Keane Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Dec 2012
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 0 days from filing to permit and 65 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 727 43rd Av | repair threads and risers exterior stairs in kind. less then 50%. the stairs are exterior stairs.Details
repair threads and risers exterior stairs in kind. less then 50%. the stairs are exterior stairs. | $2,500 |
| Nov 10, 2010 | Completed final sign-off Jan 2011 | 1861 24th Av | install 2" stucco vent underneath overhang of house. repair stucco damage t inside of stair wall.Details
install 2" stucco vent underneath overhang of house. repair stucco damage t inside of stair wall. | $1,000 |
| Jan 4, 2007 | Completed final sign-off Mar 2007 | 1861 24th Av | replace (e) siding with hardi plank in upper floor, cover (e) siding in lower floor. at rear of bldg. repair (e) back stair in kind less than 50%. approx 320 sq. ft.Details
replace (e) siding with hardi plank in upper floor, cover (e) siding in lower floor. at rear of bldg. repair (e) back stair in kind less than 50%. approx 320 sq. ft. | $7,500 |