Keane Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Dec 2012
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2012 | Completed final sign-off Apr 2013 | 81 Westwood Dr | add full bath with shower to garage level, add new den and storageDetails
add full bath with shower to garage level, add new den and storage | $23,000 |
| Sep 9, 2011 | Completed final sign-off Dec 2011 | 2451 21st Av | kitchen remodel: replace cabinets, countertops, floor coverings. kitchen envelope to remain the same. plumbing fixtures and electrical fixtures to be replace, replace 2-windows at side.Details
kitchen remodel: replace cabinets, countertops, floor coverings. kitchen envelope to remain the same. plumbing fixtures and electrical fixtures to be replace, replace 2-windows at side. | $29,500 |
| Aug 16, 2011 | Completed final sign-off Sep 2011 | 144 Hugo St | repair water damage underneath bay window. repair in-kind. provide 2" vent underneath bay window.Details
repair water damage underneath bay window. repair in-kind. provide 2" vent underneath bay window. | $5,000 |
| May 23, 2011 | Completed final sign-off Sep 2011 | 222 Sutter St | office ti on the 4t fl suite 400. provide (n0 break room cabs, sikn, faucet , plbg. extend 1 int.partial ht wall to full height. install (n) int. doors and sidelights @ (e) offices. add electrical outlets and lightingDetails
office ti on the 4t fl suite 400. provide (n0 break room cabs, sikn, faucet , plbg. extend 1 int.partial ht wall to full height. install (n) int. doors and sidelights @ (e) offices. add electrical outlets and lighting | $113,000 |
| May 18, 2011 | Completed final sign-off Jan 2012 | 2007 Irving St | partial facade dry rot repair, gyp cieling replacement, overhang roll roofing, replace tenant space entrance door. restucco in kind.Details
partial facade dry rot repair, gyp cieling replacement, overhang roll roofing, replace tenant space entrance door. restucco in kind. | $12,000 |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 727 43rd Av | repair threads and risers exterior stairs in kind. less then 50%. the stairs are exterior stairs.Details
repair threads and risers exterior stairs in kind. less then 50%. the stairs are exterior stairs. | $2,500 |
| Nov 10, 2010 | Completed final sign-off Jan 2011 | 1861 24th Av | install 2" stucco vent underneath overhang of house. repair stucco damage t inside of stair wall.Details
install 2" stucco vent underneath overhang of house. repair stucco damage t inside of stair wall. | $1,000 |
| Jun 4, 2010 | Completed final sign-off Aug 2010 | 133 Randall St | kitchen remodel; replace kitchen cabinets, countertops, floor covering, kitchen envelope to remain as-is. plumbing, fixtures to be replace. electrical fixtures to be replace. replace skylight. (33"x33").Details
kitchen remodel; replace kitchen cabinets, countertops, floor covering, kitchen envelope to remain as-is. plumbing, fixtures to be replace. electrical fixtures to be replace. replace skylight. (33"x33"). | $17,800 |
| May 11, 2010 | Completed final sign-off Jun 2010 | 2039 20th Av | stucco to be removed from underneath baywindow and approx. 1" up in outer wall of bay window. replace damaged lumber and re-stuccoDetails
stucco to be removed from underneath baywindow and approx. 1" up in outer wall of bay window. replace damaged lumber and re-stucco | $3,800 |
| Dec 7, 2009 | Completed final sign-off Jan 2010 | 2731 Harrison St | comply cc report cc-5549 for physical inspectionDetails
comply cc report cc-5549 for physical inspection | $14,500 |
| Jan 4, 2007 | Completed final sign-off Mar 2007 | 1861 24th Av | replace (e) siding with hardi plank in upper floor, cover (e) siding in lower floor. at rear of bldg. repair (e) back stair in kind less than 50%. approx 320 sq. ft.Details
replace (e) siding with hardi plank in upper floor, cover (e) siding in lower floor. at rear of bldg. repair (e) back stair in kind less than 50%. approx 320 sq. ft. | $7,500 |
| Sep 26, 2006 | Completed final sign-off Feb 2007 | 2621 24th Av | dryrot repair. front of house 100 sqft approx. remove stucco in kind.Details
dryrot repair. front of house 100 sqft approx. remove stucco in kind. | $5,000 |
| Jun 1, 2006 | Completed final sign-off Dec 2006 | 170 27th Av | remodel extg bathroom/remodel 2 batheoom at 3rd floorDetails
remodel extg bathroom/remodel 2 batheoom at 3rd floor | $15,000 |