Block 3711, lot 013
77 Beale St
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 12,601 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
174 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 77 Beale St | asbestos abatement of fireproofing,stucco and asbestos paint.Details
asbestos abatement of fireproofing,stucco and asbestos paint. | $28,500,000 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 77 Beale St | interior soft demolition and asbestos abatementDetails
interior soft demolition and asbestos abatement | ||
| Jun 28, 2022 | Never finaled issued Aug 2022, no final | 77 Beale St | Turner Construction Co | work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.Details
work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler. | $728,548 |
| Feb 15, 2022 | Expired or cancelled withdrawn Sep 2025 | 77 Beale St | Turner Construction Co | renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.Details
renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign. | $105,596,280 |
| Apr 9, 2021 | Never finaled issued May 2021, no final | 77 Beale St | Able Maintenance Inc | remove (1) 5k diesel ust. remove (1) 12k gasoline ust. remove overhead piping in parking garage. non structural no electrical.Details
remove (1) 5k diesel ust. remove (1) 12k gasoline ust. remove overhead piping in parking garage. non structural no electrical. | $50,000 |
| Jul 9, 2020 | Completed final sign-off Aug 2020 | 77 Beale St | Siemens Industry, Inc. | 27th fl - as built dwgs for fire alarm work on "swing space" remodel. dwgs reflect as installed conditions for both (n) & (e) devices per request of sffd. initial life safety permit done under pa 2019-0514-0508. no new devices added under this permitDetails
27th fl - as built dwgs for fire alarm work on "swing space" remodel. dwgs reflect as installed conditions for both (n) & (e) devices per request of sffd. initial life safety permit done under pa 2019-0514-0508. no new devices added under this permit | |
| Jun 24, 2019 | Completed final sign-off Jul 2019 | 77 Beale St | Siemens Industry, Inc. | "as built" permit for the deletion of 6 duct detectors on the "fsd" project on floors 15 & 16, at the request of sffd testing inspector, to reflect the final installation. ref pa #201810314616. maher naDetails
"as built" permit for the deletion of 6 duct detectors on the "fsd" project on floors 15 & 16, at the request of sffd testing inspector, to reflect the final installation. ref pa #201810314616. maher na | |
| May 28, 2019 | Completed final sign-off Aug 2019 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | 16th flr, fire sprinklers. add 4 sprinklers to conform w/ the (n) wall / ceiling layout of tenant improvement.Details
16th flr, fire sprinklers. add 4 sprinklers to conform w/ the (n) wall / ceiling layout of tenant improvement. | $2,100 |
| May 15, 2019 | Completed final sign-off May 2019 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | 16th fl: add 5, relocate 0 and plug 0 sprinklers to conform with new wall ceiling layout of tenant improvementDetails
16th fl: add 5, relocate 0 and plug 0 sprinklers to conform with new wall ceiling layout of tenant improvement | $2,625 |
| May 14, 2019 | Completed final sign-off Jul 2019 | 77 Beale St | Siemens Industry, Inc. | 8/f: fire alarm work for swing space rmodel on floor 8. additions are 10 smoke detectors, 2 strobe power supplies, 44 speaker strobes. ref 201801199088Details
8/f: fire alarm work for swing space rmodel on floor 8. additions are 10 smoke detectors, 2 strobe power supplies, 44 speaker strobes. ref 201801199088 | $37,400 |
| May 14, 2019 | Completed final sign-off Aug 2020 | 77 Beale St | Siemens Industry, Inc. | 27/f: fire alarm work for the swing space remodel on floor 27, additions are 9 smoke detectors, 2 strobe power supplies, 49 speaker strobes. ref 201801199085Details
27/f: fire alarm work for the swing space remodel on floor 27, additions are 9 smoke detectors, 2 strobe power supplies, 49 speaker strobes. ref 201801199085 | $39,900 |
| May 7, 2019 | Never finaled issued May 2019, no final | 77 Beale St | W M Wireless Inc | t mobile temporary installation of (2) antenna on roof and cable to (e) equipment, installation of (1) temporary cabinet , 1 temp breaker n/a maherDetails
t mobile temporary installation of (2) antenna on roof and cable to (e) equipment, installation of (1) temporary cabinet , 1 temp breaker n/a maher | $6,500 |
| Feb 27, 2019 | Completed final sign-off Aug 2019 | 77 Beale St | R L H Fire Protection Inc | 27th flr. fire sprinkler, tenant improvement. relocate 166 heads, add 29 heads and delete 20 heads. ref pa 201801199085Details
27th flr. fire sprinkler, tenant improvement. relocate 166 heads, add 29 heads and delete 20 heads. ref pa 201801199085 | $53,210 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 77 Beale St | Siemens Industry, Inc. | fire alarm work for the fsd and fan unit additions on floors 15 & 16; 17 duct detectors are added on floor 15; 1 smoke detector, 6 duct detectors, and 6 modules are added on floor 16. ref pa #201810314616.Details
fire alarm work for the fsd and fan unit additions on floors 15 & 16; 17 duct detectors are added on floor 15; 1 smoke detector, 6 duct detectors, and 6 modules are added on floor 16. ref pa #201810314616. | $37,080 |
| Dec 19, 2018 | Completed final sign-off Apr 2019 | 77 Beale St | Siemens Industry, Inc. | fire alarm work for the "fire/smoke damper" installation on floor 11; additions are duct detectors. ref pa 2018-1031-4615Details
fire alarm work for the "fire/smoke damper" installation on floor 11; additions are duct detectors. ref pa 2018-1031-4615 | $17,435 |
| Dec 7, 2018 | Expired or cancelled cancelled Jan 2026 | 77 Beale St | C B 2 Builders Incorporated | 15th and 16th floor: smoke management report for record only. no scope associated with this permit. ref app#201810314616Details
15th and 16th floor: smoke management report for record only. no scope associated with this permit. ref app#201810314616 | |
| Nov 29, 2018 | Completed final sign-off May 2019 | 77 Beale St | R L H Fire Protection Inc | 8th floor - fire sprinkler tenant improvement relocate 167 heads, add 15 heads, delete 28 heads ref 201801199088Details
8th floor - fire sprinkler tenant improvement relocate 167 heads, add 15 heads, delete 28 heads ref 201801199088 | $53,210 |
| Nov 13, 2018 | Completed final sign-off Feb 2020 | 77 Beale St | Siemens Industry, Inc. | 32nd fl - fire alarm work to add 2 relay modules for fire/smoke damper control and monitoring as part of the "hvac upgrade" projects. ref pa 2018-0507-8397Details
32nd fl - fire alarm work to add 2 relay modules for fire/smoke damper control and monitoring as part of the "hvac upgrade" projects. ref pa 2018-0507-8397 | $1,100 |
| Oct 31, 2018 | Completed final sign-off Apr 2019 | 77 Beale St | C B 2 Builders Incorporated | replace existing fsd's and install core vav's on the 11th floor. hvac upgrade.Details
replace existing fsd's and install core vav's on the 11th floor. hvac upgrade. | $750,000 |
| Oct 31, 2018 | Completed final sign-off Apr 2020 | 77 Beale St | C B 2 Builders Incorporated | replace existing fsd's and install core vav's. upgrade on the 15th floor . install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor.Details
replace existing fsd's and install core vav's. upgrade on the 15th floor . install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor. | $1,800,000 |
| May 7, 2018 | Completed final sign-off Feb 2020 | 77 Beale St | Roebbelen Contracting Inc | upgrade to existing hvac system on 32nd fl adding new vavs, replace control valves, balancing, fsd improvements - adding 5 (n) fsds and 17 (e) fsds intrfaced to icdiacator panel, new bms controls maher not reqDetails
