Block 0228, lot 038
475 Sansome St
- City’s use
- Commercial Office
- Built
- 1900
- Lot
- 4 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 475 Sansome St | Principal Builders Inc. | floor 20 +21- interior soft demo.Details
floor 20 +21- interior soft demo. | $80,000 |
| Sep 17, 2026 | In progress issued Sep 2026 | 475 Sansome St | Principal Builders Inc. | floor 12-15 interior soft demo. ab-017Details
floor 12-15 interior soft demo. ab-017 | $120,000 |
| Apr 9, 2026 | In progress filed Apr 2026, not yet issued | 475 Sansome St | A-1 Modular Inc | 5/fl- install (3) furntiure privacy phone booths at open office area within (e) occupied office suite. no change to the floor area or mep work.Details
5/fl- install (3) furntiure privacy phone booths at open office area within (e) occupied office suite. no change to the floor area or mep work. | $70,000 |
| Nov 10, 2025 | Completed final sign-off Dec 2025 | 475 Sansome St | Bilcor Inc | 11/f: install (12) ceiling mount speaker-strobes. relocate (7) wall mount strobes. architecture ref t.i permit 202507171048Details
11/f: install (12) ceiling mount speaker-strobes. relocate (7) wall mount strobes. architecture ref t.i permit 202507171048 | $4,329 |
| Oct 1, 2025 | Completed final sign-off Oct 2025 | 475 Sansome St | Phase One Fire Life Safety Systems Inc | 16/fl-as built to permit 202509054640- update as built to reflect addresses to addressable devices per the field fire inspector instructions on the job card.Details
16/fl-as built to permit 202509054640- update as built to reflect addresses to addressable devices per the field fire inspector instructions on the job card. | |
| Sep 19, 2025 | Completed final sign-off Oct 2025 | 475 Sansome St | Phase One Fire Life Safety Systems Inc | full ti on 16th fllor to an (e) voice evac. fire alarm control panel. existing remote power supplies shall remain & connected to the new notification devices. a total of 53 notification devices & 26 addressable devices are being added. fire alarm only. arch 202507160904 and mech 202506138670Details
full ti on 16th fllor to an (e) voice evac. fire alarm control panel. existing remote power supplies shall remain & connected to the new notification devices. a total of 53 notification devices & 26 addressable devices are being added. fire alarm only. arch 202507160904 and mech 202506138670 | $100,030 |
| Sep 17, 2025 | Completed final sign-off Nov 2025 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | 11/f: add 23, relocate 40 fire sprinkler per t.i. ref permit 202507171048.Details
11/f: add 23, relocate 40 fire sprinkler per t.i. ref permit 202507171048. | $39,129 |
| Sep 11, 2025 | Completed final sign-off Dec 2025 | 475 Sansome St | Honeywell International, Inc | 7th fl ref pa # 2025-0627-9716: fire alarm ti. add 2 rib relays 2 relay modules. demo 5 wall strobes 1 smoke detector 5 ceiling 1 smoke detector. add 8 ceiling speaker/strobes 2 ceiling strobes 2 duct detectorsDetails
7th fl ref pa # 2025-0627-9716: fire alarm ti. add 2 rib relays 2 relay modules. demo 5 wall strobes 1 smoke detector 5 ceiling 1 smoke detector. add 8 ceiling speaker/strobes 2 ceiling strobes 2 duct detectors | $2,000 |
| Aug 6, 2025 | Completed final sign-off Oct 2025 | 475 Sansome St | Anderson, Rowe & Buckley, Inc. | 7th fl - fire protection ti relocate 7, add 2, total 9 ref pa 202506279716Details
7th fl - fire protection ti relocate 7, add 2, total 9 ref pa 202506279716 | $4,112 |
| Jul 17, 2025 | Completed final sign-off Dec 2025 | 475 Sansome St | Codesign Llc | 11/f: tenant improvement project in an (e) suite partially occupying the 11th flr. project includes new offices, meeting rooms, break area. no structural work or exterior scope work.Details
11/f: tenant improvement project in an (e) suite partially occupying the 11th flr. project includes new offices, meeting rooms, break area. no structural work or exterior scope work. | $1,781,907 |
| Jul 11, 2025 | Completed final sign-off Sep 2025 | 475 Sansome St | R L H Fire Protection Inc | 16th fl - fire sprinklers permit. relocate 77 and add 34 pendent sprinklers; relocate 72 and add 35 upright sprinklers. delete 15 pendent sprinklers. ref pa 202502190638Details
16th fl - fire sprinklers permit. relocate 77 and add 34 pendent sprinklers; relocate 72 and add 35 upright sprinklers. delete 15 pendent sprinklers. ref pa 202502190638 | $135,000 |
| Jun 27, 2025 | Completed final sign-off Dec 2025 | 475 Sansome St | Principal Builders Inc. | 7th fl/ suite 700- expansion of existing office into vacant office space.demo and construction of non-structural partitions. including mechanical rework, new plumbing, electrical and fire protection and finishes. new /revised hvac, electrical, plumbing, & life safty work will be design build.Details
7th fl/ suite 700- expansion of existing office into vacant office space.demo and construction of non-structural partitions. including mechanical rework, new plumbing, electrical and fire protection and finishes. new /revised hvac, electrical, plumbing, & life safty work will be design build. | $2,088,658 |
| Jun 13, 2025 | In progress issued Jun 2025 | 475 Sansome St | Skyline Construction | 16/f: deferred mep scope for 202502190638. modifications include heat pumps, ddc control, fan cell units, lighting with associated circuits and controls, power signal, plumbing fixture update. scope or work on 16th flDetails
16/f: deferred mep scope for 202502190638. modifications include heat pumps, ddc control, fan cell units, lighting with associated circuits and controls, power signal, plumbing fixture update. scope or work on 16th fl | $1,200,000 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 475 Sansome St | Honeywell International, Inc | 16th fl - fire alarm ti stair in-fill. demo (2) door holders & (1) smoke detector ref pa 202411074617Details
16th fl - fire alarm ti stair in-fill. demo (2) door holders & (1) smoke detector ref pa 202411074617 | $2,000 |
| Jan 16, 2025 | Completed final sign-off Mar 2025 | 475 Sansome St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvements add 4 and remove 8 fire sprinklers 15 & 16 floorDetails
existing fire sprinkler system tenant improvements add 4 and remove 8 fire sprinklers 15 & 16 floor | $3,500 |
| Jan 10, 2025 | In progress issued Jan 2025 | 475 Sansome St | Honeywell International, Inc | 11th fl. tenant improvement demo (2) wall strobes, (1) speaker, install (8) speaker/strobes (10) strobes (4) control relays (1) dual monitr module, (11) duct detectors, (1) smoke relocate (2) speakers, replace (1) existing smoke. ref #2024-0909-0362Details
11th fl. tenant improvement demo (2) wall strobes, (1) speaker, install (8) speaker/strobes (10) strobes (4) control relays (1) dual monitr module, (11) duct detectors, (1) smoke relocate (2) speakers, replace (1) existing smoke. ref #2024-0909-0362 | $4,800 |
| Dec 18, 2024 | Completed final sign-off Jan 2025 | 475 Sansome St | Bcci Construction Company | 11th fl - seismic anchorage for a battery unit weighting 2798 lbs on (e) floor. ref 202409090362Details
11th fl - seismic anchorage for a battery unit weighting 2798 lbs on (e) floor. ref 202409090362 | |
| Dec 2, 2024 | Completed final sign-off Jul 2025 | 475 Sansome St | Skyline Construction | 18th & 19th fl: revision to 202409261699: plans to show structural installation of phone booth anchorageDetails
18th & 19th fl: revision to 202409261699: plans to show structural installation of phone booth anchorage | |
| Nov 8, 2024 | Completed final sign-off Feb 2025 | 475 Sansome St | Phase One Fire Life Safety Systems Inc | 18&19/fl-ti ref 202409261699- fire alarm ti project consisting of an additional (20) notification appliances for added phone boothsDetails
18&19/fl-ti ref 202409261699- fire alarm ti project consisting of an additional (20) notification appliances for added phone booths | $19,220 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 475 Sansome St | Principal Builders Inc. | 16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.Details
16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible. | $50,000 |
