Permits filed here

175 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 19, 2026In progress
filed Nov 2026, not yet issued
77 Beale StBayview Environmental Services Inc.interior soft demolition and asbestos abatement
Details
Permit
202609188382

interior soft demolition and asbestos abatement

Open the permit page

$18,824,451
Oct 30, 2026In progress
filed Oct 2026, not yet issued
77 Beale Stdrilling of (7) 6- to 10-inch diameter borings to 70 to 90 feet below street grade within the footprint of the building on private property. construct a permanent well within the borings (mw-2, -3,-4,-6) and perform a pump test in 3 of the borings (pt-2,-4,-5).
Details
Permit
202610300149

drilling of (7) 6- to 10-inch diameter borings to 70 to 90 feet below street grade within the footprint of the building on private property. construct a permanent well within the borings (mw-2, -3,-4,-6) and perform a pump test in 3 of the borings (pt-2,-4,-5).

Open the permit page

$2,000
Sep 22, 2026In progress
filed Sep 2026, not yet issued
77 Beale Stasbestos abatement of fireproofing,stucco & asbestos paint.interior work.
Details
Permit
202609228482

asbestos abatement of fireproofing,stucco & asbestos paint.interior work.

Open the permit page

$28,500,000
Jun 28, 2022Never finaled
issued Aug 2022, no final
77 Beale StTurner Construction Cowork on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.
Details
Permit
202206287307
Permit issued
Aug 9, 2022

work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.

Open the permit page

$728,548
Feb 15, 2022Expired or cancelled
withdrawn Sep 2025
77 Beale StTurner Construction Corenovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.
Details
Permit
202202157996

renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.

Open the permit page

$105,596,280
Apr 9, 2021Never finaled
issued May 2021, no final
77 Beale StAble Maintenance Incremove (1) 5k diesel ust. remove (1) 12k gasoline ust. remove overhead piping in parking garage. non structural no electrical.
Details
Permit
202104098250
Permit issued
May 25, 2021

remove (1) 5k diesel ust. remove (1) 12k gasoline ust. remove overhead piping in parking garage. non structural no electrical.

Open the permit page

$50,000
Jul 9, 2020Completed
final sign-off Aug 2020
77 Beale StSiemens Industry, Inc.27th fl - as built dwgs for fire alarm work on "swing space" remodel. dwgs reflect as installed conditions for both (n) & (e) devices per request of sffd. initial life safety permit done under pa 2019-0514-0508. no new devices added under this permit
Details
Permit
202007099871
Permit issued
Jul 10, 2020
Final sign-off
Aug 17, 2020

27th fl - as built dwgs for fire alarm work on "swing space" remodel. dwgs reflect as installed conditions for both (n) & (e) devices per request of sffd. initial life safety permit done under pa 2019-0514-0508. no new devices added under this permit

Open the permit page

Jun 24, 2019Completed
final sign-off Jul 2019
77 Beale StSiemens Industry, Inc."as built" permit for the deletion of 6 duct detectors on the "fsd" project on floors 15 & 16, at the request of sffd testing inspector, to reflect the final installation. ref pa #201810314616. maher na
Details
Permit
201906244175
Permit issued
Jun 27, 2019
Final sign-off
Jul 19, 2019

"as built" permit for the deletion of 6 duct detectors on the "fsd" project on floors 15 & 16, at the request of sffd testing inspector, to reflect the final installation. ref pa #201810314616. maher na

Open the permit page

May 28, 2019Completed
final sign-off Aug 2019
77 Beale StAyoob & Peery Plumbing Co Inc16th flr, fire sprinklers. add 4 sprinklers to conform w/ the (n) wall / ceiling layout of tenant improvement.
Details
Permit
201905281817
Permit issued
May 28, 2019
Final sign-off
Aug 16, 2019

16th flr, fire sprinklers. add 4 sprinklers to conform w/ the (n) wall / ceiling layout of tenant improvement.

Open the permit page

$2,100
May 15, 2019Completed
final sign-off May 2019
77 Beale StAyoob & Peery Plumbing Co Inc16th fl: add 5, relocate 0 and plug 0 sprinklers to conform with new wall ceiling layout of tenant improvement
Details
Permit
201905150776
Permit issued
May 16, 2019
Final sign-off
May 30, 2019

16th fl: add 5, relocate 0 and plug 0 sprinklers to conform with new wall ceiling layout of tenant improvement

Open the permit page

$2,625
May 14, 2019Completed
final sign-off Aug 2020
77 Beale StSiemens Industry, Inc.27/f: fire alarm work for the swing space remodel on floor 27, additions are 9 smoke detectors, 2 strobe power supplies, 49 speaker strobes. ref 201801199085
Details
Permit
201905140508
Permit issued
May 14, 2019
Final sign-off
Aug 10, 2020

27/f: fire alarm work for the swing space remodel on floor 27, additions are 9 smoke detectors, 2 strobe power supplies, 49 speaker strobes. ref 201801199085

Open the permit page

$39,900
May 14, 2019Completed
final sign-off Jul 2019
77 Beale StSiemens Industry, Inc.8/f: fire alarm work for swing space rmodel on floor 8. additions are 10 smoke detectors, 2 strobe power supplies, 44 speaker strobes. ref 201801199088
Details
Permit
201905140506
Permit issued
May 14, 2019
Final sign-off
Jul 26, 2019

8/f: fire alarm work for swing space rmodel on floor 8. additions are 10 smoke detectors, 2 strobe power supplies, 44 speaker strobes. ref 201801199088

Open the permit page

$37,400
May 7, 2019Never finaled
issued May 2019, no final
77 Beale StW M Wireless Inct mobile temporary installation of (2) antenna on roof and cable to (e) equipment, installation of (1) temporary cabinet , 1 temp breaker n/a maher
Details
Permit
201905079936
Permit issued
May 7, 2019

t mobile temporary installation of (2) antenna on roof and cable to (e) equipment, installation of (1) temporary cabinet , 1 temp breaker n/a maher

Open the permit page

$6,500
Feb 27, 2019Completed
final sign-off Aug 2019
77 Beale St27th flr. fire sprinkler, tenant improvement. relocate 166 heads, add 29 heads and delete 20 heads. ref pa 201801199085
Details
Permit
201902273935
Permit issued
Apr 12, 2019
Final sign-off
Aug 16, 2019

27th flr. fire sprinkler, tenant improvement. relocate 166 heads, add 29 heads and delete 20 heads. ref pa 201801199085

Open the permit page

$53,210
Dec 19, 2018Never finaled
issued Dec 2018, no final
77 Beale StSiemens Industry, Inc.fire alarm work for the fsd and fan unit additions on floors 15 & 16; 17 duct detectors are added on floor 15; 1 smoke detector, 6 duct detectors, and 6 modules are added on floor 16. ref pa #201810314616.
Details
Permit
201812198817
Permit issued
Dec 20, 2018

fire alarm work for the fsd and fan unit additions on floors 15 & 16; 17 duct detectors are added on floor 15; 1 smoke detector, 6 duct detectors, and 6 modules are added on floor 16. ref pa #201810314616.

Open the permit page

$37,080
Dec 19, 2018Completed
final sign-off Apr 2019
77 Beale StSiemens Industry, Inc.fire alarm work for the "fire/smoke damper" installation on floor 11; additions are duct detectors. ref pa 2018-1031-4615
Details
Permit
201812198691
Permit issued
Dec 19, 2018
Final sign-off
Apr 9, 2019

fire alarm work for the "fire/smoke damper" installation on floor 11; additions are duct detectors. ref pa 2018-1031-4615

Open the permit page

$17,435
Dec 7, 2018Expired or cancelled
cancelled Jan 2026
77 Beale StC B 2 Builders Incorporated15th and 16th floor: smoke management report for record only. no scope associated with this permit. ref app#201810314616
Details
Permit
201812077740

15th and 16th floor: smoke management report for record only. no scope associated with this permit. ref app#201810314616

Open the permit page

Nov 29, 2018Completed
final sign-off May 2019
77 Beale St8th floor - fire sprinkler tenant improvement relocate 167 heads, add 15 heads, delete 28 heads ref 201801199088
Details
Permit
201811296952
Permit issued
Dec 13, 2018
Final sign-off
May 15, 2019

8th floor - fire sprinkler tenant improvement relocate 167 heads, add 15 heads, delete 28 heads ref 201801199088

Open the permit page

$53,210
Nov 13, 2018Completed
final sign-off Feb 2020
77 Beale StSiemens Industry, Inc.32nd fl - fire alarm work to add 2 relay modules for fire/smoke damper control and monitoring as part of the "hvac upgrade" projects. ref pa 2018-0507-8397
Details
Permit
201811135580
Permit issued
Nov 13, 2018
Final sign-off
Feb 4, 2020

32nd fl - fire alarm work to add 2 relay modules for fire/smoke damper control and monitoring as part of the "hvac upgrade" projects. ref pa 2018-0507-8397

Open the permit page

$1,100
Oct 31, 2018Completed
final sign-off Apr 2020
77 Beale StC B 2 Builders Incorporatedreplace existing fsd's and install core vav's. upgrade on the 15th floor . install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor.
Details
Permit
201810314616
Permit issued
Nov 1, 2018
Final sign-off
Apr 24, 2020

replace existing fsd's and install core vav's. upgrade on the 15th floor . install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor.

Open the permit page

$1,800,000
Oct 31, 2018Completed
final sign-off Apr 2019
77 Beale StC B 2 Builders Incorporatedreplace existing fsd's and install core vav's on the 11th floor. hvac upgrade.
Details
Permit
201810314615
Permit issued
Dec 7, 2018
Final sign-off
Apr 10, 2019

replace existing fsd's and install core vav's on the 11th floor. hvac upgrade.

