Block 0289, lot 001

225 Bush St

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 10, 2026Completed
final sign-off Aug 2026
225 Bush StJva Management Corpsuite 120: new center counter for coffee shop includes as-built floor plan and equipment plan, counter elevations and materials construction plan.$45,000
Jun 26, 2026In progress
issued Jul 2026
225 Bush StNovo Construction Inc14th floor ti: remodel office spaceincluding break rooms, open and private offices, and conference rooms.new ceilings, 2 new single-user restrooms an new finishes. mep deferred$637,369
Jul 29, 2025In progress
issued Jul 2025
225 Bush StBilcor Inc17th fl. install (1) ceiling mount speaker strobe. ref#: 202505025733.$1,000
May 2, 2025Completed
final sign-off Sep 2025
225 Bush StBcci Construction Company17/fl-install 14 phone booths (10 sf each x 14 = 140 sf) for live ramp at 225 bush st.$7,000
Feb 24, 2025Completed
final sign-off Feb 2025
225 Bush StBilcor Inc15th & 16th fl- install 16 speaker strobes. remove and replace 1 speaker strobe ref 2025-0109-7987$11,322
Jan 14, 2025Completed
final sign-off Sep 2025
225 Bush StBilcor Inc15/f: install 1 control relay. ref 202408057901, mep 202411014240$666
Jan 9, 2025Completed
final sign-off Apr 2025
225 Bush StNovo Construction Incinstallation of 16 phone booth total: 15th floor 9 phone booths, 16th floor 7 phone booths$98,100
Dec 19, 2024In progress
issued May 2025
225 Bush Streplacement sign " bingo street coffee"$200
Nov 22, 2024In progress
issued Nov 2024
225 Bush StGolden Gate Fire Protection Inc15th fl - fire sprinklers ti; relocate 6 pendents and add 2 uprights$2,000
Nov 1, 2024Completed
final sign-off May 2025
225 Bush StNovo Construction Incmech & electrical work for t.i. on 15th fl, ref to 202408057901$15,000
Oct 3, 2024Completed
final sign-off Dec 2024
225 Bush StRichlen Constructionste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only
Sep 30, 2024Completed
final sign-off Oct 2024
225 Bush StBilcor Inc18th fl - install 3 ceiling mount speaker strobes ref pa 202407247143$1,998
Sep 16, 2024Completed
final sign-off Sep 2024
225 Bush StR L H Fire Protection Inc18/fl-ti 202407247143- fire sprinkler relocate (2) and add (1) fire sprinklers$1,500
Aug 5, 2024Completed
final sign-off May 2025
225 Bush StNovo Construction Inc15th fl - existing tenant space with minor construction (new offices)$98,100
Jul 24, 2024In progress
issued Aug 2024
225 Bush StRichlen Constructionsuite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit.$322,998
Jan 10, 2024In progress
issued Jan 2024
225 Bush StBilcor Inc17th fl: install (3) ceiling mount speaker-strobes. install (2) duct detector. install (2) control relays. arch and mech 202310168717.$3,996
Nov 8, 2023Completed
final sign-off Dec 2023
225 Bush StAyoob & Peery Plumbing Co Inc17th flr. relocate 12 fire sprinkler per it. job: 23-673. ref#: 202310168717$7,453
Nov 1, 2023Completed
final sign-off Dec 2023
225 Bush StAyoob & Peery Plumbing Co Inc15th fl: add 4, changeout 4 fire sprinkler per t.i.. ref pa3 202309267422.$3,445
Oct 16, 2023Completed
final sign-off Apr 2024
225 Bush StBcci Construction Company17/f: interior only, office ti to include new non-structural partitions, doors, finishes, ceilings and lighting. electrical and mechanical included.$150,000
Sep 28, 2023Completed
final sign-off Jan 2024
225 Bush StBcci Construction Company16th fl: interior only office ti to include new non-structural partitions, doors, finishes, ceilings and lighting. electrical and plumbing included. no mechanical hvac ductwork.$150,000
Sep 26, 2023Completed
final sign-off Jan 2024
225 Bush StBcci Construction Company15th fl - interior only office tenant improvement. new partitions, doors, finishes, ceiings and lighting. electrical and plumbing included$100,000