upgrade to existing hvac system on 32nd fl adding new vavs, replace control valves, balancing, fsd improvements - adding 5 (n) fsds and 17 (e) fsds intrfaced to icdiacator panel, new bms controls maher not req | $670,000 |
| Mar 21, 2018 | Completed final sign-off Jul 2024 | 77 Beale St | Siemens Industry, Inc. | fire alarm work to upgrade the (e) life safety system, the work will include the replacement of 17 panels, all field devices to be reused & will remain as installed.Details
fire alarm work to upgrade the (e) life safety system, the work will include the replacement of 17 panels, all field devices to be reused & will remain as installed. | $200,000 |
| Mar 1, 2018 | Never finaled issued Mar 2018, no final | 77 Beale St | street spaceDetails
street space | ||
| Feb 1, 2018 | Expired or cancelled withdrawn Oct 2018 | 77 Beale St | C B 2 Builders Incorporated | fsd and vav upgrade at 11th and 15th floor only. n/a for maherDetails
fsd and vav upgrade at 11th and 15th floor only. n/a for maher | $1,500,000 |
| Jan 19, 2018 | Completed final sign-off Aug 2020 | 77 Beale St | Roebbelen Contracting Inc | 8th fl - full floor buildout. partitions, mepDetails
8th fl - full floor buildout. partitions, mep | $2,300,000 |
| Jan 19, 2018 | Completed final sign-off Aug 2020 | 77 Beale St | Roebbelen Contracting Inc | 27th fl - full floor buildout. partitions, mepDetails
27th fl - full floor buildout. partitions, mep | $2,300,000 |
| Dec 15, 2017 | Completed final sign-off Aug 2020 | 77 Beale St | Roebbelen Contracting Inc | 8th flr: soft demo - partition, ceilings and flooring. maher n/a.Details
8th flr: soft demo - partition, ceilings and flooring. maher n/a. | $50,000 |
| Dec 15, 2017 | Completed final sign-off Aug 2020 | 77 Beale St | Roebbelen Contracting Inc | 27th flr: soft demo - partition, ceilings and flooring. maher naDetails
27th flr: soft demo - partition, ceilings and flooring. maher na | $50,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 77 Beale St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Nov 2, 2017 | Completed final sign-off Mar 2019 | 77 Beale St | Roebbelen Contracting Inc | provide new gaurd shack and parking area approach. all associated mechanical and elec work. coordinate demo of existing gaurd shackDetails
provide new gaurd shack and parking area approach. all associated mechanical and elec work. coordinate demo of existing gaurd shack | $70,000 |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 77 Beale St | Siemens Industry, Inc. | fire alarm addition of 1 speaker/strobe for a conference room on floor 10; device being added as a portional of the "restack" remodel project. ref pa 2016-1219-5268. maher naDetails
fire alarm addition of 1 speaker/strobe for a conference room on floor 10; device being added as a portional of the "restack" remodel project. ref pa 2016-1219-5268. maher na | $510 |
| May 25, 2017 | Never finaled issued Jun 2017, no final | 77 Beale St | Roebbelen Contracting Inc | ti of existing security office in basement. including celing, finishes, mep & accessible restroomDetails
ti of existing security office in basement. including celing, finishes, mep & accessible restroom | $275,000 |
| May 19, 2017 | Completed final sign-off Feb 2021 | 77 Beale St | Roebbelen Contracting Inc | 9/f- revision to pa#2016-1219-5271, revise square footage calculation, removal of fixed cabinetry & furnishings from calculation, modify of exit signage. n/a ordinance #155-13Details
9/f- revision to pa#2016-1219-5271, revise square footage calculation, removal of fixed cabinetry & furnishings from calculation, modify of exit signage. n/a ordinance #155-13 | $200,000 |
| May 19, 2017 | Completed final sign-off Feb 2021 | 77 Beale St | Roebbelen Contracting Inc | 10/f- revision to pa#201612195268, modify of exit signage based on site conditions & inspections. n/a ordinance #155-13Details
10/f- revision to pa#201612195268, modify of exit signage based on site conditions & inspections. n/a ordinance #155-13 | $200,000 |
| Feb 24, 2017 | Never finaled issued Mar 2017, no final | 77 Beale St | Walschon Fire Protection Inc | demo extg sprinklers to allow for new partitions and ceilings. instll nw pendent sprinklers, add upright sprinkler hangers, branch line restraints, & upgrade bracing on extg fire sprinkler main. demo extg hose cabinets and relocate. maher n/a. t.i-9th fl: 201612195271 & t.i-10th fl: 201612195268Details
demo extg sprinklers to allow for new partitions and ceilings. instll nw pendent sprinklers, add upright sprinkler hangers, branch line restraints, & upgrade bracing on extg fire sprinkler main. demo extg hose cabinets and relocate. maher n/a. t.i-9th fl: 201612195271 & t.i-10th fl: 201612195268 | $50,000 |
| Feb 21, 2017 | Completed final sign-off Jan 2020 | 77 Beale St | Siemens Industry, Inc. | 9th & 10th flr: fire alarm - add 24 smoke detectors. 10 duct detectors, 102 speaker/strobes & 4 pull stations. maher na. ref 2016-1219-5271 (9th fl) and 2016-1219-5268 (10th fl).Details
9th & 10th flr: fire alarm - add 24 smoke detectors. 10 duct detectors, 102 speaker/strobes & 4 pull stations. maher na. ref 2016-1219-5271 (9th fl) and 2016-1219-5268 (10th fl). | $75,200 |
| Feb 10, 2017 | Completed final sign-off Feb 2017 | 77 Beale St | Siemens Industry, Inc. | 3rd floor: fire alarm as built permit for the wellness center. the revision corrects a duct detector address per the sffd testing inspector. n/a for maher. ref app#201607192705.Details
3rd floor: fire alarm as built permit for the wellness center. the revision corrects a duct detector address per the sffd testing inspector. n/a for maher. ref app#201607192705. | |
| Dec 19, 2016 | Completed final sign-off Feb 2021 | 77 Beale St | Roebbelen Contracting Inc | 9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinanceDetails
9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance | $2,000,000 |
| Dec 19, 2016 | Completed final sign-off Feb 2021 | 77 Beale St | Roebbelen Contracting Inc | 10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinanceDetails
10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance | $2,000,000 |
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 77 Beale St | Swinerton Builders | exterior lobby - install new wood plantersDetails
exterior lobby - install new wood planters | $28,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 77 Beale St | street space: meters only. ref m728387Details
street space: meters only. ref m728387 | ||
| Oct 6, 2016 | Never finaled issued Oct 2016, no final | 77 Beale St | street spaceDetails
street space | ||
| Oct 6, 2016 | Completed final sign-off Dec 2016 | 77 Beale St | Pribuss Engineering Inc | fire sprinkler ti under pa 2016-0719-2705, relocate 76, add 3; total: 79 x 517.32 =40,868. n/a maher ord. 155-13Details
fire sprinkler ti under pa 2016-0719-2705, relocate 76, add 3; total: 79 x 517.32 =40,868. n/a maher ord. 155-13 | $40,868 |
| Sep 23, 2016 | Completed final sign-off Oct 2016 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | levelb2: relocate one (1) sprinkler to conform with the new wall/ceiling layout of the ti ref pa 2015-1214-5089. maher naDetails
levelb2: relocate one (1) sprinkler to conform with the new wall/ceiling layout of the ti ref pa 2015-1214-5089. maher na | $203 |
| Sep 22, 2016 | Completed final sign-off Feb 2017 | 77 Beale St | Siemens Industry, Inc. | 3rd flr: add 1 smoke detectors, 7 duct detectors, 1 strobe power supply, 24 speaker/strobes, 6 strobes ref 2016 0719 2705 maher naDetails
3rd flr: add 1 smoke detectors, 7 duct detectors, 1 strobe power supply, 24 speaker/strobes, 6 strobes ref 2016 0719 2705 maher na | $22,220 |