Open the permit page

$750,000
May 7, 2018Completed
final sign-off Feb 2020
77 Beale StRoebbelen Contracting Incupgrade to existing hvac system on 32nd fl adding new vavs, replace control valves, balancing, fsd improvements - adding 5 (n) fsds and 17 (e) fsds intrfaced to icdiacator panel, new bms controls maher not req
Details
Permit
201805078397
Permit issued
May 21, 2018
Final sign-off
Feb 6, 2020

upgrade to existing hvac system on 32nd fl adding new vavs, replace control valves, balancing, fsd improvements - adding 5 (n) fsds and 17 (e) fsds intrfaced to icdiacator panel, new bms controls maher not req

Open the permit page

$670,000
Mar 21, 2018Completed
final sign-off Jul 2024
77 Beale StSiemens Industry, Inc.fire alarm work to upgrade the (e) life safety system, the work will include the replacement of 17 panels, all field devices to be reused & will remain as installed.
Details
Permit
201803214191
Permit issued
Mar 29, 2018
Final sign-off
Jul 16, 2024

fire alarm work to upgrade the (e) life safety system, the work will include the replacement of 17 panels, all field devices to be reused & will remain as installed.

Open the permit page

$200,000
Mar 1, 2018Never finaled
issued Mar 2018, no final
77 Beale Ststreet space
Details
Permit
M895687
Permit issued
Mar 1, 2018

street space

Open the permit page

Feb 1, 2018Expired or cancelled
withdrawn Oct 2018
77 Beale StC B 2 Builders Incorporatedfsd and vav upgrade at 11th and 15th floor only. n/a for maher
Details
Permit
201802010175

fsd and vav upgrade at 11th and 15th floor only. n/a for maher

Open the permit page

$1,500,000
Jan 19, 2018Completed
final sign-off Aug 2020
77 Beale StRoebbelen Contracting Inc27th fl - full floor buildout. partitions, mep
Details
Permit
201801199085
Permit issued
Jul 27, 2018
Final sign-off
Aug 28, 2020

27th fl - full floor buildout. partitions, mep

Open the permit page

$2,300,000
Jan 19, 2018Completed
final sign-off Aug 2020
77 Beale StRoebbelen Contracting Inc8th fl - full floor buildout. partitions, mep
Details
Permit
201801199088
Permit issued
Jul 27, 2018
Final sign-off
Aug 28, 2020

8th fl - full floor buildout. partitions, mep

Open the permit page

$2,300,000
Dec 15, 2017Completed
final sign-off Aug 2020
77 Beale StRoebbelen Contracting Inc8th flr: soft demo - partition, ceilings and flooring. maher n/a.
Details
Permit
201712156584
Permit issued
Jan 26, 2018
Final sign-off
Aug 28, 2020

8th flr: soft demo - partition, ceilings and flooring. maher n/a.

Open the permit page

$50,000
Dec 15, 2017Completed
final sign-off Aug 2020
77 Beale StRoebbelen Contracting Inc27th flr: soft demo - partition, ceilings and flooring. maher na
Details
Permit
201712156582
Permit issued
Jan 26, 2018
Final sign-off
Aug 28, 2020

27th flr: soft demo - partition, ceilings and flooring. maher na

Open the permit page

$50,000
Nov 28, 2017Never finaled
issued Nov 2017, no final
77 Beale Ststreet space & mta parking meter
Details
Permit
M859827
Permit issued
Nov 28, 2017

street space & mta parking meter

Open the permit page

Nov 2, 2017Completed
final sign-off Mar 2019
77 Beale StRoebbelen Contracting Incprovide new gaurd shack and parking area approach. all associated mechanical and elec work. coordinate demo of existing gaurd shack
Details
Permit
201711022940
Permit issued
Dec 13, 2017
Final sign-off
Mar 21, 2019

provide new gaurd shack and parking area approach. all associated mechanical and elec work. coordinate demo of existing gaurd shack

Open the permit page

$70,000
Jul 7, 2017Never finaled
issued Jul 2017, no final
77 Beale StSiemens Industry, Inc.fire alarm addition of 1 speaker/strobe for a conference room on floor 10; device being added as a portional of the "restack" remodel project. ref pa 2016-1219-5268. maher na
Details
Permit
201707071180
Permit issued
Jul 11, 2017

fire alarm addition of 1 speaker/strobe for a conference room on floor 10; device being added as a portional of the "restack" remodel project. ref pa 2016-1219-5268. maher na

Open the permit page

$510
May 25, 2017Never finaled
issued Jun 2017, no final
77 Beale StRoebbelen Contracting Incti of existing security office in basement. including celing, finishes, mep & accessible restroom
Details
Permit
201705257612
Permit issued
Jun 6, 2017

ti of existing security office in basement. including celing, finishes, mep & accessible restroom

Open the permit page

$275,000
May 19, 2017Completed
final sign-off Feb 2021
77 Beale StRoebbelen Contracting Inc10/f- revision to pa#201612195268, modify of exit signage based on site conditions & inspections. n/a ordinance #155-13
Details
Permit
201705197137
Permit issued
Dec 1, 2017
Final sign-off
Feb 5, 2021

10/f- revision to pa#201612195268, modify of exit signage based on site conditions & inspections. n/a ordinance #155-13

Open the permit page

$200,000
May 19, 2017Completed
final sign-off Feb 2021
77 Beale StRoebbelen Contracting Inc9/f- revision to pa#2016-1219-5271, revise square footage calculation, removal of fixed cabinetry & furnishings from calculation, modify of exit signage. n/a ordinance #155-13
Details
Permit
201705197133
Permit issued
Dec 1, 2017
Final sign-off
Feb 23, 2021

9/f- revision to pa#2016-1219-5271, revise square footage calculation, removal of fixed cabinetry & furnishings from calculation, modify of exit signage. n/a ordinance #155-13

Open the permit page

$200,000
Feb 24, 2017Never finaled
issued Mar 2017, no final
77 Beale StWalschon Fire Protection Incdemo extg sprinklers to allow for new partitions and ceilings. instll nw pendent sprinklers, add upright sprinkler hangers, branch line restraints, & upgrade bracing on extg fire sprinkler main. demo extg hose cabinets and relocate. maher n/a. t.i-9th fl: 201612195271 & t.i-10th fl: 201612195268
Details
Permit
201702240099
Permit issued
Mar 7, 2017

demo extg sprinklers to allow for new partitions and ceilings. instll nw pendent sprinklers, add upright sprinkler hangers, branch line restraints, & upgrade bracing on extg fire sprinkler main. demo extg hose cabinets and relocate. maher n/a. t.i-9th fl: 201612195271 & t.i-10th fl: 201612195268

Open the permit page

$50,000
Feb 21, 2017Completed
final sign-off Jan 2020
77 Beale StSiemens Industry, Inc.9th & 10th flr: fire alarm - add 24 smoke detectors. 10 duct detectors, 102 speaker/strobes & 4 pull stations. maher na. ref 2016-1219-5271 (9th fl) and 2016-1219-5268 (10th fl).
Details
Permit
201702219722
Permit issued
Feb 21, 2017
Final sign-off
Jan 30, 2020

9th & 10th flr: fire alarm - add 24 smoke detectors. 10 duct detectors, 102 speaker/strobes & 4 pull stations. maher na. ref 2016-1219-5271 (9th fl) and 2016-1219-5268 (10th fl).

Open the permit page

$75,200
Feb 10, 2017Completed
final sign-off Feb 2017
77 Beale StSiemens Industry, Inc.3rd floor: fire alarm as built permit for the wellness center. the revision corrects a duct detector address per the sffd testing inspector. n/a for maher. ref app#201607192705.
Details
Permit
201702109119
Permit issued
Feb 16, 2017
Final sign-off
Feb 23, 2017

3rd floor: fire alarm as built permit for the wellness center. the revision corrects a duct detector address per the sffd testing inspector. n/a for maher. ref app#201607192705.

Open the permit page

Dec 19, 2016Completed
final sign-off Feb 2021
77 Beale StRoebbelen Contracting Inc10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance
Details
Permit
201612195268
Permit issued
Jan 13, 2017
Final sign-off
Feb 5, 2021

10th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance

Open the permit page

$2,000,000
Dec 19, 2016Completed
final sign-off Feb 2021
77 Beale StRoebbelen Contracting Inc9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance
Details
Permit
201612195271
Permit issued
Jan 13, 2017
Final sign-off
Feb 23, 2021

9th floor - office t.i. , structural, mep for full floor to prepare for future tenant. n/a maher ordinance

Open the permit page

$2,000,000
Nov 16, 2016Never finaled
issued Nov 2016, no final
77 Beale StSwinerton Buildersexterior lobby - install new wood planters
Details
Permit
201611162839
Permit issued
Nov 23, 2016

exterior lobby - install new wood planters

Open the permit page

$28,000
Nov 15, 2016Never finaled
issued Nov 2016, no final
77 Beale Ststreet space: meters only. ref m728387
Details
Permit
M739168
Permit issued
Nov 15, 2016

street space: meters only. ref m728387

Open the permit page

Oct 6, 2016Completed
final sign-off Dec 2016
77 Beale StPribuss Engineering Incfire sprinkler ti under pa 2016-0719-2705, relocate 76, add 3; total: 79 x 517.32 =40,868. n/a maher ord. 155-13
Details
Permit
201610069678
Permit issued
Oct 11, 2016
Final sign-off
Dec 8, 2016

fire sprinkler ti under pa 2016-0719-2705, relocate 76, add 3; total: 79 x 517.32 =40,868. n/a maher ord. 155-13

Open the permit page

$40,868
Oct 6, 2016Never finaled
issued Oct 2016, no final
77 Beale Ststreet space
Details
Permit
M728387
Permit issued
Oct 6, 2016

street space

Open the permit page

Sep 23, 2016Completed
final sign-off Oct 2016
77 Beale StAyoob & Peery Plumbing Co Inclevelb2: relocate one (1) sprinkler to conform with the new wall/ceiling layout of the ti ref pa 2015-1214-5089. maher na
Details
Permit
201609238615
Permit issued
Sep 23, 2016
Final sign-off
Oct 20, 2016

levelb2: relocate one (1) sprinkler to conform with the new wall/ceiling layout of the ti ref pa 2015-1214-5089. maher na

Open the permit page

$203
Sep 22, 2016Completed
final sign-off Feb 2017
77 Beale StSiemens Industry, Inc.3rd flr: add 1 smoke detectors, 7 duct detectors, 1 strobe power supply, 24 speaker/strobes, 6 strobes ref 2016 0719 2705 maher na
Details
Permit
201609228465
Permit issued
Sep 23, 2016
Final sign-off
Feb 21, 2017

