9 Claude Ln

150 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 28, 2026In progress
filed Sep 2026, not yet issued
9 Claude Lnprep sink installation, add fridge, sandwich prep table, countertop oven to warm bread only$750
Jan 8, 2026Completed
final sign-off Feb 2026
9 Claude LnQwest Construction Incp/a for a tenant improvement to a vacant/former hair salon to create a limited restaurant with no food preparation (only coffee and packaged food) and a maximum occupant load of 49. no change of use. includes new plumbing fixtures.$10,000
Jul 6, 2020Completed
final sign-off Aug 2020
222 Sutter StState Roofing Systems Increroofing: remove (e) bur roof system (2 layers) and install new saranfil 60mil fleect back pvc. 133 squares, type c, white. shall comply with cool roof requirements per 2019 california energy code (cec) section 141.0(b)2b$95,614
Jul 26, 2018Completed
final sign-off Aug 2018
222 Sutter StRed Hawk Fire & Security Ca Llcfire alarm as-built for pa#201801309854, update sequence of operation
Jan 30, 2018Completed
final sign-off Aug 2018
222 Sutter StRed Hawk Fire & Security Ca Llcroof: fire alarm as-built drawings for pa #201710181597. added heat detectors & shunt trip relay. maher na
Oct 18, 2017Never finaled
issued Nov 2017, no final
222 Sutter StRed Hawk Fire & Security Ca Llcroof: fire alarm t.i. - elevator modernization. add 1 control relay for elevator flashing helmet function, and 2 smoke detectors in machine room, located on roof. n/a for maher$2,400
Oct 11, 2017Completed
final sign-off Nov 2020
222 Sutter StSprig Electric (Archkey Solutions)5/f- electrical title 24 for pa#201707061086. n/a ordinance #155-13$250,000
Sep 15, 2017Never finaled
issued Sep 2017, no final
222 Sutter StRed Hawk Fire & Security Ca Llcfire alarm ti on 5th floor, add 27 wall mount speakers strobes & 2 smoke detectors in idf room ref# 201707061086; n/a maher$14,700
Sep 13, 2017Never finaled
issued Sep 2017, no final
222 Sutter StNovo Construction Inc5th floor - provide new heat pump, ducts & diffusers. relcoate existing heat pumps, provide new exhusat fan , provide new fsfs. ref pa #201707061086. n/a maher ordinance$20,000
Aug 30, 2017Never finaled
issued Aug 2017, no final
222 Sutter StPioneer Fire Inc.5/f: relocate 38 pendents and 7 upright pendents maher not req$14,925
Jul 6, 2017Completed
final sign-off Nov 2020
222 Sutter StNovo Construction Inc5th fl ti: including demo of non-loading partitions, (n) non-load bearing partitions. meps, structural, fire sprinkler and fire alarm will be submitted under seperate permit if needed. (building is fully sprinklered) maher na$922,383
May 31, 2016Completed
final sign-off Jun 2016
222 Sutter StRed Hawk Fire & Security Ca Llcfire alarm ti on 6th & 8th floor. add (2) duct detectors for new heat pump. ref pa 2016-0129-8354 (8th floor)$6,000
May 10, 2016Never finaled
issued May 2016, no final
222 Sutter StRed Hawk Fire & Security Ca Llc4th floor: 3 new control relays for smoke curtain release. 1 new duct detector for 1 new heat pump. maher na$10,000
May 10, 2016Never finaled
issued May 2016, no final
222 Sutter StRed Hawk Fire & Security Ca Llc5th floor: 3 new control relays for smoke curtain release. 1 new duct detector for 1 new heat pump. maher na$10,000
Apr 21, 2016Completed
final sign-off Apr 2016
222 Sutter StPioneer Fire Inc.5 relocated pendents on 4/f lobby. t.i. pa#201512185464. n/a ordinance #155-13$2,500
