Block 0287, lot 009
9 Claude Ln
150 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 9 Claude Ln | prep sink installation, add fridge, sandwich prep table, countertop oven to warm bread only | $750 | |
| Jan 8, 2026 | Completed final sign-off Feb 2026 | 9 Claude Ln | Qwest Construction Inc | p/a for a tenant improvement to a vacant/former hair salon to create a limited restaurant with no food preparation (only coffee and packaged food) and a maximum occupant load of 49. no change of use. includes new plumbing fixtures. | $10,000 |
| Jul 6, 2020 | Completed final sign-off Aug 2020 | 222 Sutter St | State Roofing Systems Inc | reroofing: remove (e) bur roof system (2 layers) and install new saranfil 60mil fleect back pvc. 133 squares, type c, white. shall comply with cool roof requirements per 2019 california energy code (cec) section 141.0(b)2b | $95,614 |
| Jul 26, 2018 | Completed final sign-off Aug 2018 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm as-built for pa#201801309854, update sequence of operation | |
| Jan 30, 2018 | Completed final sign-off Aug 2018 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | roof: fire alarm as-built drawings for pa #201710181597. added heat detectors & shunt trip relay. maher na | |
| Oct 18, 2017 | Never finaled issued Nov 2017, no final | 222 Sutter St | Red Hawk Fire & Security Ca Llc | roof: fire alarm t.i. - elevator modernization. add 1 control relay for elevator flashing helmet function, and 2 smoke detectors in machine room, located on roof. n/a for maher | $2,400 |
| Oct 11, 2017 | Completed final sign-off Nov 2020 | 222 Sutter St | Sprig Electric (Archkey Solutions) | 5/f- electrical title 24 for pa#201707061086. n/a ordinance #155-13 | $250,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 222 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 5th floor, add 27 wall mount speakers strobes & 2 smoke detectors in idf room ref# 201707061086; n/a maher | $14,700 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 222 Sutter St | Novo Construction Inc | 5th floor - provide new heat pump, ducts & diffusers. relcoate existing heat pumps, provide new exhusat fan , provide new fsfs. ref pa #201707061086. n/a maher ordinance | $20,000 |
| Aug 30, 2017 | Never finaled issued Aug 2017, no final | 222 Sutter St | Pioneer Fire Inc. | 5/f: relocate 38 pendents and 7 upright pendents maher not req | $14,925 |
| Jul 6, 2017 | Completed final sign-off Nov 2020 | 222 Sutter St | Novo Construction Inc | 5th fl ti: including demo of non-loading partitions, (n) non-load bearing partitions. meps, structural, fire sprinkler and fire alarm will be submitted under seperate permit if needed. (building is fully sprinklered) maher na | $922,383 |
| May 31, 2016 | Completed final sign-off Jun 2016 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 6th & 8th floor. add (2) duct detectors for new heat pump. ref pa 2016-0129-8354 (8th floor) | $6,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 222 Sutter St | Red Hawk Fire & Security Ca Llc | 4th floor: 3 new control relays for smoke curtain release. 1 new duct detector for 1 new heat pump. maher na | $10,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 222 Sutter St | Red Hawk Fire & Security Ca Llc | 5th floor: 3 new control relays for smoke curtain release. 1 new duct detector for 1 new heat pump. maher na | $10,000 |
| Apr 21, 2016 | Completed final sign-off Apr 2016 | 222 Sutter St | Pioneer Fire Inc. | 5 relocated pendents on 4/f lobby. t.i. pa#201512185464. n/a ordinance #155-13 | $2,500 |
| Apr 11, 2016 | Completed final sign-off Sep 2016 | 222 Sutter St | Field Construction Inc. | 5th flr: demo of ceiling and lighting in lobby. install new ceiling and lighting. maher na | $250,000 |