3rd flr: add 1 smoke detectors, 7 duct detectors, 1 strobe power supply, 24 speaker/strobes, 6 strobes ref 2016 0719 2705 maher na

Open the permit page

$22,220
Aug 26, 2016Never finaled
issued Aug 2016, no final
77 Beale StSiemens Industry, Inc.b2 level - fire alarm work for the "hvac" remodel on basment level b2; additions are 3 duct detectors, 3 modules, add 2 speaker/strobes. ref pa
Details
Permit
201608266059
Permit issued
Aug 26, 2016

b2 level - fire alarm work for the "hvac" remodel on basment level b2; additions are 3 duct detectors, 3 modules, add 2 speaker/strobes. ref pa

Open the permit page

$4,380
Aug 22, 2016Never finaled
issued Aug 2016, no final
77 Beale StRoebbelen Contracting Inc, Swinerton Builders9th floor: demolition only. ab-017 n/a for maher
Details
Permit
201608225614
Permit issued
Aug 29, 2016

9th floor: demolition only. ab-017 n/a for maher

Open the permit page

$50,000
Aug 22, 2016Never finaled
issued Aug 2016, no final
77 Beale StRoebbelen Contracting Inc, Swinerton Builders10th floor: demolition only.ab 017 n/a for maher
Details
Permit
201608225616
Permit issued
Aug 29, 2016

10th floor: demolition only.ab 017 n/a for maher

Open the permit page

$50,000
Jul 19, 2016Completed
final sign-off Jul 2017
77 Beale StSwinerton Builders3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13
Details
Permit
201607192705
Permit issued
Aug 9, 2016
Final sign-off
Jul 28, 2017

3rd fl: tenant improvement of (e) offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13

Open the permit page

$1,280,000
Jun 29, 2016Completed
final sign-off Oct 2016
77 Beale StSiemens Industry, Inc.fier alarm "as-built" drawing revisions to correct smoke detector and module address points pwer the sffd testing inspector. ref pa 2012-1221-6694. maher na
Details
Permit
201606291141
Permit issued
Jun 29, 2016
Final sign-off
Oct 13, 2016

fier alarm "as-built" drawing revisions to correct smoke detector and module address points pwer the sffd testing inspector. ref pa 2012-1221-6694. maher na

Open the permit page

Jun 20, 2016Never finaled
issued Aug 2016, no final
77 Beale StRoebbelen Contracting Inc3rd floor: install new electrical outlets and service. install occupancy sensors. n/a for maher.
Details
Permit
201606200343
Permit issued
Aug 23, 2016

3rd floor: install new electrical outlets and service. install occupancy sensors. n/a for maher.

Open the permit page

$50,000
May 5, 2016Completed
final sign-off Nov 2016
77 Beale StParadigm General Contractorsrevision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 1110 2287. maher na
Details
Permit
201605056628
Permit issued
May 5, 2016
Final sign-off
Nov 14, 2016

revision to ref pa 2015 0401 3538/the purpose of this submission is to remove scope , to modify the (e) trench drain, from permit 2013 0401 3538. this work is being performed under bld permit 2015 1110 2287. maher na

Open the permit page

Apr 22, 2016Completed
final sign-off Sep 2016
77 Beale Stfire sprinkler relocate 46, add 3, delete 14 ref 201601288213
Details
Permit
201604225504
Permit issued
Apr 25, 2016
Final sign-off
Sep 23, 2016

fire sprinkler relocate 46, add 3, delete 14 ref 201601288213

Open the permit page

$10,751
Apr 22, 2016Completed
final sign-off Sep 2016
77 Beale StSiemens Industry, Inc.fire alarm work for the "pg&e refresh" ti remodel on floor 32; additions are 4 smoke detectors and 15 speaker/strobes. ref pa 2016-0128-8213
Details
Permit
201604225434
Permit issued
Apr 22, 2016
Final sign-off
Sep 26, 2016

fire alarm work for the "pg&e refresh" ti remodel on floor 32; additions are 4 smoke detectors and 15 speaker/strobes. ref pa 2016-0128-8213

Open the permit page

$10,800
Jan 28, 2016Completed
final sign-off Oct 2016
77 Beale StSkyline Construction32nd flr: interior non-structural demolition, construction of rated and non-rated partitions, glazing doors & frames, hardware, millwork, mechanical and electrical included; maher n/a
Details
Permit
201601288213
Permit issued
Mar 18, 2016
Final sign-off
Oct 31, 2016

32nd flr: interior non-structural demolition, construction of rated and non-rated partitions, glazing doors & frames, hardware, millwork, mechanical and electrical included; maher n/a

Open the permit page

$475,680
Jan 11, 2016Never finaled
issued Jan 2016, no final
77 Beale Ststreet space permit
Details
Permit
M653747
Permit issued
Jan 11, 2016

street space permit

Open the permit page

Dec 16, 2015Never finaled
issued Dec 2015, no final
77 Beale Ststreet space w/mta
Details
Permit
M647427
Permit issued
Dec 16, 2015

street space w/mta

Open the permit page

Dec 14, 2015Never finaled
issued Jun 2016, no final
77 Beale StW. Bradley Electric, Sprig Electric (Archkey Solutions)total building electrical distribution replacement level b2 through 34. modification to the (e) level b2 electrical room inluding architectural, mechanical & electrical. n/a for maher ordinance155-13.
Details
Permit
201512145089
Permit issued
Jun 30, 2016

total building electrical distribution replacement level b2 through 34. modification to the (e) level b2 electrical room inluding architectural, mechanical & electrical. n/a for maher ordinance155-13.

Open the permit page

$15,500,000
Nov 10, 2015Completed
final sign-off May 2016
77 Beale StC B 2 Builders Incorporatedwill modify the existing rench drain near the 77 beale entrance. project has non occupied spaces and does not inhibit the access to our usability of existing occupied spaces. n/a for maher.
Details
Permit
201511102287
Permit issued
Jan 4, 2016
Final sign-off
May 5, 2016

will modify the existing rench drain near the 77 beale entrance. project has non occupied spaces and does not inhibit the access to our usability of existing occupied spaces. n/a for maher.

Open the permit page

$150,000
Nov 6, 2015Completed
final sign-off Jun 2016
77 Beale StJfc Construction Inc.modification to an (e) t-mobile microcell facility including: removing 1 (e) antenna, replacing/relocating 1 antenna to top of penthouse; install 1 (n) faux vent pipe to conceal antenna; install 2 (n) rrus, 2 (n) diplexers & 4 (n) 7/8" coax cables; remove all (e) coax & conduit to old antenn
Details
Permit
201511062000
Permit issued
Jan 22, 2016
Final sign-off
Jun 28, 2016

modification to an (e) t-mobile microcell facility including: removing 1 (e) antenna, replacing/relocating 1 antenna to top of penthouse; install 1 (n) faux vent pipe to conceal antenna; install 2 (n) rrus, 2 (n) diplexers & 4 (n) 7/8" coax cables; remove all (e) coax & conduit to old antenn

Open the permit page

$16,000
Oct 29, 2015Never finaled
issued Oct 2015, no final
77 Beale StPribuss Engineering Inclevel b1 fire sprinkler ti 201312124039 relcate 38, add 05 total 43
Details
Permit
201510291110
Permit issued
Oct 29, 2015

level b1 fire sprinkler ti 201312124039 relcate 38, add 05 total 43

Open the permit page

$22,129
Oct 27, 2015Completed
final sign-off Mar 2016
77 Beale StSiemens Industry, Inc.fire alarm for the "office improvement" remodel on level b1, addtions are 5 smoke detectors, 2 duct detectors, 2 modules, and 11 speaker/strobes. ref pa 2013-1212-4039. maher na
Details
Permit
201510270820
Permit issued
Oct 29, 2015
Final sign-off
Mar 14, 2016

fire alarm for the "office improvement" remodel on level b1, addtions are 5 smoke detectors, 2 duct detectors, 2 modules, and 11 speaker/strobes. ref pa 2013-1212-4039. maher na

Open the permit page

$10,200
Jul 13, 2015Completed
final sign-off Oct 2016
77 Beale StSiemens Industry, Inc.fire alarm as built revision on the b1 basement level to reconnect extg smoke detectors into a new remote fire alarm panel. ref app#2013-0401-3538. n/a for maher.
Details
Permit
201507131248
Permit issued
Jul 13, 2015
Final sign-off
Oct 13, 2016

fire alarm as built revision on the b1 basement level to reconnect extg smoke detectors into a new remote fire alarm panel. ref app#2013-0401-3538. n/a for maher.

Open the permit page

$3,000
Jun 3, 2015Never finaled
issued Jun 2015, no final
77 Beale Ststreet space
Details
Permit
M592847
Permit issued
Jun 5, 2015

street space

Open the permit page

May 7, 2015Never finaled
issued May 2015, no final
77 Beale Ststreetspace
Details
Permit
M585027
Permit issued
May 7, 2015

streetspace

Open the permit page

Apr 10, 2015Never finaled
issued Apr 2015, no final
77 Beale StSiemens Industry, Inc.to obtain final inspection for work approved under pa#2012-1221-6694. all work is complete.
Details
Permit
201504103301
Permit issued
Apr 10, 2015

to obtain final inspection for work approved under pa#2012-1221-6694. all work is complete.

Open the permit page

Apr 8, 2015Completed
final sign-off Apr 2015
77 Beale StSiemens Industry, Inc.12/f: fire alarm "as-built" permit as required by the sffd testing inspector; revision is to correct the area of work on the plans for floor 12.
Details
Permit
201504083038
Permit issued
Apr 8, 2015
Final sign-off
Apr 9, 2015

12/f: fire alarm "as-built" permit as required by the sffd testing inspector; revision is to correct the area of work on the plans for floor 12.

