Permit GraphShortlistSan Francisco building permits since 2000

Heather Sanders-Jacobs

License
C29638
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Shelterwerkes Arch.
Based in
Oakland
On San Francisco permits
Mar 2011 to Apr 2026

42 permits since 2000 (architect on 42 permits): 27 completed, 1 in progress, 11 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Codesign Llc (8), Accurate Contracting Inc.Dba Unispace Co (3), M C S Construction Services (3), Novo Construction Inc (3), D Kelly Construction Inc. (2), Wci-Gc Inc (2), Castillo Builders Inc, Conscious Construction, Darc Ventures Inc Dba Spl Construction S, Data Processing Air Corp., Field Construction Inc., H I & D Construction, Opi Commercial Builders, R.M.R. Construction Company, Shelter Cove Construction, Turley Construction, Yerba Buena Builders Inc
Engineers
Levi Malbuto (2), Ramil Batianclia (2), Amit Wadhwa, Armen Shamamian
Authorized agents
John Podolsky

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 22, 2026Completed
final sign-off Jul 2026
1155 Market StCodesign Llcinterior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas
Details
Permit
202604229870
Permit issued
May 11, 2026
Final sign-off
Jul 20, 2026

interior t.i. project within an (e) suite occupying the 6th fl. scope includes modifications to (e) offices and confrence rooms to create additional private offices. construction of conference rooms to create additional private closet. project also includes reconfiguration of (e) open office areas

Open the permit page

$200,000
Feb 25, 2026Completed
final sign-off Jun 2026
444 Townsend StCodesign Llcadd light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl
Details
Permit
202602256523
Permit issued
Apr 17, 2026
Final sign-off
Jun 8, 2026

add light manufacturing use. interior renovation to (e) office space. 2 new conference rooms, new shop spaces for minor repairs to personal transportation vehicles, new accessible shower, new rollup door in (e) opening & minor paint/interior finish replacement. partial change of use to lab on 1st fl

Open the permit page

$900,000
Nov 24, 2025Completed
final sign-off Dec 2025
100 01st StCodesign Llcinstall (4) anchored phone booths - ref pa# 202509115108 - 25th floor
Details
Permit
202511240351
Permit issued
Nov 25, 2025
Final sign-off
Dec 2, 2025

install (4) anchored phone booths - ref pa# 202509115108 - 25th floor

Open the permit page

$3,500
Sep 11, 2025Completed
final sign-off Oct 2025
100 01st StCodesign Llc25/fl-interior renovation to (e) office suite to include (n) office, expand pantry area and update finishes. no change to occupancy, use, or egress. no structural or remodel of exterior
Details
Permit
202509115108
Permit issued
Sep 15, 2025
Final sign-off
Oct 31, 2025

25/fl-interior renovation to (e) office suite to include (n) office, expand pantry area and update finishes. no change to occupancy, use, or egress. no structural or remodel of exterior

Open the permit page

$391,853
Jul 17, 2025Completed
final sign-off Dec 2025
475 Sansome StCodesign Llc11/f: tenant improvement project in an (e) suite partially occupying the 11th flr. project includes new offices, meeting rooms, break area. no structural work or exterior scope work.
Details
Permit
202507171048
Permit issued
Aug 5, 2025
Final sign-off
Dec 19, 2025

11/f: tenant improvement project in an (e) suite partially occupying the 11th flr. project includes new offices, meeting rooms, break area. no structural work or exterior scope work.

Open the permit page

$1,781,907
Mar 18, 2025Completed
final sign-off Jun 2025
724 Battery StWci-Gc Inc1st floor: revision (delta 3) to #2024-1230-7502: new glass partition btw meeting room and hallway. new infill wall at existing niche. mep deferred.
Details
Permit
202503182450
Permit issued
Mar 25, 2025
Final sign-off
Jun 9, 2025

1st floor: revision (delta 3) to #2024-1230-7502: new glass partition btw meeting room and hallway. new infill wall at existing niche. mep deferred.