| Nov 1, 2024 | Completed final sign-off Dec 2024 | 475 Sansome St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 12 pendents, 2 concealed pendents, and 2 uprights in the common area, as well as add 2 pendents at the stair infill. ref ti pa# 202409170929Details
fire sprinklers; relocate 12 pendents, 2 concealed pendents, and 2 uprights in the common area, as well as add 2 pendents at the stair infill. ref ti pa# 202409170929 | $4,500 |
| Oct 21, 2024 | Completed final sign-off Feb 2025 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | 11/f: add (15) relocate (44) fire sprinkler per ti. ref pa# 202409090362.Details
11/f: add (15) relocate (44) fire sprinkler per ti. ref pa# 202409090362. | $36,645 |
| Oct 17, 2024 | Completed final sign-off Oct 2024 | 475 Sansome St | R L H Fire Protection Inc | fire sprinkler permit. relocate 5 and add 14 sprinklers on the 18th ad 19th fl. ti 202409261699Details
fire sprinkler permit. relocate 5 and add 14 sprinklers on the 18th ad 19th fl. ti 202409261699 | $9,700 |
| Oct 15, 2024 | Completed final sign-off Jul 2025 | 475 Sansome St | Skyline Construction | 18th & 19th fl- hvac work modification. new heat pump & ddc controlsDetails
18th & 19th fl- hvac work modification. new heat pump & ddc controls | $55,000 |
| Sep 26, 2024 | Completed final sign-off Jul 2025 | 475 Sansome St | Skyline Construction | 18+19/fl- office ti for modification of phone booth to be anchored to structrue and relocate sprinkler protection within booth due to fire code violation life safety work will be on separte permitDetails
18+19/fl- office ti for modification of phone booth to be anchored to structrue and relocate sprinkler protection within booth due to fire code violation life safety work will be on separte permit | $200,000 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 475 Sansome St | Principal Builders Inc. | 11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill.Details
11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill. | $221,074 |
| Sep 9, 2024 | Completed final sign-off Apr 2025 | 475 Sansome St | Bcci Construction Company | 11th fl -tenant improvement. includes new non-load bearing walls, lighting, fixtures & finishesDetails
11th fl -tenant improvement. includes new non-load bearing walls, lighting, fixtures & finishes | $880,258 |
| Sep 5, 2024 | Completed final sign-off Sep 2024 | 475 Sansome St | Honeywell International, Inc | fire alarm demo scope - remove devices. demo - 9 speakers, 7 strobes; relocate 2 speakers, 1 strobe, 1 smoke; install 2 speaker strobes to provide minimum coverage during construction ref pa 202408128460Details
fire alarm demo scope - remove devices. demo - 9 speakers, 7 strobes; relocate 2 speakers, 1 strobe, 1 smoke; install 2 speaker strobes to provide minimum coverage during construction ref pa 202408128460 | $3,800 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 475 Sansome St | Anderson, Rowe & Buckley, Inc. | 11th fl demo plan- relocate 44 sprinklersDetails
11th fl demo plan- relocate 44 sprinklers | |
| Aug 12, 2024 | Completed final sign-off Sep 2024 | 475 Sansome St | Principal Builders Inc. | 11th floor: demo of non-load bearing partitions. ceiling, light fixtures, finishes, and doors. new non- bearing corridor partitions and doors.Details
11th floor: demo of non-load bearing partitions. ceiling, light fixtures, finishes, and doors. new non- bearing corridor partitions and doors. | $133,686 |
| Jul 23, 2024 | Completed final sign-off Oct 2024 | 475 Sansome St | Honeywell International, Inc | fire alarm tenant improvement 8th fl. demo 2 spkr/strobes, 7 speakers, 9 strobes, relocate 1 spkr, 2 strbs,install 14 spkr/strbs 11 strobes, 9 duct detectors, 9 relays reb,3 control relays, replace 2 smokes, ref 202207198832Details
fire alarm tenant improvement 8th fl. demo 2 spkr/strobes, 7 speakers, 9 strobes, relocate 1 spkr, 2 strbs,install 14 spkr/strbs 11 strobes, 9 duct detectors, 9 relays reb,3 control relays, replace 2 smokes, ref 202207198832 | $6,500 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 475 Sansome St | Anderson, Rowe & Buckley, Inc. | 8th fl - fire sprinkler system add 16, remove 15 & relocate 51 sprinklers ref pa 202405021310Details
8th fl - fire sprinkler system add 16, remove 15 & relocate 51 sprinklers ref pa 202405021310 | $43,000 |
| Jun 24, 2024 | Completed final sign-off Nov 2024 | 475 Sansome St | Principal Builders Inc. | revision to bpa# 202405021310: to update millwork detail and depth per plans.Details
revision to bpa# 202405021310: to update millwork detail and depth per plans. | |
| May 2, 2024 | Completed final sign-off Nov 2024 | 475 Sansome St | Principal Builders Inc. | 8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.Details
8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep. | $3,051,349 |
| Nov 8, 2022 | Completed final sign-off Jun 2023 | 475 Sansome St | Bcci Construction Company | 5th fl - revision to pa arch & mep permit. proposed millwork planters to be omitted ref pa 2022-0719-8832 adding light fixture and wall furing, changeing wall type and realigning glass partition at rm. #504 patch and repair as noted.Details
5th fl - revision to pa arch & mep permit. proposed millwork planters to be omitted ref pa 2022-0719-8832 adding light fixture and wall furing, changeing wall type and realigning glass partition at rm. #504 patch and repair as noted. | |
| Sep 30, 2022 | Completed final sign-off Apr 2023 | 475 Sansome St | Honeywell International, Inc | ref pa# 2022-0719-8832: f.a. modification on 5th fl. add 16 speaker/strobes, 6 strobes, 9 duct detectors, 11 ribrelax, 3 control relays, replace 6 speakr/strobes w/ new and 1 strobe power supply, demo 11 speaker/strobes, 5 speakers, 4 strobesDetails
ref pa# 2022-0719-8832: f.a. modification on 5th fl. add 16 speaker/strobes, 6 strobes, 9 duct detectors, 11 ribrelax, 3 control relays, replace 6 speakr/strobes w/ new and 1 strobe power supply, demo 11 speaker/strobes, 5 speakers, 4 strobes | $35,000 |
| Jul 19, 2022 | Completed final sign-off Jun 2023 | 475 Sansome St | Bcci Construction Company | 5/f: new non-structural partitions, doors, and associated mep. demo permit 202205254994. structural drawings included.Details
5/f: new non-structural partitions, doors, and associated mep. demo permit 202205254994. structural drawings included. | $2,700,000 |
| May 25, 2022 | Completed final sign-off Jul 2022 | 475 Sansome St | Bcci Construction Company | 5th fl: demo only permit to remove (e) partitions, ceiling, and mep elements per ab-017. sprinkler pa# 202205234804.Details
5th fl: demo only permit to remove (e) partitions, ceiling, and mep elements per ab-017. sprinkler pa# 202205234804. | $50,000 |
| May 23, 2022 | Completed final sign-off Jul 2022 | 475 Sansome St | Pribuss Engineering Inc | 5th fl: plug off (e) pendant sprinklers & provide upright coverage throughout for demo of (e) office in suites 500, 520, 570. total uprights = 72 heads.Details
5th fl: plug off (e) pendant sprinklers & provide upright coverage throughout for demo of (e) office in suites 500, 520, 570. total uprights = 72 heads. | $36,000 |
| Jun 29, 2021 | Completed final sign-off Jul 2021 | 475 Sansome St | Rossi Builders Inc. | 17/f: demising wall. maher n/a. suites 1700/1720Details
17/f: demising wall. maher n/a. suites 1700/1720 | $10,000 |
| Nov 23, 2020 | Expired or cancelled cancelled Jul 2023 | 475 Sansome St | Dome Construction Corp | determine occ load for assembly space. fire review only, administrative permit only for occupant load. revision to: 2020-0110-1681.Details
determine occ load for assembly space. fire review only, administrative permit only for occupant load. revision to: 2020-0110-1681. | |
| Oct 30, 2019 | Completed final sign-off Nov 2019 | 475 Sansome St | Golden Gate Fire Protection Inc | 21st fl - as built ref 2019-0930-3016. change from steel pipe to flex pipe for the armoversDetails
21st fl - as built ref 2019-0930-3016. change from steel pipe to flex pipe for the armovers | $1,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 475 Sansome St | Honeywell International, Inc | 21st fl fa modification: add 24 spreaker/strobes; 1 strobe, 2 speakers, 1 control relay; 1 rps upgrade to 10amps. demo 6 speaker/strobes. ref pa #201907085255. maher na.Details