Open the permit page

Apr 8, 2015Never finaled
issued Apr 2015, no final
77 Beale StSiemens Industry, Inc.fire alarm "as-builg" permit as required by the sffd testing inspector; revision is to correct the area of work on the plnas for floor 25, including the addition of a speaker/strobe. ref pa 201407080636
Details
Permit
201504083037
Permit issued
Apr 8, 2015

fire alarm "as-builg" permit as required by the sffd testing inspector; revision is to correct the area of work on the plnas for floor 25, including the addition of a speaker/strobe. ref pa 201407080636

Open the permit page

$500
Mar 11, 2015Completed
final sign-off Apr 2015
77 Beale StSiemens Industry, Inc.fire alarm addition of 1 sprinkler/stobe for "conference room 848" on flr 8 maher - not req'd
Details
Permit
201503110461
Permit issued
Mar 13, 2015
Final sign-off
Apr 3, 2015

fire alarm addition of 1 sprinkler/stobe for "conference room 848" on flr 8 maher - not req'd

Open the permit page

$500
Feb 12, 2015Expired or cancelled
cancelled Jan 2026
77 Beale Stverizon idas uses ext. antenna to serve indoor das system. proposed installation consists: new verizon (6) 19" racks within existing he room, (1) gps antenna on 1st floor, 1/2" coax from existing he room to existing bda room, sub-panel within existing he room, & (5) mrrus installed within (e) he rm.
Details
Permit
201502128165

verizon idas uses ext. antenna to serve indoor das system. proposed installation consists: new verizon (6) 19" racks within existing he room, (1) gps antenna on 1st floor, 1/2" coax from existing he room to existing bda room, sub-panel within existing he room, & (5) mrrus installed within (e) he rm.

Open the permit page

$30,000
Jan 28, 2015Completed
final sign-off Oct 2016
77 Beale Ston floor 1b mech room - fire alarm for electrical service replacement project. specifically for additon of 3 smoke detectors to complete beam pocket coverage
Details
Permit
201501286840
Permit issued
Jan 28, 2015
Final sign-off
Oct 13, 2016

on floor 1b mech room - fire alarm for electrical service replacement project. specifically for additon of 3 smoke detectors to complete beam pocket coverage

Open the permit page

$1,500
Jan 26, 2015Never finaled
issued Jan 2015, no final
77 Beale Ststreet space permit
Details
Permit
M553687
Permit issued
Jan 26, 2015

street space permit

Open the permit page

Dec 23, 2014Completed
final sign-off Oct 2016
77 Beale StSiemens Industry, Inc.15th floor: fire alarm deletions of the low rise fsd project. the work for the entire job was approved by the sffd under as-built permit 2014.0502.04736. ref. appl. #2012.1221.6694. maher n/a.
Details
Permit
201412234332
Permit issued
Dec 23, 2014
Final sign-off
Oct 13, 2016

15th floor: fire alarm deletions of the low rise fsd project. the work for the entire job was approved by the sffd under as-built permit 2014.0502.04736. ref. appl. #2012.1221.6694. maher n/a.

Open the permit page

Dec 19, 2014Never finaled
issued Dec 2014, no final
77 Beale Ststreet space
Details
Permit
M544307
Permit issued
Dec 19, 2014

street space

Open the permit page

Dec 2, 2014Never finaled
issued Dec 2014, no final
77 Beale Ststreet space
Details
Permit
M540868
Permit issued
Dec 2, 2014

street space

Open the permit page

Oct 15, 2014Never finaled
issued Oct 2014, no final
77 Beale Ststreet space and mta parking
Details
Permit
M527827
Permit issued
Oct 15, 2014

street space and mta parking

Open the permit page

Oct 8, 2014Never finaled
issued Oct 2014, no final
77 Beale Ststreet space permit
Details
Permit
M525467
Permit issued
Oct 8, 2014

street space permit

Open the permit page

Oct 2, 2014Completed
final sign-off Oct 2014
77 Beale StSiemens Industry, Inc.fire alarm work for the floor 32 board room hvac ti project. additions are 1 duct detector and 1 relay module. n/a for maher.
Details
Permit
201410027848
Permit issued
Oct 2, 2014
Final sign-off
Oct 21, 2014

fire alarm work for the floor 32 board room hvac ti project. additions are 1 duct detector and 1 relay module. n/a for maher.

Open the permit page

$1,200
Aug 29, 2014Never finaled
issued Nov 2014, no final
77 Beale StAire Sheet Metal, Inc.32nd flr: install (1) chw fc unit above ceiling, install (2) wall mounted chw (ductless) units, ductwork & diffusers; maher n/a
Details
Permit
201408295037
Permit issued
Nov 6, 2014

32nd flr: install (1) chw fc unit above ceiling, install (2) wall mounted chw (ductless) units, ductwork & diffusers; maher n/a

Open the permit page

$180,000
Jul 8, 2014Completed
final sign-off Apr 2015
77 Beale StSiemens Industry, Inc.on 25th floor - addition of 1 speaker/strobe to replce existing older unit for energy hub 2550" on floor 25. n/a maher ordinance
Details
Permit
201407080636
Permit issued
Jul 8, 2014
Final sign-off
Apr 10, 2015

on 25th floor - addition of 1 speaker/strobe to replce existing older unit for energy hub 2550" on floor 25. n/a maher ordinance

Open the permit page

$500
Jul 8, 2014Completed
final sign-off Apr 2015
77 Beale StSiemens Industry, Inc.on 12th floor - addition of 1 speaker/strobe to replace existing older unit for "conference room 1219" on floor 12. n/a maher ordinance
Details
Permit
201407080635
Permit issued
Jul 8, 2014
Final sign-off
Apr 10, 2015

on 12th floor - addition of 1 speaker/strobe to replace existing older unit for "conference room 1219" on floor 12. n/a maher ordinance

Open the permit page

$500
Jun 19, 2014Never finaled
issued Jun 2014, no final
77 Beale Ststreet space
Details
Permit
M497907
Permit issued
Jun 19, 2014

street space

Open the permit page

Jun 17, 2014Completed
final sign-off Jun 2014
77 Beale StParadigm General Contractorsrevision to 201304184830 for changes to wall layout and framing details. maher 155-13 not required
Details
Permit
201406178564
Permit issued
Jun 17, 2014
Final sign-off
Jun 30, 2014

revision to 201304184830 for changes to wall layout and framing details. maher 155-13 not required

Open the permit page

Jun 3, 2014Expired or cancelled
cancelled Jul 2016
77 Beale StParadigm General Contractors3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34
Details
Permit
201406037319
Permit issued
Jun 17, 2014

3rd phase of ongoing project to replace the four existing main service switchgear. this phase of the project will replace the 1st fl of 4 switchboard section and bus riser feeding floors 15-34

Open the permit page

$300,000
May 2, 2014Completed
final sign-off Oct 2016
77 Beale StSiemens Industry, Inc.as built permit for low rise fire/smoke damper project from floors 5-18 for pge. these drawings reflect addition of 20 duct detectors. orig work under 201212216694. maher 155-13 not required
Details
Permit
201405024731
Permit issued
May 5, 2014
Final sign-off
Oct 13, 2016

as built permit for low rise fire/smoke damper project from floors 5-18 for pge. these drawings reflect addition of 20 duct detectors. orig work under 201212216694. maher 155-13 not required

Open the permit page

$12,000
Mar 12, 2014Completed
final sign-off Aug 2014
77 Beale StPhoenix Electric Co.installation of pole foundation for sfdpw/sfpuc project in subsidewalk basement, reroute extg drain line, reconstruct interior partition wall.n/a for the maher ordinance #155-13
Details
Permit
201403120566
Permit issued
May 9, 2014
Final sign-off
Aug 27, 2014

installation of pole foundation for sfdpw/sfpuc project in subsidewalk basement, reroute extg drain line, reconstruct interior partition wall.n/a for the maher ordinance #155-13

Open the permit page

$30,000
Mar 10, 2014Expired or cancelled
cancelled Mar 2020
77 Beale St(n)extenet wireless facility to install on bldg roof.install(1)panel antenna inside faux cover loc top of parapet column of 4/fl roof.(1)other antenna,(1)bbu cabinet&(2)radio node units to be loc on(e)parapet wall,behind faux cover/antenna.maher ordinance-no disturbane of at least 50 cu yd of soil.
Details
Permit
201403100294

(n)extenet wireless facility to install on bldg roof.install(1)panel antenna inside faux cover loc top of parapet column of 4/fl roof.(1)other antenna,(1)bbu cabinet&(2)radio node units to be loc on(e)parapet wall,behind faux cover/antenna.maher ordinance-no disturbane of at least 50 cu yd of soil.

Open the permit page

$19,400
Mar 7, 2014Never finaled
issued Mar 2014, no final
77 Beale StParadigm General Contractorsto obtain final inspection for work approved under pa 201204107966. all work is complete
Details
Permit
201403070131
Permit issued
Mar 7, 2014
Final sign-off
Mar 7, 2014

to obtain final inspection for work approved under pa 201204107966. all work is complete

Open the permit page

Mar 7, 2014Never finaled
issued Mar 2014, no final
77 Beale Ststreet space
Details
Permit
M468987
Permit issued
Mar 7, 2014

street space

Open the permit page

Dec 18, 2013Completed
final sign-off Jun 2014
77 Beale StSiemens Industry, Inc.2nd floor:addition of a manual station and module for the security to fire alarm system interface at the "daycare center" on floor 2. all new devices connect onto the fire alarm system. reff app#201312174375
Details
Permit
201312184491
Permit issued
Dec 20, 2013
Final sign-off
Jun 23, 2014

2nd floor:addition of a manual station and module for the security to fire alarm system interface at the "daycare center" on floor 2. all new devices connect onto the fire alarm system. reff app#201312174375

Open the permit page

$1,500
Dec 17, 2013Never finaled
issued Dec 2013, no final
77 Beale StSiemens Industry, Inc.2nd fl. t.i. install electrified lock at existing elevator lobby doors, to comply w/ section 1008.1.4.6 of 2010 sfbc. life safety work under separate permit.
Details
Permit
201312174375
Permit issued
Dec 18, 2013

2nd fl. t.i. install electrified lock at existing elevator lobby doors, to comply w/ section 1008.1.4.6 of 2010 sfbc. life safety work under separate permit.

Open the permit page

$1,200
Dec 12, 2013Completed
final sign-off May 2016
77 Beale StParadigm General Contractors, C B 2 Builders Incorporatedtenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms.
Details
Permit
201312124039
Permit issued
Dec 20, 2013
Final sign-off
May 26, 2016

tenant improvement of open office with modular furniture, a new break area, a new large conference room and 2 smaller conference rooms.