| Apr 8, 2016 | Completed final sign-off Jun 2016 | 222 Sutter St | Dome Construction Corp | 8th floor - minor t.i. of an existing unoccupied floor includes additions of lighting fixtures & electrical outlets. addition of exit signs (7). title 24 compliance. ref t.i. #201601298354. n/a maher ordinance | $3,000 |
| Mar 24, 2016 | Completed final sign-off Sep 2016 | 222 Sutter St | Field Construction Inc. | 6th & 8th floor - installation of (2) hvac units for cooling & electrical work. ref pa #201601298354 for 8th floor only. n/a maher ordinance | $40,000 |
| Mar 24, 2016 | Completed final sign-off Sep 2016 | 222 Sutter St | Field Construction Inc. | 5th floor - revision to pa #201512185467: relocate duct & vav box. n/a maher ordinance | |
| Mar 24, 2016 | Completed final sign-off Sep 2016 | 222 Sutter St | Field Construction Inc. | 4th floor - revision to pa #201512185464: relocate duct & vav box. n/a maher ordinance | |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 222 Sutter St | Field Construction Inc. | 5th floor: demo of non-structural walls including patch & paint per ab-017 t.i. under seperate permit. maher na | $40,000 |
| Feb 22, 2016 | Completed final sign-off Feb 2016 | 222 Sutter St | Pioneer Fire Inc. | 8/f: relocate 2 pendentas ref pa 2016 0129 8354 | $4,119 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 222 Sutter St | Dome Construction Corp | 8th fl minor tenant improvement of e unoccupied floor. interior non structural demo of e partitions and ceilings. modifications to partitions, ceiling grid, finishes, restroom upgrade. mep deferred. f/a, sprinklers under separate permit.n/a ordinance #155-13 | $125,000 |
| Jan 21, 2016 | Completed final sign-off Jan 2016 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | revision to pa 2015-1113-2502: correction to matrix to add won-door to sequence of operations. 3rd fl. maher na | |
| Jan 19, 2016 | Never finaled issued Jan 2016, no final | 222 Sutter St | Dome Construction Corp | 8th floor, demo only, mep under separate permit. minor interior non-structural demo to the interior of unoccupied full tenant floor. demo includes non rated partitions, doors, millwork, ceiling grid, ceiling tile & light fixtures. floor wil remain unoccupied at the completion of demo. maher na. ab17 | $9,000 |
| Dec 18, 2015 | Completed final sign-off Sep 2016 | 222 Sutter St | Field Construction Inc. | 5th floor:scope includes restrooms, restroom vestibules. demo of non structural partitions, ceiling, lighting, fixtures and finishes as required to accomodate new partitions, ceiling, lighting, fixtures and finishes. n/a for maher. | $42,000 |
| Dec 18, 2015 | Completed final sign-off Sep 2016 | 222 Sutter St | Field Construction Inc. | 4th floor: restrooms, restroom vestibules, and elevator lobby. demo of non structural partitions, ceiling, lighting, fixtures and finishes as required, ceiling, lighting, fixtures and finishes. n/a for maher. electrical- sprinklers and fire alarm sep. | $103,800 |
| Nov 13, 2015 | Completed final sign-off Feb 2016 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | add 2 speaker/strobes, 1 input/output module, 4 duct detectors & 2 smoke detectors with 1 relay. maher na | $20,000 |
| Oct 28, 2015 | Never finaled issued Oct 2015, no final | 222 Sutter St | street space | ||
| Aug 26, 2015 | Completed final sign-off Feb 2016 | 222 Sutter St | Field Construction Inc. | 3rd floor: mechanical and electrical for permit #201506259936. n/a for maher. | $230,000 |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 222 Sutter St | Pioneer Fire Inc. | 3/f: 25 relocated pendents, 2 added uprights and 3 removed pendents ref pa 2015-0625-9936 | $26,196 |
| Aug 20, 2015 | Expired or cancelled cancelled Aug 2023 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | 3rd floor: add 2 speaker/strobes. remove 2 smoke det, 7 duct det, 12 speaker/strobes, 18 relay, 1 strobe, 1 dual module. maher na | $10,000 |