Apr 11, 2016Completed
final sign-off Sep 2016
222 Sutter StField Construction Inc.5th flr: demo of ceiling and lighting in lobby. install new ceiling and lighting. maher na$250,000
Apr 8, 2016Completed
final sign-off Jun 2016
222 Sutter StDome Construction Corp8th floor - minor t.i. of an existing unoccupied floor includes additions of lighting fixtures & electrical outlets. addition of exit signs (7). title 24 compliance. ref t.i. #201601298354. n/a maher ordinance$3,000
Mar 24, 2016Completed
final sign-off Sep 2016
222 Sutter StField Construction Inc.6th & 8th floor - installation of (2) hvac units for cooling & electrical work. ref pa #201601298354 for 8th floor only. n/a maher ordinance$40,000
Mar 24, 2016Completed
final sign-off Sep 2016
222 Sutter StField Construction Inc.5th floor - revision to pa #201512185467: relocate duct & vav box. n/a maher ordinance
Mar 24, 2016Completed
final sign-off Sep 2016
222 Sutter StField Construction Inc.4th floor - revision to pa #201512185464: relocate duct & vav box. n/a maher ordinance
Mar 7, 2016Completed
final sign-off Apr 2016
222 Sutter StField Construction Inc.5th floor: demo of non-structural walls including patch & paint per ab-017 t.i. under seperate permit. maher na$40,000
Feb 22, 2016Completed
final sign-off Feb 2016
222 Sutter StPioneer Fire Inc.8/f: relocate 2 pendentas ref pa 2016 0129 8354$4,119
Jan 29, 2016Completed
final sign-off Jun 2016
222 Sutter StDome Construction Corp8th fl minor tenant improvement of e unoccupied floor. interior non structural demo of e partitions and ceilings. modifications to partitions, ceiling grid, finishes, restroom upgrade. mep deferred. f/a, sprinklers under separate permit.n/a ordinance #155-13$125,000
Jan 21, 2016Completed
final sign-off Jan 2016
222 Sutter StRed Hawk Fire & Security Ca Llcrevision to pa 2015-1113-2502: correction to matrix to add won-door to sequence of operations. 3rd fl. maher na
Jan 19, 2016Never finaled
issued Jan 2016, no final
222 Sutter StDome Construction Corp8th floor, demo only, mep under separate permit. minor interior non-structural demo to the interior of unoccupied full tenant floor. demo includes non rated partitions, doors, millwork, ceiling grid, ceiling tile & light fixtures. floor wil remain unoccupied at the completion of demo. maher na. ab17$9,000
Dec 18, 2015Completed
final sign-off Sep 2016
222 Sutter StField Construction Inc.5th floor:scope includes restrooms, restroom vestibules. demo of non structural partitions, ceiling, lighting, fixtures and finishes as required to accomodate new partitions, ceiling, lighting, fixtures and finishes. n/a for maher.$42,000
Dec 18, 2015Completed
final sign-off Sep 2016
222 Sutter StField Construction Inc.4th floor: restrooms, restroom vestibules, and elevator lobby. demo of non structural partitions, ceiling, lighting, fixtures and finishes as required, ceiling, lighting, fixtures and finishes. n/a for maher. electrical- sprinklers and fire alarm sep.$103,800
Nov 13, 2015Completed
final sign-off Feb 2016
222 Sutter StRed Hawk Fire & Security Ca Llcadd 2 speaker/strobes, 1 input/output module, 4 duct detectors & 2 smoke detectors with 1 relay. maher na$20,000
Oct 28, 2015Never finaled
issued Oct 2015, no final
222 Sutter Ststreet space
Aug 26, 2015Completed
final sign-off Feb 2016
222 Sutter StField Construction Inc.3rd floor: mechanical and electrical for permit #201506259936. n/a for maher.$230,000