Open the permit page

$425,000
Dec 11, 2013Completed
final sign-off Oct 2016
77 Beale StSiemens Industry, Inc.addition of 36 smoke detectors, 12 duct detectors, 2 modules, 3 horn/strobes, and 3 strobes for the "electrical service replacement" project from the basement b1 level up to floor 34. all devices connect onto the fire alarm system. ref pa 201304013538
Details
Permit
201312113845
Permit issued
Dec 11, 2013
Final sign-off
Oct 13, 2016

addition of 36 smoke detectors, 12 duct detectors, 2 modules, 3 horn/strobes, and 3 strobes for the "electrical service replacement" project from the basement b1 level up to floor 34. all devices connect onto the fire alarm system. ref pa 201304013538

Open the permit page

$30,000
Dec 10, 2013Never finaled
issued Dec 2013, no final
77 Beale Ststreet space permit (renewal of permit #1300304)
Details
Permit
M449927
Permit issued
Dec 10, 2013

street space permit (renewal of permit #1300304)

Open the permit page

Dec 10, 2013Never finaled
issued Dec 2013, no final
77 Beale Ststreet space permit (renewal of permit #1284563)
Details
Permit
M449907
Permit issued
Dec 10, 2013

street space permit (renewal of permit #1284563)

Open the permit page

Dec 9, 2013Completed
final sign-off Jun 2014
77 Beale StPacific Region Contractinglobby. revision to pa#2013-0418-4830. ada restroom upgrade required for previously approved sprig cafe remodel.
Details
Permit
201312093649
Permit issued
Dec 13, 2013
Final sign-off
Jun 19, 2014

lobby. revision to pa#2013-0418-4830. ada restroom upgrade required for previously approved sprig cafe remodel.

Open the permit page

$60,000
Nov 8, 2013Completed
final sign-off May 2016
77 Beale Stall floors:fire sprinkler permit. remove 23 pendents and 85 uprights on level b-1. relocate 32 uprights, add 27 uprights and add 2 pendents in shaft on all floors and switchgear room on b-1. t.i. app#201304053833
Details
Permit
201311081498
Permit issued
Nov 22, 2013
Final sign-off
May 16, 2016

all floors:fire sprinkler permit. remove 23 pendents and 85 uprights on level b-1. relocate 32 uprights, add 27 uprights and add 2 pendents in shaft on all floors and switchgear room on b-1. t.i. app#201304053833

Open the permit page

$31,354
Oct 30, 2013Completed
final sign-off Jun 2014
77 Beale StParadigm General Contractorsplumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafe
Details
Permit
201310300670
Permit issued
Dec 6, 2013
Final sign-off
Jun 10, 2014

plumbing electric scope f/(e) approved architectural, permit arch 201304184830. gr fl cafe

Open the permit page

$40,000
Sep 30, 2013Completed
final sign-off Dec 2013
77 Beale StParadigm General Contractors16th flr: demolition of one (1) non structural partition
Details
Permit
201309308030
Permit issued
Dec 2, 2013
Final sign-off
Dec 19, 2013

16th flr: demolition of one (1) non structural partition

Open the permit page

$4,000
Aug 29, 2013Never finaled
issued Aug 2013, no final
77 Beale Ststreet space permit
Details
Permit
M421807
Permit issued
Aug 29, 2013

street space permit

Open the permit page

Jul 30, 2013Never finaled
issued Jul 2013, no final
77 Beale Ststreet space and mta
Details
Permit
M412727
Permit issued
Jul 30, 2013

street space and mta

Open the permit page

Jul 18, 2013Completed
final sign-off Jan 2014
77 Beale StParadigm General Contractors5th floor-t.i build new 1-hr rated walls, install 20 min rated door & frame assemblies in (e) 1-hr rated corridor to prvide seperation between non complying exit seperation. comply w/ab-005. mech, sprinkler, life safety under seperate permits
Details
Permit
201307182138
Permit issued
Jul 30, 2013
Final sign-off
Jan 15, 2014

5th floor-t.i build new 1-hr rated walls, install 20 min rated door & frame assemblies in (e) 1-hr rated corridor to prvide seperation between non complying exit seperation. comply w/ab-005. mech, sprinkler, life safety under seperate permits

Open the permit page

$9,500
Jun 20, 2013Never finaled
issued Jun 2013, no final
77 Beale StSiemens Industry, Inc.as built drawing revisions for a separate permit per the sffd testing inspector. the changes deal with i.d. numbers for new fsds under the "high-rise fsds" project, application 2012/12/21/9997
Details
Permit
201306209997
Permit issued
Jun 20, 2013

as built drawing revisions for a separate permit per the sffd testing inspector. the changes deal with i.d. numbers for new fsds under the "high-rise fsds" project, application 2012/12/21/9997

Open the permit page

Apr 18, 2013Completed
final sign-off Jun 2014
77 Beale StParadigm General Contractorslobby. remodel (e) vacant cafe space within main lobby of pg & e building. project will entail minimal new drywall partitions, new millwork package, plumbing & electrical for coffee equipment & lighting
Details
Permit
201304184830
Permit issued
Dec 6, 2013
Final sign-off
Jun 23, 2014

lobby. remodel (e) vacant cafe space within main lobby of pg & e building. project will entail minimal new drywall partitions, new millwork package, plumbing & electrical for coffee equipment & lighting

Open the permit page

$101,848
Apr 5, 2013Completed
final sign-off Aug 2014
77 Beale StParadigm General Contractorsbasement level (b1) - selective demolitoin, ceiling, walls, non-structural as shown on plans, basement thru level 34 dumwaiter shaft. (ab-017) and (ab-005)
Details
Permit
201304053833
Permit issued
Jul 15, 2013
Final sign-off
Aug 29, 2014

basement level (b1) - selective demolitoin, ceiling, walls, non-structural as shown on plans, basement thru level 34 dumwaiter shaft. (ab-017) and (ab-005)

Open the permit page

$30,000
Apr 1, 2013Completed
final sign-off Nov 2016
77 Beale StParadigm General Contractorsproj will create (n) elect vault to accom (n)12kv svc feeders, (n) elect main distribution switch gear rm & allow routing(n) elect bus way from(n) elect rm in basement up thru bldg to provide alternative elect svc to current bldg loads. this will allow floor by floor cut over & replace of (e) elec
Details
Permit
201304013538
Permit issued
Aug 23, 2013
Final sign-off
Nov 14, 2016

proj will create (n) elect vault to accom (n)12kv svc feeders, (n) elect main distribution switch gear rm & allow routing(n) elect bus way from(n) elect rm in basement up thru bldg to provide alternative elect svc to current bldg loads. this will allow floor by floor cut over & replace of (e) elec

Open the permit page

$3,500,000
Feb 5, 2013Completed
final sign-off Apr 2013
77 Beale StC B 2 Builders Incorporated6th floor: replace with new new 80" high workstation panel.
Details
Permit
201302059476
Permit issued
Mar 4, 2013
Final sign-off
Apr 2, 2013

6th floor: replace with new new 80" high workstation panel.

Open the permit page

$500
Jan 22, 2013Completed
final sign-off Apr 2013
77 Beale StSiemens Industry, Inc.addition of 7 smoke detectors, 6 duct detectors and 3 relay modules for the "board room" remodel on floor 32, all devices connect onto the fire alarm system. ref pa# 201301097599
Details
Permit
201301228369
Permit issued
Jan 22, 2013
Final sign-off
Apr 9, 2013

addition of 7 smoke detectors, 6 duct detectors and 3 relay modules for the "board room" remodel on floor 32, all devices connect onto the fire alarm system. ref pa# 201301097599

Open the permit page

$9,600
Jan 22, 2013Completed
final sign-off Mar 2014
77 Beale StParadiso Mechanical, Incremove 120x15 section of city sidewalk, excavate pea-gravel down to ust's tank tops. remove & replace (e) frp sumps bonds to tanks. remove existing dw frp ipe system. install new co-flexible pipe system through basement wall. tie-into existing plumbing. hook up low voltage monitoring system. back
Details
Permit
201301228492
Permit issued
Jan 23, 2013
Final sign-off
Mar 14, 2014

remove 120x15 section of city sidewalk, excavate pea-gravel down to ust's tank tops. remove & replace (e) frp sumps bonds to tanks. remove existing dw frp ipe system. install new co-flexible pipe system through basement wall. tie-into existing plumbing. hook up low voltage monitoring system. back

Open the permit page

$78,500
Jan 9, 2013Completed
final sign-off May 2025
77 Beale StAyoob & Peery Plumbing Co Inc32nd floor-add & relocate fire sprinkler heads per tenant improvement-(3 add), (9 relocation). ref t.i pa#201202103920
Details
Permit
201301097599
Permit issued
Jan 9, 2013
Final sign-off
May 21, 2025

32nd floor-add & relocate fire sprinkler heads per tenant improvement-(3 add), (9 relocation). ref t.i pa#201202103920

Open the permit page

$6,100
Dec 21, 2012Never finaled
issued Dec 2012, no final
77 Beale StSiemens Industry, Inc.addition of 1 remote control panel, 14 monitor modules, 14 relay modules, 59 duct detectors for the low rise fire smoke damper project from floors 5 through 18. all new devices connect onto fire alarm system
Details
Permit
201212216694
Permit issued
Dec 21, 2012

addition of 1 remote control panel, 14 monitor modules, 14 relay modules, 59 duct detectors for the low rise fire smoke damper project from floors 5 through 18. all new devices connect onto fire alarm system

Open the permit page

$52,400
Dec 21, 2012Completed
final sign-off Apr 2015
77 Beale StSiemens Industry, Inc.addition of 12 monitor modules, 12 relay modules, 34 duct detectors the high rise fire smoke damper project from floors 19-31.
Details
Permit
201212216693
Permit issued
Dec 21, 2012
Final sign-off
Apr 9, 2015

addition of 12 monitor modules, 12 relay modules, 34 duct detectors the high rise fire smoke damper project from floors 19-31.