| Jul 27, 2015 | Expired or cancelled cancelled Sep 2017 | 222 Sutter St | Field Construction Inc. | change of use of existing 3rd floor from retail to office. for future office tenant space not to be used for post secondary education use or medical institution use. all above work per planning code only. for architectural bldg scope of work refer approved pa# 201506259936 | |
| Jun 25, 2015 | Completed final sign-off Dec 2015 | 222 Sutter St | Field Construction Inc. | t.i. 3/f: new men and women's restrooms, non-structural partitions, mill work, ceiling finishes, mep. distribution, alter elevator lobby/exit enclosure, floor infill at demolished escalator opening. n/a ordinance #155-13 | $750,000 |
| May 29, 2015 | Completed final sign-off Feb 2016 | 222 Sutter St | Field Construction Inc. | minor permit to alter to replace window glazing on 3rd flr for windows on sutter street & claude lane. no exterior alteration or work. replacing with 1/4" thk clear tempered glass. no structural work to be done. | $12,000 |
| Feb 3, 2015 | Completed final sign-off Feb 2015 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | 7th floor: fire alarm t.i. suite #750 to include 1 strobe and one speaker t.i. # 201412304648. n/a for the maher. | $3,000 |
| Feb 3, 2015 | Completed final sign-off Feb 2015 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | 7th floor: fire alarm t.i. suite #700 to include 1 strobe. t.i. # 201412314793. n/a for the maher. | $3,000 |
| Jan 26, 2015 | Expired or cancelled cancelled Jan 2026 | 222 Sutter St | suite #700: revision to appl. 201412314793. restroom upgrade based on existing conditions. maher n/a. | ||
| Dec 31, 2014 | Completed final sign-off Jun 2015 | 222 Sutter St | Bluewater Environmentl Svc Inc | ste #700: commercial ti- includes installation of break room flooring finishes, paint, millwork & plumbing fixtures.; maher n/a | $30,636 |
| Dec 30, 2014 | Completed final sign-off May 2015 | 222 Sutter St | Bluewater Environmentl Svc Inc | ste #750: commercial ti. installation of new floor finishes, paint, breakroom millwork, plumbing fixtures, and light fixtures. e/p sep permit maher not req | $180,000 |
| Dec 8, 2014 | Expired or cancelled cancelled Jan 2026 | 222 Sutter St | commercial t.i. includes non-structural inerior demo on bsmnt, 1st & 2nd flrs to bring space to warm shell condtn:1) demo extg partitions, ceiling system flr, wall,& ceiling finishes, millwork & fixtures. 2) demo of drywall frmaing/infill at perimeter extg windows. 3)demo of mep system dist. | $120,000 | |
| Dec 8, 2014 | Never finaled issued Jan 2015, no final | 222 Sutter St | Bluewater Environmentl Svc Inc | commercial t.i. includes selective demolition of non-structural partitions, flooring finishes, light fixtures and plumbing fixtures. n/a for the maher. | $16,000 |
| Oct 23, 2014 | Never finaled issued Dec 2014, no final | 222 Sutter St | Bluewater Environmentl Svc Inc | commercial t.i. includes interior* non structural demo on the 3rd fl to bring space to warm shell condition by demo of e wall/partitions, ceiling system, floor, finishes, milwork. demo escalator from 2-3rd fl,provide temporary barrier. deo restrooms, plumbing fixtures, mep distribution 3rd fl only. | $65,000 |
| Oct 1, 2014 | Never finaled issued Oct 2014, no final | 222 Sutter St | street space permit | ||
| Nov 5, 2013 | Never finaled issued Nov 2013, no final | 222 Sutter St | street space permit | ||
| Oct 24, 2013 | Never finaled issued Jan 2014, no final | 222 Sutter St | compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. clarification/alteration of equipment plan in permit #201104144061 to reflect placement of a portable counter top double burner induction cooktop as requested by sf dept of health | ||
