Permit GraphShortlistSan Francisco building permits since 2000

Craig A. Silvey

License
M31857
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M31857 at the Board for Professional Engineers
Listed as
engineer
Firm
Acco Engineered Systems
Based in
San Leandro
On San Francisco permits
Jul 2013 to Nov 2018

24 permits since 2000 (engineer on 24 permits): 14 completed, 10 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Acco Engineered Systems Inc. Dba Acco En (7), Bcci Construction Company (3), Novo Construction Inc (3), Source Planning And Construction Inc (3), Hathaway Dinwiddie Co. (2), Principal Builders Inc. (2), Skyline Construction (2), Cobe Construction Inc, Ds Doyle Construction, Field Construction Inc.
Architects
Flad & Associates, Leighton Lee
Engineers
Alexander Joseph Pacheco (2), Barry Mcgraw, Elisabeth M Allen, Jesus B Cabellon Jr

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 13, 2018Never finaled
issued Nov 2018, no final
1355 Market StAcco Engineered Systems Inc. Dba Acco En8th fl: rebalance (e) vav terminal boxes including grilles. install reheat coils on (e) coiling only boxes, rebalance box & grilles. install new terminal boxes including ductwork, grilles & thermostats. relocate (e) grilles & thermostats to accomodate new arch layout. ref pa #201807275785
Details
Permit
201811135588
Permit issued
Nov 13, 2018

8th fl: rebalance (e) vav terminal boxes including grilles. install reheat coils on (e) coiling only boxes, rebalance box & grilles. install new terminal boxes including ductwork, grilles & thermostats. relocate (e) grilles & thermostats to accomodate new arch layout. ref pa #201807275785

Open the permit page

$200,000
Jul 25, 2018Never finaled
issued Jul 2018, no final
1355 Market StAcco Engineered Systems Inc. Dba Acco En7th fl: rebalance (e) vav terminal boxes including grills. install reheat coils on existing cooling onl vav terminal boxes, rebalance. install new terminal boxes including ductwork, grills & thermostats. relocate (e) grilles and thermostats to accomodate new floor plan. ref #201805229753
Details
Permit
201807255462
Permit issued
Jul 25, 2018

7th fl: rebalance (e) vav terminal boxes including grills. install reheat coils on existing cooling onl vav terminal boxes, rebalance. install new terminal boxes including ductwork, grills & thermostats. relocate (e) grilles and thermostats to accomodate new floor plan. ref #201805229753

Open the permit page

$1,500,000
Jun 4, 2018Completed
final sign-off Sep 2018
415 Jackson StBcci Construction Company3rd fl: mep to support approved architectural ref pa 2018-0507-8340
Details
Permit
201806040845
Permit issued
Jun 5, 2018
Final sign-off
Sep 12, 2018

3rd fl: mep to support approved architectural ref pa 2018-0507-8340

Open the permit page

$55,000
Feb 16, 2018Never finaled
issued Apr 2018, no final
100 Hooper StBcci Construction Company3rd fl - mep to support approved architectural. ref #201712186749. maher na
Details
Permit
201802161534
Permit issued
Apr 19, 2018

3rd fl - mep to support approved architectural. ref #201712186749. maher na

Open the permit page

$1,420,000
Jan 10, 2018Never finaled
issued Feb 2018, no final
1400 16th StSkyline Constructiondeffered mep submittal for #2021710252229. addition of new mechanical units to support relocated offices. new sink installed in lab space. new electrical receptacles throughout area of work. maher na
Details
Permit
201801108292
Permit issued
Feb 13, 2018

deffered mep submittal for #2021710252229. addition of new mechanical units to support relocated offices. new sink installed in lab space. new electrical receptacles throughout area of work. maher na

Open the permit page

$150,000
Dec 21, 2017Completed
final sign-off May 2018
1400 16th StSkyline Construction1/f: rev to (e) pa 201710252229: revision to keep (e) door 138 in place and door 148a. revise hallway framing. maher na
Details
Permit
201712217086
Permit issued
Feb 13, 2018
Final sign-off
May 7, 2018