Aug 20, 2015Completed
final sign-off Dec 2015
222 Sutter StPioneer Fire Inc.3/f: 25 relocated pendents, 2 added uprights and 3 removed pendents ref pa 2015-0625-9936$26,196
Aug 20, 2015Expired or cancelled
cancelled Aug 2023
222 Sutter StRed Hawk Fire & Security Ca Llc3rd floor: add 2 speaker/strobes. remove 2 smoke det, 7 duct det, 12 speaker/strobes, 18 relay, 1 strobe, 1 dual module. maher na$10,000
Jul 27, 2015Expired or cancelled
cancelled Sep 2017
222 Sutter StField Construction Inc.change of use of existing 3rd floor from retail to office. for future office tenant space not to be used for post secondary education use or medical institution use. all above work per planning code only. for architectural bldg scope of work refer approved pa# 201506259936
Jun 25, 2015Completed
final sign-off Dec 2015
222 Sutter StField Construction Inc.t.i. 3/f: new men and women's restrooms, non-structural partitions, mill work, ceiling finishes, mep. distribution, alter elevator lobby/exit enclosure, floor infill at demolished escalator opening. n/a ordinance #155-13$750,000
May 29, 2015Completed
final sign-off Feb 2016
222 Sutter StField Construction Inc.minor permit to alter to replace window glazing on 3rd flr for windows on sutter street & claude lane. no exterior alteration or work. replacing with 1/4" thk clear tempered glass. no structural work to be done.$12,000
Feb 3, 2015Completed
final sign-off Feb 2015
222 Sutter StRed Hawk Fire & Security Ca Llc7th floor: fire alarm t.i. suite #750 to include 1 strobe and one speaker t.i. # 201412304648. n/a for the maher.$3,000
Feb 3, 2015Completed
final sign-off Feb 2015
222 Sutter StRed Hawk Fire & Security Ca Llc7th floor: fire alarm t.i. suite #700 to include 1 strobe. t.i. # 201412314793. n/a for the maher.$3,000
Jan 26, 2015Expired or cancelled
cancelled Jan 2026
222 Sutter Stsuite #700: revision to appl. 201412314793. restroom upgrade based on existing conditions. maher n/a.
Dec 31, 2014Completed
final sign-off Jun 2015
222 Sutter StBluewater Environmentl Svc Incste #700: commercial ti- includes installation of break room flooring finishes, paint, millwork & plumbing fixtures.; maher n/a$30,636
Dec 30, 2014Completed
final sign-off May 2015
222 Sutter StBluewater Environmentl Svc Incste #750: commercial ti. installation of new floor finishes, paint, breakroom millwork, plumbing fixtures, and light fixtures. e/p sep permit maher not req$180,000
Dec 8, 2014Expired or cancelled
cancelled Jan 2026
222 Sutter Stcommercial t.i. includes non-structural inerior demo on bsmnt, 1st & 2nd flrs to bring space to warm shell condtn:1) demo extg partitions, ceiling system flr, wall,& ceiling finishes, millwork & fixtures. 2) demo of drywall frmaing/infill at perimeter extg windows. 3)demo of mep system dist.$120,000
Dec 8, 2014Never finaled
issued Jan 2015, no final
222 Sutter StBluewater Environmentl Svc Inccommercial t.i. includes selective demolition of non-structural partitions, flooring finishes, light fixtures and plumbing fixtures. n/a for the maher.$16,000
Oct 23, 2014Never finaled
issued Dec 2014, no final
222 Sutter StBluewater Environmentl Svc Inccommercial t.i. includes interior* non structural demo on the 3rd fl to bring space to warm shell condition by demo of e wall/partitions, ceiling system, floor, finishes, milwork. demo escalator from 2-3rd fl,provide temporary barrier. deo restrooms, plumbing fixtures, mep distribution 3rd fl only.$65,000