| May 23, 2012 | Completed final sign-off Jun 2012 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. or 9th floor. 4 strobes, 8 speaker /strobes, 1 speaker. | $6,000 |
| May 16, 2012 | Never finaled issued May 2012, no final | 222 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 2 upright sprinklers on the 9th floor. delete 2 pendent and 1 upright sprinkler heads. | $1,030 |
| Apr 18, 2012 | Completed final sign-off Jun 2012 | 222 Sutter St | Novo Construction Inc | interior tenant improvement on the 9th floor to include new partitions, relocate doors and hardware new finishes. | $750,000 |
| Apr 10, 2012 | Completed final sign-off Jun 2012 | 222 Sutter St | Novo Construction Inc | interior non structural and cosmetic demo of selective interior space. ab017 | $15,000 |
| Dec 2, 2011 | Completed final sign-off Mar 2012 | 222 Sutter St | Simplex Grinnell | basement & 3rd floors-add new 8 each sprinklers in basement level at the (e) electrical room. add fire sprinkler in lobby in basement, add 4 each sprinklers in vault in basement, add 3 each sprinklers in elevator pitin basement, add 1 each upright sprinkler in closet | $6,199 |
| Sep 20, 2011 | Never finaled issued Sep 2011, no final | 222 Sutter St | Red Hawk Fire & Security Ca Llc | 6th floor fire alarm t.i. for mother jones, add 3 speaker/strobes. | $9,300 |
| Sep 1, 2011 | Completed final sign-off Oct 2011 | 222 Sutter St | Pioneer Fire Inc. | add four fire sprinklers | $2,000 |
| Aug 12, 2011 | Completed final sign-off Jan 2012 | 222 Sutter St | Cannon Constructors North Inc | 6th floor tenant improvements - minor demolition , remove workstations & reception station, build new conference room & exit door. | $67,500 |
| Aug 1, 2011 | Never finaled issued Aug 2011, no final | 222 Sutter St | street space | ||
| Jul 25, 2011 | Never finaled issued Feb 2012, no final | 222 Sutter St | Terra Nova Industries | erect a single faced electric wall sign. | $3,000 |
| Jul 25, 2011 | Never finaled issued Feb 2012, no final | 222 Sutter St | Terra Nova Industries | erect a single faced electric wall sign. | $1,000 |
| Jul 20, 2011 | Never finaled issued Jul 2011, no final | 222 Sutter St | Plant Construction Co, Lp | #900: renovation of an (e) office to remain an office including non-structural demolition, gyp. board walls, glass partitions, casework, bathrooms & painting. | $115,000 |
| Jul 6, 2011 | Completed final sign-off Aug 2011 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm ti at 222 sutter ground floor. la boulage. 2 control relays,2 duct detectors,3 wall strobes, 2 wall speaker/strobes,3 ceiling speaker/strobes. | $9,723 |
| Jul 6, 2011 | Completed final sign-off Aug 2011 | 222 Sutter St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. at 222 sutter, 4th floor. 5 speaker/stobes | $8,329 |
| Jun 30, 2011 | Expired or cancelled cancelled Jan 2026 | 222 Sutter St | Plant Construction Co, Lp | 9th floor #900 -renovation of an existing office , to remain an office, including non-structural demolition, gyp board partitions, glass aprtitions, refinish floor, casework, & painting. | $300,000 |
| Jun 3, 2011 | Completed final sign-off Aug 2011 | 222 Sutter St | Ayoob & Peery Plumbing Co Inc | ground floor-plug 11, add 10, relocate 7, replace 19 sprinklers per tenant improvement | $5,000 |
| May 23, 2011 | Completed final sign-off Sep 2011 | 222 Sutter St | Keane Construction, Cci Com'l Constr & Improv**See 985808*** | office ti on the 4t fl suite 400. provide (n0 break room cabs, sikn, faucet , plbg. extend 1 int.partial ht wall to full height. install (n) int. doors and sidelights @ (e) offices. add electrical outlets and lighting | $113,000 |
| Apr 14, 2011 | Completed final sign-off Sep 2011 | 222 Sutter St | Terra Nova Industries | ground flr. tenant improvement for (n) restaurant, work includes bathrooms, walls, cabinets, lighting, hvac, plumbing. | $120,000 |