Open the permit page

$32,400
Dec 20, 2012Completed
final sign-off Jan 2013
77 Beale StAyoob & Peery Plumbing Co Incadd 5 fire sprinkler heads at elevator mech room. addition, 19th fl. ref pa# 201210142685
Details
Permit
201212206639
Permit issued
Dec 20, 2012
Final sign-off
Jan 8, 2013

add 5 fire sprinkler heads at elevator mech room. addition, 19th fl. ref pa# 201210142685

Open the permit page

$2,570
Dec 18, 2012Never finaled
issued Dec 2012, no final
77 Beale StAyoob & Peery Plumbing Co Incsprinkler system alterations on 32nd floor. add & relocate firesprinkler heads per ti, 3 add & 73 relocate. ti pa#2012-10-09-1518.
Details
Permit
201212186451
Permit issued
Dec 18, 2012

sprinkler system alterations on 32nd floor. add & relocate firesprinkler heads per ti, 3 add & 73 relocate. ti pa#2012-10-09-1518.

Open the permit page

$39,000
Dec 14, 2012Completed
final sign-off Apr 2013
77 Beale StC B 2 Builders Incorporated32nd floor:interior renovation of extg teleconferencing room on 32nd floor. work includes select demolition of extg ceiling grid tiles and light fixtures and installing new suspended ceiling tile. elect/mech will be submitted under seperate permit.
Details
Permit
201212146240
Permit issued
Dec 17, 2012
Final sign-off
Apr 15, 2013

32nd floor:interior renovation of extg teleconferencing room on 32nd floor. work includes select demolition of extg ceiling grid tiles and light fixtures and installing new suspended ceiling tile. elect/mech will be submitted under seperate permit.

Open the permit page

$100,000
Oct 17, 2012Never finaled
issued Oct 2012, no final
77 Beale StSiemens Industry, Inc.sequence of operation revision for the "epo monitoring" project at the basement level. the fire alarm parts added for this job are under original pa# 201202083756
Details
Permit
201210172235
Permit issued
Oct 17, 2012

sequence of operation revision for the "epo monitoring" project at the basement level. the fire alarm parts added for this job are under original pa# 201202083756

Open the permit page

Oct 9, 2012Completed
final sign-off Apr 2013
77 Beale StC B 2 Builders Incorporatedselect demo of the existing ceiling grid, tiles, and light fixtures and the installation of new grid, tiles and lights. mech, elec, life safety and sprinkler are not included under this permit.
Details
Permit
201210091518
Permit issued
Oct 10, 2012
Final sign-off
Apr 15, 2013

select demo of the existing ceiling grid, tiles, and light fixtures and the installation of new grid, tiles and lights. mech, elec, life safety and sprinkler are not included under this permit.

Open the permit page

$80,000
Sep 27, 2012Completed
final sign-off Oct 2012
77 Beale StSiemens Industry, Inc.addition of 1 duct detector and relay module for a fau unit on floor 25. both devices donnect onto fire alarm system
Details
Permit
201209270744
Permit issued
Sep 27, 2012
Final sign-off
Oct 23, 2012

addition of 1 duct detector and relay module for a fau unit on floor 25. both devices donnect onto fire alarm system

Open the permit page

$1,200
Jul 16, 2012Expired or cancelled
expired Oct 2013
77 Beale StParadigm General Contractors19kth floor minor t.i. - remove (e) drywall partitions & doors, construct new gyp bd partitions & new doors at indicated to enlarge office #1974 & add #1974a. sprinkler & life safety, hvac under separate permits.
Details
Permit
201207164890
Permit issued
Aug 1, 2012

19kth floor minor t.i. - remove (e) drywall partitions & doors, construct new gyp bd partitions & new doors at indicated to enlarge office #1974 & add #1974a. sprinkler & life safety, hvac under separate permits.

Open the permit page

$16,000
Jun 7, 2012Completed
final sign-off Nov 2012
77 Beale StAyoob & Peery Plumbing Co Incas-built refer to pa# 2012-0427-9302-added isometric diagram & hydrolic calculations. change arm-over piping hose valves back to 2.5" as originally designed (based on new calcs)
Details
Permit
201206072105
Permit issued
Jun 7, 2012
Final sign-off
Nov 16, 2012

as-built refer to pa# 2012-0427-9302-added isometric diagram & hydrolic calculations. change arm-over piping hose valves back to 2.5" as originally designed (based on new calcs)

Open the permit page

Jun 6, 2012Never finaled
issued Jun 2012, no final
77 Beale StRfi Enterprises Inc.12th floor-new notification appliances being added for an tenant improvement-new fsd's to be added as well (8 total). t.i pa# 201204067773
Details
Permit
201206061915
Permit issued
Jun 6, 2012

12th floor-new notification appliances being added for an tenant improvement-new fsd's to be added as well (8 total). t.i pa# 201204067773

Open the permit page

$3,000
May 16, 2012Completed
final sign-off Jan 2013
77 Beale Stfire sprinklers: relocate 25 heads, add 16 heads on 12th and 24th floors
Details
Permit
201205160560
Permit issued
May 16, 2012
Final sign-off
Jan 16, 2013

fire sprinklers: relocate 25 heads, add 16 heads on 12th and 24th floors

Open the permit page

$15,500
May 10, 2012Completed
final sign-off Mar 2013
77 Beale StC B 2 Builders Incorporatedt.i. construct new equipment storage room, gyp board partitions. install new door. electrical, lgihting title 24 under separate permit. hvac under seperate permit. sprinkler and life safety under seperate permit.
Details
Permit
201205100210
Permit issued
May 14, 2012
Final sign-off
Mar 1, 2013

t.i. construct new equipment storage room, gyp board partitions. install new door. electrical, lgihting title 24 under separate permit. hvac under seperate permit. sprinkler and life safety under seperate permit.

Open the permit page

$14,000
Apr 27, 2012Completed
final sign-off Nov 2012
77 Beale StAyoob & Peery Plumbing Co Increlocate existing 3" fhv's and cabinets on the following floors. 8gh, 9th, 10th, 11th, 12th,13th, 15th, 16th, 18th, 19th, 20th, 21st, 22nd, 23rd, 24th, 26th, 27th, 28th, 29th, 31st. total 28 vahv relocates change existing 2-1/2" supply to 4" pipe.
Details
Permit
201204279302
Permit issued
May 2, 2012
Final sign-off
Nov 16, 2012

relocate existing 3" fhv's and cabinets on the following floors. 8gh, 9th, 10th, 11th, 12th,13th, 15th, 16th, 18th, 19th, 20th, 21st, 22nd, 23rd, 24th, 26th, 27th, 28th, 29th, 31st. total 28 vahv relocates change existing 2-1/2" supply to 4" pipe.

Open the permit page

$75,000
Apr 10, 2012Expired or cancelled
expired Oct 2013
77 Beale StParadigm General Contractorsfloor 24th minor t.i. to add 3 private offices - walls, doors, side lights, electrical & hvac adj. life safety/sprinkler under design build ti
Details
Permit
201204107966
Permit issued
Apr 16, 2012

floor 24th minor t.i. to add 3 private offices - walls, doors, side lights, electrical & hvac adj. life safety/sprinkler under design build ti

Open the permit page

$31,250
Apr 6, 2012Completed
final sign-off Oct 2013
77 Beale StParadigm General Contractors12th floor remodel t.i. include selective demolition & new partitions, doors, glazing, frames, casework, elec & hvac. plumbing & life/safety to be separate design bldg permit.
Details
Permit
201204067773
Permit issued
Apr 16, 2012
Final sign-off
Oct 15, 2013

12th floor remodel t.i. include selective demolition & new partitions, doors, glazing, frames, casework, elec & hvac. plumbing & life/safety to be separate design bldg permit.

Open the permit page

$360,000
Feb 17, 2012Never finaled
issued Feb 2012, no final
77 Beale StRfi Enterprises Inc.revision to 201009140860. as builts submittal plans, fire alarm
Details
Permit
201202174376
Permit issued
Feb 17, 2012

revision to 201009140860. as builts submittal plans, fire alarm

Open the permit page

$7,500
Feb 10, 2012Completed
final sign-off Feb 2012
77 Beale StSiemens Industry, Inc.32nd floor-addition of 2 strobes for small conference room of pg & e. both devices connect onto the life safety system.
Details
Permit
201202103920
Permit issued
Feb 10, 2012
Final sign-off
Feb 16, 2012

32nd floor-addition of 2 strobes for small conference room of pg & e. both devices connect onto the life safety system.

Open the permit page

$1,000
Feb 8, 2012Never finaled
issued Feb 2012, no final
77 Beale StSiemens Industry, Inc.basement level 1b - addition of 8 monitor modules for inputs from a new epo panel installed, all modules connect onto the life safety system.
Details
Permit
201202083756
Permit issued
Feb 8, 2012

basement level 1b - addition of 8 monitor modules for inputs from a new epo panel installed, all modules connect onto the life safety system.

Open the permit page

$3,600
Nov 15, 2011Completed
final sign-off Feb 2012
77 Beale StParadigm General Contractors29th fl ti: remove e non structural gyp board partition, install new gyp bd partition as indicated on plan. new doors, hardware. relocate e flourescent light fixtures. relocate hvac diffuser per layout. sprinkler and life safety under separate permits
Details
Permit
201111158900
Permit issued
Nov 18, 2011
Final sign-off
Feb 22, 2012

29th fl ti: remove e non structural gyp board partition, install new gyp bd partition as indicated on plan. new doors, hardware. relocate e flourescent light fixtures. relocate hvac diffuser per layout. sprinkler and life safety under separate permits

Open the permit page

$22,000
Nov 10, 2011Never finaled
issued Nov 2011, no final
77 Beale Stfire sprinkler only - relocate 9 heads, add 2 heads, total 11 heads. 29th floor for pg&e.
Details
Permit
201111108637
Permit issued
Nov 10, 2011

fire sprinkler only - relocate 9 heads, add 2 heads, total 11 heads. 29th floor for pg&e.