Open the permit page

$11,500
Mar 7, 2025In progress
filed Mar 2025, not yet issued
750 Howard Stremodel of e admin building at yerba buena gardens. renovation includes removal of e gwb partition and the creation of new private offices within the e suite
Details
Permit
202503071778

remodel of e admin building at yerba buena gardens. renovation includes removal of e gwb partition and the creation of new private offices within the e suite

Open the permit page

$90,000
Dec 30, 2024Completed
final sign-off Jun 2025
724 Battery StWci-Gc Inccommercial ti of (e) showroom space on 1st fl. ti to include (n) meeting room & (n) junction boxes for future lighting. mep approvals deffered
Details
Permit
202412307502
Permit issued
Jan 31, 2025
Final sign-off
Jun 11, 2025

commercial ti of (e) showroom space on 1st fl. ti to include (n) meeting room & (n) junction boxes for future lighting. mep approvals deffered

Open the permit page

$113,500
Dec 17, 2024Completed
final sign-off Feb 2025
333 Bush StCodesign Llc21st fl - interior renovation of (e) tenant space. (n) paint, flooring (partial), cabinet/drawer fronts & glass sidelites on select offices. no change to occupancy, use or egress. no exterior, mep or structural scope of work
Details
Permit
202412176966
Permit issued
Dec 19, 2024
Final sign-off
Feb 19, 2025

21st fl - interior renovation of (e) tenant space. (n) paint, flooring (partial), cabinet/drawer fronts & glass sidelites on select offices. no change to occupancy, use or egress. no exterior, mep or structural scope of work

Open the permit page

$178,500
Nov 13, 2023Completed
final sign-off Jan 2024
1118 Quintara Strevision to 202206226835. changes to hvac and location of 3rd bathroom at gr fl, remove 2/f bathtub.
Details
Permit
202311130654
Permit issued
Nov 21, 2023
Final sign-off
Jan 30, 2024

revision to 202206226835. changes to hvac and location of 3rd bathroom at gr fl, remove 2/f bathtub.

Open the permit page

Nov 16, 2022Completed
final sign-off Aug 2023
2360 Polk StCastillo Builders Incg/f: t.i. including new nonload bearing walls, plumbing fixtures, electrical/lighting, millwork. no structural work, change of use. bar to limited restaurant.
Details
Permit
202211166613
Permit issued
Apr 28, 2023
Final sign-off
Aug 11, 2023

g/f: t.i. including new nonload bearing walls, plumbing fixtures, electrical/lighting, millwork. no structural work, change of use. bar to limited restaurant.

Open the permit page

$90,000
Oct 11, 2022Expired or cancelled
cancelled Jan 2026
2360 Polk Stelectric projecting double faced sign
Details
Permit
202210114067

electric projecting double faced sign

Open the permit page

$343
Oct 11, 2022Expired or cancelled
cancelled Jan 2026
2360 Polk Stpainted wall sign 0&
Details
Permit
202210114074

painted wall sign 0&

Open the permit page

$355
Sep 19, 2022Never finaled
filed Sep 2022, never issued
559 22nd Avnew upper level addition containing two bedrooms & two bathrooms, two roof decks(one front and one rear) to an (e)two story,single family residence.
Details
Permit
202209192730

new upper level addition containing two bedrooms & two bathrooms, two roof decks(one front and one rear) to an (e)two story,single family residence.

Open the permit page

$415,000
Aug 15, 2022Completed
final sign-off Mar 2023
221 04th StYerba Buena Builders Incti including 5 new offices and 1 meeting room no structural or plumbing scope. change of use groud floor
Details
Permit
202208150511
Permit issued
Oct 18, 2022
Final sign-off
Mar 31, 2023

ti including 5 new offices and 1 meeting room no structural or plumbing scope. change of use groud floor

Open the permit page

$73,604
Jun 22, 2022Completed
final sign-off Jan 2024
1118 Quintara Stlower level renovation includes new primary bedroom, bathroom, office & bonus room area. main level work includes new access stair to lower level. modifications to (e) closet space.
Details
Permit
202206226835
Permit issued
Aug 26, 2022
Final sign-off
Jan 30, 2024

lower level renovation includes new primary bedroom, bathroom, office & bonus room area. main level work includes new access stair to lower level. modifications to (e) closet space.