Oct 1, 2014Never finaled
issued Oct 2014, no final
222 Sutter Ststreet space permit
Nov 5, 2013Never finaled
issued Nov 2013, no final
222 Sutter Ststreet space permit
Oct 24, 2013Never finaled
issued Jan 2014, no final
222 Sutter Stcompliance with ordinance no. 155-13 not required. excavation <50 cu.yd. clarification/alteration of equipment plan in permit #201104144061 to reflect placement of a portable counter top double burner induction cooktop as requested by sf dept of health
May 23, 2012Completed
final sign-off Jun 2012
222 Sutter StRed Hawk Fire & Security Ca Llcfire alarm t.i. or 9th floor. 4 strobes, 8 speaker /strobes, 1 speaker.$6,000
May 16, 2012Never finaled
issued May 2012, no final
222 Sutter StGolden Gate Fire Protection Incfire sprinkler system upgrade, relocate 2 upright sprinklers on the 9th floor. delete 2 pendent and 1 upright sprinkler heads.$1,030
Apr 18, 2012Completed
final sign-off Jun 2012
222 Sutter StNovo Construction Incinterior tenant improvement on the 9th floor to include new partitions, relocate doors and hardware new finishes.$750,000
Apr 10, 2012Completed
final sign-off Jun 2012
222 Sutter StNovo Construction Incinterior non structural and cosmetic demo of selective interior space. ab017$15,000
Dec 2, 2011Completed
final sign-off Mar 2012
222 Sutter StSimplex Grinnellbasement & 3rd floors-add new 8 each sprinklers in basement level at the (e) electrical room. add fire sprinkler in lobby in basement, add 4 each sprinklers in vault in basement, add 3 each sprinklers in elevator pitin basement, add 1 each upright sprinkler in closet$6,199
Sep 20, 2011Never finaled
issued Sep 2011, no final
222 Sutter StRed Hawk Fire & Security Ca Llc6th floor fire alarm t.i. for mother jones, add 3 speaker/strobes.$9,300
Sep 1, 2011Completed
final sign-off Oct 2011
222 Sutter StPioneer Fire Inc.add four fire sprinklers$2,000
Aug 12, 2011Completed
final sign-off Jan 2012
222 Sutter StCannon Constructors North Inc6th floor tenant improvements - minor demolition , remove workstations & reception station, build new conference room & exit door.$67,500
Aug 1, 2011Never finaled
issued Aug 2011, no final
222 Sutter Ststreet space
Jul 25, 2011Never finaled
issued Feb 2012, no final
222 Sutter StTerra Nova Industrieserect a single faced electric wall sign.$3,000
Jul 25, 2011Never finaled
issued Feb 2012, no final
222 Sutter StTerra Nova Industrieserect a single faced electric wall sign.$1,000
Jul 20, 2011Never finaled
issued Jul 2011, no final
222 Sutter StPlant Construction Co, Lp#900: renovation of an (e) office to remain an office including non-structural demolition, gyp. board walls, glass partitions, casework, bathrooms & painting.$115,000
Jul 6, 2011Completed
final sign-off Aug 2011
222 Sutter StRed Hawk Fire & Security Ca Llcfire alarm ti at 222 sutter ground floor. la boulage. 2 control relays,2 duct detectors,3 wall strobes, 2 wall speaker/strobes,3 ceiling speaker/strobes.$9,723
Jul 6, 2011Completed
final sign-off Aug 2011
222 Sutter StRed Hawk Fire & Security Ca Llcfire alarm t.i. at 222 sutter, 4th floor. 5 speaker/stobes$8,329
Jun 30, 2011Expired or cancelled
cancelled Jan 2026
222 Sutter StPlant Construction Co, Lp9th floor #900 -renovation of an existing office , to remain an office, including non-structural demolition, gyp board partitions, glass aprtitions, refinish floor, casework, & painting.$300,000