21st fl fa modification: add 24 spreaker/strobes; 1 strobe, 2 speakers, 1 control relay; 1 rps upgrade to 10amps. demo 6 speaker/strobes. ref pa #201907085255. maher na. | $18,660 |
| Sep 30, 2019 | Completed final sign-off Nov 2019 | 475 Sansome St | Golden Gate Fire Protection Inc | 21/f: fire sprinklers, relocate 45 pendents & relocate 5 concealed pendents on 21/f. maher n/a.Details
21/f: fire sprinklers, relocate 45 pendents & relocate 5 concealed pendents on 21/f. maher n/a. | $25,000 |
| Aug 14, 2019 | Completed final sign-off Sep 2019 | 475 Sansome St | Novo Construction Inc | interior non structural demo of partition, finshes, ceiling assembly and light fixtures ref 201908138654Details
interior non structural demo of partition, finshes, ceiling assembly and light fixtures ref 201908138654 | $19,000 |
| Aug 13, 2019 | Completed final sign-off Aug 2019 | 475 Sansome St | Pioneer Fire Inc. | remove all pendent sprinklers and replace with upright sprinklers. 138 totalDetails
remove all pendent sprinklers and replace with upright sprinklers. 138 total | $10,000 |
| Jul 11, 2019 | Completed final sign-off Aug 2019 | 475 Sansome St | Pioneer Fire Inc. | remove all pendant fire sprinklers and install upright coverage throughoutDetails
remove all pendant fire sprinklers and install upright coverage throughout | $10,000 |
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 475 Sansome St | Novo Construction Inc | 18th flr. demo of non-structural partitions. demo all mep's, flooring and ceiling. ref pa 201907115677 sprinklerDetails
18th flr. demo of non-structural partitions. demo all mep's, flooring and ceiling. ref pa 201907115677 sprinkler | $125,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 475 Sansome St | Skyline Construction | partial renovation of 21st fl, new non load bearing walls, ceilings, and lighting. mep deferredDetails
partial renovation of 21st fl, new non load bearing walls, ceilings, and lighting. mep deferred | $385,000 |
| Apr 29, 2019 | Never finaled filed Apr 2019, never issued | 475 Sansome St | Novo Construction Inc | 9/f: to obtain a final inspection for work approved under pa#201406249284. maher n/a.Details
9/f: to obtain a final inspection for work approved under pa#201406249284. maher n/a. | |
| Feb 7, 2019 | Completed final sign-off Mar 2019 | 475 Sansome St | Honeywell International, Inc | f/a modifications on 20th fl: install 25 speaker/strobes & 6 strobes, upgrade strobe power supply to 10amps. demo: 6 speaker/strobes, 1 emergency door release, 1 smoke detector. ref pa #201808238106.Details
f/a modifications on 20th fl: install 25 speaker/strobes & 6 strobes, upgrade strobe power supply to 10amps. demo: 6 speaker/strobes, 1 emergency door release, 1 smoke detector. ref pa #201808238106. | $19,220 |
| Jan 18, 2019 | Completed final sign-off Jan 2019 | 475 Sansome St | Honeywell International, Inc | fire alarm modification 5th fl remove 7 strobes, 7 speakers, install 13 speaker strobesDetails
fire alarm modification 5th fl remove 7 strobes, 7 speakers, install 13 speaker strobes | $5,980 |
| Dec 6, 2018 | Completed final sign-off Dec 2018 | 475 Sansome St | Honeywell International, Inc | as built for approved f/a pa# 201811065087 no new parts were providedDetails
as built for approved f/a pa# 201811065087 no new parts were provided | |
| Nov 21, 2018 | Never finaled issued Nov 2018, no final | 475 Sansome St | 9th floor evacuation maps (4). maher n/a.Details
9th floor evacuation maps (4). maher n/a. | $2,200 | |
| Nov 6, 2018 | Completed final sign-off Dec 2018 | 475 Sansome St | Honeywell International, Inc | f/a modification on 9th fl: remove 5 spkr/strobes, 1 emergency door release and 1 control relay, relocate 1 spkr/strobes. install 12 spker/srobe, 7 strobes, 2 smoke detectors, 2 emergency door release, 1 control relay. ref app#201808238104. n/a for maherDetails
f/a modification on 9th fl: remove 5 spkr/strobes, 1 emergency door release and 1 control relay, relocate 1 spkr/strobes. install 12 spker/srobe, 7 strobes, 2 smoke detectors, 2 emergency door release, 1 control relay. ref app#201808238104. n/a for maher | $13,562 |
| Jun 22, 2018 | Completed final sign-off Aug 2018 | 475 Sansome St | Gci, Inc | unit 520: ti (2) new offices and (2) new diffusersDetails
unit 520: ti (2) new offices and (2) new diffusers | $35,000 |
| May 17, 2018 | Never finaled issued Oct 2018, no final | 475 Sansome St | Novo Construction Inc | 7/f: rev pa#201712075766 to reconfigure office space & revised occupancy load.Details
7/f: rev pa#201712075766 to reconfigure office space & revised occupancy load. | |
| Mar 28, 2018 | Completed final sign-off Apr 2019 | 475 Sansome St | Novo Construction Inc | basement - mechanical & electrical work for ti ref 201705257640Details
basement - mechanical & electrical work for ti ref 201705257640 | $5,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 475 Sansome St | Novo Construction Inc | mechanical and electrical work for ti ref pa 2017-1207-5766. maher n/aDetails
mechanical and electrical work for ti ref pa 2017-1207-5766. maher n/a | $25,000 |
| Dec 27, 2017 | Completed final sign-off May 2019 | 475 Sansome St | Novo Construction Inc | suite 720 - interior demo and ti, new door frame and hardware, new glazing, partitions, cabinets and finishes. mep/fire/life safety under sep permit. maher n/aDetails
suite 720 - interior demo and ti, new door frame and hardware, new glazing, partitions, cabinets and finishes. mep/fire/life safety under sep permit. maher n/a | $30,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 475 Sansome St | Novo Construction Inc | ste 1710 - demo of non-structural partitions ab-007. architectural & life safety deferredDetails
ste 1710 - demo of non-structural partitions ab-007. architectural & life safety deferred | $10,000 |
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 475 Sansome St | Novo Construction Inc | 7th fl suite 700 ti includes demo of non structural partitions and building n non structural partitions. new or revised meps, ls, sprinklers design build and submitted separately ( bldg fully sprinlker)Details
7th fl suite 700 ti includes demo of non structural partitions and building n non structural partitions. new or revised meps, ls, sprinklers design build and submitted separately ( bldg fully sprinlker) | $675,000 |
| Nov 9, 2017 | Completed final sign-off Nov 2017 | 475 Sansome St | Honeywell International, Inc | ref 201709229351, f/a modficcation 17th fl add 3 duct detectors for the fcus, 3 rib relay, 1 control relay. maher naDetails
ref 201709229351, f/a modficcation 17th fl add 3 duct detectors for the fcus, 3 rib relay, 1 control relay. maher na | $5,500 |
| Sep 22, 2017 | Completed final sign-off Apr 2018 | 475 Sansome St | Rossi Builders Inc. | #1700- provide new lighting & branch circuiting to (e) panel, maintain some (e) power & signal outlets, provide additional new power branch circuiting & raceway systems as required to new power & signal outlets. t.i. pa#201708164977. n/a ordinance #155-13Details
#1700- provide new lighting & branch circuiting to (e) panel, maintain some (e) power & signal outlets, provide additional new power branch circuiting & raceway systems as required to new power & signal outlets. t.i. pa#201708164977. n/a ordinance #155-13 | $75,000 |
| Sep 22, 2017 | Completed final sign-off Apr 2018 | 475 Sansome St | Rossi Builders Inc. | suite 1700- add (1) new 4 pipe fan coil unit with piping and air distribution, new supply, return, sidewall grilles, relocate pheumatic thermostats. t.i. pa #201708164977. e ref pa #201709220349. n/a ordinance #155-13, fire under separate permits.Details
suite 1700- add (1) new 4 pipe fan coil unit with piping and air distribution, new supply, return, sidewall grilles, relocate pheumatic thermostats. t.i. pa #201708164977. e ref pa #201709220349. n/a ordinance #155-13, fire under separate permits. | $100,000 |
| Sep 20, 2017 | Completed final sign-off Oct 2017 | 475 Sansome St | Golden Gate Fire Protection Inc | #1700- fire sprinkler only, relocate 15 pendents, add 2 , relocate 7 uprights, 24 heads total for integrated suite exp.Details