1/f: rev to (e) pa 201710252229: revision to keep (e) door 138 in place and door 148a. revise hallway framing. maher na

Open the permit page

Nov 13, 2017Never finaled
issued Nov 2017, no final
500 Terry A Francois BlNovo Construction Inc1st fl: mechanical work for ti new hvac ref pa 2017-1106-3167. maher na
Details
Permit
201711133794
Permit issued
Nov 21, 2017

1st fl: mechanical work for ti new hvac ref pa 2017-1106-3167. maher na

Open the permit page

$10,000
Nov 13, 2017Completed
final sign-off Sep 2019
409 Illinois StDs Doyle Construction, Cobe Construction Incportable clean room, lyo unit & new door. freeze dryer.
Details
Permit
201711133778
Permit issued
Mar 7, 2018
Final sign-off
Sep 13, 2019

portable clean room, lyo unit & new door. freeze dryer.

Open the permit page

$400,000
Oct 31, 2017Never finaled
issued Oct 2017, no final
185 Berry StHathaway Dinwiddie Co.wharf bldg: like for like grille change out in 4 restrooms. ref pa #201705176861. maher na
Details
Permit
201710312790
Permit issued
Oct 31, 2017

wharf bldg: like for like grille change out in 4 restrooms. ref pa #201705176861. maher na

Open the permit page

$25,000
Oct 31, 2017Never finaled
issued Oct 2017, no final
185 Berry StHathaway Dinwiddie Co.berry bldg: like for like grille change out in 14 restrooms. ref pa #201705176865. maher na
Details
Permit
201710312788
Permit issued
Oct 31, 2017

berry bldg: like for like grille change out in 14 restrooms. ref pa #201705176865. maher na

Open the permit page

$50,000
Sep 13, 2017Never finaled
issued Sep 2017, no final
222 Sutter StNovo Construction Inc5th floor - provide new heat pump, ducts & diffusers. relcoate existing heat pumps, provide new exhusat fan , provide new fsfs. ref pa #201707061086. n/a maher ordinance
Details
Permit
201709137880
Permit issued
Sep 13, 2017

5th floor - provide new heat pump, ducts & diffusers. relcoate existing heat pumps, provide new exhusat fan , provide new fsfs. ref pa #201707061086. n/a maher ordinance

Open the permit page

$20,000
Jul 17, 2017Completed
final sign-off Nov 2017
680 Folsom StBcci Construction Company1st floor - install new air terminal units. relocate (e) aitr terminal units where shown to accommodate new architectural layout. install new water source heat pumps for server room. install new duct work & grilles. rebalance all vav zones. ref pa #201705166668.
Details
Permit
201707172067
Permit issued
Aug 9, 2017
Final sign-off
Nov 21, 2017

1st floor - install new air terminal units. relocate (e) aitr terminal units where shown to accommodate new architectural layout. install new water source heat pumps for server room. install new duct work & grilles. rebalance all vav zones. ref pa #201705166668.

Open the permit page

$70,000
Jul 17, 2017Never finaled
issued Jul 2017, no final
1 Montgomery StAcco Engineered Systems Inc. Dba Acco En2nd fl: wells fargo: replace existing 15 reheat vav boxes with new and upgrade controls.
Details
Permit
201707172062
Permit issued
Jul 17, 2017

2nd fl: wells fargo: replace existing 15 reheat vav boxes with new and upgrade controls.

Open the permit page

$220,000
Jun 15, 2017Completed
final sign-off Aug 2017
1 Harrison StAcco Engineered Systems Inc. Dba Acco Eninstall supplemental fan coil & heat pump. maher na
Details
Permit
201706159500
Permit issued
Jun 15, 2017
Final sign-off
Aug 3, 2017

install supplemental fan coil & heat pump. maher na

Open the permit page

$95,000
Jun 12, 2017Completed
final sign-off Nov 2017
650 California StAcco Engineered Systems Inc. Dba Acco En20th & 21st floor - re-ducting of lowside ductwork to match/serve new floor plan . install wshp/tf to serve new it room. ref #201704103556 & 201704264932.
Details
Permit
201706129009
Permit issued
Jun 13, 2017
Final sign-off
Nov 15, 2017

20th & 21st floor - re-ducting of lowside ductwork to match/serve new floor plan . install wshp/tf to serve new it room. ref #201704103556 & 201704264932.

