Flad & Associates
- License
- 28429
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, lessee
- On San Francisco permits
- Sep 2005 to Aug 2019
4 permits since 2000 (architect on 3 permits, lessee on 1 permit): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cobe Construction Inc, Ds Doyle Construction, Hathaway Dinwiddie Co., Richlen Construction, Xl Construction, Corporation
- Architects
- Irene Wai Man Lo
- Engineers
- Barry Mcgraw, Craig A. Silvey
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2019 | Completed final sign-off Apr 2021 | 455 Mission Bay Blvd South | Xl Construction, Corporation | 5th flr lab/freezer storage only - interior demo. non structural demo only of non rated construction per ab017, space to remain vacant until accessible features are restored.Details
5th flr lab/freezer storage only - interior demo. non structural demo only of non rated construction per ab017, space to remain vacant until accessible features are restored. | $12,000 |
| Nov 13, 2017 | Completed final sign-off Sep 2019 | 409 Illinois St | Ds Doyle Construction, Cobe Construction Inc | portable clean room, lyo unit & new door. freeze dryer.Details
portable clean room, lyo unit & new door. freeze dryer. | $400,000 |
| Mar 7, 2017 | Completed final sign-off Jun 2019 | 1800 Owens St | Hathaway Dinwiddie Co. | non electric signDetails
non electric sign | $5,000 |
| Sep 13, 2005 | Completed final sign-off Jan 2006 | 650 California St | Richlen Construction | oti-1, 8th floor, me, ls.Details
oti-1, 8th floor, me, ls. | $36,270 |