Jul 6, 2022Completed
final sign-off Mar 2023
225 Bush StNovo Construction Incnew power and signal. new lighting and controls for t.i. 202202248616.
Jul 1, 2022Completed
final sign-off Jul 2022
225 Bush StBilcor Inc18/fl ste 1820. install (5) ceiling speakers-strobes, install (4) duct detectors, install (4) smoke detectors heads, install (4) relay module. arch ref: 2022 -0224-8616, mech 202205103868$11,220
May 10, 2022Never finaled
issued Jun 2022, no final
225 Bush StNovo Construction Inc18/f: suite 1820: mech work for t.i. to consist of demo of (e) duct work. install new duct work and relocate thermostats.ref t.i. pa202202248616.$5,000
May 2, 2022Completed
final sign-off Jul 2022
225 Bush StR L H Fire Protection Inc18/f: fire sprinkler t.i. relocate 3 pendent, add 1 pendent, add 1 upright; replace 17 pendent with upright. total 22 heads. ref permit 202202248616.$5,800
Feb 24, 2022Completed
final sign-off Mar 2023
225 Bush StNovo Construction Incste #1820: tenant improvement non-structural. combine 2 suites into 1 tenant. ded demising wall, conf rooms, offices, & ceiling. includes buildout of 2 (b) conf rooms, elec & finishes. mep & life safety will be submitted separately.$350,000
Nov 30, 2021Never finaled
issued Dec 2021, no final
225 Bush StSkyline Constructionrenew permit application # 201705106172 for final inspection only.
Jun 21, 2021Expired or cancelled
cancelled Jan 2026
225 Bush StThe Whiting-Turner Contracting Companyground flr - install one(1) two door cooler & one(1) single-door freezer to be used for grocery pick up on the existing 1st floor of the store. install(2)cooler/ freezer electrical receptacles & wiring.$20,000
Dec 15, 2020Completed
final sign-off Feb 2021
225 Bush StR L H Fire Protection Incfire sprinkler demo permit. remove 91 sprinklers and install 64 sprinklers on floors 20-22.$34,000
Dec 2, 2020Completed
final sign-off Mar 2021
225 Bush StGci, Incfl 20th, 21st, 22nd: demo non-structural doors, millwork, ceiling, grid, lighting, flooring & equipment.$100,000
Nov 18, 2020Completed
final sign-off Feb 2021
225 Bush StC B F Incste #1850: ref pa# 202007220705. electrical buildout of space, which includes 33 lights, 20 outlets, 6 data outlets and lighting controls.$51,295
Sep 30, 2020Completed
final sign-off Nov 2020
225 Bush StGolden Gate Fire Protection Incsuite #1850:relocate 10 pendents, 2 conceled for suite #1850 (18th floor)fire sprinkler only.reference #2020/0722/0705$5,500
Sep 16, 2020Never finaled
issued Oct 2020, no final
225 Bush StBilcor Incfire life safety - suite 1850: install (2) wall mount speaker strobes, (1) ceiling mount speaker strobes (2) smoke detector with base, (1) control relay. ref ti 202007220705$3,960
Jul 22, 2020Completed
final sign-off Jan 2021
225 Bush StSource Planning And Construction Inc3 & 18/f: new nonstructural partitions, doors, lighting, millwork, & finishes. no change in occupancy, use or area. elec/plumb/life safety/sprinklers deferred$473,336
Sep 17, 2019Never finaled
issued Sep 2019, no final
225 Bush StBilcor Inc17th fl - install 4 ceiling speaker strobe, 4 smoke detectors, 4 control relays, 1 call station; remove and install 12 speakers, 1 smoke detector, relocate 2 speaker strobes. ref pa 2019-0621-4143$10,800
Sep 3, 2019Completed
final sign-off Dec 2019
225 Bush StR L H Fire Protection Inc17th fl fire sprinkler tenant improvement: 7 relocated pendent, 19 added pendent, 2 relocated upright, 3 added upright, 1 relocated sidewall. 32 total heads. ref pa #201906214143$14,876
Aug 21, 2019Expired or cancelled
cancelled Jan 2026
225 Bush StSkyline Construction13th fl - revision to pa 2019-0320-5746 to show revised diagram
Aug 7, 2019Never finaled
issued Aug 2019, no final
225 Bush StMaguire Inc Dba Lahue And Associates13th fl - 4 evacuation signs$1,690
Aug 7, 2019Never finaled
issued Aug 2019, no final
225 Bush StMaguire Inc Dba Lahue And Associates13th & 14th fl - 9 evacuation signs$3,802
Jun 28, 2019Completed
final sign-off Aug 2019
225 Bush StPrincipal Builders Inc.15th fl - revision to pa 2018-1211-7695 to add small hallway/corridor outside of elevator lobby. existing card reader to be relocated
Jun 21, 2019Completed
final sign-off Feb 2020
225 Bush StPrincipal Builders Inc.17th fl ti work includes non structural partitions, doors, millwork, ceiling, flooring, and associated mep work$2,369,951
Jun 20, 2019Completed
final sign-off Jul 2019
225 Bush StGolden Gate Fire Protection Incsuite 1350: ref pa# 201905019377; relocate 7 fire sprinkler pemdent heads and relocate 10 upright sprinkler heads on the 13th fl. (suite 1350) remove 2 cancealed heads, add 2 upright heads$9,500
May 31, 2019Completed
final sign-off Jun 2019
225 Bush StBilcor Incas built to show revised location of 5" doors, door holders, smoke detectors and address on devices ref pa 2018-1211-7965
May 24, 2019Never finaled
issued Jun 2019, no final
225 Bush StNovo Construction Inc13th floor: non structural demo. new non structural partition. lighting, finishes. no change in occupancy, use or area. mep/fire/life saftey under sep permit$22,140
May 13, 2019Completed
final sign-off Aug 2019
225 Bush StField Construction Inc.3rd floor: revision to app#201812188582. limited voluntary accesiblity upgrades to toilet rooms. structural will not allow per full upgrade. no change in occupancy use or area. mep, life safty under seperate permit.