Open the permit page

$5,500
Oct 25, 2011Never finaled
issued Oct 2011, no final
77 Beale StAyoob & Peery Plumbing Co Inchigh rise sprikler renovation. relocate and add sprinklers in following floors: basement, basement 2, 1st, 2nd, 5th, 8th, 9th, 10th, 11th, 16th, 18th, 19th, 20th, 22nd, 24th, 26th, 27th, 28th, 30th, and 35th floors. relocate (70) add (44) total 121 sprinkler heads
Details
Permit
201110257610
Permit issued
Oct 26, 2011

high rise sprikler renovation. relocate and add sprinklers in following floors: basement, basement 2, 1st, 2nd, 5th, 8th, 9th, 10th, 11th, 16th, 18th, 19th, 20th, 22nd, 24th, 26th, 27th, 28th, 30th, and 35th floors. relocate (70) add (44) total 121 sprinkler heads

Open the permit page

$62,194
Oct 24, 2011Never finaled
issued Oct 2011, no final
77 Beale Stb-1 level fire sprinkler permit - relocate 12 and add 2 pendents.
Details
Permit
201110247466
Permit issued
Oct 25, 2011

b-1 level fire sprinkler permit - relocate 12 and add 2 pendents.

Open the permit page

$7,000
Aug 31, 2011Completed
final sign-off Dec 2011
77 Beale StAyoob & Peery Plumbing Co Inc3rd/19th/20th/23rd/30th & 31st flrs-tenant improvement-install 3" fire hose valves & cabinets-6 fire hose valves, 5 cabinets.
Details
Permit
201108313673
Permit issued
Sep 14, 2011
Final sign-off
Dec 27, 2011

3rd/19th/20th/23rd/30th & 31st flrs-tenant improvement-install 3" fire hose valves & cabinets-6 fire hose valves, 5 cabinets.

Open the permit page

$12,000
Aug 16, 2011Never finaled
issued Aug 2011, no final
77 Beale StAyoob & Peery Plumbing Co Inc22nd floor-seismic upgrade (sway bracing and end-of branch line restraints) of (e) overhead copper sprinkler piping
Details
Permit
201108162573
Permit issued
Aug 17, 2011

22nd floor-seismic upgrade (sway bracing and end-of branch line restraints) of (e) overhead copper sprinkler piping

Open the permit page

$5,000
Aug 16, 2011Completed
final sign-off Feb 2013
77 Beale StC B 2 Builders Incorporatedoffice ti on level b1. install doors and turnstile with card reader access, exit doors to be free exiting, demo existing concrete ramp, install new concrete ramp at secured entry. build new partitions,relocate existing light fixtures and install new ceiling. no mechanical work.
Details
Permit
201108162535
Permit issued
Aug 17, 2011
Final sign-off
Feb 5, 2013

office ti on level b1. install doors and turnstile with card reader access, exit doors to be free exiting, demo existing concrete ramp, install new concrete ramp at secured entry. build new partitions,relocate existing light fixtures and install new ceiling. no mechanical work.

Open the permit page

$69,000
Jul 29, 2011Completed
final sign-off Feb 2012
77 Beale StAyoob & Peery Plumbing Co Incfire sprinklers heads replacement on the following fl: b1,1,2,3,6,7,8,9,10,12,13,14,15,16,17,18,19,21, 22,23,24,25,26,28,29,30,31,32,33,34 & 35. total hds 3,936. recalled omega sprinklers are model gb4-fr & gb b9 central-1/2" npt, 155f & 200f. qr. also add 16 sprinklers and relocate 40 sprinklers
Details
Permit
201107291347
Permit issued
Sep 7, 2011
Final sign-off
Feb 13, 2012

fire sprinklers heads replacement on the following fl: b1,1,2,3,6,7,8,9,10,12,13,14,15,16,17,18,19,21, 22,23,24,25,26,28,29,30,31,32,33,34 & 35. total hds 3,936. recalled omega sprinklers are model gb4-fr & gb b9 central-1/2" npt, 155f & 200f. qr. also add 16 sprinklers and relocate 40 sprinklers

Open the permit page

$75,000
Jul 7, 2011Completed
final sign-off Aug 2011
77 Beale StSiemens Industry, Inc.as builts for fire alarm system for work originally done under appl. # 201006285388. revised to show what was installed uner that appl.
Details
Permit
201107079618
Permit issued
Jul 7, 2011
Final sign-off
Aug 24, 2011

as builts for fire alarm system for work originally done under appl. # 201006285388. revised to show what was installed uner that appl.

Open the permit page

May 19, 2011Completed
final sign-off Jun 2011
77 Beale StC B 2 Builders Incorporatedrevsion to appl.#201101128263 - provide epoxy coating to generator room locate roof on 5th fl. generator and fuel piping under separate permit.
Details
Permit
201105196365
Permit issued
May 19, 2011
Final sign-off
Jun 3, 2011

revsion to appl.#201101128263 - provide epoxy coating to generator room locate roof on 5th fl. generator and fuel piping under separate permit.

Open the permit page

$15,000
Apr 29, 2011Completed
final sign-off May 2011
77 Beale StSiemens Industry, Inc.level 1b as builts- revised fire alarm functional matrix drawing to match the associated crac shutdown functions as tested. the sffd inspector for the final test noted thate this change needed to be done on the original life safety permit job card. orig life safety pa #201004230952.
Details
Permit
201104295010
Permit issued
Apr 29, 2011
Final sign-off
May 24, 2011

level 1b as builts- revised fire alarm functional matrix drawing to match the associated crac shutdown functions as tested. the sffd inspector for the final test noted thate this change needed to be done on the original life safety permit job card. orig life safety pa #201004230952.

Open the permit page

Apr 15, 2011Never finaled
issued Apr 2011, no final
77 Beale StSiemens Industry, Inc.21st floor-addition of 2 duct detectors, 5 modules & 4 remote led stations for the 4 fsd installation. the detectors & modules will connect onto the (e) life safety system
Details
Permit
201104154137
Permit issued
Apr 15, 2011

21st floor-addition of 2 duct detectors, 5 modules & 4 remote led stations for the 4 fsd installation. the detectors & modules will connect onto the (e) life safety system

Open the permit page

$4,300
Mar 31, 2011Completed
final sign-off Apr 2011
77 Beale StParadigm General Contractorsoffice ti. revision to pa#2010.10.05.2288. additional work door installation to energy hub room on the 25th floor
Details
Permit
201103313237
Permit issued
Mar 31, 2011
Final sign-off
Apr 20, 2011

office ti. revision to pa#2010.10.05.2288. additional work door installation to energy hub room on the 25th floor

Open the permit page

$6,000
Mar 16, 2011Completed
final sign-off Sep 2011
77 Beale StBalch Petroleum Contractors & Buildersrevision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added.
Details
Permit
201103162212
Permit issued
Mar 28, 2011
Final sign-off
Sep 8, 2011

revision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added.

Open the permit page

Mar 11, 2011Completed
final sign-off Oct 2012
77 Beale StC B 2 Builders Incorporatedrevision to 201003107878. add 1 new emergency exit gate and remove 1 ada gate at each address above
Details
Permit
201103111876
Permit issued
Mar 11, 2011
Final sign-off
Oct 17, 2012

revision to 201003107878. add 1 new emergency exit gate and remove 1 ada gate at each address above

Open the permit page

Jan 12, 2011Completed
final sign-off Jun 2011
77 Beale StBalch Petroleum Contractors & Builderssecondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emergency generators, and hazardous containment berms with leak sensors.
Details
Permit
201101128263
Permit issued
Jan 31, 2011
Final sign-off
Jun 22, 2011

secondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emergency generators, and hazardous containment berms with leak sensors.

Open the permit page

$230,000
Jan 3, 2011Completed
final sign-off Feb 2011
77 Beale StRfi Enterprises Inc.revision to (e) pa 2010.12.14.6622, as built for fire alarm system on 25th floor.
Details
Permit
201101037788
Permit issued
Jan 3, 2011
Final sign-off
Feb 28, 2011

revision to (e) pa 2010.12.14.6622, as built for fire alarm system on 25th floor.

Open the permit page

Dec 14, 2010Completed
final sign-off Mar 2011
77 Beale StRfi Enterprises Inc.revision to 201007096317, 201007287670. final as builts, fire alarm
Details
Permit
201012146622
Permit issued
Dec 14, 2010
Final sign-off
Mar 10, 2011

revision to 201007096317, 201007287670. final as builts, fire alarm

Open the permit page

$1,000
Nov 23, 2010Never finaled
issued Nov 2010, no final
77 Beale StSiemens Industry, Inc.ground floor-as built dwgs which indicate a sequence of operation revision for the life safety system interface on "pg & e" turnstile projects. as builts permit is submitted @ request of the sffd testing inspector to receive final approval on 201005263259, 201005263264,201005263265 & 201005263269.
Details
Permit
201011235542
Permit issued
Nov 24, 2010

ground floor-as built dwgs which indicate a sequence of operation revision for the life safety system interface on "pg & e" turnstile projects. as builts permit is submitted @ request of the sffd testing inspector to receive final approval on 201005263259, 201005263264,201005263265 & 201005263269.

Open the permit page

Oct 25, 2010Completed
final sign-off Feb 2011
77 Beale StCapital Tower & Communicationsmodification of an (e) wireless telecommunications facility in kind replacement of 2 (e) cabinets & in kind replacement of 1 panel antenna
Details
Permit
201010253694
Permit issued
Dec 9, 2010
Final sign-off
Feb 8, 2011

modification of an (e) wireless telecommunications facility in kind replacement of 2 (e) cabinets & in kind replacement of 1 panel antenna

Open the permit page

$12,000
Oct 21, 2010Completed
final sign-off Nov 2010
77 Beale StC B 2 Builders Incorporated5th fl ti: remove existing non structural gyp bd partitions, build new gyp bd partitions and install new doors- no future permits required
Details
Permit
201010213478
Permit issued
Oct 21, 2010
Final sign-off
Nov 18, 2010

5th fl ti: remove existing non structural gyp bd partitions, build new gyp bd partitions and install new doors- no future permits required

Open the permit page

$5,500
Oct 20, 2010Completed
final sign-off Jul 2011
77 Beale StAc3new roof top window washing equipement at roof top and new stabilization anchors at building curtain wall
Details
Permit
201010203448
Permit issued
Nov 17, 2010
Final sign-off
Jul 6, 2011

new roof top window washing equipement at roof top and new stabilization anchors at building curtain wall

Open the permit page

$600,000
Oct 20, 2010Never finaled
issued Oct 2010, no final
77 Beale Ststreet space and mta
Details
Permit
M225906
Permit issued
Oct 20, 2010

street space and mta

Open the permit page

Oct 6, 2010Never finaled
issued Oct 2010, no final
77 Beale Ststreet space
Details
Permit
M223726
Permit issued
Oct 6, 2010

street space

Open the permit page

Oct 5, 2010Completed
final sign-off Mar 2011
77 Beale StParadigm General Contractorsrevise women's toilet for 25th floor and add 2 doors as part of change to permit app#201005263288.
Details
Permit
201010052288
Permit issued
Nov 12, 2010
Final sign-off
Mar 1, 2011

revise women's toilet for 25th floor and add 2 doors as part of change to permit app#201005263288.