#1700- fire sprinkler only, relocate 15 pendents, add 2 , relocate 7 uprights, 24 heads total for integrated suite exp. | $6,000 |
| Sep 13, 2017 | Completed final sign-off Nov 2017 | 475 Sansome St | Honeywell International, Inc | ref 201708164977 fa modfication on 17th fl install 5 new speaker/strobes, remove 1 smoke detector, 3 wall strobes, 3 speakers, replace 1 strobe power supply with 10 ampsDetails
ref 201708164977 fa modfication on 17th fl install 5 new speaker/strobes, remove 1 smoke detector, 3 wall strobes, 3 speakers, replace 1 strobe power supply with 10 amps | $4,749 |
| Aug 16, 2017 | Completed final sign-off Apr 2018 | 475 Sansome St | Rossi Builders Inc. | ste 1700: demo some existing height partitoins, construction of new full height partitons and ceiling height, partitions, finishes. mep deferred. bldg & floor fully sprinkledDetails
ste 1700: demo some existing height partitoins, construction of new full height partitons and ceiling height, partitions, finishes. mep deferred. bldg & floor fully sprinkled | $250,000 |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 475 Sansome St | street spaceDetails
street space | ||
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 475 Sansome St | Pioneer Fire Inc. | relocate (16) pendents, and (1) upright sprinklers.Details
relocate (16) pendents, and (1) upright sprinklers. | $6,432 |
| May 25, 2017 | Completed final sign-off Apr 2019 | 475 Sansome St | Novo Construction Inc | remove existing floor & wall finishes, partitions. build out new partitions, doors & ceiling. mep, life safety & fire sprinkler under separate permitDetails
remove existing floor & wall finishes, partitions. build out new partitions, doors & ceiling. mep, life safety & fire sprinkler under separate permit | $129,000 |
| Jan 20, 2017 | Completed final sign-off Mar 2017 | 475 Sansome St | Sc Builders, Inc | 12th floor - mechanical & electrical for pa #201612064229. maher ord 155-13 naDetails
12th floor - mechanical & electrical for pa #201612064229. maher ord 155-13 na | $100,000 |
| Jan 9, 2017 | Completed final sign-off Jan 2017 | 475 Sansome St | Sc Builders, Inc | 14/f- mechanical and electrical for 201611082216. n/a ordinance #155-13Details
14/f- mechanical and electrical for 201611082216. n/a ordinance #155-13 | $30,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 475 Sansome St | Sc Builders, Inc | 12th floor ti (existing building) include restrooms, conference rooms, private offices, pantry, open offices, phone rooms; no floor furniture and cubicle work, under this permitDetails
12th floor ti (existing building) include restrooms, conference rooms, private offices, pantry, open offices, phone rooms; no floor furniture and cubicle work, under this permit | $210,000 |
| Nov 8, 2016 | Completed final sign-off Dec 2016 | 475 Sansome St | Sc Builders, Inc | 14/f- interior t.i. construction includes restrooms, conference rooms, private offices, pantry, open offices and phone rooms. mep. life safety and sprinklers under seperate permits. n/a ordinance #155-13Details
14/f- interior t.i. construction includes restrooms, conference rooms, private offices, pantry, open offices and phone rooms. mep. life safety and sprinklers under seperate permits. n/a ordinance #155-13 | $130,000 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 475 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 14 sprinkler pendents for oracle on the 15th flDetails
fire sprinkler only. relocate 14 sprinkler pendents for oracle on the 15th fl | $3,220 |
| Nov 2, 2016 | Completed final sign-off Nov 2016 | 475 Sansome St | Sc Builders, Inc | 15th flr: ele & mech for maher not reqDetails
15th flr: ele & mech for maher not req | |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 475 Sansome St | Sc Builders, Inc | 15th floor: interior t.i. : demo partitions and bldg new partitions creating 4 new phone rooms and 2 new offices.n/a for maherDetails
15th floor: interior t.i. : demo partitions and bldg new partitions creating 4 new phone rooms and 2 new offices.n/a for maher | $200,000 |
| Aug 30, 2016 | Completed final sign-off Dec 2016 | 475 Sansome St | Sc Builders, Inc | 16th floor: mechanical and electrical for app#201608114824. n/a maher ord. 155-13Details
16th floor: mechanical and electrical for app#201608114824. n/a maher ord. 155-13 | $30,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2016 | 475 Sansome St | Sc Builders, Inc | 11th floor: mechanical and electrial for ref pa 2016 0706 1675 maher naDetails
11th floor: mechanical and electrial for ref pa 2016 0706 1675 maher na | $150,000 |
| Jul 18, 2016 | Completed final sign-off Dec 2016 | 475 Sansome St | Honeywell International, Inc | remove 2 smoke detectors, 3 doors holders, 6 strobes, 2 speakers added, 8 strobes. t.i. 201607061675Details
remove 2 smoke detectors, 3 doors holders, 6 strobes, 2 speakers added, 8 strobes. t.i. 201607061675 | $4,112 |
| Jun 20, 2016 | Never finaled issued Jun 2016, no final | 475 Sansome St | Pioneer Fire Inc. | remodel of all outlined areas consisting of 2 relocated pendents. ti 2013-1122-2676 (20th floor)Details
remodel of all outlined areas consisting of 2 relocated pendents. ti 2013-1122-2676 (20th floor) | $8,276 |
| May 27, 2016 | Never finaled issued May 2016, no final | 475 Sansome St | Anderson, Rowe & Buckley, Inc. | suite 570: fire sprinkler ti relocate 3 heads, plug 2. ref ti 2016-0505-6616.Details
suite 570: fire sprinkler ti relocate 3 heads, plug 2. ref ti 2016-0505-6616. | $1,554 |
| May 27, 2016 | Never finaled issued May 2016, no final | 475 Sansome St | Novo Construction Inc | 5th flr: electrical work for tenant improvement, ref. 2016-0505-6616; maher n/aDetails
5th flr: electrical work for tenant improvement, ref. 2016-0505-6616; maher n/a | $25,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 475 Sansome St | street spaceDetails
street space | ||
| Mar 27, 2015 | Completed final sign-off Apr 2015 | 475 Sansome St | Peacock Construction | 7th floor, suite 720: interior tenant improvement, new finishes and minor electrical.Details
7th floor, suite 720: interior tenant improvement, new finishes and minor electrical. | $1,200 |
| Mar 19, 2015 | Completed final sign-off Jul 2015 | 475 Sansome St | Sc Builders, Inc | 6th flr: ti - work includes new partitions, doors, frames, ceiling, lighting, casework. maher - not req'd. ele, mech, sprinklers & life safety under seperated permit to comoply with ab 2.10, check location of cardreaders.Details
6th flr: ti - work includes new partitions, doors, frames, ceiling, lighting, casework. maher - not req'd. ele, mech, sprinklers & life safety under seperated permit to comoply with ab 2.10, check location of cardreaders. | $800,000 |
| Mar 11, 2015 | Completed final sign-off Jul 2015 | 475 Sansome St | Golden Gate Fire Protection Inc | 8th floor #850 fire sprinkler only - relocate 4 sprinkler pendents & add 2 sprinkler pendents. total 6 pendents for triage consulting. ref #2015.0305.0071. n/a maher ordinanceDetails
8th floor #850 fire sprinkler only - relocate 4 sprinkler pendents & add 2 sprinkler pendents. total 6 pendents for triage consulting. ref #2015.0305.0071. n/a maher ordinance | $3,000 |
| Mar 5, 2015 | Completed final sign-off Sep 2015 | 475 Sansome St | Peacock Construction | demolition of selected non structural partitions, new non structural partitons, new doors, frames to match existing. mech, elec, ls, sprinkler sep permitDetails
demolition of selected non structural partitions, new non structural partitons, new doors, frames to match existing. mech, elec, ls, sprinkler sep permit | $110,000 |
| Aug 29, 2014 | Completed final sign-off Sep 2014 | 475 Sansome St | Peacock Construction | provision of accessable parking spaces required to support office building requirement barrier removal ab017Details
provision of accessable parking spaces required to support office building requirement barrier removal ab017 | $20,000 |
| Jun 26, 2014 | Completed final sign-off Aug 2014 | 475 Sansome St | Honeywell International, Inc | fire alarm suite 1700, add 6 new speaker strobes. ref pa# 201404123506Details