| Apr 13, 2011 | Never finaled issued Feb 2012, no final | 222 Sutter St | Terra Nova Industries | facade remodel-new windows, entry door & awnings. | $10,000 |
| Apr 4, 2011 | Completed final sign-off Jul 2011 | 222 Sutter St | Simplex Grinnell | add new fire sprinklers on basement, 3rd, 4th and reolcate sprinler on 6th fl for a total of 5 add. 20 relocate | $4,500 |
| Jan 20, 2011 | Completed final sign-off May 2011 | 222 Sutter St | Diversified Fire Products | 8th floor:fire alarm t.i.,13 control relays, 1 smoke detector,11 duct detectors,1 strobe,18 speaker/strobes. new fsd and new heat pumps shown on plan are installed under separate permit (field verify) | $8,275 |
| Jan 11, 2011 | Completed final sign-off May 2011 | 222 Sutter St | Anderson, Rowe & Buckley, Inc. | 8th floor tenant improvement- existing fire sprinkler system, 11 relcoated sprinklers, 10 added sprinklers. | $10,500 |
| Nov 9, 2010 | Completed final sign-off May 2011 | 222 Sutter St | Gci, Inc | 8th floor-tenant improvement-new non structural partitions, doors, hardware, finishes & lighting; sprinklers and fire alarm separate permit | $424,158 |
| Oct 18, 2010 | Never finaled issued Oct 2010, no final | 222 Sutter St | street space | ||
| Sep 29, 2009 | Completed final sign-off Jan 2010 | 222 Sutter St | Simplex Grinnell | scope of work is to add 1-each fire sprinkler @ basement level storage room & add 1-each fire sprinkler @ hallway & relocate existing fire sprinkler in office on 1st. flr. level. | $950 |
| Jul 28, 2009 | Never finaled issued Jul 2009, no final | 222 Sutter St | Western Waterproofing/Brisk Wp | coat sidewalk, clean sidewalk, re-coat surfarp. the area is an alley off 222 sutter, where mark lane & harlan plaace meet. approx area 23'x8' no structural work. | $2,500 |
| May 4, 2009 | Never finaled issued May 2009, no final | 222 Sutter St | mtr parking only | ||
| Feb 13, 2009 | Completed final sign-off Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | renew pa# 2006/07/25/7506 to obtain final inspection. all work is completed. | |
| Feb 13, 2009 | Completed final sign-off Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | renew pa# 2006/08/21/9963 to obtain final inspection. all work is completed. | |
| Feb 13, 2009 | Completed final sign-off Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | renew pa# 2006/09/01/1331 to obtain final inspection. all work is completed. | |
| Feb 12, 2009 | Completed final sign-off Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | to complete work and obtain final inspection for work approved under pa#200610175182. | |
| Feb 12, 2009 | Completed final sign-off Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | to complete work and obtain final inspection for work approved under pa#200608311097. | |
| Oct 27, 2008 | Completed final sign-off Dec 2008 | 222 Sutter St | revision the original pemit under #200701232180 showed gaurdrail detail to be attached to the roof and wall. the gaurdrail have been eliminated from the project(around one and a half skylights and 2 roof locations) | $30,000 | |
| Oct 9, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | Pioneer Fire Protection | relocate 8 pendents, delete 41 sprinklers & 25 new pendents. 8th floor. | $10,000 |
| Sep 25, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | selective demolition and construction of new soffits and suspenden ceiling. title 24, electric, lighting, mechanical under separate permit. | $95,000 | |
| Sep 23, 2008 | Completed final sign-off Dec 2008 | 222 Sutter St | Diversified Fire Products | 5th floor fire alarm t.i. for global fund for women includes additions of audio/visual notification devices, control relays & duct detectors. 12 control relays, 10 duct detectors, 10 smoke detectors, 2 strobes, 15 speaker/strobes, 5 speakers, 2 door holds. | $35,520 |
