removed. 1st fl-5 added & 21 relocated. ti pa's# 2012-0822-8000 & 2012-1022-2550 | $50,372 |
| Jan 28, 2013 | Completed final sign-off Oct 2013 | 645 Harrison St | Pyro-Comm Systems, Inc. | voluntary fire alarm upgrade project. 1st, 2nd & 4th floor. 3rd floor will be a separate ti project.Details
voluntary fire alarm upgrade project. 1st, 2nd & 4th floor. 3rd floor will be a separate ti project. | $120,000 |
| Jan 28, 2013 | Completed final sign-off May 2013 | 645 Harrison St | Pyro-Comm Systems, Inc. | 3rd floor t.i. project fire alarm, t.i. pa #2012.08.22.8000. facu under seperate permit. floors: ground,2,4, and penthouse under permit.Details
3rd floor t.i. project fire alarm, t.i. pa #2012.08.22.8000. facu under seperate permit. floors: ground,2,4, and penthouse under permit. | $40,000 |
| Nov 13, 2012 | Completed final sign-off Jun 2013 | 645 Harrison St | U A Construction | replace and install hvac vents per plans. rvision to 201209190128/201208228000Details
replace and install hvac vents per plans. rvision to 201209190128/201208228000 | $10,000 |
| Oct 22, 2012 | Expired or cancelled withdrawn May 2014 | 645 Harrison St | provide accessible path and ramp and restroom upgrade on ground floor. no work on exterior. add partitions on ground floor. limited office t.i. structural, mechanical & elect, plumbing included.Details
provide accessible path and ramp and restroom upgrade on ground floor. no work on exterior. add partitions on ground floor. limited office t.i. structural, mechanical & elect, plumbing included. | $750,000 | |
| Sep 19, 2012 | Completed final sign-off May 2013 | 645 Harrison St | U A Construction | 3rd floor: mechanical, plumbing & electrical system work for 3rd floor ti work under pa# 2012/08/22/8000.Details
3rd floor: mechanical, plumbing & electrical system work for 3rd floor ti work under pa# 2012/08/22/8000. | $500,000 |
| Sep 7, 2012 | Expired or cancelled cancelled Jan 2026 | 645 Harrison St | mechanical, plumbing, electrical work for 3rd floor t.i. improvement under permit 201208228000Details
mechanical, plumbing, electrical work for 3rd floor t.i. improvement under permit 201208228000 | $350,000 | |
| Sep 6, 2012 | Completed final sign-off Sep 2012 | 645 Harrison St | O'connor Plumbing & Fire Protection | installtion of 3 fire sprinkler heads in telephone rooms in suite 200. ti: 201207124738Details
installtion of 3 fire sprinkler heads in telephone rooms in suite 200. ti: 201207124738 | $1,200 |
| Aug 22, 2012 | Completed final sign-off May 2013 | 645 Harrison St | U A Construction | 3rd floor-tenant improvements & accessibilty upgrades. no exterior work to be doneDetails
3rd floor-tenant improvements & accessibilty upgrades. no exterior work to be done | $750,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 645 Harrison St | A M Rocca Inc. | #200- tenant improvement of an office. add and remove partition walls. mep, sprinklers seperate permit.Details
#200- tenant improvement of an office. add and remove partition walls. mep, sprinklers seperate permit. | $10,000 |
| Oct 14, 2011 | Never finaled issued Oct 2011, no final | 645 Harrison St | street and sidewalk permits (pp2011014721)Details
street and sidewalk permits (pp2011014721) | ||
| Nov 19, 2010 | Completed final sign-off Feb 2011 | 645 Harrison St | C B F Inc | life safety system on ground, 2, 3,4 and elevator machine room. 5 smoke detectirs, 6 heat detectorsDetails
life safety system on ground, 2, 3,4 and elevator machine room. 5 smoke detectirs, 6 heat detectors | $3,300 |
| Sep 21, 2010 | Expired or cancelled cancelled Jul 2018 | 645 Harrison St | convert existing textile use to public storage including rental office.Details
convert existing textile use to public storage including rental office. | $500,000 | |
| Sep 10, 2010 | Completed final sign-off Nov 2010 | 645 Harrison St | Ayoob & Peery Plumbing Co Inc | 4th floor-relocate fire sprinkler heads at elevator room & penthouse, total 3. (change out (e) to new heads see plan)Details
4th floor-relocate fire sprinkler heads at elevator room & penthouse, total 3. (change out (e) to new heads see plan) | $1,600 |
| Jul 1, 2010 | Completed final sign-off Jan 2011 | 645 Harrison St | Mc Carthy Building Companies Inc | barrier removal by removing a non-accessible elevator and replacing with an ada accessible elevator. fire alarm on separate permit.Details
barrier removal by removing a non-accessible elevator and replacing with an ada accessible elevator. fire alarm on separate permit. | $350,000 |