May 8, 2019Completed
final sign-off Nov 2020
225 Bush StSkyline Constructionmechanical, electrical, plumbing for tenant improvement on the 14th fl ref 201903205747$125,000
May 8, 2019Completed
final sign-off Oct 2020
225 Bush StSkyline Constructionmechanical, electrical, and plumbing for ti on the 13th fl ref 201903205746$125,000
May 2, 2019Never finaled
issued May 2019, no final
225 Bush StField Construction Inc.18th flr #1840 - partial scope - office tenant retrofit, lighting, power & signal, wiring, lighting controls.$25,000
May 1, 2019Never finaled
issued May 2019, no final
225 Bush StNovo Construction Inc13th flr. (n) non-structural partitions, glazing, millwork, finishes, lighting. no change in occupancy, use or area. mep, life safety, sprinklers under separate permit.$433,862
Apr 12, 2019Never finaled
issued Apr 2019, no final
225 Bush StField Construction Inc.3rd & 18th flr. demo, install new lighting, controls & recpetacles at suite 1820. install new receptacles at suites 357 & 370.$5,000
Apr 10, 2019Completed
final sign-off Oct 2019
225 Bush StPioneer Fire Inc.13th & 14th fl - relocate 50 pendents, 9 uprighs, add 5 pendents and 3 uprights, remove 20 uprights. ref pa 2019-0320-5747$27,000
Apr 9, 2019Never finaled
issued Apr 2019, no final
225 Bush StField Construction Inc.demo of construction of non structuralk wall; ab-017.$35,000
Mar 26, 2019Completed
final sign-off Jun 2019
225 Bush StField Construction Inc.non structural demo, new non structural walls, glazing, millwork, finishes, no change in occupancy, use or area. mep, l/s, and sprinklers under sep permit$157,545
Mar 20, 2019Completed
final sign-off Nov 2020
225 Bush St14th fl - partial floor ti to include selective demo, new partitions, ceiling finishes. mep, life safety & sprinkler under separate permit$3,500,000
Mar 20, 2019Never finaled
issued May 2019, no final
225 Bush StSkyline Construction13/f: suite 1300- partial floor ti to include selective demo, new ceiling & finishes. mep, life safety & sprinkler under separate permit$1,200,000
Feb 22, 2019Completed
final sign-off Aug 2019
225 Bush StField Construction Inc.revise door @ men's toilet room. reverse swing, add cypher lock; delete auto-door operators; delete closer
Feb 12, 2019Never finaled
issued Feb 2019, no final
225 Bush StField Construction Inc.3rd fl: electrical for pa #201812188582, restroom remodel.$29,000
Feb 8, 2019Completed
final sign-off May 2019
225 Bush StField Construction Inc.3rd & 18th fl. non struct, demo, (n) non-struct partitions, millwork, lighting, power, finishes, no change in occupancy, use or area, mep, life safety, sprinklers on sep permit$184,746
Feb 5, 2019Completed
final sign-off Feb 2019
225 Bush StGolden Gate Fire Protection Incfire sprinkler only. relocate 5 pendents on the 3rd floor restroom$2,500
Dec 18, 2018Completed
final sign-off May 2019
225 Bush StField Construction Inc.3rd flr non structural demo (n) toilet room build back for accesibility mep, life safety, sprinklers under separate permit no change in occupancy, use or area$150,000
Nov 28, 2018Never finaled
issued Nov 2018, no final
225 Bush StNovo Construction Inc2nd flr - mech work for ti. ref pa#201806222642.$50,000
Nov 7, 2018Never finaled
issued Nov 2018, no final
225 Bush St2nd fl - evacuation plans (x6)$2,850
Oct 19, 2018Never finaled
issued Oct 2018, no final
225 Bush StNovo Construction Increvision to pa #201806222642. non-structural partitions, ceiling, lights, millwork, finishes. mep, life saftey, sprinklers under sep permit. no change in ocupancy, use of area. 2nd fl.$25,000
Oct 9, 2018Completed
final sign-off Oct 2018
225 Bush StGolden Gate Fire Protection Inc16th flr - fire sprinklers - relocate 2 sprinkler pendents for acxiom ref 201809190812$1,600
Sep 14, 2018Expired or cancelled
cancelled Jan 2026
225 Bush St$162,000
Aug 22, 2018Completed
final sign-off Dec 2018
225 Bush StGolden Gate Fire Protection Inc2/f: fire sprinkler only on the 2nd fl relocate 22 pendents, add 6 pendents relocate 5 uprights and add 1, remove 1 pendent for building office gym remodel. ref pa #201806222642$18,020
Aug 8, 2018Never finaled
issued Aug 2018, no final
225 Bush StNovo Construction Inc2nd fl - electrical & plumbing for ti ref pa 2018-0622-2642$18,000
Jul 6, 2018Completed
final sign-off Oct 2018
225 Bush St2nd floor evacuation maps. (6 total)$2,700
Jun 22, 2018Never finaled
issued Jul 2018, no final
225 Bush StNovo Construction Inc2nd flr - non-struct demo, (n) non-struct partition, ceilings,lighting, finishes, toilet and shower rooms, no change in occupancy-use-area. life safety and sprinklers separate permit$1,523,262
Apr 13, 2018Never finaled
issued Apr 2018, no final
225 Bush StNovo Construction Inc2/f: revision to permit 201802161481. remove 2x2 lights & replace w/ 2x4 lights at acoustical ceiling. no change in occupancy, use, or area