| Sep 18, 2008 | Never finaled issued Sep 2008, no final | 222 Sutter St | install a total of 5 roof anchors for window washing | $1,800 | |
| Sep 9, 2008 | Completed final sign-off Dec 2008 | 222 Sutter St | Anderson, Rowe & Buckley, Inc. | 5th floor-tenant improvements to the (e) fire sprinklers system. replaced/added 98 new sprinklers | $20,000 |
| Jul 23, 2008 | Completed final sign-off Dec 2008 | 222 Sutter St | Bcci Construction Company | full 5th floor t.i. including new partitions, ceilings & finishes me, fire sprinklers under separate permit. | $956,475 |
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 222 Sutter St | Bcci Construction Company | non-structural interior, pre-construction conducted per sfab-017, space to remain unocuppied until buildout drawings are submitted per ab-017. fire sprinklers, life safety & mechanical under separate permit. no increase in office space. | $8,700 |
| Jul 3, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | Diversified Fire Products | 8th floor-fire alarm t.i. for 8th floor-demolition safe off and floor devices, relocating 2 signals. to prepare for ti, fire alarm upgrade in future seperate permit. | $6,458 |
| Jun 12, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | Pioneer Fire Protection | add 3 new sprinklers, relocate 3 sprinklers pendant & removed 3 sprinklers. | $1,500 |
| May 30, 2008 | Completed final sign-off Apr 2009 | 222 Sutter St | 8th floor: remodel of tenant space including demolition & partial suspended ceiling repair. construction of new ada compliant restrooms. electrical, mechanical, plumbing, sprinkler & life safety will be sumbitted under separate permit. | $190,000 | |
| Apr 15, 2008 | Never finaled issued Apr 2008, no final | 222 Sutter St | Ayoob & Peery Plumbing Co Inc | ground fl: relocate fire srinkler heads at lobby renovation (total 9 heads) | $2,200 |
| Mar 13, 2008 | Completed final sign-off Aug 2008 | 222 Sutter St | selective demolition of (e) lobby suspended ceiling and lighting. installation of new finishes, new suspended ceiling, new lighting, minor mechanical and sprinkler and life safety modifications | $170,000 | |
| Dec 18, 2007 | Completed final sign-off Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | renew pa# 2006/08/31/1097 & pa# 2006/10/17/5182 for final inspection only. | |
| Dec 18, 2007 | Completed final sign-off Jan 2008 | 222 Sutter St | Pankow Special Projects Lp | renew pa# 2006/04/12/8747, pa# 2006/07/25/7499 & pa# 2006/07/14/6533 for final inspection only. | |
| Sep 10, 2007 | Never finaled issued Sep 2007, no final | 222 Sutter St | street space permit | ||
| Apr 30, 2007 | Completed final sign-off Dec 2007 | 222 Sutter St | oti-1, capital & counties usa inc, 7th fl, suite 700, el, ls. | $45,000 | |
| Jan 22, 2007 | Completed final sign-off Dec 2008 | 222 Sutter St | install tie-down anchors for window washing. | $35,000 | |
| Oct 17, 2006 | Expired or cancelled expired Jun 2009 | 222 Sutter St | Mc Millan Electric | 9th floor- tenant improvement build out. 2 pull stations, 3 smoke detectors, 7 duct detectors, 3 strobes, 16 speaker strobes, 1 phon jack. | $16,000 |
| Sep 1, 2006 | Expired or cancelled expired Mar 2009 | 222 Sutter St | Pankow Special Projects Lp | roof top mechanical improvements with structural supports. | $150,000 |
| Aug 31, 2006 | Expired or cancelled expired Mar 2009 | 222 Sutter St | R L H Fire Protection Inc | t.i. upgrade on fire sprinkler system for office of beverly prior architect, 9th floor, 242 relocated heads, 42 relocate & 200 remove/replace. total 242 head. | $48,000 |
| Aug 21, 2006 | Expired or cancelled expired Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | oti-2 9/fl, el, me, ls. | $250,000 |