Jun 3, 2011Completed
final sign-off Aug 2011
222 Sutter StAyoob & Peery Plumbing Co Incground floor-plug 11, add 10, relocate 7, replace 19 sprinklers per tenant improvement$5,000
May 23, 2011Completed
final sign-off Sep 2011
222 Sutter StKeane Construction, Cci Com'l Constr & Improv**See 985808***office ti on the 4t fl suite 400. provide (n0 break room cabs, sikn, faucet , plbg. extend 1 int.partial ht wall to full height. install (n) int. doors and sidelights @ (e) offices. add electrical outlets and lighting$113,000
Apr 14, 2011Completed
final sign-off Sep 2011
222 Sutter StTerra Nova Industriesground flr. tenant improvement for (n) restaurant, work includes bathrooms, walls, cabinets, lighting, hvac, plumbing.$120,000
Apr 13, 2011Never finaled
issued Feb 2012, no final
222 Sutter StTerra Nova Industriesfacade remodel-new windows, entry door & awnings.$10,000
Apr 4, 2011Completed
final sign-off Jul 2011
222 Sutter StSimplex Grinnelladd new fire sprinklers on basement, 3rd, 4th and reolcate sprinler on 6th fl for a total of 5 add. 20 relocate$4,500
Jan 20, 2011Completed
final sign-off May 2011
222 Sutter StDiversified Fire Products8th floor:fire alarm t.i.,13 control relays, 1 smoke detector,11 duct detectors,1 strobe,18 speaker/strobes. new fsd and new heat pumps shown on plan are installed under separate permit (field verify)$8,275
Jan 11, 2011Completed
final sign-off May 2011
222 Sutter StAnderson, Rowe & Buckley, Inc.8th floor tenant improvement- existing fire sprinkler system, 11 relcoated sprinklers, 10 added sprinklers.$10,500
Nov 9, 2010Completed
final sign-off May 2011
222 Sutter StGci, Inc8th floor-tenant improvement-new non structural partitions, doors, hardware, finishes & lighting; sprinklers and fire alarm separate permit$424,158
Oct 18, 2010Never finaled
issued Oct 2010, no final
222 Sutter Ststreet space
Sep 29, 2009Completed
final sign-off Jan 2010
222 Sutter StSimplex Grinnellscope of work is to add 1-each fire sprinkler @ basement level storage room & add 1-each fire sprinkler @ hallway & relocate existing fire sprinkler in office on 1st. flr. level.$950
Jul 28, 2009Never finaled
issued Jul 2009, no final
222 Sutter StWestern Waterproofing/Brisk Wpcoat sidewalk, clean sidewalk, re-coat surfarp. the area is an alley off 222 sutter, where mark lane & harlan plaace meet. approx area 23'x8' no structural work.$2,500
May 4, 2009Never finaled
issued May 2009, no final
222 Sutter Stmtr parking only
Feb 13, 2009Completed
final sign-off Jun 2009
222 Sutter StPankow Special Projects Lprenew pa# 2006/07/25/7506 to obtain final inspection. all work is completed.
Feb 13, 2009Completed
final sign-off Jun 2009
222 Sutter StPankow Special Projects Lprenew pa# 2006/08/21/9963 to obtain final inspection. all work is completed.
Feb 13, 2009Completed
final sign-off Jun 2009
222 Sutter StPankow Special Projects Lprenew pa# 2006/09/01/1331 to obtain final inspection. all work is completed.
Feb 12, 2009Completed
final sign-off Jun 2009
222 Sutter StPankow Special Projects Lpto complete work and obtain final inspection for work approved under pa#200610175182.
Feb 12, 2009Completed
final sign-off Jun 2009
222 Sutter StPankow Special Projects Lpto complete work and obtain final inspection for work approved under pa#200608311097.