fire alarm suite 1700, add 6 new speaker strobes. ref pa# 201404123506 | $5,000 |
| Jun 24, 2014 | Completed final sign-off Dec 2014 | 475 Sansome St | Novo Construction Inc | full floor tenant improvement including selective demo, security devices, partitions, lighting. mep, life safety under sep permit. na for maher.Details
full floor tenant improvement including selective demo, security devices, partitions, lighting. mep, life safety under sep permit. na for maher. | $850,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 475 Sansome St | Novo Construction Inc | mech and elec work on the 9th fl to include demo of ductwork, new heat pump for idf room, rebalance existing fan coils. na for maher.Details
mech and elec work on the 9th fl to include demo of ductwork, new heat pump for idf room, rebalance existing fan coils. na for maher. | $400,000 |
| Apr 17, 2014 | Completed final sign-off Nov 2014 | 475 Sansome St | Rossi Builders Inc. | tenant improvement on 17th fl to construct and demo partions , doors, and ceiling as well as t24 elec/lighting. mech, sprinklers, and life safety on separate permitDetails
tenant improvement on 17th fl to construct and demo partions , doors, and ceiling as well as t24 elec/lighting. mech, sprinklers, and life safety on separate permit | $378,000 |
| Nov 22, 2013 | Completed final sign-off Jul 2014 | 475 Sansome St | Novo Construction Inc | 20th floor:partial floor t.i. including selective demolition security devices new non load bear partitions. mep and life safety under seperate permit.Details
20th floor:partial floor t.i. including selective demolition security devices new non load bear partitions. mep and life safety under seperate permit. | $30,000 |
| Nov 22, 2013 | Completed final sign-off Aug 2014 | 475 Sansome St | Novo Construction Inc | 21st floor:partial floor t.i. including selective demolition security devices non load bear partitions. mep and life safety under seperate permit. maher ordinance # 155-13 does not applyDetails
21st floor:partial floor t.i. including selective demolition security devices non load bear partitions. mep and life safety under seperate permit. maher ordinance # 155-13 does not apply | $30,000 |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 475 Sansome St | street spaceDetails
street space | ||
| Aug 26, 2013 | Completed final sign-off Feb 2014 | 475 Sansome St | Peacock Construction Inc | 5th fl. t.i. demo non structural partitions, doors, and side lites, construct new non structral partitons, new doors, frames, sidelites. mep, sprinkler, life safety separate permitDetails
5th fl. t.i. demo non structural partitions, doors, and side lites, construct new non structral partitons, new doors, frames, sidelites. mep, sprinkler, life safety separate permit | $292,000 |
| Jul 16, 2013 | Completed final sign-off Aug 2013 | 475 Sansome St | Honeywell International, Inc | 17th flr: install (4) ceiling speaker/strobes; (1) ceiling speaker; 1 heat detector, relocate 2 wall strobes, relocate 1 ceiling speaker, 201307121720Details
17th flr: install (4) ceiling speaker/strobes; (1) ceiling speaker; 1 heat detector, relocate 2 wall strobes, relocate 1 ceiling speaker, 201307121720 | $5,000 |
| Jul 12, 2013 | Completed final sign-off Jun 2014 | 475 Sansome St | Peacock Construction Inc | demo of non-structural partitions, doors & side lights, construct new non structural partitions, new door, frames & lighting. mep. sprinkler, life safety under seperate permit.Details
demo of non-structural partitions, doors & side lights, construct new non structural partitions, new door, frames & lighting. mep. sprinkler, life safety under seperate permit. | $178,000 |
| Feb 22, 2013 | Completed final sign-off Mar 2013 | 475 Sansome St | C B F Inc | 1st floor-install 1 monitor module for existing ansul systemDetails
1st floor-install 1 monitor module for existing ansul system | $1,000 |
| Feb 4, 2013 | Never finaled issued Feb 2013, no final | 475 Sansome St | C B F Inc | ground floor-remove 1 smoke detectorDetails
ground floor-remove 1 smoke detector | $300 |
| May 30, 2012 | Never finaled issued May 2012, no final | 475 Sansome St | street space and mta parkingDetails
street space and mta parking | ||
| Feb 27, 2012 | Completed final sign-off Jun 2012 | 475 Sansome St | Source Planning And Construction Inc | 8th floor-construction of demising wall between suite #800 & 840, remove some (e) non bearing walls & construct new interior partitions, relocate doors & interior sidelights. extend & continue (e) suspended ceiling & add new light fixturesDetails
8th floor-construction of demising wall between suite #800 & 840, remove some (e) non bearing walls & construct new interior partitions, relocate doors & interior sidelights. extend & continue (e) suspended ceiling & add new light fixtures | $400,000 |
| Nov 29, 2011 | Completed final sign-off Jan 2012 | 475 Sansome St | Novo Construction Inc | 18th floor ste 1800 -lighting & electrical work for tenant improvement-refer to pa# 2011-1114-8797Details
18th floor ste 1800 -lighting & electrical work for tenant improvement-refer to pa# 2011-1114-8797 | $65,000 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 475 Sansome St | R L H Fire Protection Inc | fire sprinkler only. relocate 9 heads, add1 and remove 1 head at tobin & tobin (suite #1800)Details
fire sprinkler only. relocate 9 heads, add1 and remove 1 head at tobin & tobin (suite #1800) | $5,000 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 475 Sansome St | Novo Construction Inc | tenant improvement on the 7th fl. selective demo, new finishes, mep sep permitDetails
tenant improvement on the 7th fl. selective demo, new finishes, mep sep permit | $130,000 |
| Nov 14, 2011 | Completed final sign-off Jan 2012 | 475 Sansome St | Novo Construction Inc | tenant improvment on the 18th fl. demo of interior partitions, door, and sidelight assembly. new partitions, doors, frames, cabinets. mep under separate permitDetails
tenant improvment on the 18th fl. demo of interior partitions, door, and sidelight assembly. new partitions, doors, frames, cabinets. mep under separate permit | $286,789 |
| Oct 7, 2011 | Completed final sign-off Jan 2012 | 475 Sansome St | Honeywell International, Inc | fire alarm scope: add 8 new monitor modulesDetails
fire alarm scope: add 8 new monitor modules | $7,000 |
| May 23, 2011 | Completed final sign-off May 2012 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | 2nd, 3rd, 4th floor fire sprinkler system - add control valves & repalce flow switch per tenant improvement.Details
2nd, 3rd, 4th floor fire sprinkler system - add control valves & repalce flow switch per tenant improvement. | $10,000 |
| Apr 8, 2011 | Completed final sign-off Jun 2011 | 475 Sansome St | Ward Alan Emery Construction Inc. | 5th floor-construct new server closet in suite 510, 5th floor.Details
5th floor-construct new server closet in suite 510, 5th floor. | $46,112 |
| Mar 22, 2011 | Completed final sign-off May 2011 | 475 Sansome St | Pioneer Fire Inc. | suite 2100:relocate 125 fire sprinklers,add 21 fire sprinklers and remove 8 fire sprinklers.Details
suite 2100:relocate 125 fire sprinklers,add 21 fire sprinklers and remove 8 fire sprinklers. | $20,000 |
| Mar 7, 2011 | Completed final sign-off May 2011 | 475 Sansome St | Novo Construction Inc | 21st floor-ref arch pa# 2011-0208-9816-mechanical & electrical work for t.i. to include 2 fsd, new exhaust fan, addition of vav & lighting.Details
21st floor-ref arch pa# 2011-0208-9816-mechanical & electrical work for t.i. to include 2 fsd, new exhaust fan, addition of vav & lighting. | $340,000 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 475 Sansome St | Novo Construction Inc | full floor tenant improvement including selective demolition, new partition ceiling and finishes. mep, life safty, & sprinkler sep permit.Details
full floor tenant improvement including selective demolition, new partition ceiling and finishes. mep, life safty, & sprinkler sep permit. | $1,058,600 |