Open the permit page

$105,000
Oct 26, 2021Completed
final sign-off Jan 2022
55 Hawthorne StCodesign Llcnew image quality lab in an extg 5th floor suite. tenant ti
Details
Permit
202110261175
Permit issued
Oct 27, 2021
Final sign-off
Jan 4, 2022

new image quality lab in an extg 5th floor suite. tenant ti

Open the permit page

$30,000
Jul 15, 2021Completed
final sign-off May 2022
1632 14th AvH I & D Constructionreplace (e) front solarium with standard construction including (n) window. remove rear solarium & replace with exterior balcony . new folding glass door at existing balcony.
Details
Permit
202107154455
Permit issued
Aug 17, 2021
Final sign-off
May 11, 2022

replace (e) front solarium with standard construction including (n) window. remove rear solarium & replace with exterior balcony . new folding glass door at existing balcony.

Open the permit page

$42,000
Dec 1, 2020Never finaled
filed Dec 2020, never issued
66 Bishop Stto demolish a type-v, 2-story, single family residence.
Details
Permit
202012019909

to demolish a type-v, 2-story, single family residence.

Open the permit page

$450,000
Dec 1, 2020Never finaled
filed Dec 2020, never issued
66 Bishop Stto erect a type-vb, 2-story single family dwelling- no basements.
Details
Permit
202012019911

to erect a type-vb, 2-story single family dwelling- no basements.

Open the permit page

$450,000
Mar 3, 2020Never finaled
issued Aug 2020, no final
875 Howard StR.M.R. Construction Companyremove non compliant exterior balconies and access doors. replace doors with in fill concrete wall, new storefront glazing to match existing
Details
Permit
202003035994
Permit issued
Aug 14, 2020

remove non compliant exterior balconies and access doors. replace doors with in fill concrete wall, new storefront glazing to match existing

Open the permit page

$50,000
Aug 6, 2019Never finaled
issued Aug 2019, no final
55 02nd StCodesign Llc15/f: add (1) interior window to (e) conference room.
Details
Permit
201908067979
Permit issued
Aug 15, 2019

15/f: add (1) interior window to (e) conference room.

Open the permit page

$3,500
Jan 4, 2019Never finaled
issued Mar 2019, no final
201 Eddy StD Kelly Construction Inc.g/f: minor tenant improvement including one new non-load bearing partition, light fixtures, and interior finishes. no plumbing & no structural work.
Details
Permit
201901049630
Permit issued
Mar 12, 2019

g/f: minor tenant improvement including one new non-load bearing partition, light fixtures, and interior finishes. no plumbing & no structural work.

Open the permit page

$116,118
Oct 2, 2018Completed
final sign-off Jan 2019
149 Taylor StD Kelly Construction Inc.ground floor t.i. including new non-load bearing parttions, light fixtures, and interior finishes. no structural and plumbing work.
Details
Permit
201810021952
Permit issued
Nov 7, 2018
Final sign-off
Jan 28, 2019

ground floor t.i. including new non-load bearing parttions, light fixtures, and interior finishes. no structural and plumbing work.

Open the permit page

$53,265
Sep 10, 2018Completed
final sign-off Oct 2019
560 Davis StNovo Construction Inct.i. including new non-load bearing partitions, plumbing fixtures, light fixtures, and power outlets. no structural work. n/a for maher
Details
Permit
201809109526
Permit issued
Dec 10, 2018
Final sign-off
Oct 24, 2019

t.i. including new non-load bearing partitions, plumbing fixtures, light fixtures, and power outlets. no structural work. n/a for maher

Open the permit page

$115,688
Dec 19, 2017Completed
final sign-off Aug 2018
57 Wool StShelter Cove Constructionconvert existing closet to bathroom on 2nd floor.
Details
Permit
201712196929
Permit issued
Apr 19, 2018
Final sign-off
Aug 15, 2018

convert existing closet to bathroom on 2nd floor.