Oct 27, 2008Completed
final sign-off Dec 2008
222 Sutter Strevision the original pemit under #200701232180 showed gaurdrail detail to be attached to the roof and wall. the gaurdrail have been eliminated from the project(around one and a half skylights and 2 roof locations)$30,000
Oct 9, 2008Completed
final sign-off Apr 2009
222 Sutter StPioneer Fire Protectionrelocate 8 pendents, delete 41 sprinklers & 25 new pendents. 8th floor.$10,000
Sep 25, 2008Completed
final sign-off Apr 2009
222 Sutter Stselective demolition and construction of new soffits and suspenden ceiling. title 24, electric, lighting, mechanical under separate permit.$95,000
Sep 23, 2008Completed
final sign-off Dec 2008
222 Sutter StDiversified Fire Products5th floor fire alarm t.i. for global fund for women includes additions of audio/visual notification devices, control relays & duct detectors. 12 control relays, 10 duct detectors, 10 smoke detectors, 2 strobes, 15 speaker/strobes, 5 speakers, 2 door holds.$35,520
Sep 18, 2008Never finaled
issued Sep 2008, no final
222 Sutter Stinstall a total of 5 roof anchors for window washing$1,800
Sep 9, 2008Completed
final sign-off Dec 2008
222 Sutter StAnderson, Rowe & Buckley, Inc.5th floor-tenant improvements to the (e) fire sprinklers system. replaced/added 98 new sprinklers$20,000
Jul 23, 2008Completed
final sign-off Dec 2008
222 Sutter StBcci Construction Companyfull 5th floor t.i. including new partitions, ceilings & finishes me, fire sprinklers under separate permit.$956,475
Jul 21, 2008Never finaled
issued Jul 2008, no final
222 Sutter StBcci Construction Companynon-structural interior, pre-construction conducted per sfab-017, space to remain unocuppied until buildout drawings are submitted per ab-017. fire sprinklers, life safety & mechanical under separate permit. no increase in office space.$8,700
Jul 3, 2008Completed
final sign-off Apr 2009
222 Sutter StDiversified Fire Products8th floor-fire alarm t.i. for 8th floor-demolition safe off and floor devices, relocating 2 signals. to prepare for ti, fire alarm upgrade in future seperate permit.$6,458
Jun 12, 2008Completed
final sign-off Apr 2009
222 Sutter StPioneer Fire Protectionadd 3 new sprinklers, relocate 3 sprinklers pendant & removed 3 sprinklers.$1,500
May 30, 2008Completed
final sign-off Apr 2009
222 Sutter St8th floor: remodel of tenant space including demolition & partial suspended ceiling repair. construction of new ada compliant restrooms. electrical, mechanical, plumbing, sprinkler & life safety will be sumbitted under separate permit.$190,000
Apr 15, 2008Never finaled
issued Apr 2008, no final
222 Sutter StAyoob & Peery Plumbing Co Incground fl: relocate fire srinkler heads at lobby renovation (total 9 heads)$2,200
Mar 13, 2008Completed
final sign-off Aug 2008
222 Sutter Stselective demolition of (e) lobby suspended ceiling and lighting. installation of new finishes, new suspended ceiling, new lighting, minor mechanical and sprinkler and life safety modifications$170,000
Dec 18, 2007Completed
final sign-off Jun 2009
222 Sutter StPankow Special Projects Lprenew pa# 2006/08/31/1097 & pa# 2006/10/17/5182 for final inspection only.
Dec 18, 2007Completed
final sign-off Jan 2008
222 Sutter StPankow Special Projects Lprenew pa# 2006/04/12/8747, pa# 2006/07/25/7499 & pa# 2006/07/14/6533 for final inspection only.
Sep 10, 2007Never finaled
issued Sep 2007, no final
222 Sutter Ststreet space permit
Apr 30, 2007Completed
final sign-off Dec 2007
222 Sutter Stoti-1, capital & counties usa inc, 7th fl, suite 700, el, ls.$45,000
Jan 22, 2007Completed
final sign-off Dec 2008
222 Sutter Stinstall tie-down anchors for window washing.$35,000
Oct 17, 2006Expired or cancelled
expired Jun 2009