| Aug 26, 2016 | Never finaled issued Aug 2016, no final | 77 Beale St | Siemens Industry, Inc. | b2 level - fire alarm work for the "hvac" remodel on basment level b2; additions are 3 duct detectors, 3 modules, add 2 speaker/strobes. ref paDetails
b2 level - fire alarm work for the "hvac" remodel on basment level b2; additions are 3 duct detectors, 3 modules, add 2 speaker/strobes. ref pa | $4,380 |
| Aug 22, 2016 | Never finaled issued Aug 2016, no final | 77 Beale St | Roebbelen Contracting Inc, Swinerton Builders | 10th floor: demolition only.ab 017 n/a for maherDetails
10th floor: demolition only.ab 017 n/a for maher | $50,000 |
| Aug 22, 2016 | Never finaled issued Aug 2016, no final | 77 Beale St | Roebbelen Contracting Inc, Swinerton Builders | 9th floor: demolition only. ab-017 n/a for maherDetails
9th floor: demolition only. ab-017 n/a for maher | $50,000 |
| Jul 19, 2016 | Completed final sign-off Jul 2017 | 77 Beale St | Swinerton Builders | 3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13Details
3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13 | $1,280,000 |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 77 Beale St | Siemens Industry, Inc. | fier alarm "as-built" drawing revisions to correct smoke detector and module address points pwer the sffd testing inspector. ref pa 2012-1221-6694. maher naDetails
fier alarm "as-built" drawing revisions to correct smoke detector and module address points pwer the sffd testing inspector. ref pa 2012-1221-6694. maher na | |
| Jun 20, 2016 | Never finaled issued Aug 2016, no final | 77 Beale St | Roebbelen Contracting Inc | 3rd floor: install new electrical outlets and service. install occupancy sensors. n/a for maher.Details
3rd floor: install new electrical outlets and service. install occupancy sensors. n/a for maher. | $50,000 |
| May 5, 2016 | Completed final sign-off Nov 2016 | 77 Beale St | Paradigm General Contractors | revision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 1110 2287. maher naDetails
revision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 1110 2287. maher na | |
| Apr 22, 2016 | Completed final sign-off Sep 2016 | 77 Beale St | R L H Fire Protection Inc | fire sprinkler relocate 46, add 3, delete 14 ref 201601288213Details
fire sprinkler relocate 46, add 3, delete 14 ref 201601288213 | $10,751 |
| Apr 22, 2016 | Completed final sign-off Sep 2016 | 77 Beale St | Siemens Industry, Inc. | fire alarm work for the "pg&e refresh" ti remodel on floor 32; additions are 4 smoke detectors and 15 speaker/strobes. ref pa 2016-0128-8213Details
fire alarm work for the "pg&e refresh" ti remodel on floor 32; additions are 4 smoke detectors and 15 speaker/strobes. ref pa 2016-0128-8213 | $10,800 |
| Jan 28, 2016 | Completed final sign-off Oct 2016 | 77 Beale St | Skyline Construction | 32nd flr: interior non-structural demolition, construction of rated and non-rated partitions, glazing doors & frames, hardware, millwork, mechanical and electrical included; maher n/aDetails
32nd flr: interior non-structural demolition, construction of rated and non-rated partitions, glazing doors & frames, hardware, millwork, mechanical and electrical included; maher n/a | $475,680 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 77 Beale St | street space permitDetails
street space permit | ||
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 77 Beale St | street space w/mtaDetails
street space w/mta | ||
| Dec 14, 2015 | Never finaled issued Jun 2016, no final | 77 Beale St | W. Bradley Electric, Sprig Electric (Archkey Solutions) | total building electrical distribution replacement level b2 through 34. modification to the (e) level b2 electrical room inluding architectural, mechanical & electrical. n/a for maher ordinance155-13.Details
total building electrical distribution replacement level b2 through 34. modification to the (e) level b2 electrical room inluding architectural, mechanical & electrical. n/a for maher ordinance155-13. | $15,500,000 |
| Nov 10, 2015 | Completed final sign-off May 2016 | 77 Beale St | C B 2 Builders Incorporated | will modify the existing rench drain near the 77 beale entrance. project has non occupied spaces and does not inhibit the access to our usability of existing occupied spaces. n/a for maher.Details
will modify the existing rench drain near the 77 beale entrance. project has non occupied spaces and does not inhibit the access to our usability of existing occupied spaces. n/a for maher. | $150,000 |
| Nov 6, 2015 | Completed final sign-off Jun 2016 | 77 Beale St | Jfc Construction Inc. | modification to an (e) t-mobile microcell facility including: removing 1 (e) antenna, replacing/relocating 1 antenna to top of penthouse; install 1 (n) faux vent pipe to conceal antenna; install 2 (n) rrus, 2 (n) diplexers & 4 (n) 7/8" coax cables; remove all (e) coax & conduit to old antennDetails
modification to an (e) t-mobile microcell facility including: removing 1 (e) antenna, replacing/relocating 1 antenna to top of penthouse; install 1 (n) faux vent pipe to conceal antenna; install 2 (n) rrus, 2 (n) diplexers & 4 (n) 7/8" coax cables; remove all (e) coax & conduit to old antenn | $16,000 |
| Oct 29, 2015 | Never finaled issued Oct 2015, no final | 77 Beale St | Pribuss Engineering Inc | level b1 fire sprinkler ti 201312124039 relcate 38, add 05 total 43Details
level b1 fire sprinkler ti 201312124039 relcate 38, add 05 total 43 | $22,129 |
| Oct 27, 2015 | Completed final sign-off Mar 2016 | 77 Beale St | Siemens Industry, Inc. | fire alarm for the "office improvement" remodel on level b1, addtions are 5 smoke detectors, 2 duct detectors, 2 modules, and 11 speaker/strobes. ref pa 2013-1212-4039. maher naDetails
fire alarm for the "office improvement" remodel on level b1, addtions are 5 smoke detectors, 2 duct detectors, 2 modules, and 11 speaker/strobes. ref pa 2013-1212-4039. maher na | $10,200 |
| Jul 13, 2015 | Completed final sign-off Oct 2016 | 77 Beale St | Siemens Industry, Inc. | fire alarm as built revision on the b1 basement level to reconnect extg smoke detectors into a new remote fire alarm panel. ref app#2013-0401-3538. n/a for maher.Details
fire alarm as built revision on the b1 basement level to reconnect extg smoke detectors into a new remote fire alarm panel. ref app#2013-0401-3538. n/a for maher. | $3,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 77 Beale St | street spaceDetails
street space | ||
| May 7, 2015 | Never finaled issued May 2015, no final | 77 Beale St | streetspaceDetails
streetspace | ||
| Apr 10, 2015 | Never finaled issued Apr 2015, no final | 77 Beale St | Siemens Industry, Inc. | to obtain final inspection for work approved under pa#2012-1221-6694. all work is complete.Details
to obtain final inspection for work approved under pa#2012-1221-6694. all work is complete. | |
| Apr 8, 2015 | Never finaled issued Apr 2015, no final | 77 Beale St | Siemens Industry, Inc. | fire alarm "as-builg" permit as required by the sffd testing inspector; revision is to correct the area of work on the plnas for floor 25, including the addition of a speaker/strobe. ref pa 201407080636Details
fire alarm "as-builg" permit as required by the sffd testing inspector; revision is to correct the area of work on the plnas for floor 25, including the addition of a speaker/strobe. ref pa 201407080636 | $500 |
| Apr 8, 2015 | Completed final sign-off Apr 2015 | 77 Beale St | Siemens Industry, Inc. | 12/f: fire alarm "as-built" permit as required by the sffd testing inspector; revision is to correct the area of work on the plans for floor 12.Details
12/f: fire alarm "as-built" permit as required by the sffd testing inspector; revision is to correct the area of work on the plans for floor 12. | |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 77 Beale St | Siemens Industry, Inc. | fire alarm addition of 1 sprinkler/stobe for "conference room 848" on flr 8 maher - not req'dDetails
