Jva Management Corp
- Based in
- Palo Alto
- On San Francisco permits
- Feb 2014 to Sep 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 20 completed, 5 in progress, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2026 | In progress issued Sep 2026 | 283 Maynard St | remove old roof and install new one. fix the plywood. replace 200 square feet plywood sheathing (use 5/8" thick) . nailing to match existing.Details
remove old roof and install new one. fix the plywood. replace 200 square feet plywood sheathing (use 5/8" thick) . nailing to match existing. | $9,000 |
| Jul 10, 2026 | Completed final sign-off Aug 2026 | 225 Bush St | suite 120: new center counter for coffee shop includes as-built floor plan and equipment plan, counter elevations and materials construction plan.Details
suite 120: new center counter for coffee shop includes as-built floor plan and equipment plan, counter elevations and materials construction plan. | $45,000 |
| Jan 28, 2026 | In progress issued Jan 2026 | 140 Portola Dr | to obtain final inspection for work approved under 9924472s. all work is completeDetails
to obtain final inspection for work approved under 9924472s. all work is complete | |
| Jan 28, 2026 | In progress issued Jan 2026 | 140 Portola Dr | to obtain final inspection for work approved under 9924472s. all work is completeDetails
to obtain final inspection for work approved under 9924472s. all work is complete | |
| Jan 28, 2026 | In progress issued Jan 2026 | 140 Portola Dr | to obtain final inspection for work approved under 9924472s. all work is completeDetails
to obtain final inspection for work approved under 9924472s. all work is complete | |
| Dec 4, 2025 | In progress issued Dec 2025 | 94 Denslowe Dr | to obtain final inspection for work approved under pa#202105281234. all work is complete.Details
to obtain final inspection for work approved under pa#202105281234. all work is complete. | |
| Aug 16, 2023 | Never finaled issued Aug 2023, no final | 140 Portola Dr | revision to pa9924472 includes revision of rear portion of units 1 and 2 (1st fl)-move bathroom. structural drawings for exterior decks for units 3, 4, 5, 6. work receoomnced under 202101052101.Details
revision to pa9924472 includes revision of rear portion of units 1 and 2 (1st fl)-move bathroom. structural drawings for exterior decks for units 3, 4, 5, 6. work receoomnced under 202101052101. | $27,500 |
| Mar 21, 2022 | Completed final sign-off Aug 2022 | 875 Broadway | unit 5 & 6: addition of total of 2 bathrooms and 2 cabinets for stacked washer-dryer at the 3rd fl. one each for each of units 5 & 6.Details
unit 5 & 6: addition of total of 2 bathrooms and 2 cabinets for stacked washer-dryer at the 3rd fl. one each for each of units 5 & 6. | $17,500 |
| May 28, 2021 | Never finaled issued Aug 2022, no final | 94 Denslowe Dr | 1-story rear yard addition. included in the addition is an exercise rm, bedrm, laundry rm and 2 full baths. remodel of (e) kitchen & baths. enclose from porch and relocate front door. site plans.Details
1-story rear yard addition. included in the addition is an exercise rm, bedrm, laundry rm and 2 full baths. remodel of (e) kitchen & baths. enclose from porch and relocate front door. site plans. | $85,000 |
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 338 22nd Av | remodel upper unit kitchen (100 sf) & 2 bathrooms (40 sf each)Details
remodel upper unit kitchen (100 sf) & 2 bathrooms (40 sf each) | $30,000 |
| Feb 25, 2020 | Completed final sign-off Mar 2020 | 2645 Ocean Av | unit 205: change word of 2018-0814-7262, remove "sprinkler/fire alarm deferred"Details
unit 205: change word of 2018-0814-7262, remove "sprinkler/fire alarm deferred" | |
| Feb 25, 2020 | Completed final sign-off Mar 2020 | 2645 Ocean Av | unit 202: change word of 2018-0814-7255 remove "sprinkler/fire alarm deferred". not required per sffdDetails
unit 202: change word of 2018-0814-7255 remove "sprinkler/fire alarm deferred". not required per sffd | |
| Aug 23, 2019 | Never finaled issued Aug 2019, no final | 140 Portola Dr | to obtain final inspection for work approved under pa# 99244725, 2012-1227-4241, 2005-05203049. all work is completeDetails
