Block 5512, lot 028
2845 Cesar Chavez St
- City’s use
- Commercial Misc
- Built
- 1970
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,575 sq ft
- Lot
- 12,649 sq ft
- Zoning
- NC1
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2021 | Never finaled issued Jun 2021, no final | 2845 Cesar Chavez St | sign b, install 2 electric single faced wall signs: "national"Details
sign b, install 2 electric single faced wall signs: "national" | $1,500 | |
| Jun 9, 2021 | Never finaled issued Jun 2021, no final | 2845 Cesar Chavez St | sign c, repaint 8 signs at 4 stations: "national"Details
sign c, repaint 8 signs at 4 stations: "national" | $500 | |
| Jun 9, 2021 | Never finaled issued Jun 2021, no final | 2845 Cesar Chavez St | sign a, install 1 electric doubled faced free standing sign: "national"Details
sign a, install 1 electric doubled faced free standing sign: "national" | $2,000 | |
| Jun 9, 2021 | Expired or cancelled cancelled Jan 2026 | 2845 Cesar Chavez St | sign d, install 1 electric doubled faced free standing sign: "national"Details
sign d, install 1 electric doubled faced free standing sign: "national" | $1,000 | |
| Aug 14, 2014 | Completed final sign-off Dec 2014 | 2845 Cesar Chavez St | Balch Petroleum Contractors & Builders | replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinanceDetails
replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinance | $70,000 |
| Dec 18, 2013 | Completed final sign-off Dec 2014 | 2845 Cesar Chavez St | B & B Locating | concrete pad with (7)-4" bollards on 2 sides of the tank pad. installation of 499 gallon propane tank & dispenser.Details
concrete pad with (7)-4" bollards on 2 sides of the tank pad. installation of 499 gallon propane tank & dispenser. | $4,500 |
| Jun 2, 2011 | Completed final sign-off Aug 2011 | 2845 Cesar Chavez St | Eco-Check Compliance | gas station. containment replacement - spill bucket underground storage tank replacement. replacement of concrete around bucket.Details
gas station. containment replacement - spill bucket underground storage tank replacement. replacement of concrete around bucket. | $3,000 |
| Aug 17, 2007 | Never finaled issued Oct 2007, no final | 2845 Cesar Chavez St | Accutite Technology Engineering | install healy clean air separator. 4 new dispensers. remove existing 2 dispensors. break concrete to expose underground lines, add new dispenser lines along with healy fittings. cover and reconcrete. non structural workDetails
install healy clean air separator. 4 new dispensers. remove existing 2 dispensors. break concrete to expose underground lines, add new dispenser lines along with healy fittings. cover and reconcrete. non structural work | $75,000 |