fire alarm addition of 1 sprinkler/stobe for "conference room 848" on flr 8 maher - not req'd | $500 |
| Feb 12, 2015 | Expired or cancelled cancelled Jan 2026 | 77 Beale St | verizon idas uses ext. antenna to serve indoor das system. proposed installation consists: new verizon (6) 19" racks within existing he room, (1) gps antenna on 1st floor, 1/2" coax from existing he room to existing bda room, sub-panel within existing he room, & (5) mrrus installed within (e) he rm.Details
verizon idas uses ext. antenna to serve indoor das system. proposed installation consists: new verizon (6) 19" racks within existing he room, (1) gps antenna on 1st floor, 1/2" coax from existing he room to existing bda room, sub-panel within existing he room, & (5) mrrus installed within (e) he rm. | $30,000 | |
| Jan 28, 2015 | Completed final sign-off Oct 2016 | 77 Beale St | on floor 1b mech room - fire alarm for electrical service replacement project. specifically for additon of 3 smoke detectors to complete beam pocket coverageDetails
on floor 1b mech room - fire alarm for electrical service replacement project. specifically for additon of 3 smoke detectors to complete beam pocket coverage | $1,500 | |
| Jan 26, 2015 | Never finaled issued Jan 2015, no final | 77 Beale St | street space permitDetails
street space permit | ||
| Dec 23, 2014 | Completed final sign-off Oct 2016 | 77 Beale St | Siemens Industry, Inc. | 15th floor: fire alarm deletions of the low rise fsd project. the work for the entire job was approved by the sffd under as-built permit 2014.0502.04736. ref. appl. #2012.1221.6694. maher n/a.Details
15th floor: fire alarm deletions of the low rise fsd project. the work for the entire job was approved by the sffd under as-built permit 2014.0502.04736. ref. appl. #2012.1221.6694. maher n/a. | |
| Dec 19, 2014 | Never finaled issued Dec 2014, no final | 77 Beale St | street spaceDetails
street space | ||
| Dec 2, 2014 | Never finaled issued Dec 2014, no final | 77 Beale St | street spaceDetails
street space | ||
| Oct 15, 2014 | Never finaled issued Oct 2014, no final | 77 Beale St | street space and mta parkingDetails
street space and mta parking | ||
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 77 Beale St | street space permitDetails
street space permit | ||
| Oct 2, 2014 | Completed final sign-off Oct 2014 | 77 Beale St | Siemens Industry, Inc. | fire alarm work for the floor 32 board room hvac ti project. additions are 1 duct detector and 1 relay module. n/a for maher.Details
fire alarm work for the floor 32 board room hvac ti project. additions are 1 duct detector and 1 relay module. n/a for maher. | $1,200 |
| Aug 29, 2014 | Never finaled issued Nov 2014, no final | 77 Beale St | Aire Sheet Metal, Inc. | 32nd flr: install (1) chw fc unit above ceiling, install (2) wall mounted chw (ductless) units, ductwork & diffusers; maher n/aDetails
32nd flr: install (1) chw fc unit above ceiling, install (2) wall mounted chw (ductless) units, ductwork & diffusers; maher n/a | $180,000 |
| Jul 8, 2014 | Completed final sign-off Apr 2015 | 77 Beale St | Siemens Industry, Inc. | on 12th floor - addition of 1 speaker/strobe to replace existing older unit for "conference room 1219" on floor 12. n/a maher ordinanceDetails
on 12th floor - addition of 1 speaker/strobe to replace existing older unit for "conference room 1219" on floor 12. n/a maher ordinance | $500 |
| Jul 8, 2014 | Completed final sign-off Apr 2015 | 77 Beale St | Siemens Industry, Inc. | on 25th floor - addition of 1 speaker/strobe to replce existing older unit for energy hub 2550" on floor 25. n/a maher ordinanceDetails
on 25th floor - addition of 1 speaker/strobe to replce existing older unit for energy hub 2550" on floor 25. n/a maher ordinance | $500 |
| Jun 19, 2014 | Never finaled issued Jun 2014, no final | 77 Beale St | street spaceDetails
street space | ||
| Jun 17, 2014 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | revision to 201304184830 for changes to wall layout and framing details. maher 155-13 not requiredDetails
revision to 201304184830 for changes to wall layout and framing details. maher 155-13 not required | |
| Jun 3, 2014 | Expired or cancelled cancelled Jul 2016 | 77 Beale St | Paradigm General Contractors | 3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34Details
3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34 | $300,000 |
| May 2, 2014 | Completed final sign-off Oct 2016 | 77 Beale St | Siemens Industry, Inc. | as built permit for low rise fire/smoke damper project from floors 5-18 for pge. these drawings reflect addition of 20 duct detectors. orig work under 201212216694. maher 155-13 not requiredDetails
as built permit for low rise fire/smoke damper project from floors 5-18 for pge. these drawings reflect addition of 20 duct detectors. orig work under 201212216694. maher 155-13 not required | $12,000 |
| Mar 12, 2014 | Completed final sign-off Aug 2014 | 77 Beale St | Phoenix Electric Co. | installation of pole foundation for sfdpw/sfpuc project in subsidewalk basement, reroute extg drain line, reconstruct interior partition wall.n/a for the maher ordinance #155-13Details
installation of pole foundation for sfdpw/sfpuc project in subsidewalk basement, reroute extg drain line, reconstruct interior partition wall.n/a for the maher ordinance #155-13 | $30,000 |
| Mar 10, 2014 | Expired or cancelled cancelled Mar 2020 | 77 Beale St | (n)extenet wireless facility to install on bldg roof.install(1)panel antenna inside faux cover loc top of parapet column of 4/fl roof.(1)other antenna,(1)bbu cabinet&(2)radio node units to be loc on(e)parapet wall,behind faux cover/antenna.maher ordinance-no disturbane of at least 50 cu yd of soil.Details
(n)extenet wireless facility to install on bldg roof.install(1)panel antenna inside faux cover loc top of parapet column of 4/fl roof.(1)other antenna,(1)bbu cabinet&(2)radio node units to be loc on(e)parapet wall,behind faux cover/antenna.maher ordinance-no disturbane of at least 50 cu yd of soil. | $19,400 | |
| Mar 7, 2014 | Never finaled issued Mar 2014, no final | 77 Beale St | street spaceDetails
street space | ||
| Mar 7, 2014 | Never finaled issued Mar 2014, no final | 77 Beale St | Paradigm General Contractors | to obtain final inspection for work approved under pa 201204107966. all work is completeDetails
to obtain final inspection for work approved under pa 201204107966. all work is complete | |
| Dec 18, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Siemens Industry, Inc. | 2nd floor:addition of a manual station and module for the security to fire alarm system interface at the "daycare center" on floor 2. all new devices connect onto the fire alarm system. reff app#201312174375Details
2nd floor:addition of a manual station and module for the security to fire alarm system interface at the "daycare center" on floor 2. all new devices connect onto the fire alarm system. reff app#201312174375 | $1,500 |
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 77 Beale St | Siemens Industry, Inc. | 2nd fl. t.i. install electrified lock at existing elevator lobby doors, to comply w/ section 1008.1.4.6 of 2010 sfbc. life safety work under separate permit.Details
2nd fl. t.i. install electrified lock at existing elevator lobby doors, to comply w/ section 1008.1.4.6 of 2010 sfbc. life safety work under separate permit. | $1,200 |
| Dec 12, 2013 | Completed final sign-off May 2016 | 77 Beale St | Paradigm General Contractors, C B 2 Builders Incorporated | tenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms.Details
tenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms. | $425,000 |