Apr 3, 2018Never finaled
issued May 2018, no final
225 Bush St2nd flr. electrical work for tenant improvement. ref 201802161481$5,000
Mar 23, 2018Never finaled
issued Apr 2018, no final
225 Bush StNovo Construction Incadministrative permit to document complete fire protection.
Oct 25, 2017Never finaled
issued Oct 2017, no final
225 Bush StWalschon Fire Protection Incfire sprinklers at garage levels, as builts
Sep 19, 2017Completed
final sign-off Nov 2017
225 Bush StNovo Construction Incsuite 400: tenant improvement including new non-load bearing partitions and interior finishes. no structural work. no plumbing work.$87,221
Jun 6, 2017Never finaled
issued Dec 2017, no final
225 Bush Sterect electric, single-faced, illuminated (n) sign.$2,000
May 17, 2017Completed
final sign-off Nov 2017
225 Bush StWalschon Fire Protection Incmezzanine fl (between 1st and upper level garage floors). installation of new sprinklers. new sprinkler head = 43.$24,000
May 12, 2017Completed
final sign-off Jul 2017
225 Bush StAnderson, Rowe & Buckley, Inc.2nd flr: (e) fire sprinklers add 3, relocate 9. ti 201704032986$6,000
May 10, 2017Never finaled
issued May 2017, no final
225 Bush StSkyline Constructionelectrical work for ti on the 2nd floor. ref pa 2017-0403-2986$2,000
Apr 3, 2017Completed
final sign-off Sep 2017
225 Bush StSkyline Construction2nd floor: t.i in elevator lobby and restrooms area. non-structural demo new finishes at elevator loby. upgrade toilet rooms for full accessibility. no change in area, occupancy or use.$160,000
Feb 22, 2017Completed
final sign-off Nov 2018
225 Bush StBilcor Incfire alarm tenant improvment. install: 14 ceiling mount speaker strobes, 35 duct detectors with sampling tubes, 35 control relays, 2 smoke detectors with base ref 201612124728$34,400
Dec 12, 2016Completed
final sign-off Nov 2018
225 Bush StPrincipal Builders Inc.16th floor: t.i. to install new partitions, miillwork doors, and finishes. upgrade restrooms to ada compliance and new mep. fire sprinkler and alarms on seperate permit.$2,516,835
May 26, 2016Completed
final sign-off Jul 2016
225 Bush StBilcor Inc1st flr: fire alarm tenant improvement, as built, revise sequence of operation's wordings to indicate floor of alternate recalls, ref. 2015-0820-4875.