Open the permit page

$19,000
Sep 14, 2010Completed
final sign-off Feb 2012
77 Beale StRfi Enterprises Inc.voluntary upgrade of visual notification devices.
Details
Permit
201009140860
Permit issued
Oct 7, 2010
Final sign-off
Feb 22, 2012

voluntary upgrade of visual notification devices.

Open the permit page

$110,379
Aug 10, 2010Completed
final sign-off Feb 2011
77 Beale Stt.i. upgrade of existing fire sprinkler system. relocate 2 sprinklers, add 3 sprinklers and delete 1 sprinkler
Details
Permit
201008108482
Permit issued
Aug 10, 2010
Final sign-off
Feb 18, 2011

t.i. upgrade of existing fire sprinkler system. relocate 2 sprinklers, add 3 sprinklers and delete 1 sprinkler

Open the permit page

$1,500
Aug 3, 2010Completed
final sign-off Oct 2010
77 Beale StAyoob & Peery Plumbing Co Increlocate 193 sprinklers, relocate (e) sway brace (6).
Details
Permit
201008038051
Permit issued
Aug 10, 2010
Final sign-off
Oct 15, 2010

relocate 193 sprinklers, relocate (e) sway brace (6).

Open the permit page

$27,984
Jul 28, 2010Completed
final sign-off Feb 2011
77 Beale StRfi Enterprises Inc.25th floor- as builts drawing for facp tenant improvement. tie to ap #201007096317.
Details
Permit
201007287670
Permit issued
Jul 28, 2010
Final sign-off
Feb 16, 2011

25th floor- as builts drawing for facp tenant improvement. tie to ap #201007096317.

Open the permit page

$1,000
Jul 16, 2010Never finaled
issued Jul 2010, no final
77 Beale Ststreet space
Details
Permit
M211686
Permit issued
Jul 16, 2010

street space

Open the permit page

Jul 15, 2010Never finaled
issued Jul 2010, no final
77 Beale Ststreet space and mta parking
Details
Permit
M211386
Permit issued
Jul 15, 2010

street space and mta parking

Open the permit page

Jul 9, 2010Completed
final sign-off Feb 2012
77 Beale StRfi Enterprises Inc.fire alarm tenant inprovement on the 25th floor
Details
Permit
201007096317
Permit issued
Jul 12, 2010
Final sign-off
Feb 14, 2012

fire alarm tenant inprovement on the 25th floor

Open the permit page

$14,830
Jul 7, 2010Completed
final sign-off Apr 2011
77 Beale StParadigm General Contractorsenlarge breakroom, modify and divde existing server room into server room and conference room on the 16th floor
Details
Permit
201007076105
Permit issued
Aug 23, 2010
Final sign-off
Apr 21, 2011

enlarge breakroom, modify and divde existing server room into server room and conference room on the 16th floor

Open the permit page

$200,000
Jun 28, 2010Never finaled
issued Jun 2010, no final
77 Beale StSiemens Industry, Inc.addition of 1 remote life safety panel, 22 duct detectors, 44 monitor modules, 11 relay modules, 44 remote stations f/duct detectors, 44- 24 vdc relays. for monitor and control of 44 new fsds by others which will be mounted on floors 19,20,22,23,24,26,27,28,29,30,31
Details
Permit
201006285388
Permit issued
Jun 28, 2010

addition of 1 remote life safety panel, 22 duct detectors, 44 monitor modules, 11 relay modules, 44 remote stations f/duct detectors, 44- 24 vdc relays. for monitor and control of 44 new fsds by others which will be mounted on floors 19,20,22,23,24,26,27,28,29,30,31

Open the permit page

$40,000
Jun 16, 2010Completed
final sign-off Sep 2011
77 Beale StSiemens Industry, Inc.add one (n) duct detector & 2-tri-r. work to be done in revision to permit 2010-04230952 for as-builts.
Details
Permit
201006164655
Permit issued
Jun 16, 2010
Final sign-off
Sep 8, 2011

add one (n) duct detector & 2-tri-r. work to be done in revision to permit 2010-04230952 for as-builts.

Open the permit page

$2,000
Jun 4, 2010Never finaled
issued Jun 2010, no final
77 Beale Ststreet space and sidewalk/mta
Details
Permit
M205149
Permit issued
Jun 4, 2010

street space and sidewalk/mta

Open the permit page

May 26, 2010Completed
final sign-off Apr 2011
77 Beale StParadigm General Contractorsfull tenant improvement including new open & private office, conf. rm., idf, restrooms, mep system & life safety for 77 beale, no structural work. life safety & sprinkler under separate permits.
Details
Permit
201005263288
Permit issued
Jul 16, 2010
Final sign-off
Apr 21, 2011

full tenant improvement including new open & private office, conf. rm., idf, restrooms, mep system & life safety for 77 beale, no structural work. life safety & sprinkler under separate permits.

Open the permit page

$1,875,000
May 26, 2010Never finaled
issued Jun 2010, no final
77 Beale StSiemens Industry, Inc.provide relay to unlock turn style during a fire event in basement 1. fire alarm system.
Details
Permit
201005263264
Permit issued
Jun 7, 2010

provide relay to unlock turn style during a fire event in basement 1. fire alarm system.

Open the permit page

$2,000
Apr 26, 2010Completed
final sign-off Sep 2010
77 Beale StParadigm General Contractors25th floor - demolition only for floor layout, mep. no structural and life safety work
Details
Permit
201004261056
Permit issued
Apr 26, 2010
Final sign-off
Sep 9, 2010

25th floor - demolition only for floor layout, mep. no structural and life safety work

Open the permit page

$162,000
Apr 23, 2010Never finaled
issued Apr 2010, no final
77 Beale StParadigm General Contractorsto obtain final inspection for work approved under app#200611208134. all work has been completed
Details
Permit
201004231002
Permit issued
Apr 23, 2010

to obtain final inspection for work approved under app#200611208134. all work has been completed

Open the permit page

Apr 23, 2010Completed
final sign-off Sep 2011
77 Beale StSiemens Industry, Inc.provide smoke detectors & relay modules for (n) acu units 14,18,28,31,32. provide new ald card into (e) fire alarm panel.
Details
Permit
201004230952
Permit issued
Apr 23, 2010
Final sign-off
Sep 8, 2011

provide smoke detectors & relay modules for (n) acu units 14,18,28,31,32. provide new ald card into (e) fire alarm panel.

Open the permit page

$10,000
Mar 10, 2010Expired or cancelled
expired Oct 2013
77 Beale StC B 2 Builders Incorporatednew turnstiles for security and new ada counter at guards desk for ground floor lobby locations
Details
Permit
201003107878
Permit issued
Mar 10, 2010

new turnstiles for security and new ada counter at guards desk for ground floor lobby locations

Open the permit page

$500,000
Feb 26, 2010Completed
final sign-off Apr 2010
77 Beale StSiemens Industry, Inc.fire alarm system - add module to monitor veeder root pnael.
Details
Permit
201002267231
Permit issued
Feb 26, 2010
Final sign-off
Apr 29, 2010

fire alarm system - add module to monitor veeder root pnael.

Open the permit page

$5,000
Dec 8, 2009Never finaled
issued Dec 2009, no final
77 Beale StSiemens Industry, Inc.addition of 1 smoke detector & relay module for the acu 345 unit on basement level b1. both devices connect onto (e) life safety system.
Details
Permit
200912082808
Permit issued
Dec 8, 2009

addition of 1 smoke detector & relay module for the acu 345 unit on basement level b1. both devices connect onto (e) life safety system.

Open the permit page

$900
Oct 2, 2009Completed
final sign-off Apr 2010
77 Beale StParadigm General Contractorsumbrella report-compliance with high rise sprinkler ordinance #377-93, all floors
Details
Permit
200910028171
Permit issued
Apr 23, 2010
Final sign-off
Apr 26, 2010

umbrella report-compliance with high rise sprinkler ordinance #377-93, all floors

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Siemens Industry, Inc. (47), Paradigm General Contractors (22), C B 2 Builders Incorporated (15), Roebbelen Contracting Inc (14), Ayoob & Peery Plumbing Co Inc (13), Rfi Enterprises Inc. (7), Swinerton Builders (4), Balch Petroleum Contractors & Builders (2), Pribuss Engineering Inc (2), Turner Construction Co (2), Able Maintenance Inc, Ac3, Aire Sheet Metal, Inc., Bayview Environmental Services Inc., Capital Tower & Communications, Jfc Construction Inc., Pacific Region Contracting, Paradiso Mechanical, Inc, Phoenix Electric Co., Skyline Construction, Sprig Electric (Archkey Solutions), W M Wireless Inc, W. Bradley Electric, Walschon Fire Protection Inc
Architects
Michelle Jones (4), William Walters (4), Cortland Morgan Architcts (2), Norda Chorkiu Fong (2), Rollie Childers (2), Arba Stinnett, Michael Wilk, Nestor Popowych, Nichols Booth, Oscia Wilson, Oswald Castillo
Engineers
Gurdaver Singh (3), David Johnson (2), Aaron Strauch, Adrian Mcjonkin, Christopher Lloyd, Jeff Elmendorf, Levi Malabuyo, Lorne Wilkstrom, Magnusson Klemencic Assoc., Oswald Castillo

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.