to obtain final inspection for work approved under pa# 99244725, 2012-1227-4241, 2005-05203049. all work is complete | |
| Aug 23, 2019 | Completed final sign-off Nov 2019 | 2645 Ocean Av | ste 202: revision to pa# 201808147255. relocating door at 2nd floor waiting room.Details
ste 202: revision to pa# 201808147255. relocating door at 2nd floor waiting room. | |
| Aug 23, 2019 | Never finaled issued Aug 2019, no final | 140 Portola Dr | to obtain final inspection for work approved under pa# 2005-0714-7633, 2007-1217-0582, 2007-1218-0733. jall work is completeDetails
to obtain final inspection for work approved under pa# 2005-0714-7633, 2007-1217-0582, 2007-1218-0733. jall work is complete | |
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 3330 Geary Bl | comply with nov #201926481; remove (e) damaged cantilevered canopy and repair buildng facade to maintain waterproofingDetails
comply with nov #201926481; remove (e) damaged cantilevered canopy and repair buildng facade to maintain waterproofing | $2,000 |
| Feb 6, 2019 | Completed final sign-off Mar 2019 | 126 Post St | partition wall for the office. paint and carpetDetails
partition wall for the office. paint and carpet | $80,000 |
| Oct 2, 2018 | Completed final sign-off Apr 2022 | 29 San Juan Av | to comply with nov# 201712221. scope is limited to the removal kitchen & bathrooms located under the commercial unit. kitchen was constructed without permit in basement. ab-017 appliesDetails
to comply with nov# 201712221. scope is limited to the removal kitchen & bathrooms located under the commercial unit. kitchen was constructed without permit in basement. ab-017 applies | $1,500 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 2645 Ocean Av | commercial ti (interior only) on 2nd fl suite 202 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred.Details
commercial ti (interior only) on 2nd fl suite 202 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred. | $300,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 2645 Ocean Av | ste 205-commercial ti (interior only) on 2nd fl suite 205 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred.Details
ste 205-commercial ti (interior only) on 2nd fl suite 205 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred. | $250,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2019 | 595 Buckingham Wy | ste 538-540 commercial ti (interior onl) to 5th fl for dental suite including demo of interior walls, construction fo new walls, finishes, sinks, mechanica hvac systemDetails
ste 538-540 commercial ti (interior onl) to 5th fl for dental suite including demo of interior walls, construction fo new walls, finishes, sinks, mechanica hvac system | $450,000 |
| Jun 8, 2018 | Completed final sign-off Mar 2019 | 682 06th Av | remodel lower unit kitchen and (1) bathroom, construct new bathroom at ground fl. and convert existing 2nd floor 1/2 bathroom to full bathroom, create (3) rooms (habitable) from ground floor storage area in the rearDetails
remodel lower unit kitchen and (1) bathroom, construct new bathroom at ground fl. and convert existing 2nd floor 1/2 bathroom to full bathroom, create (3) rooms (habitable) from ground floor storage area in the rear | $69,500 |
| Apr 11, 2018 | Expired or cancelled cancelled Jan 2026 | 1712 Steiner St | remodel litchen and bathroom in kind. no moving of wal or doors . replace (8) non-front facing window in same location. u-factor =0.32Details
remodel litchen and bathroom in kind. no moving of wal or doors . replace (8) non-front facing window in same location. u-factor =0.32 | $25,000 |
| Apr 11, 2018 | Never finaled issued Apr 2018, no final | 1712 Steiner St | remodel kitchen & bathroom in kind , non moving of walls or doors, replace (8) non-front facing windwo in same location u factor =0.32Details
remodel kitchen & bathroom in kind , non moving of walls or doors, replace (8) non-front facing windwo in same location u factor =0.32 | $25,000 |
| Feb 21, 2018 | Completed final sign-off Aug 2018 | 2200 Sacramento St | remodel (1) bathroom. replace tub and vanity. maher n/aDetails