222 Sutter StMc Millan Electric9th floor- tenant improvement build out. 2 pull stations, 3 smoke detectors, 7 duct detectors, 3 strobes, 16 speaker strobes, 1 phon jack.$16,000
Sep 1, 2006Expired or cancelled
expired Mar 2009
222 Sutter StPankow Special Projects Lproof top mechanical improvements with structural supports.$150,000
Aug 31, 2006Expired or cancelled
expired Mar 2009
222 Sutter StR L H Fire Protection Inct.i. upgrade on fire sprinkler system for office of beverly prior architect, 9th floor, 242 relocated heads, 42 relocate & 200 remove/replace. total 242 head.$48,000
Aug 21, 2006Expired or cancelled
expired Jun 2009
222 Sutter StPankow Special Projects Lpoti-2 9/fl, el, me, ls.$250,000
Jul 25, 2006Expired or cancelled
expired Jun 2009
222 Sutter StPankow Special Projects Lpoti-1, 9th fl, el,ls,sp.$450,000
Jul 25, 2006Expired or cancelled
expired Feb 2008
222 Sutter StPankow Special Projects Lptitle 24 calc. for previously approved permit #2200604128747 as built lighting for title 24 compliance$7,500
Jul 14, 2006Expired or cancelled
expired Feb 2008
222 Sutter StR L H Fire Protection Inct/i upgrade fire sprinkler system on 9th floor of 222 sutter st. restroom, 4 heads (pendent) relocated$800
Jul 13, 2006Never finaled
issued Jul 2006, no final
222 Sutter Ststreetspace
Apr 12, 2006Expired or cancelled
expired Feb 2008
222 Sutter Staccessable upgrade of public restrooms on the 9th floor$40,000
Oct 14, 2004Completed
final sign-off Dec 2004
222 Sutter StElco Electric Increplace existing lighting ixture, add switches; rough in new walls (outlets) on 6th flr (base bldng$36,000
Sep 28, 2004Completed
final sign-off Dec 2004
222 Sutter StDiversified Fire Productstenant improvemnet of 6th floor "mother jones" life safety only$21,000
Aug 20, 2004Completed
final sign-off Dec 2004
222 Sutter Stoti-1 6th floor el$120,000
Jul 23, 2004Completed
final sign-off Sep 2004
222 Sutter StComm Air Mechanical8/f- install & provide duct smole detection on all individual heat pumps with shut down repays$14,000
Jul 2, 2004Completed
final sign-off Sep 2004
222 Sutter StComm Air Mechanicalextend (e) outside air duct work to connect to heat pumb. work on 8th fl. interior work only.$18,240
Apr 28, 2004Completed
final sign-off May 2004
222 Sutter StJ.M. Stitt Construction Inc.interior non-structural demo only at 9th floor under this permit$10,000
Aug 21, 2003Never finaled
issued Oct 2003, no final
222 Sutter StCosco Fire Protection Inc.tenant improvement - add 112 sprinkler heads on 2nd fl.$18,000
Jul 30, 2003Never finaled
issued Jul 2003, no final
222 Sutter StAll City Electricupgrade tenant space w/ada notification devices replace (e)duct smoke det's with addressable det's$28,000
Jul 17, 2003Never finaled
issued Jul 2003, no final
222 Sutter StCosco Fire Protection Inc.relocated 142 pendant drops on 3rd fl$16,000
Apr 28, 2003Never finaled
issued Jun 2003, no final
222 Sutter StJ.M. Stitt Construction Inc.relocation of bsmnt offices/change in floor covering/painting/wall treatment$650,000
Apr 16, 2003Completed
final sign-off Jun 2003
222 Sutter StC B F Inc7/f- fire alarm modification 7 duct detectors, 10 strobes$8,600
Apr 1, 2003Completed
final sign-off Jun 2003
222 Sutter StJ.M. Stitt Construction Inc.new heat pump related ducting at 7th floor$30,000
Mar 31, 2003Never finaled
issued Aug 2003, no final
222 Sutter StAyoob & Peery Plumbing Co Incinstall new diesel fire pump, connect to (e) bulk supply$55,000
Mar 20, 2003Completed
final sign-off Jun 2003
222 Sutter StAc Electrical Design Incfire alarm tenant improvement$5,000
Mar 14, 2003Never finaled
issued Jun 2003, no final
222 Sutter StJ.M. Stitt Construction Inc.tenant improvement of 2nd and 3rd floors with a new escalator to 2nd and 3rd flrs$675,885
