Back to bathroom remodel contractors
Jva Management Corp
- Based in
- Palo Alto
- On San Francisco permits
- Feb 2014 to Sep 2026
- Last 24 months
- 6 permits filed
37 permits since 2000: 20 completed, 5 in progress, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
12 bathroom remodel permits: 4 completed, 7 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2023 | Never finaled issued Aug 2023, no final | 140 Portola Dr | revision to pa9924472 includes revision of rear portion of units 1 and 2 (1st fl)-move bathroom. structural drawings for exterior decks for units 3, 4, 5, 6. work receoomnced under 202101052101.Details
revision to pa9924472 includes revision of rear portion of units 1 and 2 (1st fl)-move bathroom. structural drawings for exterior decks for units 3, 4, 5, 6. work receoomnced under 202101052101. | $27,500 |
| Mar 21, 2022 | Completed final sign-off Aug 2022 | 875 Broadway | unit 5 & 6: addition of total of 2 bathrooms and 2 cabinets for stacked washer-dryer at the 3rd fl. one each for each of units 5 & 6.Details
unit 5 & 6: addition of total of 2 bathrooms and 2 cabinets for stacked washer-dryer at the 3rd fl. one each for each of units 5 & 6. | $17,500 |
| May 28, 2021 | Never finaled issued Aug 2022, no final | 94 Denslowe Dr | 1-story rear yard addition. included in the addition is an exercise rm, bedrm, laundry rm and 2 full baths. remodel of (e) kitchen & baths. enclose from porch and relocate front door. site plans.Details
1-story rear yard addition. included in the addition is an exercise rm, bedrm, laundry rm and 2 full baths. remodel of (e) kitchen & baths. enclose from porch and relocate front door. site plans. | $85,000 |
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 338 22nd Av | remodel upper unit kitchen (100 sf) & 2 bathrooms (40 sf each)Details
remodel upper unit kitchen (100 sf) & 2 bathrooms (40 sf each) | $30,000 |
| Oct 2, 2018 | Completed final sign-off Apr 2022 | 29 San Juan Av | to comply with nov# 201712221. scope is limited to the removal kitchen & bathrooms located under the commercial unit. kitchen was constructed without permit in basement. ab-017 appliesDetails
to comply with nov# 201712221. scope is limited to the removal kitchen & bathrooms located under the commercial unit. kitchen was constructed without permit in basement. ab-017 applies | $1,500 |
| Jun 8, 2018 | Completed final sign-off Mar 2019 | 682 06th Av | remodel lower unit kitchen and (1) bathroom, construct new bathroom at ground fl. and convert existing 2nd floor 1/2 bathroom to full bathroom, create (3) rooms (habitable) from ground floor storage area in the rearDetails
remodel lower unit kitchen and (1) bathroom, construct new bathroom at ground fl. and convert existing 2nd floor 1/2 bathroom to full bathroom, create (3) rooms (habitable) from ground floor storage area in the rear | $69,500 |
| Apr 11, 2018 | Never finaled issued Apr 2018, no final | 1712 Steiner St | remodel kitchen & bathroom in kind , non moving of walls or doors, replace (8) non-front facing windwo in same location u factor =0.32Details
remodel kitchen & bathroom in kind , non moving of walls or doors, replace (8) non-front facing windwo in same location u factor =0.32 | $25,000 |
| Apr 11, 2018 | Expired or cancelled cancelled Jan 2026 | 1712 Steiner St | remodel litchen and bathroom in kind. no moving of wal or doors . replace (8) non-front facing window in same location. u-factor =0.32Details
remodel litchen and bathroom in kind. no moving of wal or doors . replace (8) non-front facing window in same location. u-factor =0.32 | $25,000 |
| Feb 21, 2018 | Completed final sign-off Aug 2018 | 2200 Sacramento St | remodel (1) bathroom. replace tub and vanity. maher n/aDetails
remodel (1) bathroom. replace tub and vanity. maher n/a | $5,000 |
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 2044 Powell St | remodel kitchen & 2 bathroom at each unit (2044 & 2046) total 2 kitchen & 4 bathroom. all work in kind.Details
remodel kitchen & 2 bathroom at each unit (2044 & 2046) total 2 kitchen & 4 bathroom. all work in kind. | $40,000 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 2048 Powell St | remodel kitchen & 2 bathrooms. no change on wall. n/a maher ordinanceDetails
remodel kitchen & 2 bathrooms. no change on wall. n/a maher ordinance | $20,000 |
| Feb 17, 2016 | Never finaled issued Feb 2016, no final | 338 22nd Av | 1st floor: add a family room, a bedroom, and a full bath for unit #1. repair retaining walls. 2nd floor: unit#1 - remodel (e) bathroom, add a spiral stair.Details
1st floor: add a family room, a bedroom, and a full bath for unit #1. repair retaining walls. 2nd floor: unit#1 - remodel (e) bathroom, add a spiral stair. | $58,000 |