Apr 24, 2015Never finaled
issued Apr 2015, no final
225 Bush St6 evacuation plan maps for 9th fl$3,050
Apr 17, 2015Never finaled
issued Apr 2015, no final
225 Bush StSkyline Construction3rd flr: mech & elec for ti work. ref 2015 0402 2598$15,000
Apr 2, 2015Completed
final sign-off Sep 2015
225 Bush StSkyline Construction3rd floor: non-structural partitions, ceiling, lighting, electrical, millwork, finishes. no change in occupancy use, or area. mep under seperate permit.$442,458
Jan 8, 2015Completed
final sign-off May 2015
225 Bush StEco Bay Services Inc.non-structural demo only - partitions, ceilings, lights flooring millwork, finishes. no change in occupancy, use or area. demo per ab-017$125,000
Nov 24, 2014Never finaled
issued Dec 2014, no final
225 Bush StEco Bay Services Inc.demolition only, 9th flr per sfbc -ab017. arch., mep , life safety under separate permit.$100,000
Nov 19, 2014Never finaled
issued Feb 2015, no final
225 Bush StThe Whiting-Turner Contracting Companyreplace non-historical entry doors.$20,000
Oct 22, 2014Expired or cancelled
withdrawn Feb 2015
225 Bush Stsign series b - erect wall, non-electric, double faced, non-illuminated sign.$5,000
Oct 22, 2014Expired or cancelled
withdrawn Feb 2015
225 Bush Stsign series g - erect wall, non-electric, double faced, non-illuminated, new sign.$8,000
Oct 22, 2014Completed
final sign-off Mar 2015
225 Bush StThe Whiting-Turner Contracting Companysign series d - erect electric, double faced, door, indirect sign.$5,000
Oct 22, 2014Completed
final sign-off Jul 2015
225 Bush StThe Whiting-Turner Contracting Companysign series c - erect wall, non-electric, single faced, non-illuminated sign.$2,000
Oct 22, 2014Completed
final sign-off Mar 2015
225 Bush StThe Whiting-Turner Contracting Companysign series f - erect electric, double faced, door, in-direct sign.$2,000
Oct 22, 2014Completed
final sign-off Mar 2015
225 Bush StThe Whiting-Turner Contracting Companysign series e - erect electric, double faced, new sign.$5,000
Oct 22, 2014Completed
final sign-off Mar 2015
225 Bush StThe Whiting-Turner Contracting Companysign series a - erect electric, single faced, non-illuminated sign.$10,000
Oct 14, 2014Never finaled
issued Oct 2014, no final
225 Bush StEco Bay Services Inc.3rd fl. demolition of e non structural paritions, finishes, lights, ceiling, millwork.$100,000
Sep 19, 2014Completed
final sign-off Oct 2014
225 Bush StGolden Gate Fire Protection Inc5th flr: relocate 214 upright sprinklers on the 5th flr, t.i. 201406279800.$110,210
Sep 5, 2014Never finaled
issued Sep 2014, no final
225 Bush Stevacuzation plan on the 16th floor.$2,600
Sep 4, 2014Never finaled
issued Sep 2014, no final
225 Bush StEco Bay Services Inc.17th floor: demolition only of interior improvements, finishes doors, ceilings, lighting. no change in occupancy, use area using ab-017.$90,000
Aug 5, 2014Completed
final sign-off Sep 2014
225 Bush StGolden Gate Fire Protection Inc16th flr: t.i. 201405226461 relocate 158 upright sprinklers on the 16th floor, relocate 59 pendant sprinklers.$111,755
May 22, 2014Completed
final sign-off Oct 2014
225 Bush StSkyline Construction16th floor: non structural demo, new non-structural partitions, ceiling and lighting, electrical, mechanical, millwork, and finishes. no change in occupancy or use. sprinklers, fire alarm and duct detector separate permit permits$2,000,000
Mar 31, 2014Completed
final sign-off Oct 2014
225 Bush StSkyline Constructionupgrade toilet rooms to full compliance only. new and relocated accessories and partitons. add ambulatory stall in mens. no change in occupancy, use, area, water demand$35,000
Mar 17, 2014Completed
final sign-off Dec 2014
225 Bush StEco Bay Services Inc.5th floor - demo of partition walls, millwork, ceiling, electrical per ab-017$135,000
Nov 22, 2013Never finaled
issued Nov 2013, no final
225 Bush St13th floor: installing 8 evacuation signs$3,200
Nov 12, 2013Completed
final sign-off Dec 2013
225 Bush StBilcor Incinstall 31 ceiling mount speaker-strobes, 2 smoke detectors with base, replace 1 smoke detector with new smoke detector. 1 relay in server room. ref 201307172009$13,200
Oct 22, 2013Never finaled
issued Oct 2013, no final
225 Bush StEco Bay Services Inc.16th floor-demolition only-all non structural, per ab-017$50,000
Jul 17, 2013Completed
final sign-off Aug 2013
225 Bush StEco Bay Services Inc.13th floor-demo of non structural walls, doors, ceiling componenets & abandoned equipment & conduit. construction of non structural wall, relocation of door & frame & hardware- tennat improvement, mep, sprinklers and fire alarms separate permit.$55,000
May 28, 2013Completed
final sign-off Oct 2013
225 Bush StSkyline Construction6th floor:interior t.i. consisting of new partitions , glazing doors ceilings. mep, life safty and fire sprinklers under seperate permit.$1,132,740
Jun 16, 2009Completed
final sign-off Aug 2009
225 Bush StCarter Brothers Fire & Life Safety18th floor-add to an (e) fire alarm system, new fire alarm devices in an new t.i. space under pa# 2009-0610-0150-includes 3 new strobes & 2 new speakers$5,200
Jun 10, 2009Completed
final sign-off Aug 2009
225 Bush StTeamwrkx Constructiontenant improvement to include new partitions, new doors, sidelights, casework, finishes. mep, life safety, separate permit$75,000
Apr 22, 2009Completed
final sign-off May 2009
225 Bush StAnderson, Rowe & Buckley, Inc.tenant improvements to the existing fire sprinkler system, 12 relocated sprinklers.$2,400
Apr 1, 2009Completed
final sign-off May 2009
225 Bush StRudolph Commercial Interiors Inc, Rciat 18th fl: t.i. construction includs new interior partitions, new doors & new flooring throughout, mechanical, electrical under seperate permits. bathroom work per app#200811257292.$123,000
Jan 23, 2009Completed
final sign-off Feb 2010
225 Bush StC B F Inclife safety modifications. install 5 new speaker/strobe lights$2,500
Oct 30, 2008Completed
final sign-off Feb 2010
225 Bush Stdemolition: remove @ grd fl east & west lobbies, selected flr finishes, wall finishes, selected ceiling finishes, selected doors, security deck & interior lighting. construction: provide & install at grd flr, selected flr finishes, wall finishes, ceiling finishes, doors, security desk & interior lig$650,000