Mar 10, 2003Completed
final sign-off Jun 2003
222 Sutter StCosco Fire Protection Inc.fire sprinkler heads on 7th flr, 38 relocations, 2 adds, 9 plugged$5,000
Mar 7, 2003Completed
final sign-off Jun 2003
222 Sutter StR L H Fire Protection Incoti-2 7th fl, sp$9,700
Feb 6, 2003Completed
final sign-off Jun 2003
222 Sutter StParadigm General Contractorsoti-2 7th fl el,me$176,000
Feb 6, 2003Completed
final sign-off Jun 2003
222 Sutter StParadigm General Contractorsoti-1 7th fl el, me, ls, sp$200,000
Jan 21, 2003Completed
final sign-off Jun 2003
222 Sutter Stoti-1, 7th floor, el, me, ls, sp$72,757
Jan 10, 2003Completed
final sign-off Jun 2003
222 Sutter Stti-restrom upgrade, denise floor into 2 suites, elbvator lobby renovation on 7th floor$73,379
Nov 26, 2002Never finaled
issued Apr 2003, no final
222 Sutter StAc Electrical Design Incfire alarm upgrade, core only, t.i. further appl.$120,000
Sep 4, 2002Completed
final sign-off Dec 2002
9 Claude Lnrev to 200106282596,add handrail @ frnt ext, add threshold to code at rear tenant space door,
Aug 12, 2002Completed
final sign-off Jun 2003
222 Sutter Stoti-2 7th 7th floor ltg mech$140,000
Aug 7, 2002Completed
final sign-off Jun 2003
222 Sutter Stoti-1 7th floor el,me,ls,sp$111,777
Nov 14, 2001Never finaled
issued Nov 2001, no final
222 Sutter Ststreet space
Sep 13, 2001Expired or cancelled
expired Oct 2002
9 Claude LnPacific Automatic Sprinklerfire sprinkler work only, add & relocate (e)fire sprinkers to property protect the new tenant area$4,500
Jul 20, 2001Never finaled
issued Jul 2001, no final
222 Sutter Ststreet space
Jun 28, 2001Never finaled
issued Jun 2001, no final
9 Claude Lninterior electrical and plumbing /new casework/interior floor/wall finish at ground floor salon$87,000
Apr 20, 2001Completed
final sign-off Apr 2001
222 Sutter Strenew expired permit app #9905896 for final inspection only.
Jan 16, 2001Expired or cancelled
expired Jan 2002
222 Sutter Ststreet space
Oct 30, 2000Completed
final sign-off Jan 2001
222 Sutter StPlant Construction(n) wall panels in teree (e) elevators cars.$7,500
Sep 22, 2000Expired or cancelled
expired Jan 2001
222 Sutter StPlant Constructionrevision for final fire inspection
Aug 24, 2000Completed
final sign-off Jan 2001
222 Sutter StSascofire alarm t/1 4th floor$5,000
Aug 23, 2000Completed
final sign-off Jan 2001
222 Sutter StAllied Heating & Air Conditioninghvac distribution new ac untis for server room$38,200
Jul 3, 2000Completed
final sign-off Jan 2001
222 Sutter StAllied Fire Protectionrevise 4th floor fire sprinkler layout per new wall locatons upgrade heads to quick response.$10,500
May 31, 2000Completed
final sign-off Mar 2001
222 Sutter StParadigm General Contractorsoti-2 2nd floor el me ls sp$220,000
May 19, 2000Completed
final sign-off Jan 2001
222 Sutter StPlant Constructionoti-1 4th floor, electrical, mechanical, lifesafty, sprinkler$200,000
Apr 27, 2000Completed
final sign-off Mar 2001
222 Sutter StParadigm General Contractorsoti-1, 2nd floor, el, me, l/s, sp$125,000
Apr 25, 2000Completed
final sign-off Jan 2001
222 Sutter StPlant Constructioninterior non-structural/soft demo at 4th floor$30,000
Mar 8, 2000Expired or cancelled
expired Jul 2000
222 Sutter Stclarify dimension & add door opener-oti-1 5th flr none$2,000
Feb 14, 2000Expired or cancelled
expired Jul 2000
222 Sutter StSecurity Link Frm Ameritechreplace/install lornstrobes because of revonation$4,000
Feb 10, 2000Expired or cancelled
expired Jun 2000
222 Sutter Stchange regular sprinkler heads to quick response sprinkler heads$4,500
Jan 14, 2000Completed
final sign-off Sep 2000
222 Sutter Stsoft demo 5th floor oti-1 app#2000/01/11/729$30,000
Jan 11, 2000Completed
final sign-off Sep 2000
222 Sutter Stoti-1 5th floor$200,000