| Jul 25, 2006 | Expired or cancelled expired Jun 2009 | 222 Sutter St | Pankow Special Projects Lp | oti-1, 9th fl, el,ls,sp. | $450,000 |
| Jul 25, 2006 | Expired or cancelled expired Feb 2008 | 222 Sutter St | Pankow Special Projects Lp | title 24 calc. for previously approved permit #2200604128747 as built lighting for title 24 compliance | $7,500 |
| Jul 14, 2006 | Expired or cancelled expired Feb 2008 | 222 Sutter St | R L H Fire Protection Inc | t/i upgrade fire sprinkler system on 9th floor of 222 sutter st. restroom, 4 heads (pendent) relocated | $800 |
| Jul 13, 2006 | Never finaled issued Jul 2006, no final | 222 Sutter St | streetspace | ||
| Apr 12, 2006 | Expired or cancelled expired Feb 2008 | 222 Sutter St | accessable upgrade of public restrooms on the 9th floor | $40,000 | |
| Oct 14, 2004 | Completed final sign-off Dec 2004 | 222 Sutter St | Elco Electric Inc | replace existing lighting ixture, add switches; rough in new walls (outlets) on 6th flr (base bldng | $36,000 |
| Sep 28, 2004 | Completed final sign-off Dec 2004 | 222 Sutter St | Diversified Fire Products | tenant improvemnet of 6th floor "mother jones" life safety only | $21,000 |
| Aug 20, 2004 | Completed final sign-off Dec 2004 | 222 Sutter St | oti-1 6th floor el | $120,000 | |
| Jul 23, 2004 | Completed final sign-off Sep 2004 | 222 Sutter St | Comm Air Mechanical | 8/f- install & provide duct smole detection on all individual heat pumps with shut down repays | $14,000 |
| Jul 2, 2004 | Completed final sign-off Sep 2004 | 222 Sutter St | Comm Air Mechanical | extend (e) outside air duct work to connect to heat pumb. work on 8th fl. interior work only. | $18,240 |
| Apr 28, 2004 | Completed final sign-off May 2004 | 222 Sutter St | J.M. Stitt Construction Inc. | interior non-structural demo only at 9th floor under this permit | $10,000 |
| Aug 21, 2003 | Never finaled issued Oct 2003, no final | 222 Sutter St | Cosco Fire Protection Inc. | tenant improvement - add 112 sprinkler heads on 2nd fl. | $18,000 |
| Jul 30, 2003 | Never finaled issued Jul 2003, no final | 222 Sutter St | All City Electric | upgrade tenant space w/ada notification devices replace (e)duct smoke det's with addressable det's | $28,000 |
| Jul 17, 2003 | Never finaled issued Jul 2003, no final | 222 Sutter St | Cosco Fire Protection Inc. | relocated 142 pendant drops on 3rd fl | $16,000 |
| Apr 28, 2003 | Never finaled issued Jun 2003, no final | 222 Sutter St | J.M. Stitt Construction Inc. | relocation of bsmnt offices/change in floor covering/painting/wall treatment | $650,000 |
| Apr 16, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | C B F Inc | 7/f- fire alarm modification 7 duct detectors, 10 strobes | $8,600 |
| Apr 1, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | J.M. Stitt Construction Inc. | new heat pump related ducting at 7th floor | $30,000 |
| Mar 31, 2003 | Never finaled issued Aug 2003, no final | 222 Sutter St | Ayoob & Peery Plumbing Co Inc | install new diesel fire pump, connect to (e) bulk supply | $55,000 |
| Mar 20, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | Ac Electrical Design Inc | fire alarm tenant improvement | $5,000 |
| Mar 14, 2003 | Never finaled issued Jun 2003, no final | 222 Sutter St | J.M. Stitt Construction Inc. | tenant improvement of 2nd and 3rd floors with a new escalator to 2nd and 3rd flrs | $675,885 |
| Mar 10, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | Cosco Fire Protection Inc. | fire sprinkler heads on 7th flr, 38 relocations, 2 adds, 9 plugged | $5,000 |
| Mar 7, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | R L H Fire Protection Inc | oti-2 7th fl, sp | $9,700 |
| Feb 6, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | Paradigm General Contractors | oti-2 7th fl el,me | $176,000 |