Oct 30, 2008Never finaled
issued Oct 2008, no final
225 Bush Ststreet space only.
Oct 30, 2008Completed
final sign-off Feb 2010
225 Bush StNovo Construction Incremove at ground fl east & west lobbies: selected doors & selected storefront. construction: install at ground floor selected exterior address sign, selected doors & selected storefront. interior scope of work to be permitted seperately. m.e.p. under seperate permit.$250,000
Apr 15, 2008Completed
final sign-off May 2008
225 Bush StAyoob & Peery Plumbing Co Increlocate fire sprinkler head pendant improvements, 8 relocated at 18th floor$1,800
Oct 30, 2007Completed
final sign-off Apr 2008
225 Bush StSwinerton Builders19th floor-add. structural support at two movable wall locations.$10,000
Oct 19, 2007Completed
final sign-off Jan 2008
225 Bush StAcco Engineered Systems Inc. Dba Acco Enprovide and install 2 exhaust fans, 6 ceiling supply difusers and 16 ceiling return difusers, relocate 5 prematic thermostats, demo and cap return duct as indicated on plans.replace all new ceiling grilles per plan ref pa# 2007/10/18/5838 for architectural t.i. work$17,000
Oct 18, 2007Completed
final sign-off Jan 2008
225 Bush StPankow Special Projects Lpt/i in suites 1825 & 1840 & a corridor. new one-hour corridor,exit signs,emergency lighting. mep , fire alarm sprinkler on sep app.$131,000
Sep 21, 2007Completed
final sign-off Apr 2008
225 Bush StAyoob & Peery Plumbing Co Inc19th floor: relocate 17 fire sprinkler heads in the tenant space.$3,500
May 11, 2007Completed
final sign-off Dec 2007
225 Bush StBcci Construction Companyrestroom upgrades and demolition$75,000
Sep 5, 2006Completed
final sign-off Feb 2007
225 Bush StSkyline Constructionsprinkler work, 8 relocates.$2,800
Aug 15, 2006Completed
final sign-off Feb 2007
225 Bush StSkyline Constructionsprinkler work, 2 relocates.$500
Jan 6, 2006Completed
final sign-off Feb 2006
225 Bush StSkyline Constructionoti-1, el, me, ls, sp- 12th floor$60,000
Nov 10, 2005Completed
final sign-off Jan 2006
225 Bush StBcci Construction Companyminor interior tenant improvement on the 13th floor.$15,000
May 24, 2005Completed
final sign-off Jul 2005
225 Bush StBcci Construction Companyremove existing closet wall and door. install new elevator lobby doors$10,000
Dec 16, 2004Expired or cancelled
expired May 2011
225 Bush StAyoob & Peery Plumbing Co Incbuild out install fire sprinkler system connect to existing risers 14/f$55,000
Nov 15, 2004Expired or cancelled
expired May 2006
225 Bush StAyoob & Peery Plumbing Co Incinstall fire sprinkler per tenant improvement connect to (e) sprinkler work at 3rd floor only.$32,500
Jun 1, 2004Completed
final sign-off Sep 2004
225 Bush Stinter non structural demo.oti-1 file in june for arch scope of wk.space remain unoccup per sfab017.$5,800
May 7, 2004Expired or cancelled
expired May 2006
225 Bush StAyoob & Peery Plumbing Co Inc16th floor- install new fire sprinkler system at 16th floor - connect to (e) riser.$60,000
Jan 30, 2004Completed
final sign-off Feb 2004
225 Bush StC B F Inclife safety system modifications at 225 bush st. (20th floor) rooms 2001,2002,2004$2,800
Jan 27, 2004Completed
final sign-off May 2004
225 Bush StC B F Inclife safety system modifications @ 4th fl. in 225 bush street$28,000
Jan 20, 2004Completed
final sign-off May 2004
225 Bush Strev#200312011261.t.i . new 1 hour corridor 405. under this permit only @ 4th flo$6,000
Dec 23, 2003Completed
final sign-off Feb 2004
225 Bush StBcci Construction Companyadd 3 fire sprinkler heads on the 20th floor$600
Dec 15, 2003Expired or cancelled
expired May 2006
225 Bush StBcci Construction Company20/f-minor interior electrical/mechanical/fire sprinklers in file server room,fire alarm seperate$17,000
Dec 1, 2003Completed
final sign-off May 2004
225 Bush Stoti-1 4th fl. el, me, ls, sp$195,000
Nov 24, 2003Completed
final sign-off Jan 2004
225 Bush Stremove (e) interior partitions suspended ceiling tile and equipment. t.i work under separate permit$10,000