| Dec 11, 2013 | Completed final sign-off Oct 2016 | 77 Beale St | Siemens Industry, Inc. | addition of 36 smoke detectors, 12 duct detectors, 2 modules, 3 horn/strobes, and 3 strobes for the "electrical service replacement" project from the basement b1 level up to floor 34. all devices connect onto the fire alarm system. ref pa 201304013538Details
addition of 36 smoke detectors, 12 duct detectors, 2 modules, 3 horn/strobes, and 3 strobes for the "electrical service replacement" project from the basement b1 level up to floor 34. all devices connect onto the fire alarm system. ref pa 201304013538 | $30,000 |
| Dec 10, 2013 | Never finaled issued Dec 2013, no final | 77 Beale St | street space permit (renewal of permit #1284563)Details
street space permit (renewal of permit #1284563) | ||
| Dec 10, 2013 | Never finaled issued Dec 2013, no final | 77 Beale St | street space permit (renewal of permit #1300304)Details
street space permit (renewal of permit #1300304) | ||
| Dec 9, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Pacific Region Contracting | lobby. revision to pa#2013-0418-4830. ada restroom upgrade required for previously approved sprig cafe remodel.Details
lobby. revision to pa#2013-0418-4830. ada restroom upgrade required for previously approved sprig cafe remodel. | $60,000 |
| Nov 8, 2013 | Completed final sign-off May 2016 | 77 Beale St | R L H Fire Protection Inc | all floors:fire sprinkler permit. remove 23 pendents and 85 uprights on level b-1. relocate 32 uprights, add 27 uprights and add 2 pendents in shaft on all floors and switchgear room on b-1. t.i. app#201304053833Details
all floors:fire sprinkler permit. remove 23 pendents and 85 uprights on level b-1. relocate 32 uprights, add 27 uprights and add 2 pendents in shaft on all floors and switchgear room on b-1. t.i. app#201304053833 | $31,354 |
| Oct 30, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafeDetails
plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafe | $40,000 |
| Sep 30, 2013 | Completed final sign-off Dec 2013 | 77 Beale St | Paradigm General Contractors | 16th flr: demolition of one (1) non structural partitionDetails
16th flr: demolition of one (1) non structural partition | $4,000 |
| Aug 29, 2013 | Never finaled issued Aug 2013, no final | 77 Beale St | street space permitDetails
street space permit | ||
| Jul 30, 2013 | Never finaled issued Jul 2013, no final | 77 Beale St | street space and mtaDetails
street space and mta | ||
| Jul 18, 2013 | Completed final sign-off Jan 2014 | 77 Beale St | Paradigm General Contractors | 5th floor-t.i build new 1-hr rated walls, install 20 min rated door & frame assemblies in (e) 1-hr rated corridor to prvide seperation between non complying exit seperation. comply w/ab-005. mech, sprinkler, life safety under seperate permitsDetails
5th floor-t.i build new 1-hr rated walls, install 20 min rated door & frame assemblies in (e) 1-hr rated corridor to prvide seperation between non complying exit seperation. comply w/ab-005. mech, sprinkler, life safety under seperate permits | $9,500 |
| Jun 20, 2013 | Never finaled issued Jun 2013, no final | 77 Beale St | Siemens Industry, Inc. | as built drawing revisions for a separate permit per the sffd testing inspector. the changes deal with i.d. numbers for new fsds under the "high-rise fsds" project, application 2012/12/21/9997Details
as built drawing revisions for a separate permit per the sffd testing inspector. the changes deal with i.d. numbers for new fsds under the "high-rise fsds" project, application 2012/12/21/9997 | |
| Apr 18, 2013 | Completed final sign-off Jun 2014 | 77 Beale St | Paradigm General Contractors | lobby. remodel (e) vacant cafe space within main lobby of pg & e building. project will entail minimal new drywall partitions, new millwork package, plumbing & electrical for coffee equipment & lightingDetails
lobby. remodel (e) vacant cafe space within main lobby of pg & e building. project will entail minimal new drywall partitions, new millwork package, plumbing & electrical for coffee equipment & lighting | $101,848 |
| Apr 5, 2013 | Completed final sign-off Aug 2014 | 77 Beale St | Paradigm General Contractors | basement level (b1) - selective demolitoin, ceiling, walls, non-structural as shown on plans, basement thru level 34 dumwaiter shaft. (ab-017) and (ab-005)Details
basement level (b1) - selective demolitoin, ceiling, walls, non-structural as shown on plans, basement thru level 34 dumwaiter shaft. (ab-017) and (ab-005) | $30,000 |
| Apr 1, 2013 | Completed final sign-off Nov 2016 | 77 Beale St | Paradigm General Contractors | proj will create (n) elect vault to accom (n)12kv svc feeders, (n) elect main distribution switch gear rm & allow routing(n) elect bus way from(n) elect rm in basement up thru bldg to provide alternative elect svc to current bldg loads. this will allow floor by floor cut over & replace of (e) elecDetails
proj will create (n) elect vault to accom (n)12kv svc feeders, (n) elect main distribution switch gear rm & allow routing(n) elect bus way from(n) elect rm in basement up thru bldg to provide alternative elect svc to current bldg loads. this will allow floor by floor cut over & replace of (e) elec | $3,500,000 |
| Feb 5, 2013 | Completed final sign-off Apr 2013 | 77 Beale St | C B 2 Builders Incorporated | 6th floor: replace with new new 80" high workstation panel.Details
6th floor: replace with new new 80" high workstation panel. | $500 |
| Jan 22, 2013 | Completed final sign-off Apr 2013 | 77 Beale St | Siemens Industry, Inc. | addition of 7 smoke detectors, 6 duct detectors and 3 relay modules for the "board room" remodel on floor 32, all devices connect onto the fire alarm system. ref pa# 201301097599Details
addition of 7 smoke detectors, 6 duct detectors and 3 relay modules for the "board room" remodel on floor 32, all devices connect onto the fire alarm system. ref pa# 201301097599 | $9,600 |
| Jan 22, 2013 | Completed final sign-off Mar 2014 | 77 Beale St | Paradiso Mechanical, Inc | remove 120x15 section of city sidewalk, excavate pea-gravel down to ust's tank tops. remove & replace (e) frp sumps bonds to tanks. remove existing dw frp ipe system. install new co-flexible pipe system through basement wall. tie-into existing plumbing. hook up low voltage monitoring system. backDetails
remove 120x15 section of city sidewalk, excavate pea-gravel down to ust's tank tops. remove & replace (e) frp sumps bonds to tanks. remove existing dw frp ipe system. install new co-flexible pipe system through basement wall. tie-into existing plumbing. hook up low voltage monitoring system. back | $78,500 |
| Jan 9, 2013 | Completed final sign-off May 2025 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | 32nd floor-add & relocate fire sprinkler heads per tenant improvement-(3 add), (9 relocation). ref t.i pa#201202103920Details
32nd floor-add & relocate fire sprinkler heads per tenant improvement-(3 add), (9 relocation). ref t.i pa#201202103920 | $6,100 |
| Dec 21, 2012 | Completed final sign-off Apr 2015 | 77 Beale St | Siemens Industry, Inc. | addition of 12 monitor modules, 12 relay modules, 34 duct detectors the high rise fire smoke damper project from floors 19-31.Details
addition of 12 monitor modules, 12 relay modules, 34 duct detectors the high rise fire smoke damper project from floors 19-31. | $32,400 |
| Dec 21, 2012 | Never finaled issued Dec 2012, no final | 77 Beale St | Siemens Industry, Inc. | addition of 1 remote control panel, 14 monitor modules, 14 relay modules, 59 duct detectors for the low rise fire smoke damper project from floors 5 through 18. all new devices connect onto fire alarm systemDetails
addition of 1 remote control panel, 14 monitor modules, 14 relay modules, 59 duct detectors for the low rise fire smoke damper project from floors 5 through 18. all new devices connect onto fire alarm system | $52,400 |