Open the permit page

$180,000
Apr 4, 2017Completed
final sign-off Apr 2017
1 Montgomery StPrincipal Builders Inc.25/f elevator lobby - mep. title 24 to install new diffusers return air slots, fire smoke dampers and ductwork, t.i. pa#201702219789
Details
Permit
201704043180
Permit issued
Apr 4, 2017
Final sign-off
Apr 17, 2017

25/f elevator lobby - mep. title 24 to install new diffusers return air slots, fire smoke dampers and ductwork, t.i. pa#201702219789

Open the permit page

$3,000
Mar 23, 2017Completed
final sign-off Oct 2018
760 Market StNovo Construction Incmechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1215-5072
Details
Permit
201703232134
Permit issued
Mar 23, 2017
Final sign-off
Oct 25, 2018

mechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1215-5072

Open the permit page

$70,000
Feb 10, 2017Completed
final sign-off Apr 2017
33 New Montgomery StField Construction Inc.11th floor - mechanical & electrical. architectural pa #201701207557. there is no structural work associated this scope of work. n/a maher ordinance
Details
Permit
201702109135
Permit issued
Feb 15, 2017
Final sign-off
Apr 4, 2017

11th floor - mechanical & electrical. architectural pa #201701207557. there is no structural work associated this scope of work. n/a maher ordinance

Open the permit page

$175,000
Oct 27, 2016Never finaled
issued Nov 2016, no final
1 Montgomery StPrincipal Builders Inc.t24 electrical/mechanical to install new equipment on 21st fl ref 201610200817
Details
Permit
201610271334
Permit issued
Nov 15, 2016

t24 electrical/mechanical to install new equipment on 21st fl ref 201610200817

Open the permit page

$440,000
May 11, 2015Completed
final sign-off Jul 2015
505 Montgomery StAcco Engineered Systems Inc. Dba Acco Enadding 2 new vav boxes, replacing old grilles and rebalancing extg vav's in effected areas. ref app# 201505045262
Details
Permit
201505115906
Permit issued
May 11, 2015
Final sign-off
Jul 9, 2015

adding 2 new vav boxes, replacing old grilles and rebalancing extg vav's in effected areas. ref app# 201505045262

Open the permit page

$50,000
Feb 5, 2015Completed
final sign-off Sep 2016
71 Stevenson StSource Planning And Construction Inct.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.
Details
Permit
201502057618
Permit issued
Feb 12, 2015
Final sign-off
Sep 27, 2016

t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.

Open the permit page

$550,000
Feb 5, 2015Completed
final sign-off Sep 2016
71 Stevenson StSource Planning And Construction Inc20th fl: t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.
Details
Permit
201502057621
Permit issued
Feb 12, 2015
Final sign-off
Sep 27, 2016

20th fl: t.i. includes construction of non-load bearing partitions, new millwork etc. mechanical & electrical included. fire sprinklers and life safety work under seperate permit.

Open the permit page

$700,000
Jul 15, 2014Completed
final sign-off Aug 2016
71 Stevenson StSource Planning And Construction Inc3rd floor- mechanical drawings for refence pa 2014.0604.7435.
Details
Permit
201407151275
Permit issued
Jul 16, 2014
Final sign-off
Aug 3, 2016

3rd floor- mechanical drawings for refence pa 2014.0604.7435.

Open the permit page

$100,000
Jul 23, 2013Completed
final sign-off Jan 2014
100 Spear StAcco Engineered Systems Inc. Dba Acco Eninstall 3 new boilers to replace 1 existing boiler, install pump for each boiler.
Details
Permit
201307232512
Permit issued
Jul 23, 2013
Final sign-off
Jan 16, 2014

install 3 new boilers to replace 1 existing boiler, install pump for each boiler.

Open the permit page

$165,000