Open the permit page

$40,000
Sep 19, 2017Completed
final sign-off Nov 2017
225 Bush StNovo Construction Incsuite 400: tenant improvement including new non-load bearing partitions and interior finishes. no structural work. no plumbing work.
Details
Permit
201709198993
Permit issued
Sep 25, 2017
Final sign-off
Nov 16, 2017

suite 400: tenant improvement including new non-load bearing partitions and interior finishes. no structural work. no plumbing work.

Open the permit page

$87,221
Sep 1, 2017Never finaled
issued Dec 2017, no final
210 Golden Gate AvM C S Construction Servicesreplacement of exterior door into food distribution tenant space
Details
Permit
201709016689
Permit issued
Dec 8, 2017

replacement of exterior door into food distribution tenant space

Open the permit page

$6,500
Aug 25, 2017Never finaled
issued Jan 2018, no final
360 Guerrero St#213 - new bathroom including toilet, sink & shower within (e) closet area. no exterior work, no sturctural work.
Details
Permit
201708255906
Permit issued
Jan 12, 2018

#213 - new bathroom including toilet, sink & shower within (e) closet area. no exterior work, no sturctural work.

Open the permit page

$7,500
Jun 22, 2017Completed
final sign-off Feb 2018
210 Golden Gate AvM C S Construction Servicesground fl ti. including new non-load bearing partitions, plumbing fixtures, millwork, light fixtures and interior finishes. no structural work. n/a for maher.
Details
Permit
201706220063
Permit issued
Sep 14, 2017
Final sign-off
Feb 26, 2018

ground fl ti. including new non-load bearing partitions, plumbing fixtures, millwork, light fixtures and interior finishes. no structural work. n/a for maher.

Open the permit page

$154,120
Feb 9, 2017Completed
final sign-off Apr 2019
349 Bacon StTurley Constructionconvert portion of garage to add bedroom, bathroom. replace 2 windows in-kind, replace window with door tankless water heater, new furnace, washer, dryer
Details
Permit
201702099022
Permit issued
Mar 1, 2017
Final sign-off
Apr 22, 2019

convert portion of garage to add bedroom, bathroom. replace 2 windows in-kind, replace window with door tankless water heater, new furnace, washer, dryer

Open the permit page

$23,000
Jan 24, 2017Completed
final sign-off Mar 2017
660 03rd StNovo Construction Inc2nd flr: minor ti - new non load bearing partitions, lighting & interior finishes, no exterior and no structural work maher na
Details
Permit
201701247746
Permit issued
Jan 27, 2017
Final sign-off
Mar 16, 2017

2nd flr: minor ti - new non load bearing partitions, lighting & interior finishes, no exterior and no structural work maher na

Open the permit page

$188,090
Jan 3, 2017Completed
final sign-off Jan 2020
135 Webster StDarc Ventures Inc Dba Spl Construction Shorizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage.
Details
Permit
201701036382
Permit issued
Aug 17, 2017
Final sign-off
Jan 17, 2020

horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage.

Open the permit page

$90,000
Dec 1, 2016Never finaled
issued Jan 2017, no final
270 Brannan StM C S Construction Servicestenant improvement of a ground floor cafe. scope includes new non-load bearing partitions, lighting, plumbing fixtures, millwork and interior finishes. n/a for the maher.
Details
Permit
201612013954
Permit issued
Jan 12, 2017

tenant improvement of a ground floor cafe. scope includes new non-load bearing partitions, lighting, plumbing fixtures, millwork and interior finishes. n/a for the maher.