| Dec 20, 2012 | Completed final sign-off Jan 2013 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | add 5 fire sprinkler heads at elevator mech room. addition, 19th fl. ref pa# 201210142685Details
add 5 fire sprinkler heads at elevator mech room. addition, 19th fl. ref pa# 201210142685 | $2,570 |
| Dec 18, 2012 | Never finaled issued Dec 2012, no final | 77 Beale St | Ayoob & Peery Plumbing Co Inc | sprinkler system alterations on 32nd floor. add & relocate firesprinkler heads per ti, 3 add & 73 relocate. ti pa#2012-10-09-1518.Details
sprinkler system alterations on 32nd floor. add & relocate firesprinkler heads per ti, 3 add & 73 relocate. ti pa#2012-10-09-1518. | $39,000 |
| Dec 14, 2012 | Completed final sign-off Apr 2013 | 77 Beale St | C B 2 Builders Incorporated | 32nd floor:interior renovation of extg teleconferencing room on 32nd floor. work includes select demolition of extg ceiling grid tiles and light fixtures and installing new suspended ceiling tile. elect/mech will be submitted under seperate permit.Details
32nd floor:interior renovation of extg teleconferencing room on 32nd floor. work includes select demolition of extg ceiling grid tiles and light fixtures and installing new suspended ceiling tile. elect/mech will be submitted under seperate permit. | $100,000 |
| Oct 17, 2012 | Never finaled issued Oct 2012, no final | 77 Beale St | Siemens Industry, Inc. | sequence of operation revision for the "epo monitoring" project at the basement level. the fire alarm parts added for this job are under original pa# 201202083756Details
sequence of operation revision for the "epo monitoring" project at the basement level. the fire alarm parts added for this job are under original pa# 201202083756 | |
| Oct 9, 2012 | Completed final sign-off Apr 2013 | 77 Beale St | C B 2 Builders Incorporated | select demo of the existing ceiling grid, tiles, and light fixtures and the installation of new grid, tiles and lights. mech, elec, life safety and sprinkler are not included under this permit.Details
select demo of the existing ceiling grid, tiles, and light fixtures and the installation of new grid, tiles and lights. mech, elec, life safety and sprinkler are not included under this permit. | $80,000 |
| Sep 27, 2012 | Completed final sign-off Oct 2012 | 77 Beale St | Siemens Industry, Inc. | addition of 1 duct detector and relay module for a fau unit on floor 25. both devices donnect onto fire alarm systemDetails
addition of 1 duct detector and relay module for a fau unit on floor 25. both devices donnect onto fire alarm system | $1,200 |
| Jul 16, 2012 | Expired or cancelled expired Oct 2013 | 77 Beale St | Paradigm General Contractors | 19kth floor minor t.i. - remove (e) drywall partitions & doors, construct new gyp bd partitions & new doors at indicated to enlarge office #1974 & add #1974a. sprinkler & life safety, hvac under separate permits.Details
19kth floor minor t.i. - remove (e) drywall partitions & doors, construct new gyp bd partitions & new doors at indicated to enlarge office #1974 & add #1974a. sprinkler & life safety, hvac under separate permits. | $16,000 |
| Jun 7, 2012 | Completed final sign-off Nov 2012 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | as-built refer to pa# 2012-0427-9302-added isometric diagram & hydrolic calculations. change arm-over piping hose valves back to 2.5" as originally designed (based on new calcs)Details
as-built refer to pa# 2012-0427-9302-added isometric diagram & hydrolic calculations. change arm-over piping hose valves back to 2.5" as originally designed (based on new calcs) | |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 77 Beale St | Rfi Enterprises Inc. | 12th floor-new notification appliances being added for an tenant improvement-new fsd's to be added as well (8 total). t.i pa# 201204067773Details
12th floor-new notification appliances being added for an tenant improvement-new fsd's to be added as well (8 total). t.i pa# 201204067773 | $3,000 |
| May 16, 2012 | Completed final sign-off Jan 2013 | 77 Beale St | R L H Fire Protection Inc | fire sprinklers: relocate 25 heads, add 16 heads on 12th and 24th floorsDetails
fire sprinklers: relocate 25 heads, add 16 heads on 12th and 24th floors | $15,500 |
| May 10, 2012 | Completed final sign-off Mar 2013 | 77 Beale St | C B 2 Builders Incorporated | t.i. construct new equipment storage room, gyp board partitions. install new door. electrical, lgihting title 24 under separate permit. hvac under seperate permit. sprinkler and life safety under seperate permit.Details
t.i. construct new equipment storage room, gyp board partitions. install new door. electrical, lgihting title 24 under separate permit. hvac under seperate permit. sprinkler and life safety under seperate permit. | $14,000 |
| Apr 27, 2012 | Completed final sign-off Nov 2012 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | relocate existing 3" fhv's and cabinets on the following floors. 8gh, 9th, 10th, 11th, 12th,13th, 15th, 16th, 18th, 19th, 20th, 21st, 22nd, 23rd, 24th, 26th, 27th, 28th, 29th, 31st. total 28 vahv relocates change existing 2-1/2" supply to 4" pipe.Details
relocate existing 3" fhv's and cabinets on the following floors. 8gh, 9th, 10th, 11th, 12th,13th, 15th, 16th, 18th, 19th, 20th, 21st, 22nd, 23rd, 24th, 26th, 27th, 28th, 29th, 31st. total 28 vahv relocates change existing 2-1/2" supply to 4" pipe. | $75,000 |
| Apr 10, 2012 | Expired or cancelled expired Oct 2013 | 77 Beale St | Paradigm General Contractors | floor 24th minor t.i. to add 3 private offices - walls, doors, side lights, electrical & hvac adj. life safety/sprinkler under design build tiDetails
floor 24th minor t.i. to add 3 private offices - walls, doors, side lights, electrical & hvac adj. life safety/sprinkler under design build ti | $31,250 |
| Apr 6, 2012 | Completed final sign-off Oct 2013 | 77 Beale St | Paradigm General Contractors | 12th floor remodel t.i. include selective demolition & new partitions, doors, glazing, frames, casework, elec & hvac. plumbing & life/safety to be separate design bldg permit.Details
12th floor remodel t.i. include selective demolition & new partitions, doors, glazing, frames, casework, elec & hvac. plumbing & life/safety to be separate design bldg permit. | $360,000 |
| Feb 17, 2012 | Never finaled issued Feb 2012, no final | 77 Beale St | Rfi Enterprises Inc. | revision to 201009140860. as builts submittal plans, fire alarmDetails
revision to 201009140860. as builts submittal plans, fire alarm | $7,500 |
| Feb 10, 2012 | Completed final sign-off Feb 2012 | 77 Beale St | Siemens Industry, Inc. | 32nd floor-addition of 2 strobes for small conference room of pg & e. both devices connect onto the life safety system.Details
32nd floor-addition of 2 strobes for small conference room of pg & e. both devices connect onto the life safety system. | $1,000 |
| Feb 8, 2012 | Never finaled issued Feb 2012, no final | 77 Beale St | Siemens Industry, Inc. | basement level 1b - addition of 8 monitor modules for inputs from a new epo panel installed, all modules connect onto the life safety system.Details
basement level 1b - addition of 8 monitor modules for inputs from a new epo panel installed, all modules connect onto the life safety system. | $3,600 |
| Nov 15, 2011 | Completed final sign-off Feb 2012 | 77 Beale St | Paradigm General Contractors | 29th fl ti: remove e non structural gyp board partition, install new gyp bd partition as indicated on plan. new doors, hardware. relocate e flourescent light fixtures. relocate hvac diffuser per layout. sprinkler and life safety under separate permitsDetails