| Feb 6, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | Paradigm General Contractors | oti-1 7th fl el, me, ls, sp | $200,000 |
| Jan 21, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | oti-1, 7th floor, el, me, ls, sp | $72,757 | |
| Jan 10, 2003 | Completed final sign-off Jun 2003 | 222 Sutter St | ti-restrom upgrade, denise floor into 2 suites, elbvator lobby renovation on 7th floor | $73,379 | |
| Nov 26, 2002 | Never finaled issued Apr 2003, no final | 222 Sutter St | Ac Electrical Design Inc | fire alarm upgrade, core only, t.i. further appl. | $120,000 |
| Sep 4, 2002 | Completed final sign-off Dec 2002 | 9 Claude Ln | rev to 200106282596,add handrail @ frnt ext, add threshold to code at rear tenant space door, | ||
| Aug 12, 2002 | Completed final sign-off Jun 2003 | 222 Sutter St | oti-2 7th 7th floor ltg mech | $140,000 | |
| Aug 7, 2002 | Completed final sign-off Jun 2003 | 222 Sutter St | oti-1 7th floor el,me,ls,sp | $111,777 | |
| Nov 14, 2001 | Never finaled issued Nov 2001, no final | 222 Sutter St | street space | ||
| Sep 13, 2001 | Expired or cancelled expired Oct 2002 | 9 Claude Ln | Pacific Automatic Sprinkler | fire sprinkler work only, add & relocate (e)fire sprinkers to property protect the new tenant area | $4,500 |
| Jul 20, 2001 | Never finaled issued Jul 2001, no final | 222 Sutter St | street space | ||
| Jun 28, 2001 | Never finaled issued Jun 2001, no final | 9 Claude Ln | interior electrical and plumbing /new casework/interior floor/wall finish at ground floor salon | $87,000 | |
| Apr 20, 2001 | Completed final sign-off Apr 2001 | 222 Sutter St | renew expired permit app #9905896 for final inspection only. | ||
| Jan 16, 2001 | Expired or cancelled expired Jan 2002 | 222 Sutter St | street space | ||
| Oct 30, 2000 | Completed final sign-off Jan 2001 | 222 Sutter St | Plant Construction | (n) wall panels in teree (e) elevators cars. | $7,500 |
| Sep 22, 2000 | Expired or cancelled expired Jan 2001 | 222 Sutter St | Plant Construction | revision for final fire inspection | |
| Aug 24, 2000 | Completed final sign-off Jan 2001 | 222 Sutter St | Sasco | fire alarm t/1 4th floor | $5,000 |
| Aug 23, 2000 | Completed final sign-off Jan 2001 | 222 Sutter St | Allied Heating & Air Conditioning | hvac distribution new ac untis for server room | $38,200 |
| Jul 3, 2000 | Completed final sign-off Jan 2001 | 222 Sutter St | Allied Fire Protection | revise 4th floor fire sprinkler layout per new wall locatons upgrade heads to quick response. | $10,500 |
| May 31, 2000 | Completed final sign-off Mar 2001 | 222 Sutter St | Paradigm General Contractors | oti-2 2nd floor el me ls sp | $220,000 |
| May 19, 2000 | Completed final sign-off Jan 2001 | 222 Sutter St | Plant Construction | oti-1 4th floor, electrical, mechanical, lifesafty, sprinkler | $200,000 |
| Apr 27, 2000 | Completed final sign-off Mar 2001 | 222 Sutter St | Paradigm General Contractors | oti-1, 2nd floor, el, me, l/s, sp | $125,000 |
| Apr 25, 2000 | Completed final sign-off Jan 2001 | 222 Sutter St | Plant Construction | interior non-structural/soft demo at 4th floor | $30,000 |
| Mar 8, 2000 | Expired or cancelled expired Jul 2000 | 222 Sutter St | clarify dimension & add door opener-oti-1 5th flr none | $2,000 | |
| Feb 14, 2000 | Expired or cancelled expired Jul 2000 | 222 Sutter St | Security Link Frm Ameritech | replace/install lornstrobes because of revonation | $4,000 |
| Feb 10, 2000 | Expired or cancelled expired Jun 2000 | 222 Sutter St | change regular sprinkler heads to quick response sprinkler heads | $4,500 | |
| Jan 14, 2000 | Completed final sign-off Sep 2000 | 222 Sutter St | soft demo 5th floor oti-1 app#2000/01/11/729 | $30,000 | |
| Jan 11, 2000 | Completed final sign-off Sep 2000 | 222 Sutter St | oti-1 5th floor | $200,000 |