Sep 12, 2003Never finaled
issued Oct 2003, no final
225 Bush StAyoob & Peery Plumbing Co Incinstall new fire sprinkler system at 15th floor$48,000
May 15, 2003Completed
final sign-off Sep 2003
225 Bush StEdward Weldingrepair of an existing steel equipment platform by replacing corroded and deterioating metals as requ$49,500
May 14, 2002Expired or cancelled
expired Oct 2002
225 Bush StSignsaversto erect a double-faced non-electric projecting wall sign$600
Jan 18, 2002Completed
final sign-off Mar 2002
225 Bush StC B F Increlocate existing strobes @ 9th fl$800
Jan 17, 2002Expired or cancelled
expired Sep 2002
225 Bush StBcci Construction Companyoti2:(9th fl only) ltg. mech, spr$9,500
Jan 3, 2002Completed
final sign-off Feb 2002
225 Bush StC B F Incmodification of fire alarm system, 225 bush st 3rd flr, hold opens, smoke detectors, strobe lights &$1,500
Dec 12, 2001Completed
final sign-off Mar 2002
225 Bush StBcci Construction Companyoti-1 9th floor el me sp ls$150,000
Nov 21, 2001Expired or cancelled
expired May 2002
225 Bush StBcci Construction Companyminor interior demolition of nonbearing partitions and finishes$6,500
Nov 15, 2001Expired or cancelled
expired Sep 2002
225 Bush StJacobs Southard Enterrevision to pa#200107194093$7,600
Nov 15, 2001Completed
final sign-off Dec 2001
225 Bush StC B F Increlocate extg strobes and 1 new strobe at 225 bush st on 3rd floor$600
Oct 30, 2001Completed
final sign-off Dec 2001
225 Bush StSkyline Constructionoti-2 3rd floor ltg spr$25,000
Oct 16, 2001Expired or cancelled
expired Apr 2002
225 Bush StVkk Signmakers Inc.sign
Oct 10, 2001Completed
final sign-off Feb 2002
225 Bush Stoti-3rd flr,ltg ls$35,570
Oct 10, 2001Completed
final sign-off Feb 2002
225 Bush Stoti-1,3rd flr,ltg,mech,ls,spr$5,000
Oct 10, 2001Completed
final sign-off Dec 2001
225 Bush Stoti-1 3rd flr,el,me,ls,$85,625
Oct 10, 2001Completed
final sign-off Nov 2001
225 Bush StC B F Inc1st floor-life safety modification$6,000
Oct 9, 2001Expired or cancelled
expired Feb 2002
225 Bush StBcci Construction Companyrenew applon #20000125145/20000126319/200002071277/200003104019
Oct 9, 2001Expired or cancelled
expired Feb 2002
225 Bush StBcci Construction Companyrenew/200006011463/200004268243/200003104017/200002071175
Oct 9, 2001Expired or cancelled
expired Feb 2002
225 Bush StBcci Construction Companyrenew app #99250024
Sep 26, 2001Expired or cancelled
expired Mar 2002
225 Bush StDpr Construction Inct.i. for new bank offices on 3rd floor (fire sprinklers).$4,200
Sep 21, 2001Expired or cancelled
expired Jul 2002
225 Bush StC B F Inc1st floor, life safety modifications$6,000
Sep 14, 2001Completed
final sign-off Nov 2001
225 Bush StParadigm General Contractorsoti-2 5th floor ltg only$5,000
Sep 6, 2001Expired or cancelled
expired Sep 2002
225 Bush StAyoob & Peery Plumbing Co Incinstall fire sprinkler main, install sprinkler at corridor, leave outlets for future tenant improvem$15,850
Sep 4, 2001Completed
final sign-off Nov 2001
225 Bush Strevise to app #200108015102 eliminate smoke door in elevator lobby
Aug 30, 2001Completed
final sign-off Nov 2001
225 Bush StSuperior Automatic Sprinklert.i. for new bank on 1st floor (fire)$20,300
Aug 28, 2001Completed
final sign-off Nov 2001
225 Bush StSkyline Constructionelectrical work to be performed on 1st floor only, no increase in office space$12,000
Aug 2, 2001Completed
final sign-off Nov 2001
225 Bush Stprovide t/i on 3/f & upgrade restrms for ada compliance life safety & fire alarm under sep permit$90,000
Jul 19, 2001Completed
final sign-off Nov 2001
225 Bush Stt.i./non bearing partition walls & new finishes, new ceiling system$100,000
Jul 18, 2001Completed
final sign-off Nov 2001
225 Bush Stretrofit storefront provide handicap access per plans$6,000
Jul 17, 2001Expired or cancelled
expired Dec 2001
225 Bush StSkyline Constructioncolumn & beam detail, rev. to appl#9924208