29th fl ti: remove e non structural gyp board partition, install new gyp bd partition as indicated on plan. new doors, hardware. relocate e flourescent light fixtures. relocate hvac diffuser per layout. sprinkler and life safety under separate permits | $22,000 |
| Nov 10, 2011 | Never finaled issued Nov 2011, no final | 77 Beale St | R L H Fire Protection Inc | fire sprinkler only - relocate 9 heads, add 2 heads, total 11 heads. 29th floor for pg&e.Details
fire sprinkler only - relocate 9 heads, add 2 heads, total 11 heads. 29th floor for pg&e. | $5,500 |
| Oct 25, 2011 | Never finaled issued Oct 2011, no final | 77 Beale St | Ayoob & Peery Plumbing Co Inc | high rise sprikler renovation. relocate and add sprinklers in following floors: basement, basement 2, 1st, 2nd, 5th, 8th, 9th, 10th, 11th, 16th, 18th, 19th, 20th, 22nd, 24th, 26th, 27th, 28th, 30th, and 35th floors. relocate (70) add (44) total 121 sprinkler headsDetails
high rise sprikler renovation. relocate and add sprinklers in following floors: basement, basement 2, 1st, 2nd, 5th, 8th, 9th, 10th, 11th, 16th, 18th, 19th, 20th, 22nd, 24th, 26th, 27th, 28th, 30th, and 35th floors. relocate (70) add (44) total 121 sprinkler heads | $62,194 |
| Oct 24, 2011 | Never finaled issued Oct 2011, no final | 77 Beale St | R L H Fire Protection Inc | b-1 level fire sprinkler permit - relocate 12 and add 2 pendents.Details
b-1 level fire sprinkler permit - relocate 12 and add 2 pendents. | $7,000 |
| Aug 31, 2011 | Completed final sign-off Dec 2011 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | 3rd/19th/20th/23rd/30th & 31st flrs-tenant improvement-install 3" fire hose valves & cabinets-6 fire hose valves, 5 cabinets.Details
3rd/19th/20th/23rd/30th & 31st flrs-tenant improvement-install 3" fire hose valves & cabinets-6 fire hose valves, 5 cabinets. | $12,000 |
| Aug 16, 2011 | Completed final sign-off Feb 2013 | 77 Beale St | C B 2 Builders Incorporated | office ti on level b1. install doors and turnstile with card reader access, exit doors to be free exiting, demo existing concrete ramp, install new concrete ramp at secured entry. build new partitions,relocate existing light fixtures and install new ceiling. no mechanical work.Details
office ti on level b1. install doors and turnstile with card reader access, exit doors to be free exiting, demo existing concrete ramp, install new concrete ramp at secured entry. build new partitions,relocate existing light fixtures and install new ceiling. no mechanical work. | $69,000 |
| Aug 16, 2011 | Never finaled issued Aug 2011, no final | 77 Beale St | Ayoob & Peery Plumbing Co Inc | 22nd floor-seismic upgrade (sway bracing and end-of branch line restraints) of (e) overhead copper sprinkler pipingDetails
22nd floor-seismic upgrade (sway bracing and end-of branch line restraints) of (e) overhead copper sprinkler piping | $5,000 |
| Jul 29, 2011 | Completed final sign-off Feb 2012 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | fire sprinklers heads replacement on the following fl: b1,1,2,3,6,7,8,9,10,12,13,14,15,16,17,18,19,21, 22,23,24,25,26,28,29,30,31,32,33,34 & 35. total hds 3,936. recalled omega sprinklers are model gb4-fr & gb b9 central-1/2" npt, 155f & 200f. qr. also add 16 sprinklers and relocate 40 sprinklersDetails
fire sprinklers heads replacement on the following fl: b1,1,2,3,6,7,8,9,10,12,13,14,15,16,17,18,19,21, 22,23,24,25,26,28,29,30,31,32,33,34 & 35. total hds 3,936. recalled omega sprinklers are model gb4-fr & gb b9 central-1/2" npt, 155f & 200f. qr. also add 16 sprinklers and relocate 40 sprinklers | $75,000 |
| Jul 7, 2011 | Completed final sign-off Aug 2011 | 77 Beale St | Siemens Industry, Inc. | as builts for fire alarm system for work originally done under appl. # 201006285388. revised to show what was installed uner that appl.Details
as builts for fire alarm system for work originally done under appl. # 201006285388. revised to show what was installed uner that appl. | |
| May 19, 2011 | Completed final sign-off Jun 2011 | 77 Beale St | C B 2 Builders Incorporated | revsion to appl.#201101128263 - provide epoxy coating to generator room locate roof on 5th fl. generator and fuel piping under separate permit.Details
revsion to appl.#201101128263 - provide epoxy coating to generator room locate roof on 5th fl. generator and fuel piping under separate permit. | $15,000 |
| Apr 29, 2011 | Completed final sign-off May 2011 | 77 Beale St | Siemens Industry, Inc. | level 1b as builts- revised fire alarm functional matrix drawing to match the associated crac shutdown functions as tested. the sffd inspector for the final test noted thate this change needed to be done on the original life safety permit job card. orig life safety pa #201004230952.Details
level 1b as builts- revised fire alarm functional matrix drawing to match the associated crac shutdown functions as tested. the sffd inspector for the final test noted thate this change needed to be done on the original life safety permit job card. orig life safety pa #201004230952. | |
| Apr 15, 2011 | Never finaled issued Apr 2011, no final | 77 Beale St | Siemens Industry, Inc. | 21st floor-addition of 2 duct detectors, 5 modules & 4 remote led stations for the 4 fsd installation. the detectors & modules will connect onto the (e) life safety systemDetails
21st floor-addition of 2 duct detectors, 5 modules & 4 remote led stations for the 4 fsd installation. the detectors & modules will connect onto the (e) life safety system | $4,300 |
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 77 Beale St | Paradigm General Contractors | office ti. revision to pa#2010.10.05.2288. additional work door installation to energy hub room on the 25th floorDetails
office ti. revision to pa#2010.10.05.2288. additional work door installation to energy hub room on the 25th floor | $6,000 |
| Mar 16, 2011 | Completed final sign-off Sep 2011 | 77 Beale St | Balch Petroleum Contractors & Builders | revision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added.Details
revision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added. | |
| Mar 11, 2011 | Completed final sign-off Oct 2012 | 77 Beale St | C B 2 Builders Incorporated | revision to 201003107878. add 1 new emergency exit gate and remove 1 ada gate at each address aboveDetails
revision to 201003107878. add 1 new emergency exit gate and remove 1 ada gate at each address above | |
| Jan 12, 2011 | Completed final sign-off Jun 2011 | 77 Beale St | Balch Petroleum Contractors & Builders | secondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emergency generators, and hazardous containment berms with leak sensors.Details
secondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emergency generators, and hazardous containment berms with leak sensors. | $230,000 |
| Jan 3, 2011 | Completed final sign-off Feb 2011 | 77 Beale St | Rfi Enterprises Inc. | revision to (e) pa 2010.12.14.6622, as built for fire alarm system on 25th floor.Details
revision to (e) pa 2010.12.14.6622, as built for fire alarm system on 25th floor. | |
| Dec 14, 2010 | Completed final sign-off Mar 2011 | 77 Beale St | Rfi Enterprises Inc. | revision to 201007096317, 201007287670. final as builts, fire alarmDetails
revision to 201007096317, 201007287670. final as builts, fire alarm | $1,000 |
| Nov 23, 2010 | Never finaled issued Nov 2010, no final | 77 Beale St | Siemens Industry, Inc. | ground floor-as built dwgs which indicate a sequence of operation revision for the life safety system interface on "pg & e" turnstile projects. as builts permit is submitted @ request of the sffd testing inspector to receive final approval on 201005263259, 201005263264,201005263265 & 201005263269.Details