Open the permit page

$71,086
Oct 21, 2016Expired or cancelled
cancelled Jan 2026
274 Brannan StData Processing Air Corp.suite 315, 3rd floor - demo several walls
Details
Permit
201610210905

suite 315, 3rd floor - demo several walls

Open the permit page

$10,000
May 19, 2016Never finaled
issued May 2016, no final
145 Taylor StField Construction Inc.1) 145 taylor basement: retrofit extg hvac/electrical. 2)149 taylor street ground floor: new power recepticles. provide new lighting/power as required. ref app#201604074191
Details
Permit
201605197862
Permit issued
May 19, 2016

1) 145 taylor basement: retrofit extg hvac/electrical. 2)149 taylor street ground floor: new power recepticles. provide new lighting/power as required. ref app#201604074191

Open the permit page

$8,000
Apr 28, 2016Never finaled
issued Apr 2016, no final
1 California StAccurate Contracting Inc.Dba Unispace Co8th floor: work related to approved bldg permit #201604134657. (partial foor t.i. include office space, breakroom, and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. two way communication on fire alarm.
Details
Permit
201604285926
Permit issued
Apr 29, 2016

8th floor: work related to approved bldg permit #201604134657. (partial foor t.i. include office space, breakroom, and restrooms). fire/life safety/sprinklers shall be design build under seperate permits. two way communication on fire alarm.

Open the permit page

Apr 13, 2016Completed
final sign-off Aug 2016
1 California StAccurate Contracting Inc.Dba Unispace Co6th, 7th & 8th floors partial tenant improvement includ. demo/construction of partitoins, restroom upgrades, no structural work. mep, fire/life safety under separate permit.
Details
Permit
201604134657
Permit issued
Apr 29, 2016
Final sign-off
Aug 31, 2016

6th, 7th & 8th floors partial tenant improvement includ. demo/construction of partitoins, restroom upgrades, no structural work. mep, fire/life safety under separate permit.

Open the permit page

$1,254,770
Apr 5, 2016Completed
final sign-off Aug 2016
1 California StAccurate Contracting Inc.Dba Unispace Co5th flr: ti - full flr icludes restroom upgrades, new furniture, partitions demo & construction, no structural. mep/fire/alarms under sep permit. compliance with maher ordinance no 155-13 not required.
Details
Permit
201604053943
Permit issued
May 2, 2016
Final sign-off
Aug 30, 2016

5th flr: ti - full flr icludes restroom upgrades, new furniture, partitions demo & construction, no structural. mep/fire/alarms under sep permit. compliance with maher ordinance no 155-13 not required.

Open the permit page

$1,700,000
Apr 24, 2015Completed
final sign-off Dec 2015
501 02nd StOpi Commercial Builders7/f: ti- minor/limited demo, interior partitions & glass wall system, construct, relocate/add lighting fixtures, alterations of (e) mech system, alter/add of life safety devices. limited structural work related to operable partition, plumbing for coffee maker. new finishes & incidental work
Details
Permit
201504244578
Permit issued
Apr 29, 2015
Final sign-off
Dec 17, 2015

7/f: ti- minor/limited demo, interior partitions & glass wall system, construct, relocate/add lighting fixtures, alterations of (e) mech system, alter/add of life safety devices. limited structural work related to operable partition, plumbing for coffee maker. new finishes & incidental work

Open the permit page

$110,000
Mar 6, 2015Completed
final sign-off Jun 2015
650 Townsend StConscious Constructionpartial ti suite 425. the scope inculdes addition of non load bearing partitions, soft seating, finishes and millwork. no structural work. maher - not req'd
Details
Permit
201503060148
Permit issued
Mar 10, 2015
Final sign-off
Jun 10, 2015

partial ti suite 425. the scope inculdes addition of non load bearing partitions, soft seating, finishes and millwork. no structural work. maher - not req'd

Open the permit page

$203,040
Mar 11, 2011Completed
final sign-off May 2012
611 San Bruno Avinterior remodel to the ground floor (garage) of an (e) single family home. (e) space is non habitable, renovation will create a garage, separate habitable space with bathroom, hallway, living room & closets.
Details
Permit
201103111881
Permit issued
Mar 11, 2011
Final sign-off
May 10, 2012

interior remodel to the ground floor (garage) of an (e) single family home. (e) space is non habitable, renovation will create a garage, separate habitable space with bathroom, hallway, living room & closets.

Open the permit page

$50,000