remodel (1) bathroom. replace tub and vanity. maher n/a | $5,000 |
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 2044 Powell St | remodel kitchen & 2 bathroom at each unit (2044 & 2046) total 2 kitchen & 4 bathroom. all work in kind.Details
remodel kitchen & 2 bathroom at each unit (2044 & 2046) total 2 kitchen & 4 bathroom. all work in kind. | $40,000 |
| Jan 20, 2017 | Never finaled issued Jun 2017, no final | 78 Division St | t.i. to reconfigure showroom. locate office near sample room. n/a for maherDetails
t.i. to reconfigure showroom. locate office near sample room. n/a for maher | $75,000 |
| Oct 28, 2016 | Completed final sign-off Nov 2017 | 1720 Steiner St | change 2 new vinyl windows, (replace 2 existing windows on lightwell).Details
change 2 new vinyl windows, (replace 2 existing windows on lightwell). | $600 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 2048 Powell St | remodel kitchen & 2 bathrooms. no change on wall. n/a maher ordinanceDetails
remodel kitchen & 2 bathrooms. no change on wall. n/a maher ordinance | $20,000 |
| Apr 8, 2016 | Completed final sign-off May 2016 | 3101 Clement St | roof repair, refinish top - reslope area for better drainage.Details
roof repair, refinish top - reslope area for better drainage. | $2,000 |
| Mar 24, 2016 | Never finaled issued Mar 2016, no final | 3330 Geary Bl | exploratory demo - removal of drywall at ceilings & walls for engineer evaluation for complaint # 201606871 date 3/21/16Details
exploratory demo - removal of drywall at ceilings & walls for engineer evaluation for complaint # 201606871 date 3/21/16 | $2,000 |
| Feb 17, 2016 | Never finaled issued Feb 2016, no final | 338 22nd Av | 1st floor: add a family room, a bedroom, and a full bath for unit #1. repair retaining walls. 2nd floor: unit#1 - remodel (e) bathroom, add a spiral stair.Details
1st floor: add a family room, a bedroom, and a full bath for unit #1. repair retaining walls. 2nd floor: unit#1 - remodel (e) bathroom, add a spiral stair. | $58,000 |
| Mar 3, 2015 | Completed final sign-off Jan 2017 | 468 Victoria St | (unit legalization ordin. 43-14) legalization of (e) unauthorized "in law" dwelling unit at 1/f add a rear deck.(legalized the kitchen) (the existing living space @ 1/f is under app #200206088162,200208053168 & 200802265555)Details
(unit legalization ordin. 43-14) legalization of (e) unauthorized "in law" dwelling unit at 1/f add a rear deck.(legalized the kitchen) (the existing living space @ 1/f is under app #200206088162,200208053168 & 200802265555) | $8,000 |
| Nov 25, 2014 | Completed final sign-off Aug 2015 | 595 Buckingham Wy | 2nd generation of ti including demo of existing interior partitons and door frames. additon of new interior partitions, doors/frames and millwork. existing ada restrooms to remain. no structural or exterior work. mep under serparate permitDetails
2nd generation of ti including demo of existing interior partitons and door frames. additon of new interior partitions, doors/frames and millwork. existing ada restrooms to remain. no structural or exterior work. mep under serparate permit | $105,995 |
| Sep 4, 2014 | Completed final sign-off Jan 2015 | 126 Post St | core & shell improvement to remove partitions and enclosed stairway between first and second floor per plan. t.i. under separate permit.Details
core & shell improvement to remove partitions and enclosed stairway between first and second floor per plan. t.i. under separate permit. | $9,000 |
| Aug 5, 2014 | Completed final sign-off Jan 2015 | 126 Post St | 4th floor: t.i. to extg day spa space. improvements include new offices, conference room, storage, restrooms and kitchenette. mech, elec, plmg, fire sprinkler and life safety permits under seperate permits.Details
4th floor: t.i. to extg day spa space. improvements include new offices, conference room, storage, restrooms and kitchenette. mech, elec, plmg, fire sprinkler and life safety permits under seperate permits. | $75,000 |
| Feb 27, 2014 | Completed final sign-off Feb 2016 | 355 24th Av | mandatory soft story per sfbc chapter 34 b.Details
mandatory soft story per sfbc chapter 34 b. | $40,000 |