ground floor-as built dwgs which indicate a sequence of operation revision for the life safety system interface on "pg & e" turnstile projects. as builts permit is submitted @ request of the sffd testing inspector to receive final approval on 201005263259, 201005263264,201005263265 & 201005263269. | |
| Oct 25, 2010 | Completed final sign-off Feb 2011 | 77 Beale St | Capital Tower & Communications | modification of an (e) wireless telecommunications facility in kind replacement of 2 (e) cabinets & in kind replacement of 1 panel antennaDetails
modification of an (e) wireless telecommunications facility in kind replacement of 2 (e) cabinets & in kind replacement of 1 panel antenna | $12,000 |
| Oct 21, 2010 | Completed final sign-off Nov 2010 | 77 Beale St | C B 2 Builders Incorporated | 5th fl ti: remove existing non structural gyp bd partitions, build new gyp bd partitions and install new doors- no future permits requiredDetails
5th fl ti: remove existing non structural gyp bd partitions, build new gyp bd partitions and install new doors- no future permits required | $5,500 |
| Oct 20, 2010 | Never finaled issued Oct 2010, no final | 77 Beale St | street space and mtaDetails
street space and mta | ||
| Oct 20, 2010 | Completed final sign-off Jul 2011 | 77 Beale St | Ac3 | new roof top window washing equipement at roof top and new stabilization anchors at building curtain wallDetails
new roof top window washing equipement at roof top and new stabilization anchors at building curtain wall | $600,000 |
| Oct 6, 2010 | Never finaled issued Oct 2010, no final | 77 Beale St | street spaceDetails
street space | ||
| Oct 5, 2010 | Completed final sign-off Mar 2011 | 77 Beale St | Paradigm General Contractors | revise women's toilet for 25th floor and add 2 doors as part of change to permit app#201005263288.Details
revise women's toilet for 25th floor and add 2 doors as part of change to permit app#201005263288. | $19,000 |
| Sep 14, 2010 | Completed final sign-off Feb 2012 | 77 Beale St | Rfi Enterprises Inc. | voluntary upgrade of visual notification devices.Details
voluntary upgrade of visual notification devices. | $110,379 |
| Aug 10, 2010 | Completed final sign-off Feb 2011 | 77 Beale St | R L H Fire Protection Inc | t.i. upgrade of existing fire sprinkler system. relocate 2 sprinklers, add 3 sprinklers and delete 1 sprinklerDetails
t.i. upgrade of existing fire sprinkler system. relocate 2 sprinklers, add 3 sprinklers and delete 1 sprinkler | $1,500 |
| Aug 3, 2010 | Completed final sign-off Oct 2010 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | relocate 193 sprinklers, relocate (e) sway brace (6).Details
relocate 193 sprinklers, relocate (e) sway brace (6). | $27,984 |
| Jul 28, 2010 | Completed final sign-off Feb 2011 | 77 Beale St | Rfi Enterprises Inc. | 25th floor- as builts drawing for facp tenant improvement. tie to ap #201007096317.Details
25th floor- as builts drawing for facp tenant improvement. tie to ap #201007096317. | $1,000 |
| Jul 16, 2010 | Never finaled issued Jul 2010, no final | 77 Beale St | street spaceDetails
street space | ||
| Jul 15, 2010 | Never finaled issued Jul 2010, no final | 77 Beale St | street space and mta parkingDetails
street space and mta parking | ||
| Jul 9, 2010 | Completed final sign-off Feb 2012 | 77 Beale St | Rfi Enterprises Inc. | fire alarm tenant inprovement on the 25th floorDetails
fire alarm tenant inprovement on the 25th floor | $14,830 |
| Jul 7, 2010 | Completed final sign-off Apr 2011 | 77 Beale St | Paradigm General Contractors | enlarge breakroom, modify and divde existing server room into server room and conference room on the 16th floorDetails
enlarge breakroom, modify and divde existing server room into server room and conference room on the 16th floor | $200,000 |
| Jun 28, 2010 | Never finaled issued Jun 2010, no final | 77 Beale St | Siemens Industry, Inc. | addition of 1 remote life safety panel, 22 duct detectors, 44 monitor modules, 11 relay modules, 44 remote stations f/duct detectors, 44- 24 vdc relays. for monitor and control of 44 new fsds by others which will be mounted on floors 19,20,22,23,24,26,27,28,29,30,31Details
addition of 1 remote life safety panel, 22 duct detectors, 44 monitor modules, 11 relay modules, 44 remote stations f/duct detectors, 44- 24 vdc relays. for monitor and control of 44 new fsds by others which will be mounted on floors 19,20,22,23,24,26,27,28,29,30,31 | $40,000 |
| Jun 16, 2010 | Completed final sign-off Sep 2011 | 77 Beale St | Siemens Industry, Inc. | add one (n) duct detector & 2-tri-r. work to be done in revision to permit 2010-04230952 for as-builts.Details
add one (n) duct detector & 2-tri-r. work to be done in revision to permit 2010-04230952 for as-builts. | $2,000 |
| Jun 4, 2010 | Never finaled issued Jun 2010, no final | 77 Beale St | street space and sidewalk/mtaDetails
street space and sidewalk/mta | ||
| May 26, 2010 | Never finaled issued Jun 2010, no final | 77 Beale St | Siemens Industry, Inc. | provide relay to unlock turn style during a fire event in basement 1. fire alarm system.Details
provide relay to unlock turn style during a fire event in basement 1. fire alarm system. | $2,000 |
| May 26, 2010 | Completed final sign-off Apr 2011 | 77 Beale St | Paradigm General Contractors | full tenant improvement including new open & private office, conf. rm., idf, restrooms, mep system & life safety for 77 beale, no structural work. life safety & sprinkler under separate permits.Details
full tenant improvement including new open & private office, conf. rm., idf, restrooms, mep system & life safety for 77 beale, no structural work. life safety & sprinkler under separate permits. | $1,875,000 |
| Apr 26, 2010 | Completed final sign-off Sep 2010 | 77 Beale St | Paradigm General Contractors | 25th floor - demolition only for floor layout, mep. no structural and life safety workDetails
25th floor - demolition only for floor layout, mep. no structural and life safety work | $162,000 |
| Apr 23, 2010 | Never finaled issued Apr 2010, no final | 77 Beale St | Paradigm General Contractors | to obtain final inspection for work approved under app#200611208134. all work has been completedDetails
to obtain final inspection for work approved under app#200611208134. all work has been completed | |
| Apr 23, 2010 | Completed final sign-off Sep 2011 | 77 Beale St | Siemens Industry, Inc. | provide smoke detectors & relay modules for (n) acu units 14,18,28,31,32. provide new ald card into (e) fire alarm panel.Details
provide smoke detectors & relay modules for (n) acu units 14,18,28,31,32. provide new ald card into (e) fire alarm panel. | $10,000 |
| Mar 10, 2010 | Expired or cancelled expired Oct 2013 | 77 Beale St | C B 2 Builders Incorporated | new turnstiles for security and new ada counter at guards desk for ground floor lobby locationsDetails
new turnstiles for security and new ada counter at guards desk for ground floor lobby locations | $500,000 |
| Feb 26, 2010 | Completed final sign-off Apr 2010 | 77 Beale St | Siemens Industry, Inc. | fire alarm system - add module to monitor veeder root pnael.Details
fire alarm system - add module to monitor veeder root pnael. | $5,000 |
| Dec 8, 2009 | Never finaled issued Dec 2009, no final | 77 Beale St | Siemens Industry, Inc. | addition of 1 smoke detector & relay module for the acu 345 unit on basement level b1. both devices connect onto (e) life safety system.Details
addition of 1 smoke detector & relay module for the acu 345 unit on basement level b1. both devices connect onto (e) life safety system. | $900 |
| Oct 2, 2009 | Completed final sign-off Apr 2010 | 77 Beale St | Paradigm General Contractors | umbrella report-compliance with high rise sprinkler ordinance #377-93, all floorsDetails
umbrella report-compliance with high rise sprinkler ordinance #377-93, all floors |
Find contractors for work like this