Jul 14, 2001Expired or cancelled
withdrawn Sep 2001
225 Bush Stprovide storefront to comply with handicap$5,000
Jul 13, 2001Completed
final sign-off Nov 2001
225 Bush Stinterior renovation on g/f & mezz floor install a new elevator to provide access to mezz floor$1,800,000
Jul 13, 2001Completed
final sign-off Nov 2001
225 Bush Stprovide mechanical electrical plumbing & life safety per plans
Jul 12, 2001Completed
final sign-off Nov 2001
225 Bush StParadigm General Contractorsoti-1, 5th fl, ltg. mech, ls$8,500
Jun 14, 2001Completed
final sign-off Nov 2001
225 Bush StC B F Inclife safety modifccation @ ground rl.$4,000
Jun 4, 2001Completed
final sign-off Nov 2001
225 Bush StDpr Construction Incsoft demo only on flooring drywall & ceiling. this includes ground floor, mezz & 3rd floor.$65,000
Apr 13, 2001Expired or cancelled
expired Apr 2002
225 Bush Ststreetspace
Apr 13, 2001Expired or cancelled
expired Aug 2001
225 Bush StSkyline Constructionrevision to bpa#200004187507, revised scope for store front entry,$100
Jan 29, 2001Completed
final sign-off Nov 2001
225 Bush StC B F Incmodification to (e) fire alarm system on 18th floor$14,000
Jan 16, 2001Completed
final sign-off Nov 2001
225 Bush StParadigm General Contractorsoti-3 18th floor sp$7,500
Jan 4, 2001Completed
final sign-off Nov 2001
225 Bush StParadigm General Contractorsoti-2, 18th floor, el, me$51,000
Dec 7, 2000Expired or cancelled
expired Jun 2001
225 Bush StBcci Construction Companyfire sprinkler system work on the 22nd floor - calculated system$12,000
Nov 16, 2000Expired or cancelled
cancelled Apr 2001
225 Bush StBcci Construction Companyspray on structural fireproofing on the 22nd floor$65,000
Nov 14, 2000Expired or cancelled
expired Apr 2001
225 Bush StC B F Inclife safety modification$700
Nov 14, 2000Completed
final sign-off Jan 2001
225 Bush StC B F Inclife safety modifications to existing system on 7th floor$9,000
Nov 13, 2000Completed
final sign-off Nov 2001
225 Bush StParadigm General Contractorsoti-1 18th floor el,me,ls,sp$84,000
Sep 19, 2000Expired or cancelled
expired Mar 2001
225 Bush Stfire sprinkler system
Sep 19, 2000Expired or cancelled
expired May 2001
225 Bush StSkyline Constructionsprinkler system at 1st floor$9,000
Sep 15, 2000Completed
final sign-off Jan 2001
225 Bush StBcci Construction Companyoti-2 7th floor el me$125,000
Sep 13, 2000Completed
final sign-off Jan 2001
225 Bush StBcci Construction Companyfire sprnklr shop drawup for work on the 7th floor$10,000
Sep 12, 2000Completed
final sign-off Jan 2001
225 Bush StBcci Construction Companyoti-2, el, me, l/s & sp-7th floor$400,000
Sep 8, 2000Completed
final sign-off Nov 2000
225 Bush StLedda Plumbing Increlocate fire sprinklers at 1st floor$1,200
Aug 30, 2000Expired or cancelled
expired Aug 2001
225 Bush Ststreet space
Jul 17, 2000Completed
final sign-off May 2001
225 Bush StBcci Construction Companyfire sprinklers at floating ceilings. as built shop drawings.$8,500
Jul 17, 2000Completed
final sign-off May 2001
225 Bush StBcci Construction Companyfire sprinklers at floating ceilings. as built shop drawings$8,500
Jun 1, 2000Expired or cancelled
expired Nov 2000
225 Bush StC B F Incinstall controlls for new preaction system.$4,000
Apr 24, 2000Completed
final sign-off May 2001
225 Bush StSkyline Constructionoti 1 7th floor, el, me, ls$144,500
Apr 5, 2000Completed
final sign-off Aug 2001
225 Bush Stwork related to hvac system.new water chiller,piping,heat ex$2,500,000
Mar 27, 2000Expired or cancelled
expired Sep 2000
225 Bush StSkyline Constructionfire sprinkler work to be performed no increase in space$8,000
Feb 16, 2000Completed
final sign-off Aug 2001
225 Bush StBcci Construction Companyoti-3, sp 12th fl.$12,000
Feb 15, 2000Expired or cancelled
expired Jun 2000
225 Bush Ststreet space
Feb 9, 2000Expired or cancelled
expired Feb 2001
225 Bush StBcci Construction Companystructural work in association w/office buildout$70,000