| Jan 6, 2009 | Never finaled issued Jan 2009, no final | 645 Harrison St | Tyco Integrated Security | to obtain final inspection for work approved under pa#200804089132. all work has been completed.Details
to obtain final inspection for work approved under pa#200804089132. all work has been completed. | |
| Nov 3, 2008 | Never finaled issued Nov 2008, no final | 645 Harrison St | street space permitDetails
street space permit | ||
| Apr 8, 2008 | Never finaled issued Apr 2008, no final | 645 Harrison St | Tyco Integrated Security | replace old panel with new unimode loud panel, install new smoke above panel & pull station next to it. connect (e) horn/strobe, pull stations, water flows and tamper switches to new panel and monitor per nfpa 72 remote station monitoringDetails
replace old panel with new unimode loud panel, install new smoke above panel & pull station next to it. connect (e) horn/strobe, pull stations, water flows and tamper switches to new panel and monitor per nfpa 72 remote station monitoring | $6,000 |
| Sep 25, 2002 | Completed final sign-off Oct 2002 | 645 Harrison St | renew pa#2000/03/06/3567,2000/05/23/0779,2000/07/27/6358,2000/09/05/9646,2001/10/25/1698 for finalDetails
renew pa#2000/03/06/3567,2000/05/23/0779,2000/07/27/6358,2000/09/05/9646,2001/10/25/1698 for final | ||
| Jul 18, 2002 | Completed final sign-off Oct 2002 | 645 Harrison St | Sabah International Incorporated | renew#200201096532 for final inspectionDetails
renew#200201096532 for final inspection | |
| Feb 25, 2002 | Completed final sign-off Mar 2002 | 645 Harrison St | response correction notice dated 1/24/02. approve ramp installed as an equilavent facilitation.Details
response correction notice dated 1/24/02. approve ramp installed as an equilavent facilitation. | ||
| Jan 9, 2002 | Expired or cancelled expired Oct 2002 | 645 Harrison St | Sabah International Incorporated | renew #200109057570 for final inspectionDetails
renew #200109057570 for final inspection | |
| Oct 25, 2001 | Expired or cancelled expired Oct 2002 | 645 Harrison St | rev to 200005230779;ti on 2nd flrDetails
rev to 200005230779;ti on 2nd flr | $2,500 | |
| Oct 2, 2001 | Expired or cancelled expired Oct 2002 | 645 Harrison St | renew three expired app#200003063567,200005230779,200009059646 for final inspectionDetails
renew three expired app#200003063567,200005230779,200009059646 for final inspection | ||
| Sep 5, 2001 | Expired or cancelled expired Oct 2002 | 645 Harrison St | Sabah International Incorporated | renewal for final inspection only 200004127076Details
renewal for final inspection only 200004127076 | |
| Feb 28, 2001 | Completed final sign-off Mar 2002 | 645 Harrison St | barrier free work to entry for access compliance rv 200005230779 new 1:12 ramp betwn prop line entryDetails
barrier free work to entry for access compliance rv 200005230779 new 1:12 ramp betwn prop line entry | $35,000 | |
| Sep 5, 2000 | Expired or cancelled expired Oct 2002 | 645 Harrison St | addendum to app #200005230779Details
addendum to app #200005230779 | ||
| Jul 27, 2000 | Expired or cancelled expired Oct 2002 | 645 Harrison St | furnish and install 6 air conditioning units within the ce8ling of the 2nd floor ref: pa#20000523077Details
furnish and install 6 air conditioning units within the ce8ling of the 2nd floor ref: pa#20000523077 | $92,000 | |
| Jun 14, 2000 | Expired or cancelled expired Oct 2002 | 645 Harrison St | Marquee Fire Protection Dba Pye Barker F | revamp (e) fire sprinkler system 2nd floor -add (7) new sprinkler-relocate (7) existingDetails
revamp (e) fire sprinkler system 2nd floor -add (7) new sprinkler-relocate (7) existing | $2,800 |
| May 23, 2000 | Expired or cancelled expired Oct 2002 | 645 Harrison St | 2nd floor tentant improvement & changes of front entryDetails
2nd floor tentant improvement & changes of front entry | $300,000 | |
| Apr 12, 2000 | Expired or cancelled expired Oct 2002 | 645 Harrison St | install fm200 fire system on 2nd flDetails
install fm200 fire system on 2nd fl | $21,298 | |
| Mar 13, 2000 | Expired or cancelled expired Jul 2000 | 645 Harrison St | Marquee Fire Protection Dba Pye Barker F | remove existing fire sprinkler heads (7), five adds-17 relocates-pipe scheduleDetails
remove existing fire sprinkler heads (7), five adds-17 relocates-pipe schedule | $2,400 |
| Mar 6, 2000 | Expired or cancelled expired Oct 2002 | 645 Harrison St | remodel: one computer workrm, new finishes, work to (e) elevator for ada complience, restrm upgradesDetails
remodel: one computer workrm, new finishes, work to (e) elevator for ada complience, restrm upgrades | $45,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.