| Dec 9, 2010 | Completed final sign-off Jan 2011 | 475 Sansome St | Stripe Inc. Dba Garnett Sign Studio | to erect non electric double faced projecting sign. field verify that new sign does not obstruct any existing fire escape that may be present.Details
to erect non electric double faced projecting sign. field verify that new sign does not obstruct any existing fire escape that may be present. | $1,030 |
| Oct 6, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Pioneer Fire Inc. | relocate 4 fire sprinkler heads on the 17th fl, suite 1750Details
relocate 4 fire sprinkler heads on the 17th fl, suite 1750 | $3,900 |
| Sep 29, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | 17th floor tenant improvements including minor demolition & build back. new carpet & paint. mep,ls and sp separate permitDetails
17th floor tenant improvements including minor demolition & build back. new carpet & paint. mep,ls and sp separate permit | $90,000 |
| May 21, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Pioneer Fire Inc. | revision to 201003128082. move fire sprinkler in line w/ lights.Details
revision to 201003128082. move fire sprinkler in line w/ lights. | |
| May 17, 2010 | Completed final sign-off Oct 2010 | 475 Sansome St | Honeywell International, Inc | fire alarm system on the 20th efl. 44 strobes, 1 strobe power supply, 1 control relay, 1 maual pull stationDetails
fire alarm system on the 20th efl. 44 strobes, 1 strobe power supply, 1 control relay, 1 maual pull station | $8,000 |
| May 12, 2010 | Never finaled issued Jun 2010, no final | 475 Sansome St | Hathaway Dinwiddie Co. | mechanical scope: modify (e) hvac system to match (n) floor layout; add 2-(n) co-boxes; add 4-(n) transfer fans. electrical scope: (n) power & lighting to follow (n) floor layout; ref. set: 201005041630 for arch dwgs.Details
mechanical scope: modify (e) hvac system to match (n) floor layout; add 2-(n) co-boxes; add 4-(n) transfer fans. electrical scope: (n) power & lighting to follow (n) floor layout; ref. set: 201005041630 for arch dwgs. | $100,000 |
| May 4, 2010 | Completed final sign-off Oct 2010 | 475 Sansome St | Hathaway Dinwiddie Co. | 20th. flr: t.i. include demo of non-structural partitions & bldg. new non-structural partitions. all (n) or revised hvac, electrical, plumbing, life safety & sprinkler work will be design build & permit submitted separately. bldg. full sprink. field verify that elev lobby complies with ab-2.10Details
20th. flr: t.i. include demo of non-structural partitions & bldg. new non-structural partitions. all (n) or revised hvac, electrical, plumbing, life safety & sprinkler work will be design build & permit submitted separately. bldg. full sprink. field verify that elev lobby complies with ab-2.10 | $620,000 |
| Mar 15, 2010 | Completed final sign-off May 2010 | 475 Sansome St | Honeywell International, Inc | 7th floor. fire alarm system: add 9 strobes and 2 speakers.Details
7th floor. fire alarm system: add 9 strobes and 2 speakers. | $10,000 |
| Mar 12, 2010 | Never finaled issued Mar 2010, no final | 475 Sansome St | Pioneer Fire Inc. | 5th,7th,8th,17th &18th floors-remove 10 pendent fire sprinklersDetails
5th,7th,8th,17th &18th floors-remove 10 pendent fire sprinklers | $3,000 |
| Mar 4, 2010 | Completed final sign-off May 2010 | 475 Sansome St | Pioneer Fire Inc. | suites 740-750. relocate 8 fire sprinklers.Details
suites 740-750. relocate 8 fire sprinklers. | $3,000 |
| Feb 2, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | floor 17th - base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.Details
floor 17th - base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain. | $160,000 |
| Feb 2, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | floor 18th base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.Details
floor 18th base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain. | $160,000 |
| Jan 25, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | base building improvements-floor 7 building core. finish upgrades to elevator lobby & multi-tenant corridor. code & finish upgrades to men's & women's restrooms. fire sprinkler, plumbing & electrical drawings under separate permit. (e) mech. system to remain.Details
base building improvements-floor 7 building core. finish upgrades to elevator lobby & multi-tenant corridor. code & finish upgrades to men's & women's restrooms. fire sprinkler, plumbing & electrical drawings under separate permit. (e) mech. system to remain. | $160,000 |
| Jan 25, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | base building improvements-floor 8-building core. finish upgrades to elevator lobby & multi tenant corridor. code & finish upgrades to men's & women's restrooms. fire sprinkler, plumbing & electrical drawings under separate permit. (e) mech. systems to remain.Details
base building improvements-floor 8-building core. finish upgrades to elevator lobby & multi tenant corridor. code & finish upgrades to men's & women's restrooms. fire sprinkler, plumbing & electrical drawings under separate permit. (e) mech. systems to remain. | $160,000 |
| Jan 15, 2010 | Completed final sign-off May 2010 | 475 Sansome St | Novo Construction Inc | 7th floor office ti. selective demo, new private offices, conference room, millwork and new finishes throughout. mep under separate permit. create 2 spec suites. fire alarm and fire sprinklers on separate permits.Details
7th floor office ti. selective demo, new private offices, conference room, millwork and new finishes throughout. mep under separate permit. create 2 spec suites. fire alarm and fire sprinklers on separate permits. | $200,000 |
| Jan 15, 2010 | Completed final sign-off Dec 2010 | 475 Sansome St | Novo Construction Inc | 5th floor. office ti, base builidng, building core, finish upgrades to elevator lobby and multi tenant corridor. code and finish upgrades to men's and women's restrooms. sprinklers, fire alarm, plumbing and electrical under separate permit. existing mechanical systems to remain.Details
5th floor. office ti, base builidng, building core, finish upgrades to elevator lobby and multi tenant corridor. code and finish upgrades to men's and women's restrooms. sprinklers, fire alarm, plumbing and electrical under separate permit. existing mechanical systems to remain. | $160,000 |
| Dec 18, 2009 | Never finaled issued Dec 2009, no final | 475 Sansome St | street space and sidewalkDetails
street space and sidewalk | ||
| Aug 21, 2009 | Completed final sign-off Oct 2009 | 475 Sansome St | Novo Construction Inc | 7th fl - relocation of existing circuits & lighting to create new office and open area for electrical fed. furniture. ref. appl. #2009/0728/3590. life safety/fire alarm is required under separate permit.Details
7th fl - relocation of existing circuits & lighting to create new office and open area for electrical fed. furniture. ref. appl. #2009/0728/3590. life safety/fire alarm is required under separate permit. | $40,000 |
| Jul 28, 2009 | Completed final sign-off Oct 2009 | 475 Sansome St | Novo Construction Inc | tenant improvements for 7th. flr.-selective demolition, new private offices, conference room & new finishes throughout. mechanical, electrical drawings under a separate permit.Details
tenant improvements for 7th. flr.-selective demolition, new private offices, conference room & new finishes throughout. mechanical, electrical drawings under a separate permit. | $129,000 |
| Jul 17, 2009 | Completed final sign-off Aug 2009 | 475 Sansome St | compliance with high rise sprinkerl ordinance# 377-93. umbrella permit. all floors.Details
compliance with high rise sprinkerl ordinance# 377-93. umbrella permit. all floors. | ||
| Mar 25, 2009 | Completed final sign-off Jul 2009 | 475 Sansome St | R L H Fire Protection Inc | complaince to the following floors-basement-added 13, 1st fl-added 5, 2nd fl-added 7, 3rd fl-added 2, 4th fl-added 2, 5th fl-relocated 4, roof-relocated 1, added 2, total 36.Details
complaince to the following floors-basement-added 13, 1st fl-added 5, 2nd fl-added 7, 3rd fl-added 2, 4th fl-added 2, 5th fl-relocated 4, roof-relocated 1, added 2, total 36. | $8,100 |
| Nov 10, 2008 | Never finaled issued Nov 2008, no final | 475 Sansome St | Western Roofing Service | reroofing.Details
reroofing. | $250,000 |
| Jul 24, 2008 | Completed final sign-off Jul 2008 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | renew application for final inspection only 200711137915Details
renew application for final inspection only 200711137915 | |
| May 29, 2008 | Completed final sign-off Jun 2008 | 475 Sansome St | Principal Builders Inc. | 7th floor, ste. 720-mechanical work-install exhaust fanDetails
7th floor, ste. 720-mechanical work-install exhaust fan | $1,200 |
| May 13, 2008 | Completed final sign-off Jun 2008 | 475 Sansome St | C B F Inc | life safety system modifications. 1 smoke sensor, 6 speakers/strobes 1 strobe power supply.Details
life safety system modifications. 1 smoke sensor, 6 speakers/strobes 1 strobe power supply. | $4,200 |
| Apr 28, 2008 | Completed final sign-off Jun 2008 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements (4 heads relocated).Details
relocate fire sprinkler heads per tenant improvements (4 heads relocated). | $900 |
| Mar 28, 2008 | Completed final sign-off Aug 2008 | 475 Sansome St | C B F Inc | 5th floor-life safety system modifications at 475 sansome street. spherion-add 1 smoke dectector and 11 speaker/strobesDetails
5th floor-life safety system modifications at 475 sansome street. spherion-add 1 smoke dectector and 11 speaker/strobes | $6,500 |
| Feb 27, 2008 | Completed final sign-off Aug 2008 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | 5th floor-relocate fire sprinkler heads per tenant imprvements (29 total heads)Details
5th floor-relocate fire sprinkler heads per tenant imprvements (29 total heads) | $4,500 |
| Jan 14, 2008 | Completed final sign-off Jun 2008 | 475 Sansome St | Principal Builders Inc. | 7th floor - ti for suite 720 on the 7th floor. construct new partition walls. mechanical and fire safety will be under seperate permit.Details
7th floor - ti for suite 720 on the 7th floor. construct new partition walls. mechanical and fire safety will be under seperate permit. | $82,000 |
| Jan 14, 2008 | Completed final sign-off Aug 2008 | 475 Sansome St | Principal Builders Inc. | ti for suites 520 and 540 on the 5th floor. construct new interior partition walls and mill work. mechanical and electrical work will be under a seperate permit.Details
ti for suites 520 and 540 on the 5th floor. construct new interior partition walls and mill work. mechanical and electrical work will be under a seperate permit. | $384,657 |
| Nov 13, 2007 | Expired or cancelled expired Jul 2008 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | 21st floor: relocate 7 relo. fire sprikler heads per tenant improvment.Details
21st floor: relocate 7 relo. fire sprikler heads per tenant improvment. | $1,700 |
| Oct 29, 2007 | Completed final sign-off May 2008 | 475 Sansome St | Gci, Inc | 11th floor, mixt greens. demo on two existing in line exhaust fans and two fire smoke dampers. provide and install new rectangular exhaust duct work and 3m fire wrap.Details
11th floor, mixt greens. demo on two existing in line exhaust fans and two fire smoke dampers. provide and install new rectangular exhaust duct work and 3m fire wrap. | $10,000 |
| Oct 25, 2007 | Expired or cancelled expired Aug 2012 | 475 Sansome St | Otis Elevator Co | install new elevator control on all floors. new technology that will provide equivalent facilitation for path of travel not currently defined by ca title 24. provide new hall stations and announcements in place of traditional call fixtures in lobbies and each landing.Details
install new elevator control on all floors. new technology that will provide equivalent facilitation for path of travel not currently defined by ca title 24. provide new hall stations and announcements in place of traditional call fixtures in lobbies and each landing. | $116,838 |
| May 3, 2007 | Never finaled issued May 2007, no final | 475 Sansome St | Gci, Inc | to erect non-electrical signDetails
to erect non-electrical sign | |
| Apr 24, 2007 | Completed final sign-off Nov 2007 | 475 Sansome St | Cupertino Electric Inc. | fire alarm ssytem for new tenant improvement on 10th floorDetails
fire alarm ssytem for new tenant improvement on 10th floor | $76,000 |
| Apr 23, 2007 | Completed final sign-off Nov 2007 | 475 Sansome St | Critchfield Mechanical Inc | oti-2, yahoo, 10th floor, me.Details
oti-2, yahoo, 10th floor, me. | $130,000 |
| Apr 19, 2007 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | revision to app 200611218236 to show high top van prking as existing compliantDetails
revision to app 200611218236 to show high top van prking as existing compliant | |
| Apr 18, 2007 | Completed final sign-off Sep 2007 | 475 Sansome St | Gci, Inc | revision to permit appl#200611178012 to show high top van parking as existing compliantDetails
revision to permit appl#200611178012 to show high top van parking as existing compliant | |
| Apr 18, 2007 | Completed final sign-off Nov 2007 | 475 Sansome St | Gci, Inc | revision to 200611218238 to show high top van parking as existing compliant 15th floorDetails
revision to 200611218238 to show high top van parking as existing compliant 15th floor | |
| Apr 18, 2007 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | revision to app 2006/11/17/8014 to show high top van parking as existing compliantDetails
revision to app 2006/11/17/8014 to show high top van parking as existing compliant | |
| Apr 18, 2007 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | revision to 200611128239 to show high top van parking as existing compliantDetails
revision to 200611128239 to show high top van parking as existing compliant | |
| Apr 6, 2007 | Never finaled issued Apr 2007, no final | 475 Sansome St | Devcon Construction | interior demolition of tenant space prior to improvement work under pa#2007/03/22/6922 currently under review. tenant improvement work to begin after permit is issued and demolition is complete.Details
interior demolition of tenant space prior to improvement work under pa#2007/03/22/6922 currently under review. tenant improvement work to begin after permit is issued and demolition is complete. | $60,000 |
| Apr 4, 2007 | Expired or cancelled expired Apr 2009 | 475 Sansome St | Gci, Inc | life safety for restaurant space, 8 speaker/strobes, 4 smoke detectors.Details
life safety for restaurant space, 8 speaker/strobes, 4 smoke detectors. | $10,000 |
| Apr 3, 2007 | Completed final sign-off Oct 2007 | 475 Sansome St | Dpw Inc. | modify existing sprinkler system on 1st & mezzanine floor for new walls and ceilings. 30 relocates, sprinkler work only.Details
modify existing sprinkler system on 1st & mezzanine floor for new walls and ceilings. 30 relocates, sprinkler work only. | $11,500 |
| Mar 23, 2007 | Completed final sign-off May 2007 | 475 Sansome St | Dpr Construction Inc | oti-4 5th floor l/sDetails
oti-4 5th floor l/s | $4,000 |
| Mar 22, 2007 | Completed final sign-off Nov 2007 | 475 Sansome St | Devcon Construction | oti-1, yahoo, 10th floor, el, ls, sp.Details
oti-1, yahoo, 10th floor, el, ls, sp. | $600,000 |
| Mar 22, 2007 | Completed final sign-off May 2007 | 475 Sansome St | Pribuss Engineering Inc | oti-3 5th/fl -sp.Details
oti-3 5th/fl -sp. | $4,650 |
| Mar 19, 2007 | Completed final sign-off Sep 2007 | 475 Sansome St | Cupertino Electric Inc. | install (3) smoke detector, (3) strobes and (3) speakers for 17th fl tenant build-out at 475 sansome st.Details
install (3) smoke detector, (3) strobes and (3) speakers for 17th fl tenant build-out at 475 sansome st. | $54,000 |
| Mar 5, 2007 | Completed final sign-off May 2007 | 475 Sansome St | Dpr Construction Inc | oti-2 5th floor el, meDetails
oti-2 5th floor el, me | $75,000 |
| Feb 14, 2007 | Completed final sign-off May 2007 | 475 Sansome St | mission bell - oti-1 5th floor, el, sp, me, ls5Details
mission bell - oti-1 5th floor, el, sp, me, ls5 | $250,000 | |
| Jan 24, 2007 | Completed final sign-off Sep 2007 | 475 Sansome St | Gci, Inc | cti-1, cushman & wakefield, 17/fl, el, me, ls, sp.Details
cti-1, cushman & wakefield, 17/fl, el, me, ls, sp. | $150,000 |
| Jan 8, 2007 | Completed final sign-off May 2007 | 475 Sansome St | Dpr Construction Inc | unit#530.non structural demo only.Details
unit#530.non structural demo only. | $75,000 |
| Dec 27, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | Gci, Inc | 17th floor-demo of partial tenant space on 17th floor (partitions, doors, etc.) no structural demo.Details
17th floor-demo of partial tenant space on 17th floor (partitions, doors, etc.) no structural demo. | $30,659 |
| Dec 13, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | oti-3, cushman & wakefield, 14th fl, el, me.Details
oti-3, cushman & wakefield, 14th fl, el, me. | $740,000 |
| Dec 13, 2006 | Completed final sign-off Nov 2007 | 475 Sansome St | Gci, Inc | cushman wakefield:oti-3 15th fl el,meDetails
cushman wakefield:oti-3 15th fl el,me | $824,000 |
| Dec 13, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | cushman/wakefield:oti-3 16th fl el,meDetails
cushman/wakefield:oti-3 16th fl el,me | $789,000 |
| Dec 7, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | oti-2,cushman & wakefield,16/fl, sp.Details
oti-2,cushman & wakefield,16/fl, sp. | $37,400 |
| Dec 6, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | Gci, Inc | oti-2, cushman & wakefield, 11/fl, sp.Details
oti-2, cushman & wakefield, 11/fl, sp. | $37,400 |
| Dec 6, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | Gci, Inc | oti-2, cushman & wakefield, 14/fl, sp.Details
oti-2, cushman & wakefield, 14/fl, sp. | $37,400 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | Swinerton Builders | to renew pa#200512069655,#200509263806,#200602023605 for final inspection.Details
to renew pa#200512069655,#200509263806,#200602023605 for final inspection. | |
| Sep 27, 2006 | Completed final sign-off Oct 2006 | 475 Sansome St | Cupertino Electric Inc. | modifications & additions to the existing honeywell fire alarm system. ref: to app. no. 200608048597Details
modifications & additions to the existing honeywell fire alarm system. ref: to app. no. 200608048597 | $75,000 |
| Sep 15, 2006 | Completed final sign-off Oct 2006 | 475 Sansome St | Critchfield Mechanical Inc | 9th floor - install 6 new vav cooling only and relocate grilles in couple of zones.Details
9th floor - install 6 new vav cooling only and relocate grilles in couple of zones. | $15,000 |
| Aug 31, 2006 | Expired or cancelled expired Mar 2009 | 475 Sansome St | Geo M Robinson & Co | modify existing fire sprinkler system to protect new wall and ceiling layout on 9th floor. 138 sprinklers relocated, 12 sprinklers added.Details
modify existing fire sprinkler system to protect new wall and ceiling layout on 9th floor. 138 sprinklers relocated, 12 sprinklers added. | $12,500 |
| Aug 4, 2006 | Completed final sign-off Oct 2006 | 475 Sansome St | oti-1 9th floor el, me, l/s, spDetails
oti-1 9th floor el, me, l/s, sp | $800,500 | |
| Jul 18, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | Morrow-Meadows Corp Dba: Arc Electric Co | renew pa# 200511158172 for final inspection.Details
renew pa# 200511158172 for final inspection. | |
| May 24, 2006 | Completed final sign-off Sep 2006 | 475 Sansome St | minor demolition, install new glass partition some newe elkectrical hone data outlets new milli work w/sink. work on 17th flDetails
minor demolition, install new glass partition some newe elkectrical hone data outlets new milli work w/sink. work on 17th fl | $43,160 | |
| Apr 14, 2006 | Completed final sign-off Jul 2006 | 475 Sansome St | Principal Builders Inc. | oti-2, 20th floor, sp.Details
oti-2, 20th floor, sp. | $1,700 |
| Mar 17, 2006 | Completed final sign-off Jul 2006 | 475 Sansome St | Principal Builders Inc. | demo permit only oti-1 previously submitted ref oti-1 #200603076113Details
demo permit only oti-1 previously submitted ref oti-1 #200603076113 | $4,000 |
| Mar 7, 2006 | Completed final sign-off Jul 2006 | 475 Sansome St | Principal Builders Inc. | oti-1 20th floor, el, me, ls, sp demolition of existing ceiling height partitions,construct new ceiling height and slab to slab partitions & associated ceiling electrical power (lighting distribution to existing building at 475 sansome st. 20th floorDetails
oti-1 20th floor, el, me, ls, sp demolition of existing ceiling height partitions,construct new ceiling height and slab to slab partitions & associated ceiling electrical power (lighting distribution to existing building at 475 sansome st. 20th floor | $40,000 |
| Feb 2, 2006 | Expired or cancelled expired Jun 2007 | 475 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers (49), dry stand pipe, auto sprink.Details
relocate fire sprinklers (49), dry stand pipe, auto sprink. | $8,350 |
| Nov 15, 2005 | Expired or cancelled expired Jun 2007 | 475 Sansome St | Morrow-Meadows Corp Dba: Arc Electric Co | fire alarm upgrades to lobbyDetails
fire alarm upgrades to lobby | $10,400 |
| Jan 11, 2005 | Expired or cancelled cancelled Nov 2005 | 475 Sansome St | oti-1, 6th floor only.Details
oti-1, 6th floor only. | $30,000 | |
| Jan 6, 2005 | Completed final sign-off Jul 2005 | 475 Sansome St | York Heating & Air Cond | replace chiller #1 and add exhaust fanDetails
replace chiller #1 and add exhaust fan | $459,388 |
| Dec 14, 2004 | Completed final sign-off Jan 2005 | 475 Sansome St | Richlen Construction | oti-4, 17th floor, ls.Details
oti-4, 17th floor, ls. | $9,000 |
| Dec 3, 2004 | Never finaled issued Dec 2004, no final | 475 Sansome St | Dpw Inc. | relocate 36 existing sprinkler heads add 5 new and plug off 2 on 17th floor onlyDetails
relocate 36 existing sprinkler heads add 5 new and plug off 2 on 17th floor only | $7,000 |
| Nov 1, 2004 | Completed final sign-off Jan 2005 | 475 Sansome St | Hathaway Dinwiddie Co. | oti-3 8th fl- ls.Details
oti-3 8th fl- ls. | $15,000 |
| Oct 18, 2004 | Completed final sign-off Jan 2005 | 475 Sansome St | Hathaway Dinwiddie Co. | minor mechanical, electrical, sprinkler work on 8th floorDetails
minor mechanical, electrical, sprinkler work on 8th floor | $52,000 |
| Oct 13, 2004 | Completed final sign-off Jan 2005 | 475 Sansome St | oti-1, 17th floor, el, me, ls,spDetails
oti-1, 17th floor, el, me, ls,sp | $210,000 | |
| Sep 24, 2004 | Never finaled issued Sep 2004, no final | 475 Sansome St | Hathaway Dinwiddie Co. | soft demo of portion of 8/f build out will come in future oti permitDetails
soft demo of portion of 8/f build out will come in future oti permit | $15,000 |
| Jul 1, 2004 | Completed final sign-off Aug 2004 | 475 Sansome St | Devcon Construction | performing ti of 6th floor. upgrade fire alarm system w/(n) horn/strobe,smoke det. conduit and wirinDetails
performing ti of 6th floor. upgrade fire alarm system w/(n) horn/strobe,smoke det. conduit and wirin | $40,000 |
| Jun 25, 2004 | Completed final sign-off Aug 2004 | 475 Sansome St | Geo M Robinson & Co | relocate 10, add 4, plug 2 ceiling heads sprinkler plan only under this permit @ 6th flDetails
relocate 10, add 4, plug 2 ceiling heads sprinkler plan only under this permit @ 6th fl | $3,900 |
| Jun 21, 2004 | Completed final sign-off Aug 2004 | 475 Sansome St | mechanical work only for 6th fl office, relocate grilles, add 3 vav boxes & 6 transfer fans.Details
mechanical work only for 6th fl office, relocate grilles, add 3 vav boxes & 6 transfer fans. | $15,000 | |
| May 27, 2004 | Completed final sign-off Aug 2004 | 475 Sansome St | Devcon Construction | oti-1 6th floor, el, me, ls, spDetails
oti-1 6th floor, el, me, ls, sp | $500,000 |
| Oct 14, 2003 | Completed final sign-off Nov 2003 | 475 Sansome St | Dpr Construction Inc | relocate two sprinklers and add one at 8th floor onlyDetails
relocate two sprinklers and add one at 8th floor only | $1,500 |
| Oct 2, 2003 | Completed final sign-off Nov 2003 | 475 Sansome St | Dpr Construction Inc | extg trading room/demo extg ceiling height partition/install new ceiling height partitions to expandDetails
extg trading room/demo extg ceiling height partition/install new ceiling height partitions to expand | $10,000 |
| May 27, 2003 | Completed final sign-off Jul 2003 | 475 Sansome St | Rudolph Caler/Lumen Electric | oti-2 at 18th fl, lsDetails
oti-2 at 18th fl, ls | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.